Progress report ' TECHNICAL SERVICES DEPT. - W. 0. KRUMMRICH PLANT
| JOB NO. | 9134l ' 4119
REPORT NO.
' '' ' ' 1 DATE ` [y .
1 9 /22'fc 69
1
W.O. KRUMMRICH PLANT
--- 1i-------------------------;-------------
8 E.Blllen
IS M.Goldasich
RESEARCH c--
0 E. Malone
B J.Shafer
* J. 0. Bright
*0 A. E. Leisy IS. R.McCutchan ' W.R. Richard
GENERAL OFFICE
* J. E. Smith
Qd. danna
D. E. Cayard
OTHERS {
J. R? Savage
HITSO W. R. KELLOOO
ANatara*
*S j.C. Landwehr
E3.T. . DALTON
0J. W. Molloy
B J. Davis 0 E.Mares
Qc. E. ANAGNOSTOPOULOS Qr. w. EDWARDS
*D So. 2nd St.
J '0 P.B.Hodges
R. E. Howard
p.O. DeGarmo
0 G. L. Bratsch K G.Hudson
' 13 W. A. Kuhn
US. A. HCININOEN
tDT.M'. Patrick
D. J. O'Toole a F.Elliott
0 D. . HOSMKR .
* J. F. Ouinn
0D. W. Jackson EJ R.Hamlet S l. Sprandel 0 D.Sartor
H. C. Carder Bl E.S.Tucker-
N. L. SAMPLE
JtFt?Qn
0 B.R.Williams gg R.Spiller
^ R. Stratmeyer
;
TO RECEIVE DETAIL SECTION
title:
WATER POLLUTION: AROCLOR CONTROL
PERSONNEL:
M, Pierle (C. F. BucmTey)
To determine source and quantity of Aroclor losses to the sewer.
Aroclor losses are confined to Departments 238, 217, 218, 243, 245, 246, 258, 270, 273, and 275. Department 245 is now hauling 3600-4800 gallons/year of spent aroclor to the Monsanto landfill. The remaining major source of aroclor in the sewer is Department 246. . From yield losses it is estimated that these losses total 40,000 #/yr. to the sewer. A project with estimated cost of $10,000 is presently being developed to minimize the Department 246. losses.
Water and mud samples are being taken to determine both the actual plant losses and the effect of W.G.K.'s outfall on the aroclor levels in the Mississippi River.
M. A. Pierle Technical Services Dept.
Jo
COMPANY CONFIDENTIAL INFORMATION
tltf document is the property of Monsanto Company and the recipient is responsible for its safekeeping and disposition* It contains confiden tial information of Monsanto Company which must not be reproduced, revealed to unauthorised persons or sent outside the company without proper authorisation* Either retain in secsee flies er destroy.
STLCOPCB4101121
913^1:4119(1)
-2- September 22, 1969
BACKGROUND:
The outbreak of adverse publicity toward the use of chlorinated hydrocarbon insecticides has caused the W.G.K. plant to study the losses of polychlorinated biphenyl (aroclor) from the plant. Recent studies have indicated that PCB materials act similar to the insecti cides in that they are resistant to biological breakdown in the environment, and therefore, they tend to concentrate in animals such as birds or fish.
The object of this report is to summarize preliminary information on the sources and quantities of aroclor material in the W.G.K. plant effluent.
DETAILS:
A. Sources
1. Each manufacturing department was surveyed to determine whether or not aroclor could be present in its effluent. The use of aroclor is confined to Departments 238, 243, 245, 258, 270, 273, and 275.
2. Aroclor has also been detected in the catch pot systems in Department 218 and 217. This is contained in the HC1 off-gas from Department 246.
3. The manufacturing department, 246, has aroclor in its effluent. This is readily visible in the department's trench sewers.
B. Quantity
1. Although aroclor is used in the above stated departments, only two departments (245, 238) have to completely change out their system on a routine basis.
Department 245 uses 600 gallons every 1 1/2 - 2 months, and Department 238 uses about 2,000 gallons/year. Other department losses are from vapor losses due to tank breathing and leaks from pump parking.
2. The amount of aroclor in the HC1 off-gas system is believed to be minor since it is infrequently found in the 217 and 218 catch pots.
3. Based on yield losses. Department 246 losses are estimated at 40,000#/yr.
DSW 384157
STLCOPCB4101122
91341:4119(1)
-3- September 22, 1969
B. Quantity (continued)
4. General
The following sampling program has been developed to quantify the losses from the W.G.K-. plant and to de termine the effects in the Mississippi River.
Liquid Samples
1. Plant outfall - one weekly composite sample. 2. One weekly composite sample representing effluent
from Department 246.
Mud Samples
1. Sample from primary treatment plant sludge. 2. 0.5 miles upstream of outfall. 3. 200 feet below outfall. 4. 1.0 miles below outfall.
All of above are taken once per month.
To date, due to work priority, analytical results are not available. Samples will continue to be collected.
C. Control Measures
1. Dept. 245 - The aroclor which previously had been sewered is now being hauled to the Monsanto landfill. This amounts to a plant reduction of 3600 to 4800 gallons per year.
2. Dept. 238 - This material has and will continue to be dis posed of at the landfill.
3. A project is presently being developed for Dept. 246 as part of a general paving project which should minimize aroclor losses. It involves the construction of settling chambers in trench sewers which will act as collection basins for the aroclor. The material will be removed by either a steam jet pump or a sump pump if it is needed. The estimated cost for aroclor loss control is $10,000.
DSW 384158 STLCOPCB4101123
913^1:^119(1)
-4- September 22, 1969
CONCLUSIONS:
1. The major sources of aroclor in the plant effluent
is Department 246.
.
2. Laboratory results are not yet available to actually quantify total plant or Department 246 losses.
3. A project to minimize Department 246 losses is being developed. Estimated cost is $10,000.
FUTURE WORK: 1. Continue supplying samples to the laboratory. 2. Improve monitoring system in Department 246. 3. Report on analytical results when obtained.
DSVV 384159
STLCOPCB4101124
APPENDIX
DSW 384160
STLCOPCB4101125
' "f* /(
'
Vt
'
' .'
*'
........... ......
-
' '
./ /
..... ..
RESULTS
WGK WATER SAMPLES
OR Log No.
Sample Identification
Date Taken
Amount Found (Reported As ppm Aroclor 1242
Except Where . Noted)
14 WGK 15 WGK 16 WGK . 17 WGK 18 WGK . 19 WGK ' .19 WGK 20 WGK 21 WGK 95 WGK
96 WGK
37 WGK
98 WGK '
99 WGK
100 WGK
101 WGK 102 WGK
24N, #1, Sewer 24N, #2, Sewer
7/69 7/69
' 0.05 1.40
. , ovS" /-
SV0, #1,- Sewer S.V0, #2, Sewer 24 N, #1
7/69 7/69 7/18/69
^0;r8P *4 . '67
- . 1.87
'-/. 8 7
MVO, #1
7/18/69
MVO, #1, Oil Layer 24N, #2 MVO, #2 MVO
24 N
24N
SVO
24N
MVO
.'
24N
`
-
.
*
7/18/69
7/15/69
7/15/69
10/2/69 -10/7/69
9/25/69 -9/30/69
10/2/69 -10/7/69
9/25/69 -9/30/69
7/28/69 -8/3/69 7/28/69 -8/3/69 7/21/69
0.17% 1.71 fesO#* -6? t.L~ $"53^ 3/2
& <Lcl. 0.20
4.-4^. 0.45 (.J*. V- Oj-r-j, ,J A /