PPG Industries. Inc. Chemicals P.O. Box 1000 Lake Charles. Louisiana 70602 June 4, 1992
Mr. John R. Newton Surveillance Program Manager
Compliance Division Louisiana Department of Environmental Quality P. o. Box 82135 Baton Rouge, LA 70884*2135
Re: Inspection of March 30 through April 2, 1992 PPG, Lake Charles, LA - noted deficiencies
Dear Mr Newton,
On March 31 through April 2, 1992, representatives of LDEQ performed an air inspection of the PPG Industries, Lake Charles complex. Their report indicated that PPG appeared to be operating in compliance with applicable Louisiana Air Quality Regulations at the time of the inspection. However, the report did note four deficiencies. In your May 4, 1992
letter, you asked that PPG respond in writing to each of the noted deficiencies and state what measures would be taken to
correct these deficiencies. The deficiencies noted are itemized below:
Item No. 1
Fugitive dust emissions observed at the Silicas Plant at a rail car loadout station and from th
cleaning of a vacuum truck used for spill cleanup.
Item No. 2
Inadequate record keeping pertaining to scrubbers and baghouses in the silicas Plant
[Required by Permit No. 2085 (M-I)].
Item No. 3
Inadequate recordkeeping in the TE II Unit regarding responses to area monitor alarms.
Item No. 4
VCM area monitors not span checked daily as required by regulation.
PPG has addressed these deficiencies and the corrective actions for each item are listed below.
Item No. 1 See Attachment No. 1 (pages 1-4)
Item No. 2 Se Attachment No. 1 (pages 1, 5 and 6)
SL 025631
Item No. 3 Item No. 4
PPG has responded in full to agency concerns about recordkeeping. In addition, concerns about carrier gas bottle switching have been addressed. SOPs pertaining to these issues have been revised and all personnel concerned have been made aware of the revisions and their responsibilities. See Attachments No. 2 and No. 3.
PPG has revised area monitoring plans to comply with the regulatory requirement that all VCM area monitors be span checked daily. Sections affected in the area monitoring plans are provided in Attachments No. 4, 5, 6, and 7 and the revisions highlighted.
If you have any questions regarding these responses, please call me at 318/491-4698.
fn 1 1 w
M Environmental Foreman
MWR
Certified Mail/Return Receipt Requested
SL 025632
r Attachment No. 1
Page l
=DG Industries, inc. Chemicals P.O. Box 1000 Lake Charles. Louisiana 70602
CATE:
May 22, 1992
TO: M. Rasberry
FROM:
Dale French
SUBJECT: Response to DEQ Inspection at Silicas
During the March 31, 1992 visit to Silicas, DEQ observed three items of concern that were reported in their letter dated May 4, 1992. Actions have been implemented that correct all three items.
Fugitive dust emissions were observed during the loading of a bulk car. The loading procedure in effect at the time of the visit called for all hatch doors to be opened and a vacuum hose placed in one of the open hatches. Since the inspection, different procedures have been tested, and as May 20, 1992 memo from Linda Reinhardt states, a new procedure has been implemented that provides much better control of fugitive dust emissions. This procedure calls for two hatches to be opened at a compartment, while all others remain closed. A vacuum hose with a seal adaptor is placed over one opening while the other is used for loading. This procedure is repeated for each compartment.
Fugitive dust emissions were also noted where an Allwaste vacuum truck, used for spill clean up, was being dumped into the Grit Chamber. A memo issued April 14, 1992 to Allwaste Services by Jerry Carlile, Dryer operations Foreman, outlines the guidelines for dumping into the Grit Chamber, and the requirements to control fugitive dust. It should be noted that this was an isolated incident; however, the checks implemented should keep it from future occurrences.
At the time of the inspection. Silicas was initiating a record keeping procedure for all of it's scrubbers and baghouses. This procedure has been implemented. A sample of the log sheets is attached. These forms will be kept by each control room and will be available for review during inspections.
SL 02563^
I
f PPG CHEMICALS Lake Charles, LA
Attachment No. 1 Page 2
silica Products
Interoffice Memo
Subject:
Charlie Haynes Linda Reinhardt 5/20/92 Dust Control During Bulk Loading
As you are aware, testing of the bulk baghouse vacuum system as a means of controlling fugitive dust emissions during bulk car loading operations showed a marked improvement in dust containment. The standard loading procedure should be modified, effective today, to require the use of the vacuum system.
Please review the new loading procedure with each bulk loader and revise the SOP accordingly. It must be understood that:
1. The procedure must be followed for each and every car loaded
2. The vacuum supply hoses must be maintained (i.e., no holes, securely attached). Any hoses not in use must be sealed.
3. In addition to supplying vacuum to the compartment during loading, the system is also to be used to vacuum any loose powder from the top of the car prior to washing the car.
SL 025634
Attachment No. l Page 3
-=G industries, me. Chemicals - 0. 3ox lOOO ^aKe Claries. Louisiana "502
April 14, 1992
David Fanta, General Manager Allwaste Services of Louisiana, P. 0. Box 113 Sulphur, LA 70663
Inc.
Mr. Fanta;
On March 30 - April Z, 1992 The Louisiana Department of Environmental Quality performed an air quality inspection of the PPG Lake Charles facility. On March 31, 1992 an inspection of the Silica Products facility was made.
One "area of concern" listed by the inspectors in their final report as a deficiency affects both PPG and Allwaste. This incident involved an Allwaste vacuum truck washing out at the grit chamber with a water hose. This action created a noticeable dust cloud.
Because of the increasing standards for air quality impos d on PPG by DEQ the following guidelines will be necessary when processing waste silica within the PPG Silicas facility:
1. Notify the Dryer Operations Foreman before dumping any material into the grit chamber.
2. The Dryer Operations Foreman will determine if the material can be dumped into the grit chamber.
3. All dry silica waste powder that is dumped into the grit chamber will have to be mixed with sufficient water to completely eliminate dust.
4. Any large amounts of wet silica will be sent to the Tricil press for in plant processing.
5. Significant amounts of dry silica will be sent to the BFI landfill per our.normal procedure.
6. Any large amounts of dry silica that cannot be sent to the BFI landfill will be mixed with water and sent to th Tricil press f r in plant pr c ssmg.
Th d cisi n for implementing it ms 4 and 5 will be m d the Spray Dry r Op rations F reman (4827) and Dry r Op rations F reman (4230).
SL 025635
by
Attachment No. l Page 4
-=G incusmes. me. Chemicals O. Box 1000 _a*e Chanes. Louisiana 73502
Regards.
Jerry Carlile Silica Products Dryer Operations Foreman
'r*?r Cntrsi ftson i
<
!
, :c7sr i:raDer .,L5 !i:7:;a> t * **7ir %^****
id b a* j * taubbt
; ::7*r ::n::er I ftiln; iTiQ ?ici::g ;::u:cer
`;rc:er
Attachment No. l Page 5
:v *i:e a.j Awage facial -jaaniai
;=en
I
0256^7 St
Open*
Attachment No. l Page 6
iscecci::: sheet
i
J
\ -------------------------------------------------------- 4
P.eascr. `:.szact::r. Ir.scectcr
` - --.-a
-- ' --1 '
J Eternal Inspect;::::
i] Structure
!1 i
1 1 j
]
. v " a -a-actf
1
'l 1
! --j i
V^Wk* t.a, Wt J ^|
*. *.i8.*. V'.sihie detects . Sags Bag cages Hotatno Heron:
Jj,
j 11 j
,j
ij
Poise a:r system
j Contents
j
!1 1 'tmentr
i 1
1 i
.1______________ ________
4
_______ i
SI. 25638
Attachment No. 2
:CHECK j ACTION STEPS (capital letters) and Comments 'Small letters)
1. WHEN AN AIR MONITCP ALARM TS RECEIVED. THE APPROPRIATE OPERATOR OR LEAD OPERATOR 13 TO 30 OUT AND INVESTIGATE THE LEAK IMMEDIATELY. It is vcur reopenslet 1;"V to investigate, correct, and report on any alarms that occur. Our ambient air monitormu records are reviewed by the La. DEQ. To assure them that we are handling VC correctly, our records must be complete.
- 2. CORRECTIVE ACTION IS TO BE TAKEN TO STOP THE LEAK IF ONE IS FOUND. RESPIRATORY PROTECTION MUST BE WORN.
0 - 50 .................................. PPM COMFO-II HALF MASK 50 - 250 ............................. PPM COMFO-II FULL FACE MASK >250 OR UNKNOWN............... PPM AIR PACK OR BREATHING AIR
3. THE FOLLOWING INFORMATION IS TO BE NOTED IN THE LOGBOOK FOR EACH ALARM: (NOTE: STEPS A - D ARE TO BE DONE FOR EVERY ALARM NEEDING RESPONSE. REPEATED ALARMS AT "HE SAME POINT ARE NOT ACCEPTABLE; USE OF AN HNU OR TIP IS REQUIRED ON REPEAT ALARMS.)
(a) WHEN THE ALARM WAS RECEIVED. WRITE TIME IN MILITARY FORM.
(b) WHAT MEANS OR INSTRUMENTATION WAS USED TO SEARCH FOR OR FIND THE LEAK.
(C) RESULTS OF THE LEAK CHECK INCLUDING AN INSTRUMENT READING.
(d) WHAT WAS FOUND. EVEN IF NOTHING WAS FOUND. WRITE "NOTHING FOUND."
-------
g SL 025oJ
4. IF THE AIR MONITOR SYSTEM APPEARS TO BE MALFUNCTIONING ON BACK SHIFT, IMMEDIATELY CONTACT THE SHIFT SUPERVISOR TO CAL OUT THE ANALYZER GROUP TO REPAIR THE SYSTEM. IF ANALYZER TFOUND TO BE MALFUNCTIONING MONDAY-FRIDAY BEFORE 05:00 A.M.. THE ANALYZER GROUP MUST BE CALLED CUT. AFTER 05:00 A.M., TH
LEAD MAN SHOULD PASS ON TO HIS RELIEF THAT THE ANALYZER
THE LEADMAN 13 RESPONSIBLE "OR CHECKINGTMit 3Hl:T REPORTS AND DAILY REPORTS. RESPONSE TO ALARMS ARE TO BE IMMEDIATELY' EACH ALARM ON THE REPORT SHOULD CONTAIN A PHRASE STATING SC AN EXAMPLE OF THIS IS "OPERATOR CHECKED ~A"1T ALARM "IMF
MAKE EVERY EFFORT TO CHECK THE ALARM , SOCN AS POSSIBLE. T FOR SOME REASON WE ARE UNABLE TO DC = . . ':..0..7..E......A..S.....S..U. .C..H.....A..M..D.
GIVE A REASON. THE REMAINDER OF THE RESPONSE SHOULD CLEARLY STATE WHAT WAS FOUND AND WHAT CCRFEC*"IVF ACTION WAS TAKEN.
EXAMPLES OF THIS ARE: '...CHECKED WITH LEAK-DETEK. FOUND A PLUG LEAKING ON FT-141. TIGHTENED IT I? AMD "HE LEAK
STOPPED..CHECKED WITH HNU AND FOUND NOTHING.
-------
5. IF THE RESPONSE IN THE LCGBOOK IS INCOMPLETE OR MISSING. THF LEAD MAN IS RESPONSIBLE FOR "RACKING DOWN "HR ANSWERS. WRIT? NOTE IN THE APPROPRIATE LOGBOOKS IF NECESSARY.-
-------
7. TRI-11 MONITORING POINTS ARE: 1. NW OF THE VC DOPP KETTLES 2. SE OF THE QUENCH TOWER 3. SOUTH OF THE QUENCH LIQ. PUMPS 4. NW OF FURNACE FEED DRYERS 5. WEST OF THE VC-HCL STILL 6. NW OF THE VC-HCL REFLUX TANK 7. SE OF THE VC STRIPPER REFLUX TANK 8. SW OF THE CATALYST POT 9. NW OF THE DCE REACTOR PUMPS
10. IN CONTROL ROOM LAB 11. NEAR THE PROCESS SUMP
SL 025640
WRITTEN BY: RMC APPROVED 3Y:RMC
DATE: 5-20-92
Attachm nt No. 3
OPERATOR'S NAME:
DATE
CHECK ACTION STEPS (Capital letters) and Comments Small letters)
1. JOB SAFETY INSTRUCTIONS REVIEWED.
2. INSURE THAT YOU ARE WEARING PROPER SAFETY EQUIPMENT.( IT 13 ALWAYS PROPER TO WEAR SAFETY GLASSES (OR GOGGLES), HARD HAT EAR PLUGS, AND ESCAPE RESPIRATOR IN THE PLANT.)
NOTE: THE PRESSURES OF THE ANALYZER FEED LINES AND CYLINDERS ARE INDICATED BY THE GAUGES ON THE REGULATORS. THE VC OPERATOR RECORDS PRESSURE THREE TIMES A DAY ON THE VC PROCESS LOGSHEET.
CHANGE CYLINDERS WHEN THE CYLINDER PRESSURE IS c00 PSIG OR-LESS. EVERY THURSDAY, CHECK BOTTLE PRESSURE TO MAKE SURE RrvrTT.fcs WILL LAST THROUGH THE WEEKEND. THE ANALYZER IS~AUTOMATICLY `CALIBRATED EVERYDAY. BOTTLE CHANGES CAN GET THE CALIBRATION OUT OF RANGE ? BY MOT HAV r~NG TO SWITCH BOTTLES ON THE WEEKEND WILL HELP TO KEEF CALIBRATION THE'"same ON DAYS FRIDAY ff?E"SflALYZER PERSON WILL MAKE CORRECTIONS FOR THE POTTT.F SWITCH THAT TGoITTLACE ON THURSDAY. IF THE "BOTTLE "THAT WAS SWITCHED Ql.r THURSDAY HAS A REASONABLE AMOUNT OF PRESSURE IN IT FOR A COUPLE OF OA" YOU DO NOT HAVE TO REMOVE IT. IT CAN BE PUT BACK IN SEPVTCE- plfRTNO THE WEEK UNTIL IT'S PRESSURE GETS DOWN TO 500 PSIG.
_____
3. CLOSE OFF THE CYLINDER BEING CHANGED AT THE CYLINDER HEAD. CLOSE OFF THE APPROPRIATE BLOCK VALVE ON THE HARD PIPE HEADER TO THE REGULATOR.
4. OPEN THE CYLINDER VALVE OF THE SECOND CYLINDER ALREADY IN THE RACK AND LEAK CHECK THE FEEDLINE TO THE HEADER. THEN OPEN THE BLOCK VALVE OF THE SECOND CYLINDER AND ADJUST TO THE APPROPRIATE PRESSURE. THE PRESSURE SETTING FOR THE ANALYZER IS 80 PSIG.
5. REMOVE FEED LINE FROM EMPTY CYLINDER AND CAP THE CYLINDER.
6. REMOVE THE CYLINDER AND REPLACE IT WITH A FULL CYLINDER.
NOTE*. REMEMBER TO REHANG THE SAFETY CHAIN OR ROPE ON THE RACK.
______ 7. RECONNECT THE FEED LINE TO THE NEW CYLINDER. THE CYLINDER SHOULD NOT BE OPENED UNTIL IT IS NECESSARY.
SL 0256A1
NOTE: ONLY ONE CYLINDER SHOULD BE OPENED TO THE REGULATOR FEED LTN INSPECT ALL TUBING AND FITTINGS WHEN WORKING WITH HIG PRESS.
______ 8. RECORD IN LOGBOOK.
Attachment No. 4
ii At approximately 8:15 am every morning the vinyl
monitoring system will automatically benchmark accuracy.
l i After three benchmarking runs i all r.-> occur
"
minutes) the Vinyl and Lead Operators check the benchmark
1EVTATI0N.
The lead Operator will record these numoers m t.'- .-races provided on ins daily log- sheet.
4) IF THE DEVIATION IS GREATER THAN
OR %SS THAN
TWR
LEAD OPERATOR IS TO CALL OUT A MEMBER OF THE ANALYZER
GROUP TO CALIBRATE THE SYSTEM. IF IT IS ON THE WEEKEND THE
LEAD OPERATOR IS TO CALL THE SHIFT SUPERVISOR TO CALL OUT
A MEMBER OF THE ANALYZER GROUP TO CALIBRATE THE SYSTEM.
SI 25642
Attachment No. 5 ??G INDUSTRIES, INC. LAKE CHARLES, LOUISIANA
7CM II
VINYL CHLORIDE LEAK DETECTION AND FT.TMTNATION PROGRAM I. Monitoring Equipment II. Calibration and Maintenance III. Monitoring Program
IV. Plan of Action
v. Definition of a Laafc
AREAS INCLUDED IN THIS PROGRAMS 1. VCX Formation, Purification, and Shift Storage
Areas
2. VCX Low Teayeratnre storage and Barge and-ship
Areas*-
SL 025643
Attachment No. 5 :i. CALIBRATION AND MAINTENANCE
A. rixed Point System
*
Tha vinyl chloride monitoring system is calibrated and span checked daily with a gas mixture containing 5 ppm vinyl chloride in nitrogen. A calibration gas cylinder, the gas analysis of which is traceable to the National Bureau of Standards, or an equivalent gas mixture and certified with a statement of shelf life, is used. Maintenance is be performed on an as-needed basis based upon a daily check of the operation and condition f the system. In addition, on an annual basis, the integrity of the system is tested by introducing a known concemtrati n of VCM into each sample point in the field. B. Portable Detector The portable hydrocarbon detector is calibrated weekly to
verify that it has not lost its sensitivity to vinyl chloride. The gas used for this test comes from a gas cylinder containing 10 ppm VCM in air, the gas anslysis of which is traceable to the National Bureau of Standards, or from an equivalent gas mixture and is certified with a statement of shelf life. Maintenance is performadion an as-needed basis based upon the operation and condition f the detector.
SL 025644
Attachment No. 6
??G INDUSTRIES, INC. LAKE CHARLES, LOUISIANA
VINYL STORAGE/LOADING AREA
VINYL CHLORIDE
SSSI3N MO SLIMINftHQN PBQSBAM
I. Monitoring Equipment II. calibration and Maintenance III. Monitoring Program IV. plan of Action v. Definition of a Leak
AREAS INCLUDED IN THIS PROGRAM 1. vcm Tank Car Loading 2. Sphere storage Area 3. Day Tanka Storage Area 4. Maintenance Shop
SL 025645
Attachment No. 6
CALIBRATION AND MAINTENANCE A. Fixed Point System
The vinyl chloride monitoring system is calibrated and span checked with a gas mixture containing 5 ppm vinyl chloride in nitrogen daily. A calibration gas cylind r, the gas analysis of which is traceable to the National Bureau of Standards, or an equivalent gas mixture and certified with a statement of shelf life, is used. Maintenance is performed on an as-needed basis based upon a daily check of the operation and condition of the system. In addition, on an annual basis, an accuracy test of the system is conducted by introducing a known concentration of VCM into each sample point. 3. Portable Detector The portable hydrocarbon detector is checked weekly to verify that it has not lost its sensitivity to vinyl chloride. The gas used for this test comes from a gas cylinder containing 10 ppm VCM in air, the gas analysis of which is traceable to the National Bureau of standards, or an equivalent gas mixture and is certified with a statement of shelf life. Maintenance is performed on an as-needed basis based upon the operation and condition of the detector.
025&A6
>
t Attachment No. 7
PPG INDUSTRIES, INC. LAKE CHARLES, LOUISIANA VC SECTION OF TRI-ETHANE II
VINYL CHLORIDE
LEAK D]=<***SQB AMD ELIMIMAT10H- ESOSEAtt
I. Monitoring Equipment II. Calibration and Maintenance III. Monitoring Program IV. Plan of Action V. Definition of a Leak
$L 025647
4
Attachment No. 7
II. CALIBRATION AND MAINTENANCE A. Fixed Point System The vinyl chloride monitoring system is calibrated and span checked with a gas mixture containing 5 ppm vinyl chloride in nitrogen daily. A calibration gas cylinder, the gas analysis of which is traceable to the National Bureau of Standards, or an equivalent gas mixture and certified with a statement of shelf life, is used. Maintenance is performed on an as-needed basis based upon a daily check of the operation and condition of the system, in addition, on an annual basis, an accuracy test of the system is conducted by introducing a known concentration of VCM into each sample point. B. Portable Detector The portable hydrocarbon detector is checked weekly to verify that it has not lost its sensitivity to vinyl chloride. The gas used for this test comes from a gas cylinder containing 10 ppm VCM in air, the gas analysis of which is traceable to the National Bureau of Standards, or an equivalent gas mixture and is certified with a statement of shelf life. Maintenance is performed on an as-needed basis based upon the operation and condition of the detector.
SL 025648