BURNS 41cIDONNELL
Mr. Criswell June 23, 2023 Page 7
Table 3: Summary of Capital, O&M and Leyelized Costs for Class 5 Estimate Method, EPA Emission Baseline
Summary of Particulate Emissions Control Costs from Colstrip
PM
Emissions
Economic Impacts
PM-10 Control Removal
Alternative
(Ranked by PM-10 Rate)
Efficiency %
(Note B)
Upstream ESP . Upstream FF Wet ESP
48.72 . 48.72 48.72
Reheat ESP Reheat FF 2022 Baseline (Scrubber)
48.72 48.72
Emission
Rate lb/MMBtu
0.010 . 0.010 0.010 0.010 0.010
0.0195
Hourly
Emission Lbs/Hr 152 . 152 152 152 152
296
Annual
Emission Tons/yr
566 566 566 566 566
1103
Emission
Reduction Tons/yr 538 538 538 538 538
Installed Capital
Annual 0 &M
Total Annual
Cost
in millions $
486 0 . 404.9 744 5 263.5 351 2
Cost
in millions $
29 8 . 29.9 16 6 10.5 14 9
Cost
millions/yr
87.4 78.0 104 9 41.8 56.5
N/A
N/A
N/A
Average Control
Cost $Iton
162,500 145,000 195,000
77,700 105,000
N/A
Sierra Club FOIA 2025-EPA-04883
ED_018388_00000307-00038
SC_EVERSPLIT0006134