Document baOb6yrOp1GvawnkxdBJppyzk
Ofrt poster (optional) g
TESTtNO auxiliaries should be a simple . procedure that tits right into Operotlon .
PROPER Inttollotlon of piping, return* HPT filling* make it possible to rolse eon* cuts down on your maintenance heodoehos densote over various building members
long Life for Auxiliaries Is a Design Problem
Put Heating-System Maintenance On a Long-Range Operating Program
Here's a somewhat different approach fo heating-system upkeep, it's based on on operating background that fakes info account expected useful fife of system auxiliaries
By THOMAS i BARRETT, Building Supt, Waldert-Astetlo Hotel
Heating-system maintenance is no part-time job (or any large steam user. It involves three major steps-testing, replacing; modernising. Behind each of these steps there ought to be a well thought-out program and, most Important, a final judgment on whether (he costs, direct or indirect, are worth the. candle.
TESTING Let's look at the first ol our steps, heating-system testing.
In the hotel business our final test is the guest's satisfaction. He's usually looking for the best in comlort, and is quick to call us if lie thinks we're foiling down on the job.
To our mind, the best and only answer to his questionable judgment is a good zone control, monitored by an outdoor 4 thermostat. It gives you an absolute reference point, and ' soleguards you ogoinst gelling your whole healing system out of whack to oblige an isolated few. Yet it does lake Into account the fact that direct sunlight hitting one zone greatly . changes that zone's need for heat from your central plant-' It wosn'l too long ago that we ignored this feel.
When it comes to testing the parts of a heating system, like trope, expansion joints, valves, piping, we consider main- . tenonce to much a part of operation that we set up no hard-.1 and-fost rules. For example, many trap manufacturers recom mend monthly to onnuol tests (or ill traps throughout a system.
We feel differently about this. We believe the extent of our testing should be the simple, easy cheeks an operator ctn . make on his regular rounds. To that end we put in the usual J
shutoff valves before and ofter the trap, protect it whh strainer ahead, and then instoll the trap with union fittings before ond alter. On each trap that permits it, we put a test'
valve. We also school the operator on what to expect when he
opens that lest valve, or how to make a rough temperature
120
SUNT OPERATION AN MAINTENANCE SECTION
ROWE*
check *UI> M* b',"
*'("P' .U.h.<' *"* *"*
gig*,*,,! when he mokes his quick cheek, like a steady
blast ol steam from a bucket trap or a continuous flow of nf(eiiiat. ho reports trap trouble at once. Right here is
where we deport from the usuol practice. We buy all our trops Irom a single manufacturer. You'll why |ater when we talk about replocemem ond installa
tion. With this buying policy we've found traps protested by strainers ?give pretty satisfactory service for their normal
life. When one goes bad we yank it out and stick in a replace
ment. Then we scrap the old trap. We figure it hao probably
een its best days anywoy. Sure, we know manufacturers give a good set of instruc
tions for inspection and repair. We've found, though, that
we've had mighty few trop failures to begin with. Then only
a couple out of those few are troubles our shop can fix up.
So wo feel it is cheaper in labor and in parts inventory to junk our ailing traps. And that's what we do today.
Same of our engineer friends have argued this point with us, but slop and think. If you've got valve or seet trouble,
you should remember never to use a new acat with an old
valve, or the other way around. Or you should run rother
delicate checks on thermal buckets, or bellows. We say for
the very few traps you'll save, for maybe another year or so,
you'll be money ahead by junking eeeh one and replacing it
wiiba-new trap whose life expectancy Is probably years more.
PIPING CHECKS
When troubles show up on maintenance of piping and'fil lings, we blame most of them on design or installation. We feel the first fundamental in heating-system design is to be suro condensate returns flow by gravity even if you plan o vacuum pump such as we use. We correct with drip connec tions any shifts'in pitch of piping runs that come to our atten tion, or Indications of too few drips o? drains, made evident by water hammer banging away. Now and again,' you hear of horizontal steom-supply mains acting UP from condensate slugs.
The first drawing, p 120. is an excellent way of handling this problem. It gathers the condensate from the bottom of the pipe and returns it directly to the return line. We're strong believer* in dripping individual risers as a definite aid to a better healing system.
What's more, we personally like (lie vacuum-return system because it gives us positive action. Than, too, it helps solve the occasional condensate-return problem of lifting conden sate over building structural members hy letting ynu use lift fittings, middle drawing, top o( p 120.
Wa've always felt there are a flock of disadvantages in using sn ordinary trap to lift condenaate to o higher level. We know it can be done and you explain it by the fact that the steam pressure inside the equipment the trap is draining supplies the energy to roise the condensate. But the limitslioo on how high you can lift condensote by this method, plus thi difficulties in warm-up periods, is enough to discour age us. We just don't think there's enough pressure available when you need it most.
Expansion joints are a particular maintenance problem with us. Our piping system is getting olong in years. S wo ve been replnciim runs with wrought iron, and are grad ually making headway. Where expansion room seems in order, we're putting in loops in place of the old corrugated joints.
The failure of these parts is probably due to two things
~Hbalr age and pnssibly some corrosion attack from dissolved gases In the reluming condensate. Occasionally wa've had the vseuum on our vacuum pump drop nff fast. By now wc know
it's one of our older corrugated expansion joints splitting, and we shut down different risers until the vacuum climbs back. This way, we isolate the riser at (suit and get to work on it quickly. If space allows, we put in a loop.
INSTALLATION, REPLACEMENT
All the way through these comments on piping checks and
healing-eyatem tests we've been working in something on
replacements, like the loops instead of corrugated expansion
joints. Their only purpose is to give us longer life, less main
tenance.
. ..
There's nothing quite like t sound, engineered installation
io cut down on later maintenance. And aa a part of a sound
installation we believe you ought to look ahead to replace
ments by right equipment selection and location in your sys
tem.
This means in getting equipment, like traps, for example,
order from one manufacturer and standardize on that oelec-
lion. That way you can insist on the right size ond design
trap for your system with assurance that the manufacturer will check and confirm your selection. Next, when a trap
fails, your men can pull a duplicate trap out of stock. You
know it will be the.same as the one It replaces. Any engineer
who has ever run a sizable steam system will tell you that
pipefitters have a habit of replacing traps by pipe-fitting size.
And In a system is big sk ours we can't be standing by (or
occasional trap replacements.
Next, locate traps In tbe right place, that Is, close to drip
points end below them where possible, but in a spot where
you can get at them to test or replace easily.
MODERNIZATION
To our way of thinking, the last phase of a good heatingmalnlenonce program is modernization. Standardizing on equipment may not look like a good atari. But we don't consider it any handicap. If anyone shows us o piece ol equipment that will dr> a heller job than we get with what we're using and the improvement is large enough to ju-uify the cnrl, we're for it.
Wo mean particularly developments In engineering prac tices like the use of amines to protect condensote-return sys tems from corrosion. Or, possibly, some of the newer idem of spotting newer, differently designed heat-transfer equip ment like convectors onder large windows to offset the Haavy cold-wall losses from greater and greater ue of glnsj.
JULY IS))
SLANT OPERATION ANO MAINTENANCE SECTION
111