UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
REGION 1
NVIRONMAGEENBCYOS5 TPOOSNT, OFMFAIC E0 S2Q1U0AR9E-, 3S9U1IT2E
100
PROTECTION
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
Lawrence Street, Norfolk, MA
From:Raymond Putnam, Inspector
RAYMONDPUTNAM Digitally signed by RAYMOND PUTNAMDate: 2024.08.29 12: 01: 47-04'00 '
Thru:Stephanie Tougas, Inspector
To:File
I. Facility Information
A. Facility Name:Waite's Crossing
B. Facility Location:67 Lawrence Street
Norfolk, MA 02056
C. Facility Contacts:Thomas DiPlacido Jr. President
DiPlacido Development Corp.
850 Franklin Street, Suite 16
Wrentham, MA 02093
508.384.6324 ext 4
D. NPDES ID No (s).: s,
II. Background Information
A. Date(s) of inspection: August 12, 2024
B. Weather Conditions: clear, 76 degrees F
C. US EPA Representative(s):
Ray Putnam
Stephanie Tougas
ED_019088A_00012679-00001
D. State / Local Representative(s):
None
E. Federally Enforceable Requirements Covered During the Inspection:
2022 Construction General Permit
F. Previous Enforcement Actions:
None
III. Type and Purpose of Inspection
Evaluation
IV. Facility Description
The construction site is located on the north side of Lawrence Street. The site disturbs
approximately 25 acres of earth. Waite's Crossing is a thirty - two (32) unit home
ownership development consisting of residential units, parking, and landscaping, along a
central road (Waite's Crossing). The site engineer stamped plans (signed 6/15/21) are
attached to this report. The project area includes historic gravel pits in the northern
section, some of which are now designated as PUBHh (palustrine unconsolidated bottom)
on the National Wetlands Inventory (NWI). All the soils within the project area are
classified as hydrological soil group A (excessively well drained) or sand and gravel pit
(see NRCS Soil Drainage Class report).
V. Inspection
Inspector Tougas requested site access to conduct an inspection on August 8, 2024.
A. Opening Conference
Inspector Tougas and I arrived onsite at 10:30 am. Tom DiPlacido greeted us. Inspector
Tougas and I introduced ourselves, and I presented my credentials. The Norfolk Town
Planner, Richard McCarthy, and the Norfolk Conservation Commission Argent, Caitlin
Nover, arrived shorty thereafter. I explained EPA was there to assess the storm
water / erosion control components and to assess the overall applicability of the NPDES
construction stormwater general permit. I further explained that this inspection was
initiated by EPA targeting that identified the large clearing associated with the work, and
that EPA did not have a record of an NOI for Waite's Crossing. Mr. DiPlacido stated that
in conjunction with his engineer and the town planner's office, it was determined that a
federal Construction General Permit (CGP) was not required at this site. He stated that
the entire subdivision is located within a natural valley that contained all stormwater. He
also pointed out the soils were very sandy throughout the entire project and infiltration
was rapid. There are wetlands bordering the Mill River to the north of the project (north
sections of lots 19-21) and the project clearing / grading was at least 100 feet from the
edge of the flagged wetlands. Ms. Nover stated she was there largely to check on the
2
ED_019088A_00012679-00002
potential vernal pools to the north of the project as recent aerial imagery appeared to
show tire tracks through the wetlands. Mr. DiPlacido said there was an old road out there
that leads away from the commuter rail station and that encourages a lot of off - road
vehicle traffic in the project area. He stated he would show us the road. He also
mentioned there had been some recent incidents of vandalism, including removing basin
covers and silt fencing. I asked Mr. DiPlacido if all clearing was completed for the
project at this point. He stated all clearing was complete and currently the subgrades are
being raised from onsite burrow pits and onsite processed materials.
B. Project Area Tour
Mr. DiPlacido accompanied us on the site walk, beginning counterclockwise along the
north east side towards the infiltration basin. We observed a catch basin along Waite's
Crossing Road. Mr. DiPlacido indicated that it was piped to outfall into an infiltration
basin. We observed the outfall and noted the silt fencing at the limit of work in this area.
The infiltration basin will remain after construction to treat stormwater. Mr. DiPlacido
pointed out a temporary drainage swale diverting water along the western edge of the
construction site (lots 10 and 21) into the infiltration basin. This drainage swale will be
abandoned when final grades are established.
The group walked outside of the limit of work north of the infiltration basin and
continued into the woods to observe the wetlands. There is a slight elevation increase
between the silt fence and the wetlands to the north. There was evidence of off road
vehicles using the old fire roads in this area.
We continued along the western edge of the project area. As was observed on the eastern
edge, the elevation of the natural topography was higher outside the limit of work over
most of the western edge, and exposed ledge was observed.
The road at the construction entrance was free of sediment, and the grade slopes into the
project area from the adjacent road (Lawrence Street).
C. Closing Conference
We thanked Mr. DiPlacido for his time. He asked if EPA had any suggestions for
improving the stormwater management on site. I told him the site looked good overall,
and that EPA would send a report.
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
3
ED_019088A_00012679-00003
File nameDescription
20240812_143731596_iOSCentral project area north of entrance
20240812_143732611_iOS
Central project area
20240812_143739292_iOS
20240812_143914129_iOS
Burrow pit in central area- east permitter
Central project area on Waite's Crossing Rd
looking north west
20240812_144144301_iOSCentral project area on Waite's Crossing Rd
looking west
20240812_144217336_iOS
Catch basin with anti - vandalism block on top
20240812_144428654_iOS
Infiltration basin in background, north section
of project area
20240812_144511519_iOSInfiltration basin
20240812_144612037_iOSInfiltration basin
20240812_144742809_iOS
Infiltration basin
20240812_144823644_iOS
20240812_145607519_iOS
20240812_145613708_iOS
Silt fence at limit of work north
Catch basin outfall into infiltration basin
20240812_145816261_iOS
20240812_145855520_iOSWestern edge of limit of work. Establishing
subgrade.
20240812_150350792_iOS
Exposed ledge on western limit of work
20240812_151429200_iOS
20240812_151436464_iOSConstruction site entrance
4
ED_019088A_00012679-00004