Document bOyV1OYqqQexakw5pZjVeOJeZ
TO:
Distribution
Interoffice Communication
FROM: DATE:
SUBJ:
T. G. Grumbles November 15, 1989
INDUSTRIAL HYGIENE MEETING ACTION ITEMS
VISTA
Below are the significant Action Items from the annual meeting:
1. The MSDS non-emergency phone number will be changed to a Houston number, probably Jackie O'Connell's.
2. A project team was formed to review long term record storage needs and recommend alternatives for storage and retrieval. Team members are Robert Martin (Leader), Bill Jones, Randy Gantz, and Mike Horowitz.
3. Dr. Drumwright and TGG will provide information on heart stress standards and management to the Safety Directors.
4. TGG will begin efforts to develop a "corporate" Industrial Hygiene Procedures Manual.
5. Safety Directors will send copies of their existing plant forms for the following to TGG:
a. Field sampling data (data collection) b. Chain of custody c. Employee notification of results d. Training documentation
6. TGG will review existing forms and propose corporate forms for the four items.
7. Safety Directors will send a summary of their business with CTEK to TGG.
8. TGG will use Item 7 results to discuss costs with C-TEK.
9. TGG will discuss overexposure notifications and placement of the analytical method number on reports with C-TEK.
10.
OSHA regulatory interpretation done on individual requests will be routinely copied to all Safety Directors.
11.
TGG will develop a memo on the need and justification for developing a "pro-active" asbestos management program, including identification of existing asbestos.
12.
TGG will distribute the recommended CFM rates for chemical fume hoods.
VVV 0QG0Q7069
13.
TGG will provide guidance, or find someone who can, "demonstrating competency" when training.
on
In addition to the above there is a need for a general assessment
of our industrial hygiene needs and deficiencies.
This would
include some of the items above, multiple areas that would be
assessed during audits, general manpower requirements an industrial
hygiene training needs. I plan to do that assessment this year.
The need is clear, but, how to accomplish it is not at this time.
Hopefully auditing will resume this spring.
Please let me know if I've missed anything.
dlj .900
Dis tribution:
SAFETY DIRECTORS
Bruce Trego-Aber, Bill Jones-Balt, Harry Peirce-Blane, A. E. Russell-Hmd, K. L. Fogg-LCCF, R. V. Gantz-LCLAB, G. M. ShirleyLCVCM, J. D. Harris-Okc, R. B. Martin-Austin, D. A. Barclay, D. L. Morgan, J. R. Drunrwright
cc: PLANT MANAGERS
R. V. Seymour-Aber, L. R. Bauer-Balt, G. D. Williams-Blane, J. B. Maher-Hmd, J. Friend-LCCP, J. W. Ware-LCLAB, R. A. ConradLCVCM, H. D. Garrison-Okc, P. L. Foote-Prem, V. U. Weiss-Austin
T. H. Huffman, J. A. DeBernardi
VVV 000007070