Document baQm6MML5jq9r78oeGy6doOBg

( (Js v GEORGIA GULF REGULATORY TRAINING MATRIX 1 d ]QQy ^gr oePr REGULATION 1910.95 OSHA REGULATORY TRAINING REQUIREMENTS OCCUPATIONAL NOISE EXPOSURE WHO: All employees who are exposed at or above an eight hours TWA of 85 dB. A. Environmental Department 1. Manager 2. Superintendent 3. Engineers B. Manufacturing Department 1. Managers 2. Superintendent 3. Supervisors 4. Technicians C. Maintenance 1. Manager 2. Superintendent 3. Engineers 4. Supervisors 5. Technicians D. Stores 1. Manager 2. Superintendent 3. Supervisors 4. Technicians E. Industrial Relations Department 1. Manager 2. Superintendent 3. Safety Supervisor 4. Safety Analysts 5. Personnel Supervisor 6. Nurse 1910,177 1910.178 1910.1017 SERVICING SPLIT RIM TIRES (CONTINUED) WHEN: Prior to servicing rim tires and as necessary to maintain proficiency (i.e. annually). Estimated Time/Year - 30 Minutes. POWERED INDUSTRIAL TRUCKS " 7`' ' ' WHO: All fork truck operators. WHAT: Georgia Gulf Forktruck Training Module WHEN: Initially before operting trucks. Estimated Time-1 1/2 Hours Initially Only. VCM WHO: Each employee working in VCM or PVC units. WHAT: A. Nature of health hazard from chronic exposure to vinyl chloride including specifically the carcinogenic hazard. B. The specific nature of operations which could result in exposure to vinyl chloride in excess of the permissible limit and necessary of protective steps. C. The purpose for, proper use, and limita tions of respiratory protective devices. D. The fire hazard and acute toxicity of vinyl chloride and necessary protective steps. 9 uGC 003: 1910.1017 VCM WHAT: (CONTINUED) E. The purpose for and description of the monitoring program. F. Purpose for and description of the medical surveillance program. G. Emergency procedure. H. Specific information to aid the employee in recognition of conditions which may result in release of vinyl chloride and the review of this standard at the em ployees first training and indoctrination program and annually thereafter. WHEN: Initially and Annually Estimated Time/Year - 1 Hour. 1910.1001 ASBESTOS. ETC. WHO: All Asbestos Workers A. Gulf Coast Contract Employees who dismantle asbestos. B. Cell renewal personnel of Master Maintenance. C. Supervisors for A and B above (Contract). D. Supervisors of the above activites (Georgia Gulf). WHAT: See Attachment "A" WHEN: Before job assignment and annually thereafter. Estimated Time/Year - 1 Hour. GG._ UUi l 10