Document bOyO20bLeX6EQYeY5Mn0J8oZ0

Region 6 Compliance Assurance and Enforcement Division INSPECTION REPORT Inspection Date(s): Media: Regulatory Program(s) Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Contact: 10/22/2018 Water Clean Water Act City of Kenner City of Kenner 1 W 30th Street Kenner, LA 70065 P.O. Box 730 Kenner, LA 70063 Jefferson Parish Joanne Massony 504-468-7292 FRS Number: Identification/Permit Number: Media Number: NAICS: SIC: LA0066800 4952 Personnel participating in inspection: Michael Williams EPA/ 6EN-WMH Tom Aepelbacher LDEQ Joanne Massony VEOLIA Plant Manager / Wastewater Director Inspector Inspector Wastewater Director 281-983-2150 504-736-7752 504-468-7292 EPA Lead Inspector Signature/Date Supervisor Signature/Date MICHAEL WILLIAMS Digitally signed by MICHAEL WILLIAMS DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=MICHAEL WILLIAMS, 0.9.2342.19200300.100.1.1=68001003655912 Date: 2019.02.28 13:31:50 -06'00' Michael D. Williams Date CAROL PETERS-WAGNON Carol Peters Digitally signed by CAROL PETERS-WAGNON DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=CAROL PETERS-WAGNON, 0.9.2342.19200300.100.1.1=68001003652679 Date: 2019.03.01 12:55:12 -06'00' Date City of Kenner (LA0066800) Inspection Date 10/22/2018 Section I - Introduction PURPOSE OF THE INSPECTION EPA Region 6 inspector, Michael Williams and LDEQ Inspector, Tom Aepelbacher, arrived at the City of Kenner at 10:20 am on October 22, 2018 for an unannounced inspection. We met with Wastewater Director, Joanne Massony. I presented my credentials to Ms. Massony and informed her that this was an EPA lead Compliance Evaluation inspection to determine compliance with the facility's National Pollutant Discharge Elimination System (NPDES) permit and the Clean Water Act. The scope of the inspection was with permit LA0066800, facility operations and maintenance under the Clean Water Act. The inspection was conducted under the authority of the NPDES permit program, in accordance with the Federal CWA. The information presented in this report is based on the materials and information supplied by City of Kenner (Owner) and Veolia (Operator), representatives (the permittee), observations made during the inspection and records and reports maintained by the permittee. FACILITY DESCRIPTION Treatment The City of Kenner facility in Kenner, Louisiana has one treatment plant. It is a 15.2 MGD activated sludge treatment plant. The plant consists of the original older 5.25 MGD activated sludge treatment plant (North Plant) that was opened in 1985, a 3.3 MGD activated sludge treatment plant (South Plant) that was opened in 1996. The North Plant was expanded by 5 MGD, during 2004 - 2006, with the addition of two (2) aeration basins and two (2) clarifiers. The site disinfects with sodium hypochlorite. The facility discharges to the Mississippi River via Outfall 001. Collection The City of Kenner collection system consists of gravity sewer pipes that discharge into 79 lift stations, of which six (6) directly discharge into the plant. The collection system has approximately 182 miles of 8inch gravity sewer pipe, 178 miles of 6-inch gravity sewer pipe, 31 miles of force main pipes and greater than 4,000 manholes. Section II- Observations This inspection revealed the following observations: On the day of the inspection the South Plant was down. The expected turnaround is 30 days from the day of the inspection. There has not been any exceedance of effluent limitation since 2014. The facility has sanitary overflows in the collection system and at the plant, summarized on the monthly discharge monitoring reports. Section III- Areas of Concerns 2 City of Kenner (LA0066800) Inspection Date 10/22/2018 This inspection revealed the following areas of concerns: No major areas of concern at the plant. The site still has an ongoing problem with sanitary overflows in the collection system. (See Appendix A &B) Section IV - LIST OF APPENDICES Appendix A - Capital Improvements Appendix B - Sanitary Overflows 2006-Oct 2018 3 Appendix A Capital Improvements City of Kenner (LA0066800) Inspection Date 10/22/2018 4 WASTEWATER CAPITAL IMPROVEMENTS PROJECT NAME 39th and California Lift Station Vintage and Medoc Lift Station 33rd and Connecticut Lift Station 42nd and Erlanger Lift Station 35th and Ole Miss Liift Station 15th and Webster Lift Station Chateau Magdelaine Lift Station 42nd and Illinois Lift Station Montrachet Lift Station and Force Main 27th and Salem Force Main 39th and Arkansas (formerly California) Force Main 42nd and Illinois Force Main 42nd and Erlanger Force Main 15th and Webster Force Main Generators 33rd and Hans Lift Station and Force Main 24th and Delaware Lift Station 10th and Maria Lift Station 27th and Salem Lift Station WWTP Underground Storage Tank Closure GIS Mapping Effluent Pump Station Study WWTP Hydraulic Study Chateau Transfer Station Force Main Study 10th and Maria Modeling Vintage and Medoc Generator W. Stanford and W. Loyola Force Main 10th and Maria Force Main 31st and Jasper Lift Station 31st and Washington Lift Station Chateau Palmer Lift Station Granada and Martinique Lift Station and Force Main Rhone Lift Station Veterans and Indiana Lift Station and Force Main Yellowstone and Platt Lift Station and Force Main Canary Ansas Lift Station and Force Main Cattle Farm Lift Station and Force Main Vintage and Medoc Force Main WWTP Effluent Pump Station WWTP Improvements Hanson and Firehouse Lift Station Task 1 Hanson and Firehouse Lift Station Task 2 Gravity Sewer CCTV BRIEF PROJECT DESCRIPTION New Submersible Lift Station Rehabilitate Lift Station New Submersible Lift Station Rehabilitate Lift Station New Submersible Lift Station Rehabilitate Lift Station New Submersible Lift Station Rehabilitate Lift Station New Submersible Lift Station and 8-inch Diameter Force Main New 16-inch Diameter Force Main New 16-inch Diameter Force Main New 12-inch Diameter Force Main New 8-inch Diameter Force Main New 12-inch Diameter Force Main Generators for Backup Power at Lift Stations Rehabilitate Lift Station and New 12-inch Diameter Force Main Rehabilitate Lift Station Rehabilitate Lift Station New Submersible Lift Station with Dedicated Portable Generator Closure of Abandoned Underground Storage Tank at WWTP Develop GIS System for Sewer Infrastructure in the City of Kenner Study to Determine the Required Capacity of the WWTP Effluent Pump Station Model and Study to Determine the Required Piping and Hydraulic Improvements Needed at the WWTP Preliminary Alignment Report for the New 30-inch Diameter Force Main from Chateau Transfer Station to the WWTP Hydraulic Model Development of 10th and Maria Sub-basin Permanent Generator for Lift Station New 18-inch Diameter Force Main Force Main Replacement Lift Station Replacement Lift Station Replacement Lift Station Replacement Lift Station Replacement and Partial Force Main Replacement Lift Station Replacement Lift Station and Force Main Replacement Lift Station and Force Main Replacement Lift Station Upgrade and Force Main Replacement Lift Station Upgrade and Force Main Replacement Force Main Replacement Upgrade Effluent Pump Station Two new Clarifiers, 1 New Headworks, and Miscellaneous Pipe Work Airline and Minden and Firehouse Road Lift Station Upgrades Force Main Replacement Examination of Specified Gravity Sewer Lines Improvements Page 1 WASTEWATER CAPITAL IMPROVEMENTS PROJECT NAME Iowa Avenue Sewer Repair 10th and Maria Force Main WWTP Effluent Pump Station Chateau Transfer Station to WWTP Force Main Project 1 Chateau Transfer Station to WWTP Force Main Project 2 Chateau Transfer Station to WWTP Force Main Project 3 Effluent Force Main Study Demolition of the WWTP No. 2 Vintage and Medoc Odor Control Improvements WWTP Emergency Generator Improvements 35th and Ole Miss Lift Station Improvements BRIEF PROJECT DESCRIPTION Replacement of Gravity Main Line Force Main Replacement Upgrade Effluent Pump Station New Force Main New Force Main New Force Main Study to determine alternatives to replace the aging force main Demolish abandoned facilities at WWTP No. 2 Installation of a carbon adsorption system to control odors Installation of a new generator banking system to emergency power at the WWTP Electrical Improvements improve Completed Projects Planning Projects Design Phase Bid Phase Construction Phase Improvements Page 2 Appendix B City of Kenner (LA0066800) Inspection Date 10/22/2018 Sanitary Overflow 2006-Oct 2018 5 Year PLANT #2 2006 Date Event Began 01/13/06 01/16/06 01/16/06 02/03/06 02/22/06 03/01/06 04/05/06 05/31/06 06/13/06 06/19/06 07/18/06 07/20/06 07/24/06 SubTotal PLANT #3 Time 15:59 12:50 15:37 11:18 13:05 7:05 12:46 8:12 8:08 14:50 22:40 11:38 8:05 13 Reporting Address 2453 TAFFY DRIVE 16 CHATEAU TRIANON 4 CHATEAU HAUT BRION 3800 WILLIAMS BLVD. 91 CHATEAU DULAC 3025 PALM VISTA ST. JULIEN and PARADIS 197 CHATEAU LA TOUR DRIVE Across from 2305 44tth Street 4 CHATEAU HAUT BRION 4MGD (LIFT STATION) Driftwood & Williams Blvd. 44th & WILLIAMS BLVD. overflows Date Event Began 02/02/06 02/02/06 02/05/06 02/24/06 03/01/06 03/01/06 03/09/06 03/11/06 03/14/06 03/14/06 03/21/06 03/21/06 03/21/06 03/26/06 04/13/06 04/18/06 04/18/06 04/19/06 05/10/06 05/22/06 05/23/06 06/18/06 07/05/06 07/05/06 07/05/06 07/11/06 07/14/06 07/27/06 07/28/06 07/31/06 Time 4:00 8:45 16:38 12:07 8:10 15:33 14:00 15:57 11:50 13:45 11:59 11:59 14:46 18:43 12:55 8:20 21:48 15:45 18:35 19:29 8:48 17:21 7:20 10:00 10:00 9:52 13:04 9:46 15:18 14:15 Reporting Address #1 W. 3OTH---(PLT 3) FILMORE & CORWIN ST. 2601 MARIETTA STREET 2841 LOYOLA DRIVE BEHIND 1029 MINDEN ST. 2417 W. METAIRIE 4MGD (LS) 16 FURMAN CIRCLE 1029 MINDEN STREET 1003 MINDEN STREET 16 FURMAN CIRCLE 16 FURMAN CIRCLE 511 FILMORE STREET 1016 ST. JULIEN DRIVE 65 CHATEAU MAGDELAINE 2841 LOYOLA DRIVE 2500 GAY LYNN DRIVE 35th and OLE MISS 3403 E. LOYOLA DRIVE 3403 E. LOYOLA DRIVE 3403 E. LOYOLA DRIVE 2801 LOYOLA DRIVE 2907 TEXAS AVENUE 3420 DAVID DRIVE 3617 DAVID DRIVE 27TH & SALEM (L/S) 33rd & Connecticut L/S F/M 3011 LOYOLA DRIVE 10TH & MARIA L/S F/M 1004 SOUTH BAYOU ROAD CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Location of Event Cleanout / Manhole / Lift Station MANHOLE MANHOLE MANHOLE PRIVATE L/S STRIP MALL MANHOLE MANHOLE LIFT Station Out MANHOLE MANHOLE MANHOLE LIFT STATION MANHOLE MANHOLE Date Event Ended 01/13/06 01/16/06 01/16/06 02/03/06 02/22/06 03/01/06 04/05/06 05/31/06 06/13/06 06/19/06 07/19/06 07/20/06 07/24/06 Time 18:18 13:45 17:15 11:45 14:00 8:35 16:23 10:00 9:15 16:17 12:41 9:08 Possible volume of event (gallons) 50 200 100 1,000 500 300 1,200 200 200 600 4,000 300 500 Duration Receiving Surface Water 2:19 LAKE PONTCHARTRAIN 0:55 LAKE PONTCHARTRAIN 1:38 LAKE PONTCHARTRAIN 0:27 LAKE PONTCHARTRAIN 0:55 LAKE PONTCHARTRAIN 1:30 LAKE PONTCHARTRAIN 3:37 LAKE PONTCHARTRAIN 1:48 LAKE PONTCHARTRAIN 1:07 LAKE PONTCHARTRAIN 1:27 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN 1:03 LAKE PONTCHARTRAIN 1:03 LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) MAIN LINE BLOCKAGE STATION OUTAGE STATION OUTAGE PRIVATE L/S OVERFLOW MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE Lift Station Out/Mechanical MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE LIFT STATION OUTAGE LIFT STATION OUTAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE Resolution of Event (Washed Out Line, Repaired Force Main) WASHED OUT LINE TURNED STATION BACK ON TURNED STATION BACK ON TURNED OVER TO 4476 WASHED OUT LINE WASHED OUT LINE STATION BACK ON LINE WASHED OUT LINE WASHED OUT LINE Re-set pumps/Chat. Magdelaine LIFT STATION BACK ON LINE WASHED OUT LINE WASHED OUT LINE Location of Event Cleanout / Manhole / Lift Station Aeration tank/splitter box MANHOLE L/S 27th & DAWSON MANHOLE MANHOLE MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE M/H (03213061) M/H (03211001) MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE Lift Station Out Lift Station Out Lift Station Out Force main from L/S Force main from L/S MANHOLE 10th & MARIA /F/M MANHOLE Date Event Ended 02/02/06 02/05/06 02/24/06 03/01/06 03/01/06 03/09/06 03/11/06 03/14/06 03/14/06 03/21/06 03/21/06 03/21/06 03/27/06 04/13/06 04/18/06 04/18/06 04/19/06 05/10/06 05/22/06 05/23/06 06/18/06 07/05/06 07/05/06 07/05/06 07/11/06 07/27/06 07/28/06 07/31/06 Time 10:05 18:00 13:40 10:14 17:37 15:01 18:00 13:22 14:30 13:45 13:45 15:20 8:00 15:24 8:38 23:15 16:49 20:20 20:47 9:08 18:50 8:10 10:50 11:30 10:50 10:11 16:15 15:25 Possible volume of event (gallons) 200,000 100 1,500 200 800 200 1,000 1,200 1,000 1,300 1,000 1,200 600 800 800 500 200 2,200 500 300 100 300 300 500 600 3,000 8,000 500 6,000 300 Duration Receiving Surface Water 1:20 1:22 1:33 2:04 2:04 1:01 2:03 1:32 0:45 1:46 1:46 0:34 13:17 2:29 0:18 1:27 1:04 1:45 1:18 0:20 1:29 0:50 0:50 1:30 0:58 0:25 0:57 1:10 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) Aeration tank & splitter box SYSTEM UP/OUTAGE& RAIN L/S OFF MAIN LINE BLOCKAGE DEBRIS IN MANHOLE MAIN LINE BLOCKAGE Lift station out/Power failure MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE LIFT STATION OUTAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE Lift Station Out/Electrical Lift Station Out/Electrical Lift Station Out/Electrical Force main need to be repaired Force main need to be repaired Lift Station Out/Mechanical BROKEN FORCE MAIN MAIN LINE BLOCKAGE Power Restored/pumping down TURNED L/S BACK ON WASHED OUT LINE REMOVED DEBRIS FROM M/H WASHED OUT LINE Power on/LS BACK IN SERVICE WASHED OUT LINE Scheduled for vacuum & repair Scheduled for vacuum & repair WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE ENTERGY RESTORED POWER WASHED OUT LINE WASHED OUT LINE WASHED DOWN AREA WASHED OUT LINE ENTERGY RESTORED POWER ENTERGY RESTORED POWER ENTERGY RESTORED POWER Force main scheduled for repairs REPAIRED FORCE MAIN RESET PUMP IN STATION Force main scheduled for repairs WASHED OUT LINE 2006 Page 1 Date Event Began 08/22/06 08/22/06 08/24/06 08/24/06 08/28/06 08/31/06 09/10/06 10/09/06 10/11/06 10/17/06 10/19/06 10/19/06 11/01/06 11/01/06 11/14/06 11/25/06 11/29/06 12/06/06 12/10/06 12/14/06 12/14/06 12/15/06 12/18/06 12/21/06 12/21/06 12/26/06 12/27/06 Sub total Total Overflows 2006 Time 6:49 6:49 15:33 19:34 9:00 16:15 14:34 11:59 21:16 7:30 13:52 16:01 11:46 15:25 13:03 10:21 15:58 8:30 10:36 12:15 14:36 7:45 6:49 7:35 8:37 20:07 15:40 57 70 Reporting Address 2401 Connecticut Avenue 2401 Connecticut Avenue 1021 SOUTH BAYOU ROAD 3709 MARTINIQUE AVENUE 2301 IDAHO AVENUE 1638 AIRLINE DRIVE CHATEAU and VINTAGE 2722 WILLIAMS BLVD. Canary Ansas Lift Station 4MGD Lift Station 4325 LOIRE DRIVE 2722 WILLIAMS BLVD. 2305 44th STREET 2125 VETERANS BLVD. 201 AUBURN PLACE 3285 CHATEAU BLVD. 3285 CHATEAU BLVD. 1605 42nd STREET 1605 42nd STREET 1605 42nd STREET 2841 LOYOLA DRIVE 527 W. ESPLANADE AVENUE 33rd and WILLIAMS 100 W. ESPLANADE AVENUE 27 CLEVNER STREET 3252 CASTLE DRIVE 250 AVANT GARDE overflows Location of Event Cleanout / Manhole / Lift Station MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE LS/41st and MEDOC MANHOLE MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE LS4336 FORCE MAIN MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE Date Event Ended 08/22/06 08/22/06 08/24/06 08/24/06 08/28/06 08/31/06 09/11/06 10/09/06 10/11/06 10/17/06 10/19/06 10/19/06 11/01/06 11/01/06 11/14/06 11/25/06 11/29/06 12/06/06 12/10/06 12/14/06 12/14/06 12/15/06 12/18/06 12/21/06 12/21/06 12/26/06 12/27/06 Time 11:00 11:00 17:23 20:46 9:48 17:34 12:05 13:15 22:07 20:30 18:01 12:23 16:10 14:16 12:00 16:50 9:38 12:50 13:45 15:00 8:37 7:40 8:00 9:50 0:01 16:28 Possible volume of event (gallons) 1,200 3,000 600 500 300 200 8,000 50 600 6,000 9,000 600 200 300 55,000 1,200 1,000 200 300 500 400 300 600 1,200 1,000 1,000 1,000 Duration Receiving Surface Water 4:11 LAKE PONTCHARTRAIN 4:11 LAKE PONTCHARTRAIN 1:50 LAKE PONTCHARTRAIN 1:12 LAKE PONTCHARTRAIN 0:48 LAKE PONTCHARTRAIN 1:19 LAKE PONTCHARTRAIN 9:31 LAKE PONTCHARTRAIN 1:16 LAKE PONTCHARTRAIN 0:51 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN 6:38 LAKE PONTCHARTRAIN 2:00 LAKE PONTCHARTRAIN 0:37 LAKE PONTCHARTRAIN 0:45 LAKE PONTCHARTRAIN 1:13 LAKE PONTCHARTRAIN 1:39 LAKE PONTCHARTRAIN 0:52 LAKE PONTCHARTRAIN 1:08 LAKE PONTCHARTRAIN 2:14 LAKE PONTCHARTRAIN 1:30 LAKE PONTCHARTRAIN 0:24 LAKE PONTCHARTRAIN 0:52 LAKE PONTCHARTRAIN 0:51 LAKE PONTCHARTRAIN 0:25 LAKE PONTCHARTRAIN 1:13 LAKE PONTCHARTRAIN 3:54 LAKE PONTCHARTRAIN 0:48 LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Lift Station Outage (Electrical) Lift Station Outage (Electrical) MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE BROKEN FORCE MAIN AT L/S MAIN LINE BLOCKAGE Lift Station OUT/Mechanical Lift Station OUT/ELECTRICAL Lift Station OUT/ELECTRICAL Main Lift Up due to Heavy Rain MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE LS4336 FORCE MAIN LIFT STATION OUT LIFT STATION OUT MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE L/S out due to heavy rain L/S out due to heavy rain SYSTEM UP/HEAVY RAIN MAIN LINE BLOCKAGE Resolution of Event (Washed Out Line, Repaired Force Main) POWER BACK ON (ENTERGY) POWER BACK ON (ENTERGY) WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE STATION BACK IN SERVICE STATION BACK IN SERVICE Entergy to replace transformer SYSTEM GOING DOWN WASHED OUT LINE WASHED OUT LINE REPAIRING FORCE MAIN STATION NOW PUMPIN DOWN STATION NOW PUMPIN DOWN WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE STATION PUMPING DOWN STATION PUMPING DOWN L/S PUMPING DOWN/WASH AREA WASHED OUT LINE 2006 Page 2 Year 2007 Date Event Began 01/01/07 01/01/07 01/01/07 01/01/07 01/02/07 01/02/07 01/02/07 01/02/07 01/05/07 01/17/07 01/27/07 01/27/07 01/28/07 01/29/07 02/12/07 02/23/07 03/05/07 03/07/07 03/07/07 03/12/07 03/16/07 03/21/07 03/28/07 04/11/07 04/24/07 05/04/07 05/04/07 05/04/07 05/06/07 05/06/07 05/06/07 05/06/07 05/07/07 05/07/07 05/08/07 05/14/07 05/16/07 05/24/07 06/05/07 06/05/07 06/07/07 06/20/07 06/30/07 07/18/07 08/13/07 08/13/07 08/13/07 08/14/07 08/14/07 09/08/07 09/08/07 09/08/07 09/25/07 09/29/07 Start Time Reporting Address 9:09 11:33 10:15 15:30 8:00 11:37 15:54 8:50 16:44 10:36 16:50 16:59 18:23 7:52 15:00 17:23 9:29 10:03 14:50 18:49 7:30 11:22 13:55 13:20 14:46 15:15 13:51 18:21 19:53 20:26 9:30 16:14 10:48 9:32 12:55 6:36 7:55 7:55 8:48 8:20 14:37 9:43 16:11 18:00 17:06 7:28 9:10 11:32 15:15 16:34 15:53 8:00 197 CHATEAU LA TOUR 54 CHATEAU MOUTON 50 CHATEAU MOUTON 2 MOSELLE DRIVE 27th and ABERDEEN 4032 LAKE TRAIL DRIVE 1016 ST. JULIEN 3208 CASTLE DRIVE MEDOC and VINTAGE Veterans/Salem/N.E. corner 16 MERCUREY DRIVE 4032 LAKE TRAIL DRIVE 3420 DAVID DRIVE 2 MOSELLE DRIVE 1629-1633 42ND STREET 1638 AIRLINE HIGHWAY #1 W. 30TH (PLANT III) #1 W. 30TH (PLANT III) 20th and COLORADO 1600 JOE YENNI BLVD. 3409 WILLIAMS BLVD. 2725 TUPELO STREET 3601 LOYOLA DRIVE 4345 FLORIDA AVENUE 2601 MARIETTA STREET 4032 LAKE TRAIL DRIVE 50 BIMINI AVENUE 3702 CONNECTICUT AVENUE 5412 COCOS PLUMOSA 5408 COCOS PLUMOSA 5409 COCOS PLUMOSA CANARY ANSAS 2 MOSELLE 4032 LAKE TRAIL DRIVE 3801 E. LA. STATE DRIVE 2913 TENNESSEE AVENUE 5332 COCOS PLUMOSAS 27th and DELAWARE 2701 FLORIDA AVENUE 2701 FLORIDA AVENUE 44th and WILLIAMS 4032 LAKE TRAIL DRIVE 37th and WILLIAMS 509 JOE YENNI BLVD. 26 Chateau Pontet Canet 945 VINTAGE DRIVE 933 VINTAGE DRIVE 945 VINTAGE DRIVE 24 PONTET CANET 527 W. ESPLANADE 527 W. ESPLANADE 3281 GLEN EAGLE LANE 4207 Paradis & St. Julien #1 W. 30th St. (PLANT 3) CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Location of Event Cleanout / Manhole / Lift Station MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE L/S PUMPED OUT MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE INFLUENT SPILL INFLUENT SPILL F/M 10th & MARIA MANHOLE BROKEN LINE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE PLANT 3 HEADWORKS Date Event Ended 01/01/07 01/01/07 01/01/07 01/01/07 01/04/07 01/02/07 01/02/07 01/02/07 01/05/07 01/17/07 01/27/07 01/27/07 01/28/07 01/29/07 02/12/07 02/23/07 03/05/07 03/07/07 03/07/07 03/12/07 03/16/07 03/21/07 03/28/07 04/11/07 04/24/07 05/04/07 05/04/07 05/04/07 05/06/07 05/06/07 05/06/07 05/06/07 05/07/07 05/07/07 05/09/07 05/14/07 05/16/07 05/24/07 06/05/07 06/05/07 06/07/07 06/20/07 06/30/07 07/18/07 08/13/07 08/13/07 08/13/07 08/14/07 08/14/07 09/08/07 09/08/07 09/09/07 09/25/07 09/29/07 End Time Duration (hr:min) 15:30 15:30 15:30 15:30 10:00 14:18 16:56 10:55 17:33 10:44 19:00 18:00 19:35 9:05 16:06 18:46 6:21 3:57 5:15 0:00 2:00 2:41 1:02 2:05 0:49 0:08 2:10 1:01 1:12 1:13 1:06 1:23 0:00 0:00 13:32 14:50 19:31 9:50 12:30 14:40 14:35 15:03 15:42 14:15 19:00 20:30 22:45 10:08 19:31 3:29 0:00 0:42 2:20 1:08 0:45 1:15 0:17 0:27 0:24 0:39 0:37 2:19 0:38 3:17 10:45 15:53 7:40 9:15 9:15 9:43 12:09 20:00 10:57 18:06 18:26 18:17 8:15 0:00 12:30 16:50 17:30 18:55 9:30 1:13 2:58 1:04 1:20 1:20 0:55 3:49 5:23 1:14 1:55 0:26 1:11 0:47 14:50 0:58 1:35 0:56 3:02 1:30 Possible volume of event (gallons) 600 500 500 300 4,000 1,200 300 600 10,000 500 300 500 300 200 300 200 100 100 60,000 125 200 200 300 300 300 300 300 200 300 400 400 400 300 300 4,000 200 400 600 300 1,500 200 300 600 300 300 500 300 150 150 200 50 100 400 87,000 Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE STATION UP/RAIN FORCE MAIN BROKEN SYSTEM UP/RAIN MAIN LINE BLOCKAGE SYSTEM UP/RAIN Station need to be pumped out STATION UP/ELECTRICAL SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN System was up/heavy rain MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE cleaning grit chamber overflow from grit chamber FORCE MAIN BROKEN MAIN LINE BLOCKAGE ON PP MAIN LINE BROKEN MAIN LINE BLOCKAGE Station Outage/Electrical MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE MAIN LINE BLOCKAGE SYSTEM UP/RAIN FORCE MAIN LEAKING MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE LIFT STATION OUTAGE Lift Station Outage/Mechanical Lift Station Outage/Mechanical MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE L/S OUTAGE/ELECTRICAL MAIN LINE BLOCKAGE Lift Station Outage/Electrical Lift Station Outage/Electrical Lift Station Outage/Electrical Lift Station Outage/Electrical Lift Station Outage/Electrical LIFT STATION OUTAGE LIFT STATION OUTAGE Main line from L/S outage LIFT STATION OUTAGE Mechanical barscreen failure Resolution of Event (Washed Out Line, Repaired Force Main) WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASH DOWN AREA REPAIRED FORCE MAIN system going dwn/washed area WASHED OUT LINE system going dwn/washed area Pumped out L/S/Medoc & Vintage STATION GOING DOWN SYSTEM PUMPING DOWN SYSTEM PUMPING DOWN SYSTEM PUMPING DOWN WASHED DOWN AREA WASHED OUT LINE WASHED OUT LINE CLEANED GRIT CHAMBER sent flow to south plant Need to repair F/M-03/08/07 WASHED OUT MAIN LINE LINE BEING REPAIRED WASHED OUT MAIN LINE STATION BACK ON LINE WASHED OUT LINE WASHED OUT LINE SYSTEM PUMPING DOWN SYSTEM PUMPING DOWN SYSTEM PUMPING DOWN SYSTEM PUMPING DOWN ENTERGY CALLED OUT ENTERGY CALLED OUT ENTERGY CALLED OUT WASHED DOWN AREA SYSTEM PUMPING DOWN REPAIRING F/M ON 05/10/07 WASHED OUT LINE WASHED OUT LINE STATION PUMPING DOWN Repairing problem at L/S Repairing problem at L/S WASHED OUT LINE WASHED DOWN AREA STATION BACK ON LINE WASHED OUT LINE STATION BACK ON LINE STATION BACK ON LINE STATION BACK ON LINE WASHED DOWN AREA WASHED DOWN AREA STATION BACK ON LINE WASHED DOWN AREA STATION BACK ON LINE ENTERGY CALL OUT PROBLEM RESOLVED 2007 Page 3 Date Event Began 10/18/07 10/19/07 10/21/07 10/22/07 10/22/07 10/22/07 10/22/07 10/22/07 10/23/07 10/23/07 10/23/07 10/23/07 10/23/07 10/23/07 10/23/07 10/23/07 10/25/07 11/18/07 11/30/07 12/23/07 12/25/07 12/25/07 Start Time Reporting Address 13:18 10:25 9:33 14:05 14:25 14:58 16:33 19:11 11:55 12:25 15:45 16:30 10:03 10:36 17:00 17:00 9:44 16:08 16:37 14:22 11:12 13:33 35th & OLE MISS L/S LS4310-at 523 W. ESP. 3872 E. LOYOLA DRIVE 21 DAUTERIVE 3608 E. GRANDLAKE BLVD. 2606 HELENA STREET 23 DAUTERIVE 33rd and WILLIAMS 3644 WILLIAMS BLVD. 3712 WILLIAMS BLVD 2 MOSELLE DRIVE 3702 CONNECTICUT AVENUE 3208 CASTLE DRIVE 21 DAUTERIVE COURT 3872 E. LOYOLA DRIVE 3872 E. LOYOLA DRIVE 4032 LAKE TRAIL DRIVE 4230 CHATEAU BLVD. 1303 W. ESPLANADE 14 FURMAN CIRCLE 19 BISTINEAU COURT 13 S. CATAHOULA COURT Total Overflows 76 2007 Location of Event Cleanout / Manhole / Lift Station LIFT STATION FORCE MAIN REPAIR MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE FORCE MAIN BROKEN MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE Date Event Ended 10/18/07 10/19/07 10/21/07 10/22/07 10/22/07 10/22/07 10/22/07 10/22/07 10/23/07 10/23/07 10/23/07 10/23/07 10/23/07 10/23/07 10/23/07 10/25/07 11/18/07 11/30/07 12/23/07 12/25/07 12/25/07 End Time Duration (hr:min) 14:10 20:00 10:40 18:25 18:10 17:10 18:45 20:15 12:15 13:00 16:10 16:54 10:36 11:40 0:52 9:35 1:07 4:20 3:45 2:12 2:12 1:04 0:20 0:35 0:25 0:24 0:33 1:04 11:23 17:49 18:45 15:35 15:11 15:41 1:39 1:41 2:08 1:13 3:59 2:08 Possible volume of event (gallons) 2,000 4,000 200 300 200 200 100 200 300 300 200 300 200 300 500 3,000 150 300 200 300 400 100 Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) LIFT STATION OUTAGE BROKEN FORCE MAIN MAIN LINE BLOCKAGE SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN SYSTEM UP/RAIN BROKEN FORCE MAIN SYSTEM UP/RAIN LIFT STATION OUT MAIN LINE BLOCKAGE Lift Station Outage/Electrical Lift Station Outage/Electrical Lift Station Outage/Electrical Resolution of Event (Washed Out Line, Repaired Force Main) STATION BACK ON LINE REPAIRED FORCE MAIN WASHED OUT LINE SYSTEM GOING DOWN SYSTEM GOING DOWN SYSTEM GOING DOWN SYSTEM GOING DOWN SYSTEM GOING DOWN SYSTEM GOING DOWN SYSTEM GOING DOWN SYSTEM GOING DOWN SYSTEM GOING DOWN WASHED DOWN AREA WASHED DOWN AREA SYSTEM STILL UP REPAIRING FORCE MAIN WASHED DOWN AREA STATION BACK ON LINE WASHED OUT LINE STATION BACK ON LINE STATION BACK ON LINE STATION BACK ON LINE 2007 Page 4 Year 2008 Date Event Start Time Began Reporting Address 01/25/08 01/28/08 02/01/08 02/01/08 02/07/08 02/08/08 02/18/08 02/21/08 02/22/08 03/05/08 03/05/08 03/18/08 03/18/08 03/18/08 03/20/08 04/05/08 04/05/08 04/05/08 04/05/08 04/06/08 04/06/08 04/06/08 04/05/08 04/05/08 04/05/08 04/05/08 04/05/08 04/07/08 04/07/08 04/09/08 04/11/08 05/06/08 05/10/08 05/13/08 05/13/08 05/16/08 05/17/08 05/17/08 05/22/08 05/22/08 06/16/08 07/10/08 07/22/08 08/11/08 08/13/08 08/13/08 08/14/08 08/14/08 08/14/08 08/14/08 08/25/08 08/28/08 12:40 8:50 7:20 17:23 14:11 13:11 9:04 13:58 12:30 7:58 21:30 7:15 7:15 21:23 9:10 9:03 9:07 10:43 9:11 17:17 17:32 17:50 8:05 8:05 8:00 8:16 11:54 7:50 11:46 6:14 7:15 8:12 12:59 9:14 10:37 16:29 10:13 10:13 22:40 8:11 12:05 10:20 9:35 6:00 7:00 11:14 12:55 16:19 10:34 8:36 1009 S. BAYOU ROAD 3301 TULANE DRIVE 1 DAUTERIVE COURT 3644 WILLIAMS BLVD. 3400 W. LOUISIANA STATE 3640 WILLIAMS BLVD. VINTAGE AND WILLIAMS 2649 DELAWARE AVENUE 3901 WILLIAMS BLVD. 1238 27th STREET 1 LAKE BREEZE 921 27th STREET 921 27th STREET 4321 MACON DRIVE 4321 MACON DRIVE 26 RUE DIJON 821 CHAMPAIGNE CHATEAU ROTHCHILD 3701 CONNECTICUT AVE. 3702 CONNECTICUT 3703 CONNECTICUT 3705 CONNECTICUT 10 CHATEAU ROTHCHILD 10 CHATEAU ROTHCHILD 8 CHATEAU ROTHCHILD 933 VINTAGE 1 BRITTANY 3702 CONNECTICUT 26 RUE DIJON 716 VILLAGE ROAD 34th and KENTUCKY 2722 WILLIAMS BLVD. 33rd and WILLIAMS 3312 KENTUCKY AVENUE 521 TAYLOR STREET 2003 ILLINOIS AVENUE 3301-3325 TULANE DRIVE 27th and ILLINOIS 33rd and WILLIAMS 2701 FLORIDA AVENUE 108-104-132 DUKE DRIVE 24TH AND CRESTVIEW 2301 44th ST. (across from) F/M at Irish Bend L/S 3321 TULANE DRIVE 10th & Maria L/S to 24th & Delaware 421 FILMORE STREET 2701 FLORIDA AVENUE 2400 block DELAWARE 2636 DELAWARE AVENUE 26th and ILLINOIS 2722 WILLIAMS BLVD. CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Location of Event Cleanout / Manhole / Lift Station MANHOLE MANHOLE MANHOLE MANHOLE FORCE MAIN BROKEN FORCE MAIN BROKEN LIFT STATION OUT MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION MANHOLE MANHOLE LIFT STATION LIFT STATION LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION LIFT STATION LIFT STATION LIFT STATION LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE STUB OUT TO DRAIN MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLES LIFT STATION MANHOLE FORCE MAIN MANHOLE Contractor put piling thru gravity line MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE Date Event Ended 01/25/08 01/28/08 02/01/08 02/01/08 02/08/08 02/08/08 02/18/08 02/21/08 02/22/08 03/05/08 03/05/08 03/18/08 03/18/08 03/18/08 03/20/08 04/05/08 04/05/08 04/05/08 04/05/08 04/06/08 04/06/08 04/06/08 04/05/08 04/05/08 04/05/08 04/05/08 04/05/08 04/07/08 04/07/08 04/09/08 04/11/08 05/06/08 05/10/08 05/13/08 05/13/08 05/16/08 05/17/08 05/17/08 05/23/08 05/23/08 06/17/08 07/10/08 07/22/08 08/12/08 08/13/08 08/14/08 08/14/08 08/14/08 08/14/08 08/14/08 08/25/08 08/28/08 End Time 14:46 11:06 9:02 19:11 15:00 10:43 14:50 14:40 8:53 23:25 8:30 8:30 21:54 9:30 14:00 14:00 14:00 12:00 18:00 18:00 18:00 14:00 14:00 14:00 14:00 14:00 11:18 12:05 8:02 9:00 9:51 14:00 11:06 14:30 17:57 12:30 13:30 10:31 13:57 0:01 16:00 12:22 11:00 8:25 12:10 13:21 17:05 13:40 9:15 Duration (hr:min) 2:06 2:16 1:42 1:48 1:49 1:39 0:52 2:10 0:55 1:55 1:15 1:15 0:31 0:20 4:57 4:53 3:17 2:49 0:43 0:28 0:10 5:55 5:55 6:00 5:44 2:06 3:28 0:19 1:48 1:45 1:39 1:01 1:52 3:53 1:28 2:17 3:17 #VALUE! 13:57 7:49 0:17 1:25 0:00 1:25 0:56 0:26 0:46 3:06 0:39 Possible volume of event (gallons) 250 200 50 300 2,500 3,000 600 200 150 100 400 500 3,000 300 100 1,500 1,500 1,000 1,000 500 500 500 1,000 500 1,000 500 400 300 400 500 600 500 300 200 600 400 1,000 600 1,000 400 1,000 200 4,000 200 5,000 400 1,000 600 2,000 300 300 Receiving Surface Water LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE FORCE MAIN VALVE BROKEN VALVE ON F/M BROKEN VALVE ON F/M LIFT STATION OUTAGE SYSTEM UP/RAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE MAIN LINE BLOCKAGE AREA WASH DOWN LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE SYSTEM UP/HEAVY RAIN STATION OUT STATION OUT STATION OUT LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE SYSTEM UP RAIN MAIN LINE BLOCKAGE SYSTEM UP RAIN/OVERFLOW SYSTEM UP/RAIN SYSTEM UP/RAIN MAIN LINE BLOCKAGE FORCE MAIN BROKEN MAIN LINE BLOCKAGE BROKEN FORCE MAIN at L/S MAIN LINE BLOCKAGE Piling in line/System up MAIN LINE BLOCKAGE SYSTEM UP/L/S OUT SYSTEM UP/L/S OUT SYSTEM UP/L/S OUT SYSTEN WAS UP/HEAVY RAIN BLOCKAGE IN MAIN LINE Resolution of Event (Washed Out Line, Repaired Force Main) WASHED & VACUUMED OUT LINE WASHED OUT MAIN LINE WASHED OUT LINE NEED TO REPAIR VALVE REPAIRING FORCE MAIN REPAIRED VALVE ON F/M STATION BACK ON LINE SYSTEM GOING DOWN WASHED OUT LINE WASHED OUT MAIN LINE RESET PUMPS/BACK ON LINE ENTERGY CALLED OUT ENTERGY CALLED OUT WASHED OUT MAIN LINE WASHED DOWN AREA ELECTRICAL PROBLEM ELECTRICAL PROBLEM ELECTRICAL PROBLEM SYSTEM GOING DOWN STATION BACK ON LINE STATION BACK ON LINE STATION BACK ON LINE ELECTRICAL PROBLEM ELECTRICAL PROBLEM ELECTRICAL PROBLEM ELECTRICAL PROBLEM ELECTRICAL PROBLEM WASHED DOWN AREA WASHED DOWN AREA STAION BACK ON LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE SYSTEM GOING DOWN WASHED OUT LINE WASHED DOWN AREA SYSTEM PUMPING DOWN SYSTEM PUMPING DOWN WASHED OUT MAIN LINE REPAIRED FORCE MAIN WASHED OUT LINE REPAIRED FORCE MAIN WASHED OUT MAIN LINE Contractor repairing line WASHED OUT MAIN LINE STATION BEING WORKED ON STATION BEING WORKED ON WASHED OUT MAIN LINE WASHED DOWN AREA WASHED OUT MAIN LINE 2008 Page 5 Date Event Start Time Began Reporting Address 09/01/08 09/01/08 09/02/08 09/02/08 09/02/08 09/04/08 09/05/08 09/05/08 09/05/08 09/06/08 09/06/08 09/06/08 09/10/08 09/12/08 09/12/08 09/20/08 09/20/08 09/21/08 09/21/08 09/21/08 09/21/08 09/22/08 09/22/08 09/28/08 11/06/08 11/26/08 11/26/08 12/05/08 12/11/08 12/13/08 12/20/08 12/22/08 12/22/08 12/22/08 12/30/08 7:22 7:50 10:36 14:49 16:02 16:47 10:32 18:30 10:25 14:48 15:15 15:30 10:50 6:00 15:41 15:59 8:55 9:14 10:59 11:54 8:13 9:25 10:35 14:15 14:52 18:28 4:40 3:00 12:33 17:30 16:37 18:17 7:45 12:35 VINTAGE and WILLIAMS E. LOYOLA/W. ESPLANADE VINTAGE and LAKE TRAIL. 3610 E. GRANDLAKE W. ESP. & CONTINENTAL 27th and DAWSON 3705 CONNECTICUT AVENUE 14 E. LAFOURCHE IRISH BEND/CATTLE FARM 128 DUKE DRIVE JOE YENNI and MOSELLE 5300 CRAIG AVENUE 5300 SHAMROPS 27th & DAWSON L/S 27th & DAWSON L/S 3341 CANNES PLACE 3361 CANNES PLACE 3341 CANNES PLACE 3361 CANNES PLACE 2433 ILLINOIS AVENUE 2453 TAFFY DRIVE 3702 CONNECTICUT AVENUE DRIFTWOOD & WILLIAMS 4032 TECHE 41ST AND MEDOC 3615-3617 W.GRANDLAKE 58 FURMAN CIRCLE #1 W. 30th ST. (PLANT 3) #1 W. 30th ST. (PLANT 3) 47 ANTIGUA DRIVE 38th & MARTINIQUE 2604 ACRON STREET 312-314 CLEMSON PLACE #1 W. 30TH ST. (PLANT 3) 91 CHATEAU du LAC Total Overflows 87 2008 Location of Event Cleanout / Manhole / Lift Station MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE BROKEN FORCE MAIN MANHOLE MANHOLE North Plant RAS WELL PLANT HEADWORKS MANHOLE MANHOLE MANHOLE MANHOLE SOUTH PLT. TANK 2 INFLUENT LINE MANHOLE Date Event Ended 09/12/08 09/12/08 09/20/08 09/20/08 09/21/08 09/21/08 09/21/08 09/21/08 09/22/08 09/22/08 09/29/08 11/06/08 11/26/08 11/26/08 12/05/08 12/11/08 12/13/08 12/20/08 12/22/08 12/22/08 12/22/09 12/30/08 End Time 15:00 17:24 17:45 9:14 9:23 11:43 12:22 12:52 10:01 8:56 21:00 18:00 21:00 8:40 5:00 13:15 18:22 18:26 20:23 8:30 13:37 Duration (hr:min) 9:00 1:43 1:46 0:19 0:09 0:44 0:28 4:39 0:36 22:39 6:45 3:08 2:32 4:00 2:00 0:42 0:52 1:49 2:06 0:45 1:02 Possible volume of event (gallons) 1,000 1,000 1,000 1,000 1,000 2,000 500 1,000 1,000 1,000 1,000 1,000 1,000 18,000 1,000 500 200 200 500 1,000 800 500 2,000 5,000 300 400 30,000 50,000 200 300 200 200 1,200 300 Receiving Surface Water LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE GUSTAV/POWER OUTAGE HURRICANE IKE/POWER OUTAGE HURRICANE IKE/POWER OUTAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE SYSTEM UP DUE TO HEAVY RAIN MAIN LINE BLOCKAGE SYSTEM UP DUE TO HEAVY RAIN MAIN LINE BLOCKAGE STATION OUT/MECHANICAL PHONE CO. BROKE LINE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE PLANT OPERATOR'S ERROR HEADWORKS OVERFLOW MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE South Plt tank 2 influent line MAIN LINE BLOCKAGE Resolution of Event (Washed Out Line, Repaired Force Main) ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER ENTERGY RESTORING POWER GENERATOR SET-UP AT L/S WASHED OUT LINE WASHED DOWN AREA WASHED DOWN AREA WASHED DOWN AREA SYSTEM PUMPING DOWN WASHED OUT LINE WASHED DOWN AREA WASHED OUT LINE STATION NOW PUMPING REPAIRED FORCE MAIN WASHED OUT LINE WASHED OUT LINE AREA CLEANED UP BY CREW Overflow stopped at 5:00am WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE Sand bagged storm drain and WASHED OUT LINE 2008 Page 6 Year Date Event Began 01/03/09 01/03/09 01/03/09 01/04/09 01/05/09 01/05/09 01/09/09 01/11/09 01/16/09 01/16/09 01/26/09 02/03/09 02/03/09 02/14/09 02/14/09 02/14/09 02/14/09 02/14/09 02/14/09 02/16/09 02/19/09 02/19/09 02/19/09 02/24/09 02/25/09 02/27/09 03/26/09 03/27/09 03/26/09 03/27/09 04/27/09 04/27/09 05/05/09 05/11/09 06/08/09 06/21/09 06/23/09 06/27/09 07/20/09 08/06/09 08/21/09 08/21/09 08/21/09 08/24/09 08/31/09 09/01/09 09/11/09 09/13/09 09/14/09 09/14/09 09/14/09 09/28/09 10/05/09 10/26/09 12/01/09 12/03/09 12/03/10 12/03/09 12/03/09 CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT 2009 Start Time Reporting Address 9:40 9:40 9:40 13:58 12:01 13:22 8:13 18:06 13:30 16:49 9:00 9:00 11:50 8:00 8:17 8:30 9:23 12:56 14:34 9:39 12:17 12:30 15:40 15:19 14:28 9:00 18:15 10:49 7:00 7:55 8:18 12:33 9:45 15:30 9:07 33rd and WILLIAMS 33rd and ILLINOIS WILLIAMS and DRIFTWOOD 19 VERRET COURT 19 VERRET COURT 2 MOSELLE DRIVE 250 AVANT GARDE 316 CLEMSON PLACE S. Canal bank/at w. 30th St. 316 CLEMSON PLACE 23RD STREET 1238 27th STREET 3455 E. LOYOLA DRIVE #1 W. 30th 4301 LOIRE DRIVE 3701 CONNECTICUT AVE. 3405 TULANE DRIVE 33rd and WILLIAMS 27th and DELAWARE #2 MOSELLE DRIVE 3300 LOYOLA DRIVE DRIFTWOOD & WILLIAMS 3455 E. LOYOLA DRIVE 4100 ALABAMA AVENUE 412 VETERANS BLVD. 3455 E. LOYOLA DRIVE W. ESPLANADE & CONNECTICUT 5216 WADE DRIVE W. ESPLANADE & CONNECTICUT 10th and MARIA 5412 COOCS PLUMOSAS LS KILGORE & TRINITY 3712 WILLIAMS BLVD. 2841 LOYOLA DRIVE 1101 SUNSET DR AIRPORT ACCESS RD Location of Event Cleanout / Manhole / Lift Station MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE AIR RELEASE VALVE FROM 33RD & CONNECTICUT FM MANHOLE MANHOLE MANHOLE MANHOLE AERATION BASINS MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE Date Event End Time Ended 01/04/09 01/04/09 01/04/09 01/04/09 01/05/09 01/05/09 01/09/09 01/12/09 10:00 10:00 10:00 20:10 12:34 13:52 10:00 20:20 01/17/09 17:05 01/16/09 01/26/09 02/03/09 02/03/09 02/14/09 02/14/09 02/14/09 02/14/09 02/14/09 02/14/09 02/16/09 02/19/09 02/19/09 02/19/09 02/24/09 02/25/09 02/27/09 17:40 10:33 9:32 13:00 13:00 8:32 9:30 10:16 14:45 15:10 9:58 13:35 14:22 17:05 16:40 15:49 11:24 Duration (hr:min) 0:20 0:20 0:20 6:12 0:33 0:30 1:47 2:14 3:35 0:51 1:33 0:32 1:10 5:00 0:15 1:00 0:53 1:49 0:36 0:19 1:18 1:52 1:25 1:21 1:21 2:24 MANHOLE MANHOLE 03/26/09 03/27/09 19:00 11:28 0:45 0:39 FORCE MAIN FORCE MAIN MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE 03/27/09 04/01/09 04/27/09 05/01/09 05/05/09 05/11/09 06/08/09 06/21/09 9:00 8:54 10:00 13:20 10:16 17:00 10:50 2:00 0:59 1:42 0:47 0:31 1:30 1:43 Possible volume of event (gallons) 4,000 4,000 5,000 500 100 300 300 300 24,000 200 800 200 500 200 800 200 1,000 1,200 100 200 800 500 300 800 500 500 500 500 18,000 500 50 300 200 125 200 16:20 17:07 8:24 13:03 14:31 15:03 17:39 9:48 8:00 12:00 14:20 18:18 8:30 12:34 15:30 9:07 13:51 8:47 19:09 11:24 7:08 12:55 CHATEAU TRANSFER STATION LIFT STATION WET WELL 1301 W. ESPLANADE AVE 34 E. THIRD ST 316 CLEMSON DR #16 MERCUREY #18 MERCUREY #14 MERCUREY #2 MOSELLE 2649 DELAWARE #74 JOHN HOPKINS 2649 DELAWARE 10TH & MARIA 2649 DELAWARE 1238 27TH STREET 26TH & ILLINOIS STREET 2827 TENNESEE 27TH & DELAWARE 4032 TECHE 16 MERCUREY 2 MOSELLE 33RD AND WILLIAMS 2649 DELAWARE 4077 TULANE IRISH BEND (CATTLE FARM RD) FORCE MAIN MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MAINLINE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION 06/23/09 06/28/09 07/20/09 08/06/09 08/21/09 08/21/09 08/21/09 08/24/09 08/31/09 09/01/09 09/11/09 09/13/09 09/14/09 09/14/09 09/14/09 09/28/09 10/05/09 10/26/09 12/01/09 12/03/09 12/03/09 12/03/09 19:15 6:00 9:52 13:33 15:13 15:13 18:15 10:35 8:32 13:15 14:57 19:20 9:00 13:36 16:30 11:40 14:10 11:10 20:32 11:41 8:57 14:25 2:55 12:53 1:28 0:30 0:42 0:10 0:36 0:47 0:32 1:15 0:37 1:02 0:30 1:02 1:00 2:33 0:19 2:23 1:23 0:17 0:00 1:49 1:30 173,000 2,000 1,000 500 500 500 10 100 500 100 500 1,500 500 500 120 200 100 50 7 50 300 500 Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE LAKE PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN PONTCHARTRAIN 2009 Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) SYSTEM UP RAIN /MAIN LINE BLOCKAGE SYSTEM UP RAIN /MAIN LINE BLOCKAGE SYSTEM UP RAIN /MAIN LINE BLOCKAGE SYSTEM UP RAIN /MAIN LINE BLOCKAGE SYSTEM UP RAIN /MAIN LINE BLOCKAGE SYSTEM UP RAIN /MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE NEED TO REPLACE AIR RELEASE VALVE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE SYSTEM UP/RAIN BROKEN FORCE MAIN BROKEN FORCE MAIN MAIN LINE BLOCKAGE BROKEN FORCE MAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE LIFT STATION ELECTRICAL OUTAGE PHASE MONITOR FAILURE BROKEN FORCE MAIN BLOCKED INVERT MAINLINE BLOCKAGE SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN SYSTEM UP/ONE PUMP OFF MAINLINE BLOCKAGE SYSTEM UP/HEAVY RAIN LIFTSTATION OUTAGE LIFTSTATION OUTAGE SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN LIFTSTATION OUTAGE LIFT STATION OUTAGE BROKEN SUCTION LINE SYSTEM UP DUE TO RAIN HEAVY RAINFALL SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN LIFT STATION OUTAGE Resolution of Event (Washed Out Line, Repaired Force Main) SYSTEM HAS PUMPED DOWN SYSTEM HAS PUMPED DOWN SYSTEM HAS PUMPED DOWN SYSTEM HAS PUMPED DOWN WASHED DOWN AREA WASHED DOWN AREA WASHED OUT MAIN LINE WASHED OUT MAIN LINE REPLACED AIR RELEASE VALVE WASHED DOWN AREA WASHED OUT MAIN LINE WASHED DOWN AREA WASHED OUT MAIN LINE SYSTEM PUMPING DOWN SYSTEM PUMPING DOWN SYSTEM PUMPING DOWN WASHED DOWN AREA SYSTEM PUMPING DOWN SYSTEM PUMPING DOWN WASHED DOWN AREA WASHED OUT MAIN LINE WASHED OUT MAIN LINE Washed down area from overflow WASHED OUT MAIN LINE WASHED OUT MAIN LINE WASHED OUT MAIN LINE Tried to wash line/Follow-up WASHED DOWN AREA REPAIRED FORCE MAIN REPAIRED FORCE MAIN WASHED OUT MAIN LINE REPAIRED FORCE MAIN WASHED OUT MAIN LINE WASHED OUT MAIN LINE WASHED OUT MAIN LINE RESET BREAKERS AND WASHED AND DISINFECTED AREA REPLACED PHASE MONITOR AND WASHED AND DISINFECTED OVERFLOW AREA REPAIRED FORCE MAIN CHOPPED UP GREASE WASHED MAINLINE OPENED MANHOLE 03135026 OPENED MANHOLE 03135026 WASHED DWOAWSHNEADRDEOAWDNUEARTOEAMANHOLE OVERFLOWING ON 8/21/09 RESIDENT DID WASHED DOWN AREA WASHED MAINLINE SYSTEM UP/HEAVY RAIN RESET BREAKER PUMPS BACK ONLINE SYSTEM UP/HEAVY RAIN SYSTEM UP/HEAVY RAIN PUMPS BACK ONLINE TURNED ANOTHER PUMP ON REPAIRED SUCTION LINE WASHED DOWN AREA Page 7 Date Event Began 12/05/09 12/06/09 12/08/09 12/08/09 12/08/09 12/08/09 12/08/09 12/08/09 12/08/09 12/08/09 12/08/09 12/08/09 12/08/09 12/08/09 12/08/09 12/09/09 12/09/09 12/09/09 12/09/09 12/10/09 12/12/09 12/13/09 12/13/09 12/14/09 12/15/09 12/15/09 12/15/09 12/15/09 12/15/09 12/15/09 12/16/09 12/17/09 12/18/09 12/18/09 12/18/09 12/18/09 12/18/09 12/24/09 12/25/09 Start Time Reporting Address 12:42 10:07 7:03 7:55 8:41 9:22 9:43 9:51 10:18 10:15 10:18 10:20 12:30 14:11 16:55 13:37 14:00 15:25 18:57 9:00 17:40 10:00 16:55 10:00 7:16 8:53 11:32 8:45 11:07 15:22 14:51 16:18 8:12 9:30 12:24 13:56 13:00 10:20 0:46 26 INCARNATE WORD 233 GEORGETOWN 3162 MARIETTA 3610 E. GRANDLAKE 508 FILMORE 4234 INDIANA 2600 KINGSTON 137 EMERSON 2600 SALEM 2729 GREENWOOD 37 FURMAN 3437 FLORIDA 2609 KINGSTON 305 FURMAN 308 FURMAN 10TH & WILLIAMS 2722 WILLIAMS 929 COMPROMISE 27TH & DELAWARE 2649 DELAWARE 23 VERETT 4077 TULANE 309 FURMAN 33RD AND WILLIAMS 4036 ARIZONA 2621 GADSDEN 19 VERRET 3403 E. LOYOLA 250 AVANT GARDE 87 LISA 3277 GLEN EAGLE 2 MOSELLE 4077 TULANE TULANE & W. STANFORD 2500 BLOCK OF DELAWARE 2 MOSELLE 900 AIRLINE HWY 3940 WILLIAMS 35TH & OLE MISS Total Overflows 98 2009 Location of Event Cleanout / Manhole / Lift Station MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION Date Event End Time Ended 12/05/09 12/06/09 12/08/09 12/08/09 12/08/09 12/09/09 12/09/09 12/09/09 12/08/09 12/08/09 12/09/09 12/08/09 12/08/09 12/08/09 12/08/09 12/09/09 12/09/09 12/09/09 12/09/09 12/10/09 12/12/09 12/13/09 12/13/09 12/14/09 12/15/09 12/15/09 12/15/09 12/15/09 12/15/09 12/15/09 12/16/09 12/17/09 12/18/09 12/18/09 12/18/09 12/18/09 12/18/09 12/24/09 12/25/09 13:55 11:28 8:07 8:29 10:17 9:40 11:18 10:27 11:18 11:17 10:37 10:55 12:40 14:34 19:14 14:00 14:29 16:00 19:00 9:20 18:00 10:20 17:26 10:19 9:21 10:27 11:50 9:15 11:32 15:38 15:40 16:39 8:30 9:55 12:35 14:07 13:14 10:45 4:02 Duration (hr:min) 1:13 1:21 1:04 0:34 1:36 0:18 1:35 0:36 1:00 1:02 0:19 0:35 0:10 0:23 2:19 0:23 0:29 0:35 0:03 0:20 0:20 0:20 0:31 0:19 2:05 1:34 0:18 0:30 0:25 0:16 0:49 0:21 0:18 0:25 0:11 0:11 0:14 0:25 3:16 Possible volume of event (gallons) 100 100 100 100 200 100 100 100 3144 50 100 100 50 100 300 50 100 100 200 200 200 200 500 500 100 500 100 25 200 25 500 50 200 750 200 100 200 1000 500 Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN MAIN LINE BLOCKAGE SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN MANHOLE OVERFLOWED MANHOLE OVERFLOWED MANHOLE OVERFLOWED SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN MANHOLE OVERFLOWED MANHOLE OVERFLOWED MANHOLE OVERFLOWED LIFT STATION OUTAGE Resolution of Event (Washed Out Line, Repaired Force Main) WASHED OUT LINE WASHED OUT LINE WASHED OUT MAINLINE WASHED OUT MAINLINE WASHED DOWN AREA WASHED DOWN AREA WASHED DOWN AREA WASHED DOWN AREA 2009 Page 8 Year Date Event Began 01/04/10 01/06/10 02/04/10 02/04/10 02/04/10 02/12/10 02/12/10 02/19/10 03/06/10 03/11/10 03/12/10 03/15/10 03/15/10 03/23/10 03/28/10 03/29/10 04/24/10 05/04/10 06/06/10 06/07/10 06/21/10 2010 CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Lift Station Sub Basin Start Time Reporting Address LS-4344 LS-4341 LS-4317 LS-4317 LS-4335 LS-4317 LS-4335 LS-4339 LS-4321 LS-4100 LS-4200 LS-4211 LS-4339 LS-4302 LS-4224 LS-4211 LS-4206 LS-4317 8:27 13:47 17:44 14:12 20:13 7:38 9:54 12:00 14:09 11:06 10:56 11:05 14:39 7:45 21:00 9:31 11:49 16:09 2601 TUPELO 27TH & SALEM 4077 TULANE 4077 TULANE 33RD & WILLIAMS 4077 TULANE 33RD & WILLIAMS 2207 GREENWOOD 120 DUKE ST 26TH & ILLINOIS 1200 38TH 3901 WILLIAMS 2207 GREENWOOD 600 ST. JULIEN 1021 S. BAYOU 3901 WILLIAMS 1705 42ND ST 4049 W. LOYOLA Location of Event Cleanout / Manhole / Lift Station Date Event Ended End Time MANHOLE FORCE MAIN 01/04/10 01/06/10 9:16 14:43 MANHOLE 02/04/10 18:02 MANHOLE 02/04/10 14:47 MANHOLE 02/04/10 20:36 MANHOLE 02/12/10 8:18 MANHOLE 02/12/10 10:09 MANHOLE 02/19/10 12:25 MANHOLE MANHOLE LIFT STATION 03/06/10 03/11/10 03/12/10 15:08 11:19 11:37 MANHOLE 03/15/10 12:31 MANHOLE MANHOLE MANHOLE 03/15/10 03/23/10 03/28/10 15:15 9:35 22:40 MANHOLE MANHOLE MANHOLE 03/29/10 04/24/10 05/04/10 10:45 12:27 16:50 Duration (hr:min) 0:49 0:56 0:18 0:35 0:23 0:40 0:15 0:25 0:59 0:13 0:41 1:26 0:36 1:50 1:40 1:14 0:38 0:41 LS-4100 27TH & DELAWARE MANHOLE 06/08/10 2:57 2:57 LS-4106 8:30 AIRPORT ACCESS RD. AT 18TH ST. MANHOLE 06/07/10 9:00 0:30 LS-4317 8:55 4070 WEST LOYOLA MANHOLE 06/21/10 11:30 2:35 Possible volume of event (gallons) 100 300 100 100 400 500 300 50 200 100 500 150 30 200 10 100 300 50 21,600 14,700 1,000 Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) MAINLINE BLOCKAGE BROKEN FORCE MAIN WASHED OUT LINE W/O TO REPAIR FORCE MAIN LIFT STATION OUTAGE CONNECTED A DIESEL PUMP TO THE STATION SYSTEM UP DUE TO RAIN WASHED DOWN AREA SYSTEM UP DUE TO RAIN WASHED DOWN AREA LIFT STATION OUTAGE CONNECTED A DIESEL PUMP TO THE STATION SYSTEM UP DUE TO RAIN MAINLINE BLOCKAGE WASHED OUT MAINLINE MAINLINE BLOCKAGE SYSTEM UP DUE TO RAIN LIFT STATION OUTAGE WASHED OUT LINE WASHED DOWN AREA WASHED DOWN AREA MAINLINE BLOCKAGE WASHED OUT LINE MAINLINE BLOCKAGE MAINLINE BLOCKAGE MAINLINE BLOCKAGE WASHED OUT LINE WASHED OUT LINE WASHED OUT LINE MAINLINE BLOCKAGE WASHED OUT LINE MAINLINE BLOCKAGE WASHED OUT LINE M/H OVERFLOWED WASHED DOWN AREA SYSTEM UP DUE TO RAIN WASHED AREA. THIS AREA OF THE CITY RECEIVED 2.41 INCHES OF RAIN IN APPROXIMATELY 1.5 HOURS THE DAY BEFORE (6/6/10). THIS STATION IS BEING UPGRADED AND RE-ENGINEERED FROM 6,750 GPM TO 10,100 GPM. BIDS ARE BEING ACCEPTED FOR THE CONSTRUCTION OF THE UPGRADE. THE CONSTRUCTION SHOULD BE COMPLETED BY MARCH 2011. SYSTEM UP DUE TO RAIN CONTRACTORS FOR THE NEW LIFT STATION BROKE THE 4" SUCTION LINE OF AN EXISTING PUMP WHICH PUMPS THE WASTEWATER FROM A MANHOLE TO THE EXISTING STATION. WASHED AREA. THIS AREA OF THE CITY RECEIVED 2.41 INCHES OF RAIN IN APPROXIMATELY 1.5 HOURS THE DAY BEFORE (6/6/10). THIS STATION IS BEING UPGRADED AND RE-ENGINEERED FROM 2,800 GPM TO 3,100 GPM. BIDS ARE BEING ACCEPTED FOR THE CONSTRUCTION OF THE UPGRADE. THE CONSTRUCTION SHOULD BE COMPLETED BY MARCH 2011. REPAIRED 4" SUCTION LINE. 2010 Page 9 Date Event Began 06/28/10 06/28/10 06/28/10 06/30/10 06/30/10 06/30/10 06/30/10 06/30/10 06/30/10 07/01/10 07/02/10 07/02/10 07/02/10 07/02/10 07/03/10 07/11/10 07/12/10 07/13/10 07/21/10 07/21/10 08/24/10 08/27/10 Lift Station Sub Basin Start Time Reporting Address LS-4100 16:20 27TH & DELAWARE LS-4335 16:00 33RD AND WILLIAMS LS-4335 16:00 33RD & WILLIAMS LS-4100 10:08 2705 FLORIDA LS-4100 10:08 26TH & DELAWARE LS-4335 11:31 33RD & WILLIAMS LS-4335 LS-4335 TREATMENT PLANT LS-4100 LS-4313 LS-4335 LS-4335 LS-4335 LS-4100 LS-4209 LS-4113 LS-4113 LS-4110 LS-4110 LS-4209 LS-4100 15:00 33RD & ILLINOIS 15:00 33RD & INDIANA 13:30 1 WEST 3OTH ST. 8:28 7:23 6:50 7:02 7:07 19:31 14:00 14:31 7:30 11:21 11:56 9:03 2649 DELAWARE #2 MOSELLE 33RD & WILLIAMS 33RD & ILLINOIS 33RD & INDIANA 27TH & DELAWARE GELPI & DRIFTWOOD 1410 HICKMAN 1410 HICKMAN 2827 TENNESSEE 2840 IDAHO DRIFTWOOD & GELPI 27TH & DELAWARE Location of Event Cleanout / Manhole / Lift Station Date Event Ended End Time Duration (hr:min) MANHOLE 07/04/10 18:33 2:13 MANHOLE 06/28/10 17:00 1:00 MANHOLE 06/28/10 17:00 1:00 MANHOLE 06/30/10 10:30 0:22 MANHOLE 06/30/10 10:30 0:22 MANHOLE 07/01/10 13:06 1:35 MANHOLE 06/30/10 18:00 3:00 MANHOLE 06/30/10 18:00 3:00 NORTH PLANT AERATION BASINS NOS. 1 - 4 06/30/10 MANHOLE MANHOLE 07/01/10 07/02/10 MANHOLE 07/02/10 MANHOLE 07/02/10 MANHOLE 07/02/10 17:30 8:50 7:38 7:02 7:07 7:13 4:00 0:22 0:15 0:12 0:05 0:06 MANHOLE 07/03/10 21:00 1:29 MANHOLE 07/11/10 15:16 1:16 MANHOLE 07/12/10 15:05 0:34 MANHOLE 07/13/10 8:05 0:35 LIFTSTATION 07/21/10 11:56 0:35 LIFTSTATION 07/21/10 12:26 0:30 MANHOLE 08/24/10 9:28 0:25 MANHOLE 08/27/10 0:00 Possible volume of event (gallons) 61,230 300 300 300 Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) SYSTEM UP DUE TO RAIN FROM TROPICAL STORM / HURRICANE ALEX SYSTEM UP DUE TO RAIN FROM TROPICAL STORM / HURRICANE ALEX SYSTEM UP DUE TO RAIN FROM TROPICAL STORM / HURRICANE ALEX SYSTEM UP DUE TO RAIN FROM TROPICAL STORM / HURRICANE ALEX Resolution of Event (Washed Out Line, Repaired Force Main) WASHED AREA. All AVAILABLE PUMPS WERE IN OPERATON. THIS STATION IS BEING UPGRADED AND RE-ENGINEERED FROM 6,750 GPM TO 10,100 GPM. BIDS ARE BEING ACCEPTED FOR THE CONSTRUCTION OF THE UPGRADE. THE CONSTRUCTION SHOULD BE COMPLETED BY MARCH 2011. ALL AVAILABLE PUMPS WERE IN OPERATION AT THE LIFT STATION. AN EVALUATION HAS BEEN CONDUCTED FOR THE UPGRADE OF THIS LIFT STATION. THE DESIGN ENGINEER HAS BEEN CHOSEN. WASHED DOWN AREA. ALL AVAILABLE PUMPS WERE IN OPERATION AT THE LIFT STATION. AN EVALUATION HAS BEEN CONDUCTED FOR THE UPGRADE OF THIS LIFT STATION. THE DESIGN ENGINEER HAS BEEN CHOSEN. 300 10,850 900 900 250,000 1,000 25 100 25 25 1500 25 300 100 100 25 100 567,000 LAKE PONTCHARTRAIN SYSTEM UP DUE TO RAIN FROM TROPICAL STORM / HURRICANE ALEX LAKE PONTCHARTRAIN SYSTEM UP DUE TO RAIN FROM TROPICAL STORM / HURRICANE ALEX LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN SYSTEM UP DUE TO RAIN FROM TROPICAL STORM / HURRICANE ALEX SYSTEM UP DUE TO RAIN FROM TROPICAL STORM / HURRICANE ALEX SYSTEM UP DUE TO RAIN FROM TROPICAL STORM / HURRICANE ALEX LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN BROKEN VALVE LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE LIFT STATION OUTAGE BROKEN FORCEMAIN VALVE SYSTEM UP DUE TO RAIN WASHED DOWN AREA. ALL AVAILABLE PUMPS WERE IN OPERATION AT THE LIFT STATION. AN EVALUATION HAS BEEN CONDUCTED FOR THE UPGRADE OF THIS LIFT STATION. THE DESIGN ENGINEER HAS BEEN CHOSEN. THE CITY IS REVIEWING STATEMENTS OF QUALIFICATIONS OF ENGINEERING FIRMS FOR THE PERFORMANCE OF A HYDRAULIC SURVEY AND HYDRAULIC ANALYSIS OF THE PLANT. WASHED DOWN AREA WASHED DOWN AREA WASHED DOWN AREA WASHED DOWN AREA FOLLOW UP TO REPAIR FORCEMAIN WASHED DOWN AREA WASHED DOWN AREA REPRIMED PUMPS REPRIMED PUMPS & WASHED DOWN AREA FOLLOW UP TO REPAIR FORCEMAIN 2010 Page 10 Date Event Began 08/27/10 08/27/10 08/27/10 08/27/10 08/27/10 08/27/10 08/27/10 08/27/10 08/27/10 Lift Station Sub Basin LS-4100 LS-4100 LS-4106 LS-4323 LS-4335 LS-4335 LS-4335 LS-4336 LS-4100 Start Time Reporting Address 15:07 15:07 15:07 15:07 26TH & DELAWARE WILLIAMS & VETERANS 18TH & AIRPORT ACCESS RD E. GRANDLAKE & DAUTERIVE 33RD & ILLINOIS 33RD & INDIANA 33RD & WILLIAMS 33RD & CONNECTICUT 27TH & FLORIDA Location of Event Cleanout / Manhole / Lift Station Date Event Ended End Time MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE 08/27/10 08/27/10 08/27/10 08/27/10 08/27/10 08/27/10 09/03/10 08/27/10 08/27/10 Duration (hr:min) 0:00 0:00 0:00 0:00 0:00 08/29/10 PLANT 9:00 #1 W. 30th St Treatment Plant 08/30/10 1:00 16:00 11/21/10 11/24/10 11/28/10 12/07/10 12/12/10 12/12/10 12/27/10 Total Overflows 2010 LS-4321 PLANT LS-4206 LS-4341 LS-4224 LS-4305 PLANT 60 16:02 6:00 20:06 12:30 9:46 13:16 8:00 #14 FURMAN CIRCLE #1 W. 30TH ST 1700 VINTAGE 2603 SALEM 3341 CANNES #90 CHATEAU MOUTON 1 WEST 30TH STREET MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE SOUTH PLANT RAS/WAS LINE 11/21/10 11/24/10 11/28/10 12/07/10 12/12/10 12/12/10 12/27/10 16:47 6:30 21:50 14:18 10:22 14:35 9:30 0:45 0:30 1:44 1:48 0:36 1:19 1:30 Possible volume of event (gallons) 189,000 37,800 99,000 8500 67,500 22,500 594,000 4500 113,400 2MGD 50 500 30 50 25 50 500 Receiving Surface Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN SYSTEM UP DUE TO RAIN LAKE PONTCHARTRAIN EXCESSIVE RAIN 8/27 -8/30 TURNED OFF BLOWERS LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN MAINLINE BLOCKAGE BROKEN VALVE ON RAS/WAS LINE MANHOLE OVERFLOWED UNBLOCKED & WASHED OUT THE LINE VACUUMED AREA. VALVE IS BEING REPLACED. WASHED DOWN AREA LIFT STATION OUTAGE WASHED DOWN AREA LIFT STATION OUTAGE WASHED DOWN AREA MAINLINE BLOCKAGE LINE BREAK UNBLOCKED & WASHED OUT LINE DETERMINED WHICH LINE WAS BROKEN AND TURNED OFF RAS STATION. LINE WAS REPAIRED ON 12/29/10. 2010 Page 11 Year 2011 CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Date Event Began 01/23/11 01/25/11 01/26/11 02/07/11 03/05/11 03/08/11 03/09/11 03/09/11 03/09/11 03/09/11 03/09/11 03/11/11 03/12/11 03/14/11 03/18/11 03/21/11 03/29/11 03/30/11 04/01/11 04/12/11 04/13/11 04/17/11 Lift Station Sub Basin LS 4107 LS 4209 LS 4112 LS 4344 LS 4224 LS 4224 LS 4219 LS 4100 LS 4108 LS 4106 LS 4335 LS 4108 LS 4108 LS 4303 LS 4106 LS 4106 LS 4302 LS 4202 LS 4219 LS 4321 Start Time Reporting Address 11:40 W. METAIRIE & TAYLOR 17:32 DRIFTWOOD & ANTIGUA 10:21 2829 WILLLIAMS BLVD. 8:56 2605 TIFTON 15:55 3341 CANNES PLACE 10:00 3341 CANNES PLACE 10:28 3143 AUGUSTA 15:56 26TH & ILLINOIS 16:57 2118 ILLINOIS Location of Event Cleanout / Manhole / Lift Station Date Event Ended MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE 01/23/11 01/25/11 01/26/11 02/07/11 03/05/11 03/08/11 03/09/11 03/09/11 MANHOLE 03/09/11 9:00 18TH AT AIRPORT ACCESS ROAD MANHOLE 03/10/11 6:52 33RD & WILLIAMS MANHOLE 03/10/11 14:54 2219 ILLINOIS 12:23 2204 ILLINOIS 10:18 1101 SUNSET 14:00 1 WEST 30TH (PLANT) 1 WEST 30TH (PLANT) MANHOLE MANHOLE MANHOLE 03/11/11 03/12/11 03/14/11 SOUTH PLANT CLARIFIER 03/18/11 SOUTH PLANT WAS WELL 03/21/11 19:12 18TH AT AIRPORT ACCESS ROAD MANHOLE 03/30/11 16:28 1800 DUNCAN 17:27 621 VOURAY 9:32 2500 GAY LYNN 14:33 3128 UTAH 13:07 104 DUKE DRIVE MANHOLE 03/30/11 MANHOLE 04/01/11 MANHOLE 04/12/11 WASHED MAINLINE 04/13/11 MANHOLE 04/17/11 End Time 12:06 18:27 10:40 9:50 16:15 10:47 10:47 16:06 17:13 7:11 2:51 16:15 13:47 10:37 14:15 21:12 16:36 18:15 10:24 14:48 14:13 Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 5 200 100 100 100 13 100 200 6 33,000 30,000 20 100 50 100 20 37,500 300 100 25 Unknown 25 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE SYSTEM UP. HEAVY RAINFALL (2.96 INCHES IN 74 MINUTES AT NEAREST RAIN GAUGE) UNBLOCKED LINE UNBLOCKED LINE UNBLOCKED LINE UNBLOCKED AREA UNBLOCKED AREA UNBLOCKED AREA UNBLOCKED AREA UNBLOCKED AREA & WASHED & WASHED & WASHED LINE AND LINE AND LINE AND LINE AND LINE AND OUT THE OUT THE OUT THE WASHED WASHED WASHED WASHED WASHED WASHED AREA SYSTEM UP. HEAVY RAINFALL (3.27 INCHES IN 48 MINUTES AND 2.96 INCHES IN 74 MINUTES AT UPSTREAM LIFT STATION SUB- BASINS) THE INTERMITTENT OVERFLOW WAS WASTEWATER DILUTED WITH RAIN WATER. WASHED AREA. THE LIFT STATION FOR THIS SUB-BASIN IS BEING UPGRADED FROM 2,800 GPM to 3,100 GPM. LAKE PONTCHARTRAIN SYSTEM UP. HEAVY RAINFALL (2.54 INCHES IN 52 MINUTES) THE INTERMITENT OVERFLOW WAS WASTEWATER DILUTED WITH RAIN WATER. WASHED AREA. THE LIFT STATION AND FORCE MAIN FOR THIS SUB-BASIN ARE BEING UPGRADED. THE 100% DESIGN PLANS WILL BE SUBMITTED TO LDEQ ON 4/11/11 FOR THEIR REMOVAL AND APPROVAL. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN SYSTEM UP. HEAVY RAINFALL (2.96 INCHES IN 74 MINUTES) MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE WASHED AREA UNBLOCKED AREA UNBLOCKED AREA LINE LINE AND AND WASHED WASHED LAKE PONTCHARTRAIN DIESEL PUMP DISCHARGE HOSE BECAME DISLODGED FROM TANK DRAIN THE SOUTH PLANT CLARIFIER WAS BEING DRAINED FOR REPAIR. THE DISCHARGE HOSE WAS RETURNED TO THE DRAIN AND RE-SECURED. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN PUMPS TRIPPED SYSTEM UP. HEAVY RAINFALL (3.47 TO 4.17 INCHES IN 17 HOURS FROM 3/29/11 - 3/30/11 AT UPSTREAM LIFT STATION SUBBASINS) MAIN LINE BLOCKAGE BLOCKAGE BLOCKAGE BLOCKAGE BLOCKAGE WASTING PROCESS WAS SHUT DOWN AND OVERFLOW IMMEDIATELY SUBSIDED. PUMPS WERE RESET AND NORMAL OPERATION RESUMED. THE INTERMITENT OVERFLOW WAS WASTEWATER DILUTED BY RAIN WATER. WASHED AREA. THE LIFT STATION FOR THIS SUB-BASIN IS BEING UPGRADED FROM 2,800 GPM to 3,100 GPM. UNBLOCKED LINE AND WASHED AREA UNBLOCKED LINE AND WASHED AREA UNBLOCKED LINE AND WASHED AREA MAINLINE SCHEDULED TO BE TELEVISED UNBLOCKED LINE AND WASHED AREA 2011 Page 12 Date Event Began 05/09/11 05/13/11 Lift Station Sub Basin Start Time Reporting Address LS 4209 LS 4224 19:58 3701 MARTINIQUE 10:12 1325 W. ESPLANADE 05/25/11 LS 4330 12:30 131 W. ESPLANADE Location of Event Cleanout / Manhole / Lift Station MANHOLE FORCE MAIN Date Event Ended 05/09/11 05/13/11 End Time 21:50 11:12 Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water 15 6,000 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) BLOCKAGE BROKEN FORCE MAIN Resolution of Event (Washed Out Line, Repaired Force Main) UNBLOCKED LINE AND WASHED AREA REPAIRED FORCE MAIN-WO 38079 LIFT STATION 05/25/11 14:30 2,500 LAKE PONTCHARTRAIN THE STATION WAS TURNED OFF IN ORDER TO LOWER THE LEVEL OF THE PLANT'S INFLUENT SPLITTER BOX TO PLUG A FORCE MAIN FOR A CITY CONTRACTOR TO CONNECT A FORCE MAIN AT THE 33RD AND CONNECTICUT LIFT STATION. A PRIVATE LIFT STATION FROM A MIDDLE SCHOOL UPSTREAM FROM THIS STATION WAS STILL IN OPERATION. AREA WAS WASHED. 05/31/11 LS 4330 13:35 131 W. ESPLANADE LIFT STATION 05/31/11 15:30 06/05/11 06/12/11 LS 4305 LS 4109 21:30 16:30 4000 BLOCK OF CHATEAU BOULEVARD 2400 25TH STREET FORCE MAIN FORCE MAIN 06/06/11 06/12/11 12:15 17:15 06/23/11 PLANT 4:00 1 WEST 30TH STREET INFLUENT SPLITTER BOX 06/23/11 6:00 06/23/11 PLANT 4:00 1 WEST 30TH STREET AERATION BASINS NOS. 1 - 4 06/23/11 6:00 300 6,000 2,250 1,500 8,000 LAKE PONTCHARTRAIN THE THIRD FREQUENCY DRIVE THE STATION'S MALFUNCTIONED. VARIABLE (VFD) FOR PUMPS MAINTENANCE CREW MEN SWITCHED THE PUMPS OVER TO OPERATE ACROSS THE LINE. THE AREA WAS WASHED. TWO VFDS HAD BEEN ORDERED PRIOR TO THIS EVENT. A THIRD VFD HAS BEEN ORDERED. THE ELECTRIC MOTOR IS ALSO BEING INSPECTED AND REPAIRED DUE TO BEARING NOISE. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN BROKEN FORCE MAIN BROKEN FORCE MAIN SURGE FROM THE 4 MGD LIFT STATION AFTER A RAIN EVENT OF 2.65 INCHES AND I/I. THE VARIABLE FREQUENCY DRIVES FOR THE THREE 200 HP PUMPS AT THE LIFT STATION ARE BEING REPLACED DUE TO AGE AND FAILURE. THE PUMPS WERE OPERATING AT FULL LOAD, WHICH CREATED THE SURGE IN THE INFLUENT SPLITTER BOX. TWO VFDS WERE REPLACED ON 7/1/11. SURGE FROM 4 MGD LIFT STATION AFTER RAIN EVENT. THE VARIABLE FREQUENCY DRIVES FOR THE THREE 200 HP PUMPS AT THE LIFT STATION WERE BEING REPLACED DUE TO AGE AND FAILURE. THE PUMPS WERE OPERATING AT FULL LOAD, WHICH CREATED THE SURGE IN THE INFLUENT SPLITTER BOX. REPAIRED FORCE MAIN REPAIRED FORCE MAIN -WO 38675 WASHED AREA WASHED AND VACUUMED AREA 2011 Page 13 Date Event Began Lift Station Sub Basin Start Time 07/25/11 PLANT 14:20 07/25/11 PLANT 17:00 07/27/11 PLANT 14:30 Reporting Address 1 WEST 30TH STREET 1 WEST 30TH STREET 1 WEST 30TH STREET Location of Event Cleanout / Manhole / Lift Station Date Event Ended AERATION BASINS 1 - 4 07/25/11 SOUTH PLANT SCUM WELL 07/25/11 AERATION BASINS 1 - 4 06/28/11 End Time Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 19:50 18:00 0:00 2011 1 MGD 100 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAINFALL OF 2.08 INCHES AND 2.50 INCHES NEAR THE PLANT, WITH AN INTENSITY OF 1.95 INCHES IN ONE HOUR AND 2 INCHES IN 40 MINUTES, RESPECTIVELY. THIS RAINFALL WAS MEASURED AT THE GRANDLAKE AND CADDO AND LESAN LIFT STATIONS, RESPECTIVELY. SEVERE STREET FLOODING, GROUND SATURATION, AND HIGH WATER TABLE EXACERBATED THE INFLOW/INFILTRATION OF THE COLLECTION SYSTEM. THE SOUTH PLANT LOST ENTERGY POWER DURING THE RAIN EVENT. THE GENERATOR DID NOT OPERATE DUE TO DEAD BATTERIES. THE BATTERIES WERE REPLACED AND THE GENERATOR WAS STARTED. THE CITY'S GENERATOR MAINTENANCE CONTRACTOR WAS CONTACTED. UPON INSPECTION OF THE GENERATOR, THE GENERATOR TECH OBSERVED THAT A FUSE WAS BLOWN ON THE BATTERY CHARGER, WHICH HE REPLACED. WHEN THE PLANT LOST POWER, THE VALVES WERE SHUT TO THE SCUM WELLS. EVEN THOUGH THE FLOW WAS SHUT OFF, THE SCUM WELL OVERFLOWED SPORADICALLY DUE TO CRACKS IN THE JOINT, APPROXIMATELY 3 FEET FROM THE PLANT'S HIGH FLOW/RAIN EVENT PROCEDURES WERE IMPLEMENTED PRIOR TO THE EVENT. A HYDRAULIC PROFILE AND STUDY OF THE PLANT WAS PERFORMED IN 2010. A FEASIBILITY STUDY IS PRESENTLY BEING PEFORMED TO SELECT A TREATMENT PLANT UPGRADE OPTION. THE LPDES PERMIT APPLICATION FOR THE WETLANDS DISCHARGE WAS SUBMITTED TO THE LDEQ AND IS ADMINISTRATIVELY COMPLETE. THE SOUTH PLANT SCUM WELL, WAS WELL, AND VALVE PITS WERE SEALED ON THE INSIDE AND OUTSIDE. 4.552 MGD LAKE PONTCHARTRAIN HEAVY RAINFALL OF 2.64 INCHES AT CHATEAU TRANSFER STATION IN 2 HOURS AND 5 MINUTES, WITH AN INTENSITY OF 1.8 INCHES IN 42 MINUTES. OTHER AREAS OF THE CITY EXPERIENCED 0.62 - 2.42 INCHES OF RAINFALL. CERTAIN AREAS OF THE CITY HAD SEVERE STREET FLOODING. FIFTEEN LIFT STATIONS WERE AT HIGH LEVEL ALARM WITHIN TWO HOURS OF THE RAIN EVENT. BY 4:45 PM, THE EFFLUENT PUMP STATION WAS WITHIN 6 INCHES OF OVERFLOWING. IN ORDER TO PREVENT PROPERTY/EQUIPMENT DAMAGE, A PORTION OF THE PLANT'S TREATED AND DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT THE MISSISSIPPI RIVER TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. SEVERE STREET FLOODING, GROUND SATURATION, AND HIGH WATER TABLE EXACERBATED THE INFLOW/INFILTRATION OF THE COLLECTION SYSTEM. PLANT'S HIGH FLOW/HEAVY RAIN PROCEDURES WERE IMPLEMENTED BEFORE THE RAIN EVENT. A HYDRAULIC PROFILE AND STUDY OF THE PLANT WAS PERFORMED IN 2010. A FEASIBILITY STUDY IS PRESENTLY BEING PEFORMED TO SELECT A TREATMENT PLANT UPGRADE OPTION. THE LPDES PERMIT APPLICATION FOR THE WETLANDS DISCHARGE WAS SUBMITTED TO THE LDEQ AND IS ADMINISTRATIVELY COMPLETE. Page 14 Date Event Began Lift Station Sub Basin Start Time 07/27/11 PLANT 17:00 Reporting Address 1 WEST 30TH STREET Location of Event Cleanout / Manhole / Lift Station EFFLUENT PUMP STATION DIVERSION Date Event Ended 07/27/11 End Time 19:30 Duration (hr:min) Possible volume of event (gallons) 4.552 MGD Receiving Surface Water LAKE PONTCHARTRAIN INCHES AT CHATEAU TRANSFER STATION IN 2 HOURS AND 5 MINUTES, WITH AN INTENSITY OF 1.8 INCHES IN 42 MINUTES. OTHER AREAS OF THE CITY EXPERIENCED 0.62 - 2.42 INCHES OF RAINFALL. CERTAIN AREAS OF CTaHuEse oCf IETvYentH(AMDain SLEinVeERE STBRlEocEkTageF,LLOifOt SDtIaNtGio.n OFuItFaTgEeE, N LIFT STATIONSEtcW.)ERE AT HIGH LEVEL ALARM WITHIN TWO HOURS OF THE RAIN EVENT. BY 4:45 PM, THE EFFLUENT PUMP STATION WAS WITHIN 6 INCHES OF OVERFLOWING. IN ORDER TO PREVENT PROPERTY/EQUIPMENT DAMAGE, A PORTION OF THE PLANT'S TREATED AND DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT THE MISSISSIPPI RIVER TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. SEVERE STREET FLOODING, GROUND SATURATION, AND HIGH WATER TABLE EXACERBATED THE INFLOW/INFILTRATION OF THE COLLECTION SYSTEM. Resolution of Event (Washed Out Line, Repaired Force Main) THE DIVERSION VALVE CLOSED AT 7:30 PM. WAS 07/27/11 LS 4305 8:20 3600 CHATEAU BLVD. FORCE MAIN 07/30/11 6:00 07/27/11 LS 4309 10:15 OLE MISS AT WEST ESPLANADE LIFT STATION WET WELL 07/27/11 10:45 07/27/11 LS 4335 15:00 33RD AND WILLIAMS MANHOLE 07/31/11 20:00 2,000 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN ONE OF THE TWO FORCE MAINS FROM VINTAGE AND MEDOC LIFT STATIONS BROKE ON THE CHATEAU COUNTRY CLUB GOLF COURSE. THE FLOW FROM VINTAGE AND MEDOC WAS DIVERTED TO THE 35TH AND OLE MISS LIFT STATION. THERE WAS A SPORADIC FLOW FROM THE BREAK DUE TO BACK FLOW FROM THE CATTLE FARM ROAD LIFT STATION, WHICH MANIFOLDS INTO THE VINTAGE FORCE MAIN AT CHATEAU TRANSFER STATION. ENTERGY WAS INSTALLING THE NEW ELECTRICAL SERVICE FOR THE NEW LIFT STATION. A PORTABLE GENERATOR WAS CONNECTED TO THE EXISTING LIFT STATION, IN ORDER TO OPERATE THE LIFT STATION. APPROXIMATELY 15 MINUTES AFTER THE GENERATOR WAS IN SERVICE A 600-VOLT FUSE WAS BLOWN. THIS LIFT STATION IS A TRANSFER STATION ONLY AND DOES NOT HAVE ITS OWN SUB- BASIN. THEREFORE, THE WET WELL OVERFLOWED IMMEDIATELY. DUE TO THE RAIN EVENTS AND THE MARKING OF THE UTILITY LINES, THE MAIN COULD NOT BE REPAIRED UNTIL 7/30/11. THE UPSTREAM STATIONS WERE TURNED OFF. ENTERGY COMPLETED THE INSTALLATION OF THE NEW ELECTRICAL SERVICE, SERVICE WAS RESTORED TO THE EXISTING STATION, AND THE UPSTREAM LIFT STATIONS WERE TURNED ON. THE NEW LIFT STATION WENT ON LINE ON THE EVENING OF 8/11/11. LAKE PONTCHARTRAIN SPORADIC OVERFLOWS DUE TO HEAVY, INTENSE RAIN EVENTS WITH SEVERE STREET FLOODING DURING THE PERIOD OF 7/27/11 - 7/29/11. THE CONSTRUCTION OF THE NEW, UPGRADED LIFT STATION SHOULD COMMENCE IN SEPTEMBER. 2011 Page 15 Date Event Began Lift Station Sub Basin Start Time Reporting Address 07/28/11 PLANT 14:25 1 WEST 30TH STREET 07/29/11 PLANT 16:00 1 WEST 30TH STREET 07/30/11 PLANT 6:00 1 WEST 30TH STREET 08/15/11 LS 4112 15:05 1410 HICKMAN 08/26/11 LS 4112 9:56 1410 HICKMAN 09/03/11 LS 4308 7:35 3403 E. LOYOLA 09/03/11 LS 4330 W. ESPLANADE & GRANDWOOD Location of Event Cleanout / Manhole / Lift Station Date Event Ended AERATION BASINS 1 - 4, CLARIFIERS 3 - 4, NORTH PLANT AND SOUTH PLANT HEADWORKS 07/28/11 End Time Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 21:30 1.918 MGD LAKE PONTCHARTRAIN HEAVY RAIN OF 2.74 INCHES IN 2 HOURS 45 MINUTES. THE NORTH PLANT HEADWORKS BEGAN TO LAP OVER AT 2:25 PM. THE AERATION BASINS BEGAN OVERFLOWING AT 3:30 PM SPORADICALLY. CLARIFIERS 3 AND 4, EFFLUENT PUMP STATION AND THE SOUTH PLANT HEADWORKS ALSO OVERFLOWED. SEVERE STREET FLOODING, GROUND SATURATION, AND HIGH WATER TABLE EXACERBATED THE INFLOW/INFILTRATION OF THE COLLECTION SYSTEM. PLANT'S HIGH FLOW/HEAVY RAIN PROCEDURES WERE IMPLEMENTED BEFORE THE RAIN EVENT. A HYDRAULIC PROFILE AND STUDY OF THE PLANT WAS PERFORMED IN 2010. A FEASIBILITY STUDY IS PRESENTLY BEING PEFORMED TO SELECT A TREATMENT PLANT UPGRADE OPTION. THE LPDES PERMIT APPLICATION FOR THE WETLANDS DISCHARGE WAS SUBMITTED TO THE LDEQ AND IS ADMINISTRATIVELY COMPLETE. AERATION BASINS 1 - 4 07/29/11 22:00 5.333 MGD LAKE PONTCHARTRAIN CITY-WIDE HEAVY INTENSE RAIN EVENT CAUSING THE COLLECTION SYSTEM TO BE AT HIGH ALARM STATUS. SEVERE STREET FLOODING, GROUND SATURATION, AND HIGH WATER TABLE EXACERBATED THE INFLOW/INFILTRATION OF THE COLLECTION SYSTEM. PLANT'S HIGH FLOW/HEAVY RAIN PROCEDURES WERE IMPLEMENTED BEFORE THE RAIN EVENT. A HYDRAULIC PROFILE AND STUDY OF THE PLANT WAS PERFORMED IN 2010. A FEASIBILITY STUDY IS PRESENTLY BEING PEFORMED TO SELECT A TREATMENT PLANT UPGRADE OPTION. THE LPDES PERMIT APPLICATION FOR THE WETLANDS DISCHARGE WAS SUBMITTED TO THE LDEQ AND IS ADMINISTRATIVELY COMPLETE. AERATION BASINS 1 - 4, CLARIFIERS 3 - 4, EFFLUENT PUMP STATION 07/30/11 14:00 MANHOLE MANHOLE MANHOLE 08/15/11 16:19 08/26/11 10:10 09/05/11 10:48 LIFT STATION 09/03/11 11:42 7.307 MGD 210 50 1,800 2,000 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN CITY-WIDE HEAVY INTENSE RAIN EVENT DURING THE WEEK OF 7/25/11 CAUSED THE COLLECTION SYSTEM TO BE AT HIGH ALARM STATUS. GROUND SATURATION AND HIGH WATER TABLE EXACERBATED THE INFLOW/INFILTRATION OF THE COLLECTION SYSTEM. AERATION BASINS 1 - 4, CLARIFIERS 3 - 4, AND THE EFFLUENT PUMP STATION WERE OVERFLOWING. AT 9:30 AM, A PORTION OF THE PLANT'S TREATED AND DISINFECTED EFFLUENT WAS DIVERTED, FROM THE PERMITTED OUTFALL AT THE MISS. RIVER TO JEFFERSON PARISH DRAINAGE PLANT'S HIGH FLOW/HEAVY RAIN PROCEDURES WERE IMPLEMENTED BEFORE THE RAIN EVENT. THE DIVERSION VALVE WAS CLOSED AT 2:00 PM. A HYDRAULIC PROFILE AND STUDY OF THE PLANT WAS PERFORMED IN 2010. A FEASIBILITY STUDY IS PRESENTLY BEING PEFORMED TO SELECT A TREATMENT PLANT UPGRADE OPTION. THE LPDES PERMIT APPLICATION FOR THE WETLANDS DISCHARGE WAS SUBMITTED TO THE LDEQ AND IS ADMINISTRATIVELY COMPLETE. CANAL NO. 17, TO PREVENT PROPERTY/EQUIPMENT DAMAGE. LIFT STATION OUTAGE MECHANICAL REPRIMED PUMP. INSTALLED A DIESEL PUMP AT THE LIFT STATION OUTAGE MECHANICAL STATION. TWO, NEW REPLACEMENT PUMPS HAVE BEEN ORDERED. THE PUMPS HAVE A 30- DAY DELIVERY. HEAVY RAIN DUE TO TROPICAL THE DATE AND TIME COMPLETION STORM LEE IS WHEN THE LIFT STATION THE STATION EXPERIENCED AN ELECTRICAL SURGE THAT CAUSED ELECTRICAL SURGE DUE TO IT TO TRIP AND OVERFLOW. TROPICAL STORM LEE HOWEVER, THE STATION DID NOT TRANSFER TO GENERATOR POWER.. 2011 Page 16 Date Event Began Lift Station Sub Basin Start Time Reporting Address 09/03/11 PLANT 8:45 1 WEST 30TH STREET 09/03/11 LS 4313 10:15 2 ECHEZEAUX 09/03/11 LS 4313 10:15 16 MERCUREY 09/03/11 LS 4313 10:15 SYLVANER & CABERNET 09/03/11 LS 4323 10:40 #21 DAUTERIVE 09/03/11 PLANT 10:45 1 WEST 30TH STREET Location of Event Cleanout / Manhole / Lift Station Date Event Ended NORTH PLANT AERATION BASINS 1 - 4 TROUGH 09/05/11 MANHOLE 09/05/11 MANHOLE 09/05/11 MANHOLE 09/05/11 MANHOLE 09/05/11 SOUTH PLANT HEADWORKS 09/05/11 End Time Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 14:00 5:38 5:38 5:38 17:40 8:30 4,800,000 27,000 18,000 900 4,500 1,000,000 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAIN DUE TO TROPICAL STORM LEE HEAVY RAIN DUE TO TROPICAL STORM LEE WET WEATHER PLAN WAS IN PLACE BEFORE THE STORM. THE BLOWERS WERE TURNED OFF TO KEEP THE SOLIDS IN THE BASINS. THE OVERFLOW AREA WAS WASHED AND DISINFECTED THE WEEK OF 9/7/11. THE CITY HAS COMPLETED ITS FEASIBILITY STUDY FOR THE EFFLUENT PUMP STATION AND WASTEWATER PLANT IMPROVEMENTS. THE FINDINGS ARE BEING REVIEWED TO DETERMINE WHICH IMPROVEMENTS CAN BE PERFORMED BASED UPON THE AVAILABLE FUNDING. THE DATE AND TIME COMPLETION IS WHEN THE LIFT STATION RETURNED TO NORMAL WET WELL LEVEL. WASHED AND DISINFECTED OVERFLOW AREA THE WEEK OF 9/7/11. THE PUMPS FOR THE SYLVANER LIFT STATION ARE SCHEDULED TO BE UPGRADED. LAKE PONTCHARTRAIN HEAVY RAIN DUE TO TROPICAL STORM LEE THE DATE AND TIME COMPLETION IS WHEN THE LIFT STATION RETURNED TO NORMAL WET WELL LEVEL. WASHED AND DISINFECTED OVERFLOW AREA THE WEEK OF 9/7/11. THE PUMPS FOR THE SYLVANER LIFT STATION ARE SCHEDULED TO BE UPGRADED. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAIN DUE TO TROPICAL STORM LEE HEAVY RAIN DUE TO TROPICAL STORM LEE HEAVY RAIN DUE TO TROPICAL STORM LEE THE DATE AND TIME COMPLETION IS WHEN THE LIFT STATION RETURNED TO NORMAL WET WELL LEVEL. WASHED AND DISINFECTED OVERFLOW AREA THE WEEK OF 9/7/11. THE PUMPS FOR THE SYLVANER LIFT STATION ARE SCHEDULED TO BE UPGRADED. THE DATE AND TIME COMPLETION IS WHEN THE LIFT STATION RETURNED TO NORMAL WET WELL LEVEL. WASHED AND DISINFECTED OVERFLOW AREA THE WEEK OF 9/7/11. THE OVERFLOW AREA WAS WASHED AND DISINFECTED THE WEEK OF 9/7/11. THE CITY HAS COMPLETED ITS FEASIBILITY STUDY FOR THE EFFLUENT PUMP STATION AND WASTEWATER PLANT IMPROVEMENTS. THE FINDINGS ARE BEING REVIEWED TO DETERMINE WHICH IMPROVEMENTS CAN BE PERFORMED BASED UPON THE AVAILABLE FUNDING. 2011 Page 17 Date Event Began Lift Station Sub Basin Start Time Reporting Address 09/03/11 PLANT 10:45 1 WEST 30TH STREET 09/03/11 LS 4323 11:10 COCODRIE CT. & GRANDLAKE 09/03/11 LS 4202 12:00 4032 LAKE TRAIL 09/03/11 LS 4335 33RD & WILLIAMS (SE CORNER) 09/03/11 LS 4335 33RD & INDIANA 09/12/11 LS 4305 8:48 925 CHAMPAIGNE Location of Event Cleanout / Manhole / Lift Station EFFLUENT PUMP STATION MANHOLE MANHOLE MANHOLE MANHOLE FORCE MAIN Date Event Ended 09/05/11 09/05/11 09/05/11 09/07/11 09/07/11 09/14/11 End Time Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 14:00 17:40 10:49 2:45 2:45 8:30 3,000 4,500 7,200 108,000 7,200 2,000 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAIN DUE TO TROPICAL STORM LEE HEAVY RAIN DUE TO TROPICAL STORM LEE HEAVY RAIN DUE TO TROPICAL STORM LEE HEAVY RAIN DUE TO TROPICAL STORM LEE HEAVY RAIN DUE TO TROPICAL STORM LEE BROKEN FORCE MAIN THE EFFLUENT PUMP STATION WET WELL OVERFLOWED (APPROXIMATELY 3,000 GALLONS) ON 9/3/11 FROM 10:45 AM UNTIL 11:00 AM, AT WHICH TIME THE TREATED AND DISINFECTED EFFLUENT WAS DIVERTED FROM THE PERMITTED OUTFALL AT THE MISSISSIPPI RIVER TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE TOTAL EFFLUENT FLOW FOR 9/3/11 WAS 48 MGD, WHICH WAS 3.5 TIMES THE DESIGN CAPACITY OF THE PLANT. THE CITY HAS COMPLETED ITS FEASIBILITY STUDY FOR THE EFFLUENT PUMP STATION AND WASTEWATER PLANT IMPROVEMENTS. THE FINDINGS ARE BEING REVIEWED TO DETERMINE WHICH IMPROVEMENTS CAN BE PERFORMED BASED UPON THE AVAILABLE FUNDING. THE DATE AND TIME COMPLETION IS WHEN THE LIFT STATION RETURNED TO NORMAL WET WELL LEVEL. WASHED AND DISINFECTED OVERFLOW AREA THE WEEK OF 9/7/11. THE DATE AND TIME COMPLETION IS WHEN THE LIFT STATION RETURNED TO NORMAL WET WELL LEVEL. WASHED AND DISINFECTED OVERFLOW AREA THE WEEK OF 9/7/11. THE DATE AND TIME COMPLETION IS WHEN THE LIFT STATION RETURNED TO NORMAL WET WELL LEVEL. WASHED AND DISINFECTED OVERFLOW AREA THE WEEK OF 9/7/11. THE CITY COUNCIL APPROVED THE CONSTRUCTION OF THE LIFT STATION AND FORCE MAIN UPGRADE ON 10/6/11. CONSTRUCTION SHOULD BEGIN IN NOVEMBER. THE DATE AND TIME COMPLETION IS WHEN THE LIFT STATION RETURNED TO NORMAL WET WELL LEVEL. WASHED AND DISINFECTED OVERFLOW AREA THE WEEK OF 9/7/11. THE CITY COUNCIL APPROVED THE CONSTRUCTION OF THE LIFT STATION AND FORCE MAIN UPGRADE ON 10/6/11. CONSTRUCTION SHOULD BEGIN IN NOVEMBER. THE FORCE MAIN FROM THE MONTRACHET LIFT STATION BROKE AT THE REFERENCED ADDRESS. THE UTILITY LINES HAD TO BE MARKED AND A TREE HAD TO BE REMOVED BEFORE THE BROKEN FORCE MAIN SEGMENT COULD BE REPLACED (WORK ORDER 39004). CONSTRUCTION IS BEGINNING ON THE UPGRADE TO THIS LIFT STATION AND FORCE MAIN. 2011 Page 18 Date Event Began Lift Station Sub Basin Start Time Reporting Address 09/14/11 LS 4301 9:40 CHATEAU & NORMANDY 09/26/11 LS 4113 12:30 1410 HICKMAN 09/10/11 LS 4312 3416 OLE MISS 09/19/11 LS 4312 9:00 3416 OLE MISS 10/08/11 10/10/11 LS 4100 LS 4221 10:18 AIRPORT ACCESS RD. 7:31 #2 RUE DU JARDIN 10/11/11 LS 4339 14:18 #18 23RD ST. 10/19/11 LS 4112 14:42 2829 WILLIAMS BLVD. 10/22/11 N/A 11:00 1 WEST 30TH ST. 10/25/11 11/09/11 12/09/12 12/16/12 12/30/12 Total Overflows 2011 LS 4203 LS 4321 LS 4212 LS 4323 LS 4221 70 13:37 4340 WILLIAMS BLVD. 9:09 316 CLEMSON 12;21 3723 ARKANSAS 14:14 #20 EAST GRANDLAKE 14:00 #16 CHATEAU TRIANON Location of Event Cleanout / Manhole / Lift Station Date Event Ended MANHOLE 09/14/11 MANHOLE 09/26/11 FORCE MAIN 09/12/11 FORCE MAIN 09/21/11 FORCE MAIN MANHOLE 10/08/11 10/10/11 MANHOLE 10/11/11 MANHOLE 10/19/11 SOUTH PLANT RAS WELL 10/22/11 MANHOLE MANHOLE FORCE MAIN FORCE MAIN MANHOLE 10/25/11 11/09/11 12/09/12 12/16/12 12/30/12 End Time 10:17 14:00 12:00 9:30 10:45 8:06 14:48 15:00 11:15 14:48 9:45 13:32 14:30 14:45 Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 1,850 2,000 3,000 2,000 2,700 5 3,000 25 25 50 25 3,550 80 25 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN BRITTANY LIFT STATION OUTAGE LIFT STATION OUTAGE BROKEN FORCE MAIN BROKEN FORCE MAIN THE CONTACTORS FOR THE STARTER FOR BRITTANY LIFT STATION FAILED. THE CONTACTORS HAVE BEEN ORDERED. THE STATION'S PUMPS ARE WORN. NEW PUMPS HAVE BEEN ORDERED (4 - 6 WEEK DELIVERY). A DIESEL PUMP HAS BEEN INSTALLED AT THE STATION. THE OVERFLOW AREA WAS WASHED AND DISINFECTED. THE JOHN HOPKINS AND OLE MISS ASBESTOS CEMENT FORCE MAIN BROKE AT THE ENTRANCE TO THE NEW 35TH AND OLE MISS LIFT STATION. THE UTILITY LINES HAD TO BE MARKED BEFORE THE FORCE MAIN WAS REPAIRED (WORK ORDER 39003). 3416 WAS THE CLOSEST ADDRESS TO THE BREAK. THE JOHN HOPKINS AND OLE MISS ASBESTOS CEMENT FORCE MAIN BROKE NEAR 3416 OLE MISS, WHICH IS THE CLOSEST ADDRESS TO THE BREAK. THE FORCE MAIN WAS REPAIRED (WORK ORDER 39061). DUE TO A RAIN EVENT ON 9/19/11, THE REPAIR COULD NOT BE MADE UNTIL 9/21/11. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN BROKEN FORCE MAIN LIFT STATION OUT REPAIRED FORCE MAIN - WO 39197 PULLED UP FLOATS LAKE PONTCHARTRAIN LIFT STATION OUT THE STATION'S PUMPS LOST PRIME CAUSING THE LOWEST MANHOLE IN THE SUB-BASIN TO OVERFLOW. THE PUMPS WERE RE-PRIMED. LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED DOWN AREA LAKE PONTCHARTRAIN DURING THE CLEANING OF THE SOUTH PLANT NORTH AERATION BASIN/CLARIFIER TANK, THE RAS WELL OVERFLOWED. 25 GALLONS REACHED THE STORM DRAIN BEFORE THE REMAINING VOLUME WAS VACUUMED. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE BLOCKAGE BROKEN FORCE MAIN BROKEN FORCE MAIN LIFT STATION OUT WASHED DOWN AREA UNBLOCKED LINE AND WASHED AREA REPAIRED FORCE MAIN -WO 39424 REPAIRED FORCE MAIN -WO 39445 ENTERGY ELECTRICAL OUTAGE. ELECTRICAL LINE WAS REPAIRED. 2011 Page 19 Year 2012 CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Date Event Began 01/02/12 01/04/12 01/20/12 02/17/12 02/18/12 02/19/12 02/26/12 02/26/12 03/12/12 03/13/12 03/17/12 03/21/12 03/21/12 03/21/12 Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended LS 4209 LS 4321 13:05 3600 WILLIAMS BLVD. 13:12 316 CLEMSON MANHOLE MANHOLE 01/02/12 01/04/12 LS 4436 13:30 JEFFERSON PARISH SOUTH CANAL BANK AT 30TH AND UTAH FORCE MAIN AIR RELEASE VALVE 01/20/12 LS 4336 11:45 CANAL NO. 13 CROSSING 30TH ST. TREATMENT PLANT LS 4313 19:00 #1 WEST 30TH ST. 7:32 #2 MOSELLE DR. FORCE MAIN 02/22/12 AERATION BASIN 14 MANHOLE 02/20/12 02/19/12 LS 4227 11:02 1600 JOE YENNI MANHOLE 02/26/12 LS4318 LS 4206 LS 4209 13:25 ST JUDE LIFT STATION 8:59 4233 ARIZONA 16:45 WILLIAMS AND DRIFTWOOD LIFT STATION MANHOLE MANHOLE 02/26/12 03/12/12 03/13/12 LS 4310 19:50 3281 GLEN EAGLE MANHOLE 03/23/12 LS 4320 9:25 3301 TULANE MANHOLE 03/25/12 LS 4321 15:00 DUKE AND TRINITY LS LIFT STATION 03/21/12 TREATMENT PLANT 19:00 #1 WEST 30TH ST. AERATION BASIN 1- 03/23/12 4 End Time 13:40 14:04 17:00 17:45 19:00 7:45 11:38 19:15 10:18 17:48 20:15 3:00 15:30 19:00 Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 5 50 2,000 80 UNKNOWN 5 25 8,750 25 3,150 2,500 1,000 1,000 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE UNBLOCKED & WASHED OUT THE LINE MAIN LINE BLOCKAGE UNBLOCKED & WASHED OUT THE LINE JEFFERSON PARISH DRAINAGE DEPT. GRASS CUTTER HIT THE REPAIRED AIR RELEASE VALVE AND VALVE PIT AIR RELEASE VALVE PIT COVER COVER. AND DAMAGED AIR RELEASE VALVE A TEMPORARY REPAIR OF THE 33RD AND CONNECTICUT FORCE MAIN WAS PERFORMED FORCE MAIN SEEPAGE ON 2/17/12, WITHIN 2 HRS. A PERMANENT REPAIR MADE ON 2/22/12, AS SOON AS PARTS WERE AVAILABLE. HEAVY RAIN FALL ON 02/18/2012 IN THE PROCESS OF DESIGNING A PLANT EXPANSION MANHOLE OVERFLOW MANHOLE OVERFLOWED DUE TO HEAVY RAIN ON 02/18/2012. AREA WAS WASHED. THERE WAS AN OUTAGE AT THE CONVENTION MANHOLE OVERFLOW CENTER LIFT STATION. THE PUMPS WERE RESET, AND THE STATION WAS RETURNED TO SERVICE. PUMP PROBLEMS AT ST. JUDE CALLED MECHANIC. THE STATION WAS LIFT STATION RETURNED TO SERVICE AT 7:15 P.M. MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND SANITIZED AREA. MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND SANITIZED AREA. ONE PUMP WAS OUT OF SERVICE FOR REPAIR. THE PUMP IN SERVICE BECAME CLOGGED. THE LIFT STATION OUTAGE PUMP WAS REPAIRED AND RE-INSTALLED ON 4/11/12; HOWEVER, THE PUMP HAD AN ADDITIONAL ISSUE AND WAS RETURNED TO THE REPAIR SHOP. HEAVY RAIN FALL FROM 3/21/12 - WASHED AND SANITIZED OVERFLOW AREA. 3/23/12 (7.21 INCHES) PUMP 1 RAN CONTINUOUSLY FROM 3:00 PM ON 3/21/12 TO 5:00 AM ON 3/26/12. PERSONNEL HEAVY RAIN FALL FROM 3/21/12 - VERIFIED PUMP 2'S OPERATION; HOWEVER, THE 3/23/12 (7.21 INCHES) SCADA DID NOT REGISTER THE PUMP'S RUN TIME. THE OVERFLOW AREA WAS WASHED AND SANITIZED. 2.3 MILLION LAKE PONTCHARTRAIN THE PLANT'S WET WEATHER OPERATION PLAN WAS IMPLEMENTED PRIOR TO THE RAIN EVENT. THE DIGESTERS WERE LOWERED TO HANDLE HEAVY RAIN FALL FROM 3/21/12 - POTENTIAL OVERFLOW FROM THE AERATION 3/23/12 (7.21 INCHES), BASINS. THE LAST ROW OF AERATORS WERE COLLECTION SYSTEM I&I, AND TURNED OFF TO ALLOW SOLIDS TO SETTLE IN 12 UPGRADED LIFT STATIONS THE TANK. IN ADDITION, THE PLANT'S AND 6 UPGRADED FORCE MAINS TREATED AND DISINFECTED EFFLUENT WAS WERE THE ROOT CAUSES OF DIVERTED FROM THE PERMITTED OUTFALL AT PLANT OVERFLOW. THE MISSISSIPPI RIVER SEGMENT 0703 TO UPGRADED STATIONS AND JEFFERSON PARISH DRAINAGE CANAL NO. 17, FORCE MAINS TRANSPORTS IN AN EFFORT TO REDUCE THE VOLUME IN THE THE RAIN DILUTED AERATION BASINS AND CLARIFIERS. THE CITY WASTEWATER TO THE PLANT IS IN THE PROCESS OF DESIGNING A PLANT MUCH FASTER. EXPANSION, WHICH INCLUDES AN UPGRADE TO THE EFFLUENT PUMP STATION AND A FORCE MAIN TO DISCHARGE THE TREATED EFFLUENT TO THE LE BRANCHE WETLANDS. 2012 Page 20 Date Event Began 03/22/12 03/22/12 03/22/12 03/22/12 03/23/12 03/23/12 03/23/12 03/23/12 03/23/12 03/23/12 Lift Station Sub Basin LS 4313 LS 4320 LS 4313 LS 4209 LS 4342 LS 4332 LS 4335 LS 4307 LS 4307 LS 4307 Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station 7:32 #2 MOSELLE DR. MANHOLE 10:00 KILGORE AND TRINITY LS LIFT STATION 8:00 SYLVANER LS LIFT STATION 14:30 WILLIAMS AND DRIFTWOOD 2314 DAWSON MANHOLE MANHOLE 2913 TENNESSEE MANHOLE 33RD AND WILLIAMS 3500 E. LOYOLA 3533 E. LOYOLA 3609 E. LOYOLA MANHOLE MANHOLE MANHOLE MANHOLE Date Event Ended 03/23/12 03/22/12 03/22/12 03/23/12 03/23/12 03/24/12 03/23/12 03/23/12 03/23/12 End Time 18:00 10:30 8:30 7:00 Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 3,000 1,000 1,000 5,000 500 200 10,000 100 100 100 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN THE SYLVANER LS HAD ONE PUMP OUT OF SERVICE FOR REPAIR. THE PUMP IN SERVICE RAN CONTINUOUSLY FROM 8:00 AM ON 3/22/12 HEAVY RAIN FALL FROM 3/21/12 - TO 6:00 PM ON 3/23/12. THE PUMP WAS 3/23/12 (7.21 INCHES) REPAIRED AND RETURNED TO SERVICE ON 4/11/12. THE CITY IS IN THE PROCESS OF UPGRADING THE PUMPING CAPACITY OF THE STATION. THE OVERFLOW AREA WAS WASHED AND SANITIZED ON 3/26/12. BOTH PUMPS RAN CONTINUOUSLY FROM 10:00 HEAVY RAIN FALL FROM 3/21/12 - AM ON 3/22/12 TO 3:00 AM ON 3/25/12. THE 3/23/12 (7.21 INCHES) OVERFLOW AREA WAS WASHED AND SANITIZED. THE SYLVANER LS HAD ONE PUMP OUT OF SERVICE FOR REPAIR. THE PUMP IN SERVICE RAN CONTINUOUSLY FROM 8:00 AM ON 3/22/12 HEAVY RAIN FALL FROM 3/21/12 - TO 6:00 PM ON 3/23/12. THE PUMP WAS 3/23/12 (7.21 INCHES) REPAIRED AND RETURNED TO SERVICE ON 4/11/12. THE CITY IS IN THE PROCESS OF UPGRADING THE PUMPING CAPACITY OF THE STATION. THE OVERFLOW AREA WAS WASHED AND SANITIZED. HEAVY RAIN FALL FROM 3/21/12 - BOTH PUMPS AT GELPI AND OSBORNE LIFT 3/23/12 (7.21 INCHES) STATION RAN CONTINUOUSLY FROM 10:00 AM ON 3/22/12 TO 1:00 AM ON 3/25/12. HEAVY RAIN FALL FROM 3/21/12 - BOTH PUMPS RAN CONTINUOUSLY FROM 3/23/12 (7.21 INCHES) MIDNIGHT TO 7:00 AM ON 3/23/12. THE BOTH PUMPS RAN CONTINUOUSLY FROM 1:00 PM ON 3/23/12 TO 6:00 AM ON 3/24/12. HEAVY RAIN FALL FROM 3/21/12 - PERSONNEL VERIFIED THE OPERATION OF 3/23/12 (7.21 INCHES) PUMP 2 EVEN THOUGH THE SCADA DID NOT REGISTER ITS OPERATION. THE OVERFLOW AREA WAS WASHED AND SANITIZED. THIS STATION IS BEING UPGRADED AND IS UNDER CONSTRUCTION. THE STATION IS HEAVY RAIN FALL FROM 3/21/12 - CURRENTLY RUNNING ON BYPASS PUMPS; 3/23/12 (7.21 INCHES) HOWEVER, THE DISCHARGE LINES FOR THESE PUMPS HAVE NOT BEEN CONNECTED TO THE NEW UPGRADED FORCE MAIN. AREA WAS WASHED AND SANITIZED. HEAVY RAIN FALL FROM 3/21/12 - ALL AVAILABLE PUMPS WERE IN OPERATION. 3/23/12 (7.21 INCHES) AREA WAS WASHED AND SANITIZED. HEAVY RAIN FALL FROM 3/21/12 - ALL AVAILABLE PUMPS WERE IN OPERATION. 3/23/12 (7.21 INCHES) AREA WAS WASHED AND SANITIZED. HEAVY RAIN FALL FROM 3/21/12 - ALL AVAILABLE PUMPS WERE IN OPERATION. 3/23/12 (7.21 INCHES) AREA WAS WASHED AND SANITIZED. 03/23/12 LS 4307 4077 TULANE MANHOLE 03/23/12 1,000 LAKE PONTCHARTRAIN THE PUMPS RAN CONTINUOUSLY FROM 1:00 AM HEAVY RAIN FALL FROM 3/21/12 - TO 9 PM ON 3/23/12, FROM NOON TO 8:00 PM ON 3/23/12 (7.21 INCHES) 3/24/12, AND FROM 11:00 AM TO MIDNIGHT ON 3/25/12. 2012 Page 21 Date Event Began Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended End Time Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 03/23/12 LS 4324 23 DAUTERIVE MANHOLE 03/23/12 03/26/12 LS 4313 9:54 2 MOSELLE 03/31/12 LS 4313 2 MOSELLE MANHOLE 03/26/12 10:12 MANHOLE 03/31/12 04/03/12 LS 4201 8:27 5332 COCOS PLUMOSAS MANHOLE 04/03/12 9:37 04/04/12 PLANT 4:00 1 WEST 30TH STREET TROUGH FOR AERATION BASINS 1 - 4 04/06/12 7:00 CREW MAN OBSERVED THAT THE MANHOLE 100 LAKE HEAVY RAIN FALL FROM 3/21/12 - HAD OVERFLOWED. THEY RAKED THE SOLIDS PONTCHARTRAIN 3/23/12 (7.21 INCHES) INTO THE MANHOLE AND WASHED AND SANITIZED THE AREA. 10 1,520 2.25 MGD LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAIN FALL FROM 3/21/12 - WASHED AND SANITIZED OVERFLOW AREA 3/23/12 (7.21 INCHES) AFTER OVERFLOW ON 3/23/12. THE SYLVANER LS HAD ONE PUMP OUT OF SERVICE FOR REPAIR. THE PUMP WAS REPAIRED AND RETURNED TO SERVICE ON LIFT STATION OUTAGE 4/11/12. THE CITY IS IN THE PROCESS OF UPGRADING THE PUMPING CAPACITY OF THE STATION. THE OVERFLOW AREA WAS WASHED AND SANITIZED ON 3/26/12. ONE LIFT STATION PUMP HAD A BLOCKAGE, AND THE SECOND THE TECHNICIAN REMOVED THE BLOCKAGE PUMP WAS OUT OF SERVICE FROM THE PUMP. THE AREA WAS WASHED AND FOR REPLACEMENT. THERE IS SANITIZED. A 4-WEEK DELIVERY PERIOD FOR THE NEW PUMP. THE PLANT'S WET WEATHER OPERATION WAS ENACTED BEFORE THE RAIN EVENT, WHEREBY THE LAST ROW OF AERATORS IN THE AERATION BASINS IS TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE TANKS, SO THAT THEY ARE NOT THE OVERFLOW WAS DUE TO DISCHARGED OVER THE WALLS. DIGESTERS RAIN THE PREVIOUS WEEK AND NOS. 2 AND 3 WERE LOWERED TO REDUCE ANY LIGHT RAIN THE PREVIOUS 2 POTENTIAL OVERFLOWS FROM THE AERATION DAYS CAUSING SATURATED BASINS. DUE TO THE INCREASED FLOW GROUND CONDITIONS THROUGH THE PLANT FROM THE RAIN EVENT, FOLLOWED BY EXCESSIVE RAIN THE TREATED AND DISINFECTED EFFLUENT ON 4/4/12 (3.22 INCHES). DUE TO DISCHARGE FROM THE PLANT'S EFFLUENT THE INFLOW/INFILTRATION IN PUMP STATION WAS DIVERTED FROM THE THE CITY'S COLLECTION PERMITTED OUTFALL AT THE MISSISSIPPI SYSTEM, THE RAIN INUNDATED RIVER TO JEFFERSON PARISH DRAINAGE THE SYSTEM AND CANAL NO. 17, IN ORDER TO LOWER THE SUBSEQUENTLY THE PLANT. LEVELS IN THE AERATION BASINS AND CLARIFIERS, AND TO PREVENT PROPERTY DAMAGE FROM THE AERATION BASIN TROUGH OVERFLOW. THE DIVERSION OCCURRED FROM 8:45 AM ON 4/4/12 TO 7:00 AM ON 4/6/12. LDEQ PERSONNEL WERE NOTIFIED OF THE DIVERSION VIA 2012 Page 22 Date Event Began Lift Station Sub Basin Start Time Reporting Address 04/04/12 LS 4311 9:40 3212 CASTLE DRIVE 04/04/12 04/04/12 04/04/12 04/11/12 05/09/12 05/10/12 05/15/12 05/22/12 LS 4335 33RD AND WILLIAMS LS 4313 LS4311 LS4102 LS4339 LS4210 LS4303 LS4333 16:05 2 MOSELLE DRIVE 3208 CASTLE DRIVE 8:43 #34 E. 3RD STREET 10:13 22ND & GREENWOOD 12:00 3640 DELAWARE 11:21 901 SUNSET AVENUE 13:09 2909 IOWA AVENUE Location of Event Cleanout / Manhole / Lift Station Date Event Ended MANHOLE 04/04/12 MANHOLE 04/04/12 MANHOLE MANHOLE DRAINAGE CANAL MANHOLE 04/04/12 04/04/12 04/11/12 05/09/12 MANHOLE 05/10/12 MANHOLE MANHOLE 05/15/12 05/22/12 End Time Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 9:55 16:13 9:45 10:39 13:33 11:53 14:13 100 36,000 1,200 120 100 5 5 200 100 LAKE PONTCHARTRAIN HEAVY RAIN EVENT. ONE THE MOTORS BURNED UP. SUBMITTAL OF AN ONLINE INCIDENT REPORT ON THE LDEQ WEBSITE. PRIOR TO THE DIVERSION, THE NORTH SIDE OF THE PLANT SITE WAS FLOODED DUE TO THE OVERFLOW OF CANAL NO. 17, WHICH WAS CAUSED BY ISSUES WITH THE JEFFERSON PARISH DRAINAGE PUMP STATION. SOURCES OF I&I IN THE COLLECTION SYSTEM ARE BEING IDENTIFIED AND CORRECTED THROUGH SANITARY SEWER EVALUATION SURVEYS. THE CITY HAS UPGRADED 12 LIFT STATIONS AND 6 FORCE MAINS. THESE UPGRADED LIFT STATIONS NOW TRANSPORT THE WASTEWATER TO THE PLANT MORE RAPIDLY, WHICH LEADS TO PLANT OVERFLOWS DURING MODERATE TO HEAVY RAIN EVENTS. THE CITY IS CURRENTLY IN THE DESIGN STAGE FOR THE UPGRADE OF NUMEROUS LIFT STATIONS AND FORCE MAINS. FURTHERMORE, THE CITY IS PRESENTLY IN THE DESIGN STAGE OF ANOTHER PLANT EXPANSION, WHICH WILL PROVIDE FOR UPGRADED TREATMENT AND DISCHARGE CAPACITY AND FOR DISCHARGE OF 10 MGD TO THE WETLANDS. OF THE MOTOR WAS REPLACED ON 4/4/12 AND THE AREA WAS WASHED & SANITIZED. LAKE PONTCHARTRAIN HEAVY RAIN EVENT. THIS STATION'S UPGRADE IS UNDER CONSTRUCTION. THE BYPASS THE AREA WAS WASHED AND SANITIZED. PUMPS WERE NOT CONNECTED TO THE NEW FORCE MAIN. LAKE LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAIN EVENT. THIS HEAVY RAIN EVENT. ONE THE MOTORS BURNED UP. MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE THIS STATION IS BEING UPGRADED TO PUMP OF THE MOTOR WAS REPLACED ON 4/4/12 AND THE AREA WAS WASHED & SANITIZED. THE AREA WAS WASHED AND SANITIZED. UNBLOCKED LINE AND WASHED AND SANITIZED AREA LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND SANITIZED AREA. WO 40022 TO VACUUM OUT M/H LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND SANITIZED AREA UNBLOCKED LINE AND WASHED AND SANITIZED AREA 2012 Page 23 Date Event Began Lift Station Sub Basin Start Time Reporting Address 06/18/12 LS4339 11:38 #14 23RD STREET 07/01/12 07/07/12 LS4224 LS4312 20:08 3341 CANNES PLACE 9:30 3414 OLE MISS 07/19/12 N/A 5:00 1 WEST 30TH STREET 07/19/12 07/19/12 07/20/12 07/22/12 07/23/12 LS4110 LS4206 LS4224 LS4310 LS4339 14:08 2216 27TH STREET 14:45 1705 42ND STREET 16:23 1033 SOUTH BAYOU RD. 9:00 3281 GLEN EAGLE 8:55 #14 23RD STREET 07/25/12 07/30/12 07/30/12 07/31/12 LS4339 LS4207 LS4209 LS4107 6:35 #14 23RD STREET 12:05 5216 TOBY LANE 14:03 WILLIAMS & DRIFTWOOD 8:50 2425 W. METAIRIE Location of Event Cleanout / Manhole / Lift Station Date Event Ended MANHOLE 06/18/12 MANHOLE FORCE MAIN 07/01/12 07/07/12 AERATION BASINS 1 - 4 TROUGH 07/19/12 FORCE MAIN MANHOLE MANHOLE LIFT STATION 07/19/12 07/19/12 07/20/12 07/22/12 LIFT STATION 07/23/12 LIFT STATION 07/25/12 MANHOLE MANHOLE MANHOLE 07/30/12 07/30/12 07/31/12 End Time Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 12:26 20:51 9:45 7:00 14:27 15:30 16:50 9:27 9:16 7:03 12:33 14:46 9:32 100 25 50 125,000 5 50 175 325 100 100 25 125 25 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LIFT STATION OUTAGE DUE TO GREASE DISCHARGE MAIN LINE BLOCKAGE FORCE MAIN LEAKING JACKSON GREASE TRAP SERVICE HAS HAD A PROBLEM WITH GREASE DISCHARGES. IN MAY 2012, THE CITY ISSUED THE FACILTY AN ADMINISTRATIVE ORDER REQUESTING WRITTEN PROCEDURES ON THE OPERATION OF THEIR TREATMENT SYSTEM AND EVALUATIONS AS TO WHETHER A GREASE TRAP NEEDED TO BE INSTALLED IN THE DISCHARGE PIPE OF THE FLOOR DRAIN IN THEIR TREATMENT AREA AND IN THE DISCHARGE PIPE FROM THEIR TREATED EFFLUENT HOLDING TANK. IN RESPONSE TO THE ADMINISTRATIVE ORDER, THE FACILITY INSTALLED NEW TREATMENT EQUIPMENT, WHICH IS BEING TESTED. THE GREASE DISCHARGE FROM THEIR FACILITY CAUSED THE LIFT STATION FLOATS TO NOT OPERATE. THE GREASE WAS REMOVED FROM THE FLOATS AND THE STATION'S WET WELL WAS PUMPED DOWN. JACKSON GREASE TRAP SERVICE REMOVED THE REMAINING GREASE IN THE WET WELL. JACKSON GREASE TRAP SERVICE VACUUMS THE CITY'S LIFT STATION WET WELL TO WHICH ITS FACILITY'S WASTEWATER DISCHARGE FLOWS. JACKSON ALSO VACUUMS THE DOWNSTREAM LIFT STATION WET WELL. WASHED LINE AND SANITIZED AREA REPAIRED FORCE MAIN (WO 40286) LAKE PONTCHARTRAIN PERIODIC OVERLAPPING OF THE TROUGH FOR AERATION BASINS NOS. 1-4, DUE TO HIGH FLOW CONDITIONS FROM EXTENSIVE RAIN AND COLLECTION SYSTEM INFLOW-INFILTRATION AN ON-LINE INCIDENT REPORT WAS FILED ON 7/20/12. THE AREA WAS CLEANED. PLANT HYDRAULIC IMPROVEMENTS (UPGRADE) ARE CURRENTLY BEING DESIGNED. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN FORCE MAIN BROKEN MAIN LINE BLOCKAGE MANHOLE SURCHARGED LIFT STATION OUTAGE LIFT STATION OUTAGE DUE TO AN EXCESSIVE GREASE DISCHARGE INTO THE LIFT STATION. LIFT STATION OUTAGE DUE TO AN EXCESSIVE GREASE DISCHARGE INTO THE LIFT STATION. MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE REPAIRED FORCE MAIN (WO 40329) WASHED LINE AND SANITIZED AREA SYSTEM SURCHARGED DUE TO HEAVY RAIN WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA AND VACUUMED WET WELL. WASHED AND SANITIZED AREA WASHED LINE. HOWEVER, UNABLE TO WASH DOWN AREA DUE TO TRAFFIC. LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 2012 Page 24 Date Event Began 07/31/12 08/19/12 08/20/12 08/20/12 08/20/12 08/21/12 08/23/12 08/23/12 08/23/12 08/30/12 08/30/12 08/30/12 08/30/12 08/31/12 08/31/12 09/01/12 09/01/12 Lift Station Sub Basin N/A N/A LS4339 LS4313 LS4311 LS4311 LS4332 LS4332 LS4332 LS4302 LS4311 N/A LS4303 LS4324 LS306 LS4314 LS4320 Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended 1 W. 30TH PLANT MANHOLE 08/03/12 8:00 1 W. 30TH PLANT AERATION BASIN TROUGH 08/19/12 8:41 2321 SALEM 11:45 #2 MOSELLE 15:53 3208 CASTLE DR 9:19 3208 CASTLE DR 18:00 3412 DAVID DRIVE 18:00 3508 DAVID DRIVE 18:00 3617 DAVID DRIVE 13:00 4261 LOIRE 10:30 909 CAMERON COURT MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE 08/20/12 08/20/12 08/20/12 08/21/12 08/23/12 08/23/12 08/23/12 08/30/12 LIFT STATION 08/30/12 15:00 1 WEST 30TH PLANT EFFLUENT PUMP STATION 08/30/12 21:30 42ND AND WILLIAMS MANHOLE 23:35 #23 DAUTERIVE 23:40 E. LOYOLA & E. STANFORD 12:20 141 WOODLAKE BOULEVARD 14:07 3269 TULANE DRIVE MANHOLE MANHOLE MANHOLE MANHOLE 08/31/12 09/01/12 09/01/12 09/01/12 09/01/12 End Time Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 19:00 9:09 11:54 16:00 9:30 19:00 19:00 19:00 13:15 11:00 21:05 16:00 12:00 12:05 12:45 15:00 750 85,000 25 20 N/A 25 75 75 75 100 3,000 3.78 MGD 20,000 625 125 125 50 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN INFLUENT FLOW SURGES AT THE PLANT FLOWED INTO THE GRIT CHAMBER, WHICH WAS DRAINED FOR REPAIRS. THE DRAIN LINE FOR THE GRIT CHAMBER WAS BROKEN IN THE OPEN POSITION. INTERMITTENT OVERFLOW OF THE MANHOLE OCCURRED UNTIL THE INFLUENT FLOW DECREASED. AERATION BASINS NOS. 1-4 TROUGH LIFT STATION OUT HEAVY RAINFALL HEAVY RAINFALL HEAVY RAINFALL HEAVY RAINFALL HEAVY RAINFALL HEAVY RAINFALL POWER OUTAGE DUE TO HURRICANE ISAAC POWER OUTAGE DUE TO HURRICANE ISAAC CAUSED FAILURE OF THE DRY WELL SUMP PUMP. THE DRY WELL FLOODED, DAMAGING THE MOTORS. THE EMERGENCY GENERATOR FOR THE EFFLUENT PUMP STATION RAN OUT OF FUEL. THE TREATED AND DISINFECTED EFFLUENT WAS DIVERTED FROM THE PERMITTED OUTFALL AT THE MISSISSIPPI RIVER TO JEFFERSON PARISH DRAINAGE CANAL NO. 17, IN ORDER TO PREVENT PROPERTY AND EQUIPMENT DAMAGE. POWER OUTAGE DUE TO HURRICANE ISAAC CAUSED THE MOTOR SOFT STARTS TO FAIL. THE DRAIN VALVE WAS REPAIRED. THE OVERFLOW WAS CLEANED. THE OPERATIONS STAFF IMPLEMENTED THE WET WEATHER PROCEDURE BY: LOWERING THE LEVELS IN DIGESTERS NOS. 2 AND 3 TO HANDLE ANY POTENTIAL OVERFLOWS FROM THE AERATION BASINS; TURNED OFF THE LAST ROW OF AERATORS IN THE AERATION BASINS IN ORDER TO RETAIN SOLIDS; DIVERTED MAXIMUM FLOW TO AERATION BASINS 5 AND 6. AREA WAS WASHED AND SANITIZED WASHED AND SANITIZED AREA UNABLE TO WASH DOWN (WILL RETURN IN MORNING WASHED OUT LINE & SANITIZED AREA REPAIRED PUMP CONTROL REPAIRED PUMP CONTROL REPAIRED PUMP CONTROL VACUUMED MANHOLE TO PROVIDE RELIEF. VACUUMED THE WET WELL AND THE DRY WELL AT THE LIFT STATION UNTIL THE MOTORS AND PUMP ROTATING ASSEMBLIES COULD BE REPLACED. THE OPERATIONS STAFF IMPLEMENTED THE WET WEATHER PROCEDURE BY: LOWERING THE LEVELS IN DIGESTERS NOS. 2 AND 3 TO HANDLE ANY POTENTIAL OVERFLOWS FROM THE AERATION BASINS; TURNED OFF THE LAST ROW OF AERATORS IN THE AERATION BASINS IN ORDER TO RETAIN SOLIDS; DIVERTED MAXIMUM FLOW TO THE AERATION BASINS 5 AND 6. REPLACED MOTOR SOFT STARTS THAT WERE DAMAGED BY POWER OUTAGE. LAKE PONTCHARTRAIN POWER OUTAGE DUE TO HURRICANE ISAAC VACUUMED WET WELLS UNTIL A GENERATOR COULD BE PLACED AT THIS STATION. LAKE PONTCHARTRAIN POWER OUTAGE DUE TO HURRICANE ISAAC WASHED DOWN & SANITIZED AREA LAKE PONTCHARTRAIN POWER OUTAGE DUE TO HURRICANE ISAAC WASHED DOWN & SANITIZED AREA LAKE PONTCHARTRAIN POWER OUTAGE DUE TO HURRICANE ISAAC WASHED DOWN & SANITIZED AREA 2012 Page 25 Date Event Began Lift Station Sub Basin 09/01/12 09/01/12 09/01/12 09/05/12 LS4305 LS4310 LS4311 LS4306 09/07/12 09/09/12 09/10/12 LS4340 LS4227 09/19/12 LS4200 09/24/12 LS4312 10/03/12 N/A 10/08/12 N/A 11/20/12 11/27/12 12/17/13 Total Overflows 2012 LS4209 LS4310 LS4112 83 Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended 15:21 3600 CHATEAU BOULEVARD LIFT STATION 16:09 3286 VALMONT MANHOLE 20:50 3208 CASTLE DRIVE MANHOLE 10:18 E. LOYOLA & 41ST STREET FORCE MAIN 09/01/12 09/01/12 09/01/12 09/05/12 12:30 1 WEST 30TH STREET PLANT RAS WELL 09/07/12 14:13 2841 LOYOLA DRIVE 12:09 1600 JOE YENNI 17:01 1200 38TH STREET 7:15 3306 OLE MISS MANHOLE 09/09/12 MANHOLE GRAVITY PIPE FROM INFLUENT FORCE MAIN TROUGH TO WET WELL FORCE MAIN 09/10/12 09/24/12 1 WEST 30TH STREET MANHOLE 10/03/12 1 WEST 30TH STREET CLEANOUT 10/08/12 9:15 WILLIAMS & DRIFTWOOD 22:27 HOLLY HEIGHTS & SAXONY 21:00 2829 WILLIAMS MANHOLE LIFT STATION MANHOLE 11/20/12 11/27/12 12/17/13 End Time Duration (hr:min) Possible Receiving Surface volume of event (gallons) Water Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 15:58 16:34 21:10 11:40 15:03 12:35 8:36 9:58 23:25 21:26 N/A LAKE POWER OUTAGE DUE TO PONTCHARTRAIN HURRICANE ISAAC 30 LAKE POWER OUTAGE DUE TO PONTCHARTRAIN HURRICANE ISAAC 500 LAKE HEAVY RAINFALL DUE TO ON 9/11/12, NOTICED SPILL HAD ALREADY BEEN PONTCHARTRAIN HURRICANE ISAAC CLEANED UP 8,200 LAKE PONTCHARTRAIN 800 LAKE PONTCHARTRAIN 100 LAKE PONTCHARTRAIN BROKEN FORCE MAIN RAS PUMP OPERATION MALFUNCTION MAIN LINE BLOCKAGE REPAIRED FORCE MAIN - WO 40451 THE RAS PUMPS WERE RUNNING; HOWEVER, THE WELL WAS HIGH. OPERATIONS PERSONNEL TRIED TO REPRIME THE PUMPS, BUT TO NO AVAIL. THEY REMOVED THE PUMPS FOR REPAIR AND CONNECTED A DIESEL PUMP TO OPERATE THE STATION. THE PUMPS WERE RETURNED INTO OPERATION ON THE SAME DAY. WASHED DOWN & SANITIZED AREA 100 7000 SEWERAGE - 20 SLUDGE 50 14,857 125 LAKE PONTCHARTRAIN CONTAINED IN EARTHEN PIT CREATED BY THE LEAKING PIPE LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LIFT STATION OUT PUMPED WELL DOWN, SPRAYED FLOATS DIFFERENTIAL SOIL SETTLING AGGRAVATED BY SATURATED GROUND CONDITIONS FROM HURRICANE ISAAC BLD SERVICES (CITY CONTRACTOR) REPLACED AND REPAIRED THE PIPE. DUE TO THE CONDITION OF THE REMAINING PIPE, THE CITY IS INVESTIGATING THE POSSIBILITY OF LINING THE REMAINING PORTION OF THE EXISTING PIPE. BROKEN FORCE MAIN REPAIRED FORCE MAIN - WO 40484 TWO OF THE THREE IN-PLANT LIFT STATION PUMPS FAILED. PUMP 1 EXPERIENCED A SEAL FAILURE AND PUMP 2 EXPERIENCED A CHECK VALVE FAILURE THE PLUG IN THE NORTH PLANT NORTH GRIT CHAMBER DRAIN CLEANOUT STAND PIPE BLEW OUT. IN ORDER FOR A NEW PLUG TO BE INSTALLED THE GRIT CHAMBER HAD TO BE DRAINED. APPROX. 75% OF THE GRIT CHAMBER VOLUME OVERFLOWED IN THE IN-PLANT LIFT STATION SYSTEM. IN ORDER TO LESSEN THE OVERFLOW VOLUME, THE BELT PRESS FILTRATE FEED WAS SHUT DOWN COMPLETELY, UNTIL THE WET WELL LEVEL RETURNED TO NORMAL. TEN 5-GALLON BUCKETS OF SLUDGE WERE REMOVED FROM THE STORM DRAIN AND DISPOSED. IN-PLANT LIFT STATION PUMP 1 WAS REPAIRED AND REINSTALLED ON 10/31/12. PUMP 2 WAS REPAIRED AND RETURNED TO SERVICE ON 10/4/2. PUMP 3 WAS DISCONNECTED ON 11/6/12 AND IS BEING REHABILITATED. WEEKLY CLEANING OF THE WET WELL IS BEING PERFORMED UNTIL ALL OF THE PUMPS HAVE BEEN REHABILITATED. FLOW TO THE GRIT CHAMBER WAS SHUT OFF. ON 10/25/12 AND 10/26/12, THE NORTH PLANT NORTH GRIT CHAMBER VALVE AND THE NORTH PLANT SOUTH GRIT CHAMBER VALVE WERE REPLACED. MAIN LINE BLOCKAGE UNBLOCKED LINE AND SANITIZED AREA 450 LAKE PONTCHARTRAIN LIFT STATION OUTAGE RESET PUMP 200 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND DISINFECTED AREA 2012 Page 26 Year 2013 CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Date Event Began 01/10/13 01/20/13 01/28/13 02/07/13 02/16/13 Lift Station Sub Basin PLANT 3 LS 4224 LS 4206 PLANT 3 LS4321 Start Time 14:30 12:11 18:35 6:00 14:20 Reporting Address Location of Event Cleanout / Manhole / Lift Station #1 W. 30TH STREET NORTH PLANT AND SOUTH PLANT HEADWORKS, NORTH PLANT TROUGH FOR AERATION BASINS NOS. 1 - 4, NORTH PLANT CLARIFIER NO. 1 EFFLUENT PIPE, AND EFFLUENT PUMP STATION IRISH BEND & CATTLE FARM RD VINTAGE & CALIFORNIA FORCE MAIN MANHOLE #1 W. 30TH STREET PLANT 341 CLEMSON MANHOLE Date Event Ended Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 01/11/13 17:00 7,000,000 LAKE PONTCHARTRAIN INCREASED FLOWS DUE TO A HEAVY RAIN EVENT, WHICH CAUSED THE NORTH PLANT NORTH BAR SCREEN TO SHEAR A PIN, THE NORTH PLANT SOUTH BAR SCREEN BREAKERS TO TRIP, AND THE AERATION BASIN TROUGH, CLARIFIER NO. 1 EFFLUENT PIPE TO OVERFLOW AND THE EFFLUENT DOCK TO TRICKLE OVER. RAIN DILUTED UNTREATED, PARTIALLY TREATED, AND TREATED AND DISINFECTED WASTEWATER OVERFLOWED ONTO THE PLANT GROUNDS AND INTO THE PLANT STORM DRAINS. IN ORDER TO REDUCE THE OVERFLOWS AT THE AERATION BASINS' TROUGH, CLARIFIER NO. 1 EFFLUENT PIPE, AND THE EFFLUENT PUMP STATION DOCK AND TO PROTECT THE PROPERTY AND EQUIPMENT FROM DAMAGE, THE PLANT'S TREATED AND DISINFECTED EFFLUENT WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17 FROM 5:15 PM ON 1/10/13 TO 8:30 AM ON 1/11/13. IN ORDER TO REDUCE THE OVERFLOW FROM THE NORTH PLANT HEADWORKS, THE SOUTH BAR SCREEN WAS RESET ON 1/10/13. DUE TO THE SHEARED PIN ON THE NORTH BAR SCREEN AND THE VOLUME OF FLOW AT THE HEADWORKS, THE SCREEN COULD NOT BE REMOVED FROM THE CHANNEL WITH THE BOOM TRUCK (CRANE) ONSITE. A CRANE WAS RENTED ON 1/11/13 TO REMOVE THE NORTH BAR SCREEN FROM THE CHANNEL, IN ORDER TO ALLOW THE INFLUENT TO FLOW THROUGH THE CHANNEL UNHINDERED. 01/20/13 12:57 2,300 LAKE PONTCHARTRAIN BROKEN FORCE MAIN REPAIRED FORCE MAIN - WORK ORDER 40944 01/28/13 19:12 02/07/13 14:00 02/16/13 15:26 5 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED DOWN AND SANITIZED AREA THE PUMPS WERE RESET; HOWEVER, THE WELL LEVEL DID NOT RECEDE AND THE CLARIFIERS BEGAN TO OVERTOP THE WEIRS EXTENSIVE RAIN OF 2.2 INCHES (NOT THE WALLS). TO PREVENT FURTHER OCCURRED OVERNIGHT. THE DAMAGE TO EQUIPMENT AND PROPERTY THE NORTH AND SOUTH TREATED AND DISINFECTED EFFLUENT WAS HEADWORKS, AERATION BASIN DIVERTED FROM THE PERMITTED OUTFALL AT LAKE PONTCHARTRAIN WALLS 1-4; IN-PLANT WELLS MISSISSIPPI RIVER SEGMENT 0703 TO WERE OVERFLOWING. THE JEFFERSON PARISH DRAINAGE CANAL NO. 17. EFFLUENT PUMP STATION WET THE DIVERSION OCCURRED FROM 12:00 PM TO WELL WAS NEAR CAPACITY 3:00 PM. DURING THIS TIME, THE WELL WITH TWO (2) PUMPS TRIPPED RETURNED TO NORMAL LEVEL AND THE PLANT OUT. OVERFLOW CONDITIONS SUBSIDED. A PLANT AND EFFLUENT PUMP STATION UPGRADE IS UNDER DESIGN TO INCREASE THE HYDRAULIC 100 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE CAPACITY OF THE PLANT. UNBLOCKED LINE AND WASHED AND SANITIZED AREA 2013 Page 27 Date Event Began 02/25/13 02/26/13 03/05/13 03/18/13 04/14/13 04/28/13 Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) PLANT 3 6:00 #1 W. 30TH STREET PLANT 02/25/13 13:00 LS4310 LS 4201 17:18 13:31 809 DOLPHIN COURT 3132 PALM VISTA MANHOLE MANHOLE 02/26/13 03/05/13 17:29 14:02 LS 4303 PLANT PLANT 16:58 901 SUNSET 7:00 #1 W. 30TH ST. 14:00 #1 W. 30TH ST. MANHOLE 03/18/13 17:25 INFLUENT SPLITTER BOX (11A - 3P) SOUTH PLANT HEADWORKS (7A - 9A, 10A - 11A) SCUM SYSTEM (7A - 3P) NORTH PLANT (NP) CLARIFIER NO. 1 EFFLUENT PIPE (12P - 3P) NP CLARIFIER NO. 2 (10A - 3P) AERATION BASINS NOS. 1 - 4 (10A - 3P) SOUTH PLANT HEADWORKS AERATION BASINS NOS. 1 - 4 SCUM WELLS FOR AERATION BASINS NOS. 5 AND 6 NORTH PLANT SCUM SYSTEM MANHOLES EFFLUENT PUMP STATION WET WELL SAMPLE SITE FOR EFFLUENT DIVERSION PIPE 04/14/13 04/29/13 15:00 11:00 LAKE PONTCHARTRAIN RAINSTORM STARTED MID-DAY ON 2/24 AND LASTED THROUGHOUT THE NIGHT. OVERFLOW CONDITIONS WERE ANTICIPATED AND THE HIGH FLOW SOP WAS ENACTED THE MORNING OF 2/24. UPON ARRIVAL OF THE FIRST SHIFT OPERATORS ON 2/25: SOUTH HEADWORKS WAS OVERFLOWING; AND AERATION BASIN WALLS 1-4 WERE SPLASHING OVER THE WALLS. THE EFFLUENT DOCK WAS NEAR CAPACITY WITH ALL 6 OF THE PUMPS RUNNING. THE EFFLUENT WELL LEVEL DID NOT DROP AND THE WATER LEVEL IN ALL CLARIFIERS ROSE ABOVE THE WEIRS (NOT THE WALLS). TO PREVENT FURTHER DAMAGE TO EQUIPMENT AND PROPERTY, THE TREATED AND DISINFECTED EFFLUENT WAS DIVERTED FROM MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17 AT 11:00 AM ON 2/25/13. RAIN, HIGH WELL LEVELS AND HIGH FLOWS CONTINUED THROUGHOUT THE DAY BUT THE OVERFLOWS SUBSIDED AT APPROXIMATELY 2:00 PM. ON 2/26/13, THE SOUTH HEADWORKS WAS OVERFLOWING, HIGH WELL LEVELS AND HIGH FLOWS CONTINUED. RAIN/STORM CONDITIONS WERE ANTICIPATED AND RESUMED AROUND 2:00 PM AND LASTED UNTIL 6:00 PM, BUT NO OVERFLOWS WERE OBSERVED. TANK AND WELL LEVELS REMAINED HIGH ALONG WITH HIGH FLOWS SO THE DIVERSION VALVE REMAINED OPEN TO PREVENT OVERFLOW CONDITIONS AND ANY FURTHER DAMAGE TO EQUIPMENT. ON 2/27/13, NO OVERFLOWS WERE OBSERVED; TANK AND WELL LEVELS WERE NORMAL WITH HIGH FLOWS. THE DIVERSION VALVE WAS CLOSED AT 7:00 AM ON 2/27/13. NORMAL PLANT CONDITIONS RESUMED THROUGHOUT THE DAY. A PLANT AND EFFLUENT PUMP STATION UPGRADE IS UNDER DESIGN TO INCREASE THE HYDRAULIC CAPACITY. 5 LAKE PONTCHARTRAIN M/H 03104041 SEEPAGE WASHED AND SANITIZED AREA 10 LAKE PONTCHARTRAIN 200 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE UNBLOCKED THE LINE AND WASHED AND SANITIZED AREA. UNBLOCKED THE LINE. CREWMEN WERE UNABLE TO WASH AND SANITIZE AREA DUE TO TRAFFIC. WHEN CREWMEN RETURNED, THE AREA HAD ALREADY BEEN CLEANED. LAKE PONTCHARTRAIN A TWO-DAY RAIN 4/14/13) CAUSED CONDITIONS AT INTERMITTEN OCCURRED. EVENT (4/13 HIGH FLOW THE PLANT. OVERFLOWS THE HIGH FLOW STANDARD OPERATING PROCEDURE WAS ENACTED MINIMIZE SOLIDS CONTENT AND VOLUME OF ANY OVERFLOWS. ALL BAR SCREENS AND EFFLUENT PUMPS WERE IN OPERATION THROUGHOUT THE OVERFLOW PERIOD. DUE TO THE HIGH WATER LEVEL IN THE EFFLUENT PUMP STATION WET WELL, THE CLARIFIER LEVELS ROSE ABOVE THE DESIGNED TREATMENT CAPACITY AND WERE OVERLOADED. THE OVERFLOW AREAS WERE CLEANED. LAKE PONTCHARTRAIN A RAIN EVENT OF 2.57 INCHES MEASURED AT THE PLANT AND 3.13 INCHES MEASURED IN THE COLLECTION SYSTEM ON 04/28/13 CAUSED HIGH FLOW CONDITIONS AT THE PLANT. OPERATORS OBSERVED THAT THE EFFLUENT PUMP STATION WET WELL WAS OVERFLOWING AT 5:30 AM ON 4/29/13. THEY PUT EFFLUENT PUMP 3 IN SERVICE. THE OVERFLOW CEASED AT 5:40 AM. OPERATIONS PERSONNEL RAKED THE SOUTH PLANT BAR SCREEN. THE HEADWORKS OVERFLOW CEASED AT 7:10 AM. THE PLANT SAMPLE SITE FOR THE EFFLUENT DIVERSION PIPE CEASED OVERFLOWING AT 11:00 AM. AERATION BASINS NOS. 1 - 4, THE SCUM WELLS, AND PLANT SCUM SYSTEM MANHOLES WERE NOT OVERFLOWING WHEN OPERATIONS PERSONNEL ARRIVED. THE OVERFLOW AREAS WERE CLEANED. 2013 Page 28 Date Event Began 05/01/13 05/17/13 05/29/13 Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) LS 4323 LS 4110 PLANT 17:12 10:18 19:00 #21 DAUTERIVE CT. 2712 VETERANS 1 W. 30TH ST. MANHOLE MANHOLE o AERATION BASINS NOS. 1-4 TROUGH 05/01/13 05/17/13 5/29/2013 17:52 13:30 21:30 o EFFLUENT PUMP STATION WET WELL 5/30/13 08:00 o SOUTH PLANT HEADWORKS 5/29/13 18:00 o SOUTH PLANT SCUM 5/29/13 WELL 18:00 100 LAKE PONTCHARTRAIN HEAVY RAINFALL WASHED DOWN AND SANITIZED AREA 960 LAKE PONTCHARTRAIN MAIN LINE BROKEN VACUUMED M/H NO. 01103011 UNTIL THE MAIN LINE WAS REPAIRED. LAKE PONTCHARTRAIN SEVERE RAIN EVENT OF 4.73 INCHES IN 2 HOURS, STREET ALL AVAILABLE PUMPS WERE IN OPERATION AT FLOODING, AND POWER THE LIFT STATIONS. DUE TO HIGH INFLUENT OUTAGES FLOWS, THE SOUTH PLANT (SP) HEADWORKS AND SCUM WELL OVERFLOWED. THE SP BAR SCREENS WERE RAKED TO CEASE THE OVERFLOW. DUE TO THE OVERFLOWING EFFLUENT PUMP STATION WET WELL, THE TREATED AND DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17 AT 8:00 PM. 06/01/13 LS4305 14:40 933 VINTAGE 06/02/13 LS4211 18:41 39TH & ARKANSAS 06/03/13 LS4318 11:14 3601 LOYOLA DRIVE FORCE MAIN 06/01/13 15:15 LIFT STATION 06/02/13 20:30 MANHOLE 06/03/13 11:38 AN ONLINE INCIDENT REPORT WAS FILED ON THE LDEQ WEBSITE, PRIOR TO DIVERSION. THIS DIVERSION WAS PERFORMED TO PROTECT THE PROPERTY AND EQUIPMENT, AND TO LOWER THE WATER LEVELS IN THE CLARIFIERS AND AERATION BASINS. THE AERATION BASIN TROUGH CEASED OVERFLOWING AT 9:30 PM. THE DIVERSION ENDED ON 5/30/13 AT 8:00 AM. FORCE MAIN BROKEN AFTER REPAIRED BROKEN FORCE MAIN (RHONE DR. 150 LAKE PONTCHARTRAIN BEING DISTURBED BY ROAD L/S4302) WORK ORDER 41420 CONSTRUCTION. LIFT STATION OUTAGE DUE TO BIRDS HITTING TRANSFORMER ENTERGY REPAIRED THE ELECTRICAL LINE 500 LAKE PONTCHARTRAIN CAUSING THE LOSS OF TWO AND RESTORED THREE-PHASE POWER TO THE PHASES OF THE THREE PHASE SITE. THE AREA WAS WASHED AND SANITIZED. COMMERCIAL ENERY SUPPLY. LIFT STATION OUTAGE DUE TO THE STATION WAS RETURNED TO SERVICE. 20 LAKE PONTCHARTRAIN A MALFUNCTIONING FLOAT AND UNABLE TO WASH DOWN AREA DUE TO ROAD PUMP CONTROLLER FOR THE CONSTRUCTION ALTERNATOR SWITCH. 06/03/13 LS4309 17:29 3416 OLE MISS LIFT STATION 06/03/13 18:02 THE STATION WAS INSPECTED TO ENSURE THAT THE PUMPS WERE OPERATING ON THE ROUTINE CYCLE. THE AREA WAS WASHED AND SANITIZED. A MEETING WAS HELD WITH THE LIFT STATION OUTAGE DUE TO CONTROL PANEL REPRESENTATIVE ON 6/11/13 300 LAKE PONTCHARTRAIN A CONTROL PANEL FAULT. CONCERNING THE FAILURE OF THE CONTROL PANEL TO ACTIVATE THE PUMPS AS EXPECTED. A HIGH-HIGH FLOAT WAS INSTALLED ON 6/21/13 TO OVERRIDE THE CONTROL PANEL AND OPERATE ALL PUMPS TO AVOID A FUTURE OVERFLOW. 06/19/13 LS4340 12:35 2841 LOYOLA DRIVE 06/20/13 3419 OLE MISS LS4309 22:38 3423 OLE MISS MANHOLE 06/19/13 12:49 LIFT STATION 06/21/13 0:24 20 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED DOWN AND SANITIZED AREA A MEETING WAS HELD WITH THE CONTROL PANEL REPRESENTATIVE ON 6/11/13 CONCERNING THE FAILURE OF THE CONTROL LIFT STATION OUTAGE DUE TO PANEL TO ACTIVATE THE PUMPS AS EXPECTED. 450 LAKE PONTCHARTRAIN LEVEL CONTROL FAULTS. A HIGH-HIGH FLOAT WAS INSTALLED ON 6/21/13 TO OVERRIDE THE CONTROL PANEL AND OPERATE ALL PUMPS TO AVOID A FUTURE OVERFLOW. THE AREA WAS WASHED DOWN AND SANITIZED. 2013 Page 29 Date Event Began Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 2705 FLORIDA 08/13/13 LS4100 15:53 24TH AT CONNECTICUT MANHOLE 08/13/13 16:52 COLLECTION SYSTEM PERSONNEL WASHED 50 AND SANITIZED THE OVERFLOW AREA ON DURING A RAIN EVENT, PUMP 4 FLORIDA AVENUE, AND SANITIZED THE AREA (300 HP) HAD A FAILURE AND ON 24TH STREET BECAUSE THERE WAS NO LAKE PONTCHARTRAIN PUMP 1 (150 HP) HAD A SEAL STORM DRAIN PRESENT. PUMP 4'S POWER FAILURE. PUMP 4 WAS RESET HEAD IS BEING REPAIRED BY A VENDOR. 200 AND RETURNED TO OPERATION. REPLACEMENT CABLES AND CONDUIT WILL BE INSTALLED UPON COMPLETION OF THE PUMP REPAIR. 08/14/13 PLANT 14:00 #1 W. 30TH 08/15/13 08/16/13 08/19/13 LS4209 LS4100 LS4100 10:40 #47 ANTIGUA 12:20 2301 IDAHO 10:05 2301 IDAHO N. PLANT AERATION BASINS 1-4 08/14/13 19:00 S. PLANT HEADWORKS 0.8 MGD LAKE PONTCHARTRAIN THE AERATION BASINS 1-4 TROUGH OVERFLOWED ITS WALLS DUR TO INCREASED FLOWS FOR CONTINUOUS RAIN (1.49 INCHES). IN ADDITION, THE SOUTH PLANT HEADWORKS OVERFLOWED BRIEFLY. DUE TO THE INFLOW/INFILTRATION IN THE CITY'S COLLECTION SYSTEM, THE RAIN INUNDATED THE SYSTEM AND SUBSEQUENTLY THE PLANT. THE PLANT'S WET WEATHER PLAN WAS ENACTED, WHEREAS THE LAST ROW OF AERATORS ARE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE IN THE TANK. FURTHERMORE, THE DIGESTERS ARE LOWERED IN ORDER TO HANDLE ANY POTENTIAL OVERFLOWS FROM THE AERATION BASINS. IN ORDER TO RELIEVE THE OVERFLOW CONDITIONS AND TO PREVENT DAMAGE TO UPSTREAM EQUIPMENT, THE TERATED AND DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM ITS PERMITTED OUTFALL AT THE MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION VALVE WAS OPENED AT 17:30PM. THE OVERFLOW AREAS WERE VACUUMED, WASHED, AND SANITIZED. MANHOLE MANHOLE MANHOLE 08/15/13 08/16/13 08/19/13 12:45 14:15 10:40 450 LAKE PONTCHARTRAIN 600 LAKE PONTCHARTRAIN 100 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 08/21/13 PLANT 14:30 #1 W. 30TH N. PLANT AERATION BASINS 1-4 08/21/13 23:45 1.2 MGD LAKE PONTCHARTRAIN NORTH PLANT TROUGH/WALL FOR AERATION BASINS 1 - 4 BEGAN OVERFLOWING ITS WALLS INTERMITTENTLY FROM INCREASED FLOWS DUE TO A RAIN EVENT OF 1.74 INCHES IN A SHORT SPAN OF TIME. DUE TO THE INFLOW/INFILTRATION IN THE CITY'S COLLECTION SYSTEM, THE RAIN INUNDATED THE SYSTEM AND SUBSEQUENTLY THE PLANT. THE PLANT'S WET WEATHER PLAN WAS ENACTED, WHEREAS THE LAST ROW OF AERATORS ARE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE IN THE TANK. FURTHERMORE, THE DIGESTERS ARE LOWERED IN ORDER TO HANDLE ANY POTENTIAL OVERFLOWS FROM THE AERATION BASINS. THE OVERFLOW AREAS WERE VACUUMED, WASHED, AND SANITIZED. 08/26/13 09/03/13 09/03/13 09/08/13 09/09/13 09/09/13 LS4310 LS4317 LS4317 LS4112 LS4100 LS4100 14:57 9:04 10:35 10:25 13:09 14:00 HOLLY HEIGHTS & SAXONY 4105 BAYOU CASTINE 4104 BAYOU SAVAGE 2829 WILLIAMS BOULEVARD 2413 ILLINOIS 26TH AND ILLINOIS LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE 08/26/13 09/03/13 09/03/13 09/08/13 09/09/13 09/09/13 17:04 10:29 10:45 10:50 13:55 14:15 250 LAKE PONTCHARTRAIN LIFT STATION OUTAGE (BOTH CREWMAN RESET THE PUMPS AND WASHED PUMPS OUT) AND SANITIZED AREA 20 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED DOWN AREA 10 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE AT 4104 BAYOU CASTINE WASHED AND SANITIZED AREA 50 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 25 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 20 LAKE PONTCHARTRAIN EARLIER MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 2013 Page 30 Date Event Began 09/12/13 09/16/13 09/21/13 09/21/13 09/23/13 09/23/13 09/23/13 Lift Station Sub Basin LS4223 PLANT Start Time 7:57 13:00 Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 716 VILLAGE RD. MANHOLE 09/12/13 9:05 #1 W. 30TH STREET SOUTH PLANT SCUM 09/16/13 WELL 13:15 WASHED AND SANITIZED AREA. LIFT STATION OUTAGE DUE TO PRETREATMENT PERSONNEL SPOKEN WITH 20 LAKE PONTCHARTRAIN PAPER TOWELS FROM AN AREA THE MANAGEMENT OF THE BUSINESS AND BUSINESS CLOGGING THE HAVE INSTALLED PROHIBITED DISCHARGE PUMPS. SIGNS IN THE BUSINESS AND REQUESTED THAT THE BUSINESS REMOVES THE TOWELS. THE SCUM WELL OVERFLOWED ThE DIESEL PUMP WAS TURNED OFF. THE DUE TO RECEIVING EXCESSIVE OVERFLOW AREA WAS VACUUMED, WASHED, 50 LAKE PONTCHARTRAIN FLOW FROM THE DIESEL PUMP AND SANITIZED. IN ADDITION, THE SCUM PIT USED TO DRAIN SOUTH PLANT WAS VACUUMED. CLARIFIER NO. 2. PLANT 9:00 #1 W. 30TH STREET NORTH PLANT TROUGH FOR AERATION BASINS NOS. 1 - 4. 09/22/13 4.32 MG LAKE PONTCHARTRAIN SYSTEM-WIDE RAIN EVENT OF 2.78 INCHES OPERATIONS PERSONNEL IMPLEMENTED THE PLANT'S WET WEATHER PLAN, INCLUDING TURNING THE LAST ROW OF AERATORS OFF IN AERATION BASINS NOS. 1 -4 TO ALLOW THE SOLIDS TO SETTLE IN THE BASINS. AFTER THE EVENT, THE OVERFLOW AREAS WERE WASHED AND SANITIZED. LS4100 LS4100 LS4100 LS4100 10:00 2621 DELAWARE 10:10 10:22 14:06 27TH & DELAWARE 24TH & CONNECTICUT 2600 ILLINOIS MANHOLE MANHOLE MANHOLE MANHOLE 09/21/13 11:05 09/23/13 10:15 09/23/13 09/23/13 11:30 14:16 1,625 100 1,000 50 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN ONE OF THE THREE AVAILABLE PUMPS TRIPPED. THE PUMP WAS RESET AND RETURNED TO SERVICE. PUMP 4 WAS BEING REPAIRED. WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 10/07/13 PLANT 9:00 #1 W. 30TH SOUTH PLANT RAS WELL 10/07/13 9:10 DURING THE AREA POWER OUTAGE (CENTRAL WEST SIDE THE MAINTENANCE MANAGER MANUALLY OF THE CITY), THE SOUTH ACTIVATED THE GENERATOR. THE OVERFLOW 50 LAKE PONTCHARTRAIN PLANT GENERATOR AUTOMATIC AREA WAS WASHED AND SANITIZED. THE TRANSFER SWITCH CITY'S GENERATOR CONTRACTOR INSPECTED MALFUNCTIONED AND DID NOT AND REPAIRED THE TRANSFER SWITCH. TRANSFER. 10/07/13 LS4330 12:56 GRANDWOOD AT W. ESPLANADE LIFT STATION 10/07/13 13:58 4,000,000 LAKE PONTCHARTRAIN AFTER THE AREA POWER OUTAGE, THE GENERATOR'S AUTOMATIC TRANSFER SWITCH MALFUNCTIONED NOT ALLOWING THE STATION TO RETURN TO COMMERCIAL POWER. FURTHERMORE, THE FLOAT SWITCH FOR THE FUEL DAY TANK MALFUNCTIONED GIVING A FALSE READING OF FULL TO THE DAY TANK FUEL PUMP. THE AUTOMATIC TRANSFER SWITCH WAS TURNED OFF MANUALLY. THE STATION AND AREA WAS WASHED AND SANITIZED. THE AUTOMATIC TRANSFER SWITCH AND THE FUEL PUMP WERE INSPECTED BY THE GENERATOR CONTRACTOR. THE AUTOMATIC TRANSFER SWITCH IS BEING REPLACED. THE FUEL PUMP IS FULLY OPERATIONAL. 10/09/13 LS4223 11:01 716 VILLAGE RD. 10/17/13 LS4318 9:30 LOYOLA BETWEEN W. ESPLANADE AND AMELIE MANHOLE MANHOLE 10/09/13 12:15 10/17/13 12:30 MAINTENANCE PERSONNEL REMOVED THE THE LIFT STATION PUMPS LOST RAGS AND RE-PRIMED THE PUMPS. 100 LAKE PONTCHARTRAIN PRIME DUE TO RAGS IN THE COLLECTION SYSTEM PERSONNEL WASHED SUCTION CHECKS. AND SANITIZED AREA. THE SUCTION CHECKS WERE REPLACED. MAINTENANCE PERSONNEL RE-PRIMED THE 10 LAKE PONTCHARTRAIN THE LIFT STATION PUMPS LOST PUMPS. THE LIFT STATION'S SCADA WAS PRIME INSPECTED ON 10/16/13. THE SCADA WET WELL MODULE NEEDS REPLACEMENT. 2013 Page 31 Date Event Began Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 10/23/13 10/27/13 10/28/13 11/06/13 11/13/13 12/02/13 12/03/13 12/10/13 12/12/13 12/16/13 12/22/13 12/23/13 12/24/13 LS4209 13:32 47 ANTIGUA LS4223 10:39 716 VILLAGE LS4303 9:24 1016 ST. JULIEN LS 4223 10:20 716 VILLAGE RD. MANHOLE MANHOLE MANHOLE MANHOLE 10/23/13 14:17 10/27/13 11:15 10/28/13 10:27 11/06/13 11:00 LS 4223 7:53 716 VILLAGE RD. MANHOLE 11/13/13 8:00 LS4302 LS4304 LS4321 LS4206 LS4315 PLANT LS4105 LS4312 13:54 7:36 16:45 20:13 8:32 717 VOURAY DRIVE 3600 CHATEAU BOULEVARD 341 CLEMSON PLACE 1752 NEWPORT PLACE 4111 ST. JAMES DRIVE AFTER #1 WEST 30TH 17:00 STREET 9:48 421 FILMORE STREET 12:08 3306 OLE MISS MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE 12/02/13 12/03/13 12/10/13 12/12/13 12/16/13 NORTH PLANT AERATION BASINS 1-4 DISCHARGE TROUGH 12/23/13 MANHOLE 12/23/13 FORCE MAIN 12/24/13 14:15 7:56 19:11 21:18 9:00 6:00 10:44 14:27 20 100 20 10 10 10 10 75 40 5 113,900 50 80 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE COLLECTION SYSTEM PERSONNEL WASHED AND SANITIZED THE AREA. LAKE PONTCHARTRAIN THE LIFT STATION PUMPS LOST PRIME THE COLLECTION SYSTEM CREWMAN REPRIMED THE PUMPS. THERE WERE NO SOLIDS IN THE OVERFLOW. HE WASHED AND SANITIZED THE AREA. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE LIFT STATION PUMPS LOST PRIME DUE TO RAGS DISCHARGED FROM AREA BUSINESS LIFT STATION PUMPS LOST PRIME DUE TO RAGS DISCHARGED FROM AREA BUSINESS MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE COLLECTION SYSTEM PERSONNEL WASHED AND SANITIZED THE AREA. THE PUMPS WERE REPRIMED, AND THE AREA WAS WASHED AND SANITIZED. THE FLOATS IN THE STATION WERE ADJUSTED. THE PUMPS WERE REPRIMED, AND THE AREA WAS WASHED AND SANITIZED. THE FLOATS IN THE STATION WERE ADJUSTED. WASHED AREA (12/2/13), SANITIZED AREA (12/3/13) WASHED AND SANITIZED AREA LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE A RAIN EVENT OF 1.34 INCHES (MEASURED BY SCADA AT THE JACKSON LIFT STATION) CAUSED INCREASED INFLUENT FLOWS. MAIN LINE BLOCKAGE LAKE PONTCHARTRAIN BROKEN FORCE MAIN WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA THE FORCE MAIN WAS REPAIRED (WORK ORDER 41928) AND THE AREA WAS WASHED AND SANITIZED. 12/28/13 PLANT 10:30 #1 W. 30TH STREET Total Overflows 58 2013 NORTH PLANT AERATION BASINS 1-4 DISCHARGE TROUGH 12/29/14 6:00 342,840 LAKE PONTCHARTRAIN A RAIN EVENT OF 1.22 INCHES (MEASURED BY SCADA AT CHATEAU TRANSFER STATION) CAUSED INCREASED INFLUENT FLOWS. OPERATIONS PERSONNEL IMPLEMENTED THE PLANT'S WET WEATHER PLAN TO RETAIN SOLIDS IN THE AERATION BASINS. THE AREA WAS WASHED AND SANITIZED. EARTHEN BERMS HAVE BEEN INSTALLED TO RETAIN OVERFLOWS AND PREVENT THEM FROM REACHING THE STORM DRAINS. 2013 Page 32 Year 2014 CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Date Event Began Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station 01/03/14 01/05/14 LS4303 LS4321 13:00 12:13 SUNSET & MACON DRIVE 316 CLEMSON PLACE MANHOLE MANHOLE 01/13/14 PLANT 13:30 #1 W. 30TH STREET NORTH PLANT AERATION BASINS NOS. 1-4 DISCHARGE TROUGH Date Event Ended Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 01/03/14 01/05/14 15:09 13:40 50 LAKE PONTCHARTRAIN 100 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE UNBLOCKED MAIN SANITIZED AREA. UNBLOCKED MAIN SANITIZED AREA. LINE LINE AND AND WASHED WASHED AND AND 01/13/14 17:00 189,000 LAKE PONTCHARTRAIN RAIN EVENT CAUSED INCREASED INFLUENT FLOWS TO THE PLANT THE CITY'S WET WEATHER PLAN WAS IMPLEMENTED. THE BLOWERS WERE TURNED OFF TO RETAIN SOLIDS IN THE TANKS. FURTHERMORE, THE DIGESTER LEVELS WERE LOWERED. PRIOR TO THIS EVENT, AN EARTHEN BERM WAS INSTALLED BETWEEN AERATION BASINS NOS. 1 - 4 AND CLARIFIERS NOS. 1 - 4, TO CAPTURE OVERFLOWS. DURING THIS RAIN EVENT A SECTION OF THE BERM FAILED. AFTER THE EVENT, THE BERM WAS REPAIRED AND THE OVERFLOW AREA WAS CLEANED AND SANITIZED. 02/07/14 02/12/14 02/14/14 LS 4321 PLANT LS 4312 17:40 341 CLEMSON 5:30 1 W. 30TH 9:40 3400 OLE MISS MANHOLE o NORTH PLANT AERATION BASIN DISCHARGE TROUGH WALL o SOUTH PLANT HEADWORKS MANHOLE 02/07/14 02/12/14 18:33 o 11:30 o 5:55 02/14/14 13:00 02/14/14 LS 4303 15:45 1101 SUNSET MANHOLE 02/14/14 19:09 02/21/14 PLANT 2:13 1 W. 30TH NORTH PLANT AERATION BASIN DISCHARGE TROUGH WALL 02/21/14 11:00 02/23/14 PLANT 13:30 1 W. 30TH NORTH PLANT AERATION BASIN DISCHARGE TROUGH WALL 02/24/14 3:36 30 3,600 325 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE HEAVY RAIN EVENT OF 1.85 INCHES CAUSED INCREASED FLOWS TO THE PLANT DUE TO COLLECTION SYSTEM INFLOW AND INFILTRATION BROKEN FORCE MAIN MAIN LINE BLOCKAGE HEAVY RAIN EVENT OF 1.47 INCHES CAUSED INCREASED FLOWS TO THE PLANT DUE TO COLLECTION SYSTEM INFLOW AND INFILTRATION WASHED DOWN AND SANITIZED AREA THE BLOWERS WERE TURNED OFF TO RETAIN THE SOLIDS IN THE AERATION BASINS. AN EARTHEN BERM IS INSTALLED AROUND THE AERATION BASINS' NORTH WALL TO CONTAIN OVERFLOWS OF PARTIALLY TREATED WASTEWATER. THE AREAS OF THE OVERFLOWS WERE CLEANED. INTERMITTENT OVEFLOW. THE FORCE MAIN WAS REPAIRED ON 2/14/14. THE OVERFLOW AREA WAS WASHED AND SANITIZED AFTER THE REPAIR. THE MAIN LINE WAS UNBLOCKED AND THE OVERFLOW AREA WAS WASHED AND SANITIZED. THE BLOWERS WERE TURNED OFF TO RETAIN THE SOLIDS IN THE AERATION BASINS. AN EARTHEN BERM IS INSTALLED AROUND THE AERATION BASINS' NORTH WALL TO CONTAIN OVERFLOWS OF PARTIALLY TREATED WASTEWATER. THE AREAS OF THE OVERFLOWS WERE CLEANED. LAKE PONTCHARTRAIN RAIN EVENT OF 0.64 INCHES CAUSED INCREASED FLOWS TO THE PLANT DUE TO COLLECTION SYSTEM INFLOW AND INFILTRATION AND SATURATED GROUND CONDITIONS. THE BLOWERS WERE TURNED OFF TO RETAIN THE SOLIDS IN THE AERATION BASINS. AN EARTHEN BERM IS INSTALLED AROUND THE AERATION BASINS' NORTH WALL TO CONTAIN OVERFLOWS OF PARTIALLY TREATED WASTEWATER. THE AREAS OF THE OVERFLOWS WERE CLEANED. 2014 Page 33 Date Event Began Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 02/26/14 LS4100 11:00 27th & DELAWARE MANHOLE 02/26/14 11:30 HEAVY RAIN EVENT OF 1.43 ALL AVAILABLE PUMPS WERE IN OPERATION AT 150 LAKE PONTCHARTRAIN INCHES OF RAIN WITH 0.5 THE LIFT STATION. THE OVERFLOW AREA WAS INCHES IN 10 MINUTES WASHED AND SANITIZED. 02/26/14 PLANT 3:00 1 W. 30TH o NORTH PLANT AERATION BASIN DISCHARGE TROUGH WALL o EFFLUENT PUMP STATION DISCHARGE DIVERSION FROM PERMITTED OUTFALL o 02/26/14 o 02/27/14 o 14:00 o 4:00 03/10/14 03/18/14 03/28/14 03/28/14 LS4200 LS4203 LS4105 LS4320 10:40 3530 OLE MISS 17:27 12:55 2305 44TH STREET 421 FILMORE 14:30 3321 TULANE AIR RELEASE VALVE ON CANAL #16 AERIAL CROSSING MANHOLE MANHOLE MANHOLE 03/11/14 03/18/14 03/28/14 03/28/14 11:30 18:13 14:08 14:50 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 1.43 INCHES OF RAIN WITH A 0.5 INCH IN 10 MINUTES. THIS EVEN CAUSED INCREASED FLOWS TO THE PLANT DUE TO COLLECTION SYSTEM INFLOW AND INFILTRATION THE BLOWERS WERE TURNED OFF TO RETAIN THE SOLIDS IN THE AERATION BASINS. AN EARTHEN BERM IS INSTALLED AROUND THE AERATION BASINS' NORTH WALL TO CONTAIN OVERFLOWS OF PARTIALLY TREATED WASTEWATER. THE WATER LEVELS IN THE CLARIFIERS WERE ABOVE THE WEIRS. IN ORDER TO DECREASE THE AMOUNT OF PARTIALLY TREATED WASTEWATER OVERFLOWING AND THE WATER LEVELS IN THE CLARIFIERS, AND TO PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE EFFLUENT PUMP STATION'S TREATED AND DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE AREAS OF THE OVERFLOWS WERE CLEANED. BROKEN AIR RELEASE VALVE REPAIRED THE AIR RELEASE VALVE (WORK 400 LAKE PONTCHARTRAIN ON CHATEAU TRANSFER ORDER 42189) STATION FORCE MAIN 50 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND SANITIZED AREA 40 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 4.95 WASHED AND SANITIZED AREA INCHES 25 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 4.95 WASHED AND SANITIZED AREA INCHES 2014 Page 34 Date Event Began Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station 03/28/14 PLANT 11:30 #1 W. 30TH STREET NORTH PLANT AERATION BASINS 1-4 DISCHARGE TROUGH 03/29/14 LS4310 6:30 HOLLY HEIGHTS & SAXONY 03/30/14 04/11/14 04/15/14 LS4105 LS 4100 LS 4100 10:34 9:49 12:08 421 FILMORE 2301 IDAHO AVENUE 1901 24TH STREET LIFT STATION MANHOLE MANHOLE LIFT STATION Date Event Ended 03/30/14 03/29/14 03/30/14 04/11/14 04/16/14 Possible End Time volume of Receiving Surface Water event (gallons) 10:00 500,000 LAKE PONTCHARTRAIN 8:00 500 LAKE PONTCHARTRAIN 11:50 11:12 2:47 100 20 33,000 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) HEAVY RAIN EVENT OF 4.95 INCHES HEAVY RAIN EVENT OF 4.95 INCHES HEAVY RAIN EVENT OF 4.95 INCHES MAIN LINE BLOCKAGE LIFT STATION OUTAGE Resolution of Event (Washed Out Line, Repaired Force Main) THE AERATION BLOWERS WERE TURNED OFF TO RETAIN THE SOLIDS IN THE TANK. EARLIER IN THE YEAR, AN EARTHEN BERM WAS INSTALLED BETWEEN AERATION BASINS NOS. 14 AND CLARIFIERS NOS. 1-4, IN ORDER TO CONTAIN THE OVERFLOW FROM THE AERATION BASIN DISCHARGE TROUGHS. DUE TO THE HEAVY RAINS AND INCREASED INFLUENT FLOWS, PARTIALLY TREATED WASTEWATER OVERFLOWED THE TOP OF THE BERM. FURTHERMORE, THE WASTEWATER LEVELS IN CLARIFIERS NOS. 2-3 WERE ONE FOOT FROM THE TOP, AND SIX INCHES TO ONE FOOT FROM THE TOP OF THE EFFLUENT PUMP STATION WET WELL. IN ORDER TO DECREASE THE OVERFLOW OF PARTIALLY TREATED WASTEWATER, TO DECREASE THE WATER LEVELS IN THE CLARIFIERS, AND TO PREVENT EQUIPMENT AND PROOPERTY DAMAGE, THE TREATED AND DISINFECTED EFFLUENT WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION VALVE OPENED ON 3/29/14 AT 5:10AM AND CLOSED ON 3/30/14 AT 1:30PM. AN ON-LINE INCIDENT REPORT WAS FILED ON THE THE PUMPS TRIPPED DURING THE RAIN EVENT. MAINTENANCE PERSONNEL RESET THE PUMPS AND RETURNED THE STATION TO SERVICE. THE OVERFLOW AREA WAS WASHED AND SANITIZED. WASHED DOWN AND SANITIZED AREA THE LINE WAS UNBLOCKED, AND THE AREA WAS WASHED AND SANITIZED. THE PUMPS WERE RESET, AND THE AREA WAS WASHED AND SANITIZED. 04/24/14 LS 4201 19:15 RECLANADA & VINTAGE LIFT STATION 04/24/14 21:00 THIS LIFT STATION IS BEING UPGRADED BY CITY CONTRACTORS, AND IS OPERATING ON A DIESEL PUMP. VEOLIA PERSONNEL NOTIFIED 25 LAKE PONTCHARTRAIN LIFT STATION OUTAGE THE CONTRACTORS THAT THE DIESEL PUMP WAS NOT OPERATING. THE CONTRACTORS RESPONDED AND RETURNED THE DIESEL PUMP TO OPERATION. 2014 Page 35 Date Event Began Lift Station Sub Basin Start Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 05/31/14 PLANT 6:30 1 W. 30TH ST. AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH 06/02/14 20:34 LAKE PONTCHARTRAIN HEAVY INTENSE RAIN EVENT OF 4 INCHES FROM 5/31/14 - 6/1/14, WHICH CAUSED STREET FLOODING. THE DISCHARGE TROUGH OVERFLOWED INTERMITTENTLY. THE PLANT'S WET WEATHER PLAN WAS ACTIVATED. THE BLOWERS WERE TURNED OFF TO ALLOW SOLIDS TO SETTLE IN THE AERATION BASINS AND TO REDUCE THE POTENTIAL VOLUME OF SOLIDS OVERFLOWING THE TROUGH WALL. THE TREATED AND DISINFECTED PLANT EFFLUENT DISCHARGE WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 070301 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17, IN ORDER TO REDUCE THE OVERFLOW AND TO PREVENT PROPERTY AND EQUIPMENT DAMAGE. IN JANUARY 2014, AN EARTHEN BERM WAS INSTALLED BETWEEN AERATION BASINS NOS. 1 - 4 AND CLARIFIERS NOS. 1 - 4, TO RETAIN OVERFLOWS FROM THE TROUGH. 05/31/14 06/01/14 LS 4339 LS 4320 06/01/14 LS 4207 20:55 13:55 16:20 23RD ST. AT ABERDEEN ST. 3301 TULANE DRIVE 5212 JANICE AVENUE MANHOLE MANHOLE MANHOLE 05/31/14 06/01/14 06/01/14 22:10 14:20 16:50 50 50 3,000 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAIN EVENT HEAVY RAIN HEAVY RAIN UNBLOCKED MAIN LINE AND SANITIZED AREA. PUT SECOND PUMP ON AUTO CREATED WORK ORDER TO TELEVISE THE 6" LINE (WORK ORDER 42477) 06/25/15 19:45 NORTH PLANT AERATION BASIN 1-4 DISCHARGE TROUGH PLANT #1 W. 30TH STREET 06/28/14 11:00 LAKE PONTCHARTRAIN HEAVY RAIN EVENTS FROM 6/22/14 - 6/27/14 TOTALING 11.08 INCHES IN A 6-DAY PERIOD. ON 6/22/14, 6/23/14, AND 6/25/14, RESPECTIVELY, THE RAIN EVENTS WERE GREATER THAN 2.5 INCHES. THE PLANT'S WET WEATHER PLAN WAS ENACTED. THE BLOWERS WERE TURNED OFF SO THAT THE SOLIDS IN THE AERATION BASINS WOULD SETTLE TO LESSEN THE VOLUME OF SOLIDS OVERFLOWING THE TOP OF THE DISCHARGE TROUGH. IN ADDITION, THE TREATED EFFLUENT WAS DIVERTED AT THE EFFLUENT PUMP STATION WET WELL FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION BEGAN ON 6/26/14 AT 4:35 AM AND ENDED ON 6/26/14 AT 4:00 PM. THE DIVERSION WAS PERFORMED TO PREVENT PROPERTY AND EQUIPMENT DAMAGE AND TO LESSEN THE OVERFLOW OF PARTIALLY TREATED WASTEWATER FROM THE AERATION BASINS. ON 6/27/14, 2014 Page 36 Date Event Began PLANT Lift Station Sub Basin 06/28/14 06/25/14 LS 4313 07/02/14 LS4307 07/09/14 LS4109 07/18/14 PLANT 10/05/14 10/15/14 LS4303 LS4209 Start Time #1 W. 30TH STREET Reporting Address Location of Event Cleanout / Manhole / Lift Station 3:30 NORTH PLANT CLARIFIERS NOS. 2 - 4 20:15 #2 MOSELLE DRIVE 17:51 3423 OLE MISS 9:53 25TH & IDAHO (SOUTHEAST) MANHOLE LIFT STATION FORCE MAIN 16:00 1 W. 30TH NORTH PLANT AERATION BASINS 1 - 4 DISCHARGE TROUGH 17:50 12:15 1101 SUNSET BOULEVARD CORNER OF DRIFTWOOD & WILLIAMS MANHOLE MANHOLE 06/28/14 Date Event Ended 06/26/14 07/02/14 07/09/14 07/18/14 10/05/14 10/15/14 11:00 LAKE PONTCHARTRAIN Possible End Time volume of Receiving Surface Water event (gallons) HEAVY RAIN EVENTS FROM 6/22/14 - 6/27/14 TOTALING 11.08 INCHES IN A 6-DAY PERIOD. ON 6/22/14, 6/23/14, AND 6/25/14, RCEaSuPseECofTEIVvEeLnYt ,(MTHaiEn RLAinIeN EBVlEoNcTkaSgWe,ELRifEt SGtRatEioAnTEORutTaHgeA,N 2.5 IENtCc.H) ES. Resolution of Event (Washed Out Line, Repaired Force Main) 2:36 20:02 11:05 20:00 18:45 12:49 7,200 12,450 780,000 65 20 THE CITY HAD A HEAVY RAIN EVENT OF 1.23 INCHES. IN ADDITION, THE TREATED EFFLUENT WAS DIVERTED AT THE EFFLUENT PUMP STATION WET WELL FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION BEGAN ON 6/28/14 AT 7:15 AM AND ENDED ON 6/28/14 AT 11:00 AM. THE DIVERSION WAS PERFORMED TO PREVENT PROPERTY AND EQUIPMENT DAMAGE AND TO LESSEN THE OVERFLOW OF PARTIALLY TREATED WASTEWATER FROM THE AERATION BASINS AND CLARIFIERS. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 3.19 INCHES WITH 2.64 INCHES IN ONE HOUR AND GROUND SATURATION FROM THE 3.14 INCHES OF RAIN RECEIVED FROM 6/22/14 TO 6/24/14. LIFT STATION OUTAGE DUE TO A CONTROL PANEL ALARM ACKNOWLEDGMENT ISSUE THE FORCE MAIN WAS BROKEN BY A CONTRACTOR INSTALLING FIBER OPTIC LINES ALL PUMPS WERE IN CONTINUOUS OPERATION FROM 8:00 PM ON 6/25/14 TO 5:00 AM ON 6/26/14. FLOW MODELING OF THIS SUB-BASIN BEGAN IN MAY OF 2014 TO DETERMINE THE SOURCES OF INFLOW /INFILTRATION. CLEANED AREA THE FORCE MAIN REPAIR WAS PERFORMED BY BLD SERVICES, LLC ON 7/9/14. LAKE PONTCHARTRAIN RAIN EVENT OF 1.44 INCHES WITH 0.65 INCHES FALLING IN 30 MINUTES THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS WERE TURNED OFF TO ALLOW SOLIDS TO SETTLE IN THE AERATION BASINS IN ORDER TO REDUCE THE POTENTIAL AMOUNT OF SOLIDS THAT COULD OVERFLOW THE TOP OF THE WALL. FURTHERMORE, THE DIGESTERS LEVELS WERE LOWERED AND THE BAR SCREENS PUT ON HAND. IN JANUARY 2014, AN EARTHEN BERM WAS INSTALLED AROUND THE NORTH PLANT AERATION BASINS 1 - 4 AND CLARIFIERS 1 - 4 TO CAPTURE AND RETAIN OVERFLOWS. LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND SANITIZED AREA LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND SANITIZED AREA 2014 Page 37 Year 2015 Date Event Began 01/02/15 01/04/15 01/10/15 01/13/15 01/13/15 01/22/15 Lift Station Sub Basin LS 4314 LS 4320 LS 4304 LS 4209 LS 4335 LS 4311 Start Time 18:14 13:00 8:20 15:14 17:26 12:51 01/22/15 PLANT 19:48 01/23/15 PLANT 8:00 01/28/15 01/29/15 02/04/15 02/05/15 02/19/15 02/22/15 03/02/15 LS 4206 LS 4335 LS4330 LS4319 LS4209 LS4206 LS 4308 10:00 18:31 11:15 14:17 16:31 13:24 13:10 CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Reporting Address 113 WOODLAKE BOULEVARD #10 INCARNATE WORD 141 CHATEAU ST. MICHEL WILLIAMS & DRIFTWOOD 33RD & WILLIAMS PRESIDENTIAL & SESSIONS Location of Event Cleanout / Manhole / Lift Station LIFT STATION MANHOLE FORCE MAIN MANHOLE MANHOLE MANHOLE 1 W. 30TH o N. PLT. AERATION BASINS 1-4 o N. PLT. CLARIFIERS 1-4 o EFF. PUMP STATION WET WELL 1 W. 30TH EFFLUENT PUMP STATION 43RD & CALIFORNIA L/S 3110 GEORGIA AVENUE 131 W. ESPLANADE (4 MGD LS) 3405 TULANE CORNER OF DRIFTWOOD & WILLIAMS 1701 42ND STREET 429 BARONI LIFT STATION MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE Date Event Ended 01/02/15 01/04/15 01/10/15 Possible End Time volume of Receiving Surface Water event (gallons) 21:33 50 LAKE PONTCHARTRAIN 13:26 20 LAKE PONTCHARTRAIN 8:33 100 LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) LIFT STATION OUTAGE MAIN LINE BLOCKAGE BROKEN FORCE MAIN Resolution of Event (Washed Out Line, Repaired Force Main) UNCLOGGED PUMPS AND WASHED AND SANITIZED AREA UNBLOCKED LINE AND WASHED AND SANITIZED AREA REPAIRED FORCE MAIN (WORK ORDER 43009) 01/13/15 01/13/15 01/22/15 16:10 18:11 13:39 01/23/15 19:15 70 LAKE PONTCHARTRAIN 40 LAKE PONTCHARTRAIN 80 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE UNBLOCKED LINE AND SANITIZED AREA UNBLOCKED LINE AND WASHED AND SANITIZED AREA UNBLOCKED LINE AND WASHED AND SANITIZED AREA LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 3.43 INCHES CAUSED UPSET CONDITIONS AT THE PLANT ENACTED WET WEATHER PLAN BY TURNING BLOWERS OFF TO ALLOW SOLIDS TO SETTLE TO BOTTOM OF AERATION BASINS, AND LOWERED THE LEVELS IN DIGESTERS NOS. 2 AND 3 TO HANDLE ANY POTENTIAL OVERFLOW FROM THE AERATION BASINS. IN JANUARY 2014, AN EARTHEN BERM WAS INSTALLED TO CAPTURE AND CONTAIN OVERFLOWS FROM THE N. PLT. AERATION BASINS 1 - 4. ON 01/23/15 AT 8:00 AM, THE TREATED AND NONDISINFECTED PLANT EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH, TO PREVENT PROPERTY DAMAGE, AND TO REDUCE THE OVERFLOW OF PARTIALLY TREATED WASTEWATER. THE EFFLUENT FLOW WAS 50 MGD OR GREATER FROM 7:48 PM ON 01/22/15 TO APPROX. 7:00 PM ON 01/23/15. 01/23/15 01/27/15 01/29/15 02/04/15 02/05/15 19:15 11:00 19:02 11:30 14:43 5,034,719 LAKE PONTCHARTRAIN 10 LAKE PONTCHARTRAIN 5 LAKE PONTCHARTRAIN 150 LAKE PONTCHARTRAIN 30 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 3.43 INCHES CAUSED UPSET CONDITIONS AT THE PLANT VALVE PIT DRAIN LINE BLOCKAGE MAIN LINE BLOCKAGE LIFT STATION OUTAGE MAIN LINE BLOCKAGE ENACTED WET WEATHER PLAN BY TURNING BLOWERS OFF TO ALLOW SOLIDS TO SETTLE TO BOTTOM OF AERATION BASINS, AND LOWERED THE LEVELS IN DIGESTERS NOS. 2 AND 3 TO HANDLE ANY POTENTIAL OVERFLOW FROM THE AERATION BASINS. IN JANUARY 2014, AN EARTHEN BERM WAS INSTALLED TO CAPTURE AND CONTAIN OVERFLOWS FROM THE N. PLT. AERATION BASINS 1 - 4. ON 01/23/15 AT 8:00 AM, THE TREATED AND NONDISINFECTED PLANT EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH, TO PREVENT PROPERTY DAMAGE, AND TO REDUCE THE OVERFLOW OF PARTIALLY TREATED WASTEWATER. THE EFFLUENT FLOW WAS 50 MGD OR GREATER FROM 7:48 PM ON 01/22/15 TO APPROX. 7:00 PM ON 01/23/15. INTERMITTENT OVERFLOW. UNBLOCKED DRAIN LINE AND WASHED AND SANITIZED AREA UNBLOCKED LINE AND WASHED AND SANITIZED AREA REPLACED TRANSDUCER. WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 02/19/15 17:22 50 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 02/22/15 14:25 150 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 03/02/15 13:53 5 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 2015 Page 38 Date Event Began Lift Station Sub Basin Start Time Reporting Address 03/10/15 PLANT 14:00 1 W. 30TH 03/10/15 PLANT 14:40 1 W. 30TH 03/10/15 LS 4330 15:06 4MGD LS 03/10/15 03/11/15 03/11/15 03/13/15 LS 4310 LS 4310 LS 4310 LS 4311 20:25 9:42 9:42 7:39 3361 CONTINENTAL 3361 CONTINENTAL 3413 CONTINENTAL 3237 CONTINENTAL 03/13/15 LS 4330 9:08 4MGD LS 03/13/15 PLANT 10:00 1 W. 30TH 03/13/15 PLANT 10:30 1 W. 30TH 03/18/15 LS 4200 8:04 CHATEAU TRANSFER STATION Location of Event Cleanout / Manhole / Lift Station o NP AERATION BASIN 1-4 DISCHARGE TROUGH o NP CLARIFIERS 1-4 o EFFLUENT PUMP STATION WET WELL EFFLUENT PUMP STATION DISCHARGE DIVERSION LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION o NP AERATION BASIN 1-4 DISCHARGE TROUGH o NP CLARIFIERS 1-4 o EFFLUENT PUMP STATION WET WELL EFFLUENT PUMP STATION DISCHARGE DIVERSION LIFT STATION Date Event Ended 03/11/15 03/10/15 03/10/15 03/10/15 03/10/15 03/10/15 03/11/15 03/11/15 03/13/15 03/13/15 03/13/15 03/13/15 03/13/15 03/13/15 03/18/15 End Time 6:00 15:00 15:00 18:20 15:30 Possible volume of event (gallons) UNKNOWN 2,548,609 300 Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) PLANT UPSET CAUSED BY HEAVY INTENSE, RAIN EVENT OF 2.37 INCHES IN 2 HOURS (12:00 PM - 2:00 PM), WITH 1 INCH FALLING IN 0.5 HOURS, AND INFLOW AND INFILTRATION IN THE COLLECTION SYSTEM PUMP NO. 1 VFD FAILURE AFTER HEAVY RAIN EVENT OF 2.37 INCHES IN 2 HOURS (12:00 PM 2:00 PM). THE STATION OVERFLOWED WITH 5 MINUTES OF FAILURE NOTIFICATION Resolution of Event (Washed Out Line, Repaired Force Main) ENACTED THE PLANT'S WET WEATHER PLAN WHEREBY THE BLOWERS WERE TURNED OFF SO THAT THE SOLIDS WOULD SETTLE TO THE BOTTOM OF THE AERATION TANK. DIGESTERS 2 AND 3 WERE WATER LEVELS WERE LOWERED TO CAPTURE ANY POTENTIAL OVERFLOW FROM THE AERATION BASINS DISCHARGE TROUGH. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE DISCHARGE TROUGH. AT 2:40 PM, THE TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AS MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PREVENT PROPERTY DAMAGE, PROTECT EMPLOYEE HEALTH, AND TO DECREASE THE OVERFLOW VOLUME OF PARTIALLY TREATED WASTEWATER. AT THE TIME OF THE DIVERSION, THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. THE DIVERSION ENDED AT 6:20 PM. PUMP 1 CONTROLS WERE CHANGED TO FULL OPERATION. THE OVERFLOW AREA WAS WASHED AND SANITIZED. 21:25 1,500 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA ON 3/11/15 10:48 50 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 10:48 100 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 8:58 10:13 19:30 11:00 11:00 12:30 8:35 40 700 UNKNOWN 1,388,888 100 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN PUMP NO. 1 VFD FAILURE AFTER HEAVY RAIN EVENT OF 1.34 INCHES (12:00 AM - 10:00 AM). THE STATION OVERFLOWED WITH 5 MINUTES OF FAILURE NOTIFICATION PLANT UPSET CAUSED BY HEAVY RAIN EVENT OF 1.34 INCHES IN 2 HOURS (12:00 AM - 10:30 AM), INFLOW AND INFILTRATION IN THE COLLECTION SYSTEM, AND GROUND SATURATION CAUSED BY THE PREVIOUS DAYS' RAIN EVENTS. LIFT STATION OUTAGE DUE TO THE MAIN BREAKER BEING TRIPPED WHEN THE GENERATOR WAS TRANSFERRING BACK TO COMMERCIAL (ENTERGY) POWER WITH ALL PUMPS IN OPERATION. PUMP 1 CONTROLS WERE CHANGED TO FULL OPERATION. THE OVERFLOW AREA WAS WASHED AND SANITIZED. ENACTED THE PLANT'S WET WEATHER PLAN WHEREBY THE BLOWERS WERE TURNED OFF SO THAT THE SOLIDS WOULD SETTLE TO THE BOTTOM OF THE AERATION TANK. DIGESTERS 2 AND 3 WERE WATER LEVELS WERE LOWERED TO CAPTURE ANY POTENTIAL OVERFLOW FROM THE AERATION BASINS DISCHARGE TROUGH. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE DISCHARGE TROUGH. AT 10;30 AM, THE TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AS MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PREVENT PROPERTY DAMAGE, PROTECT EMPLOYEE HEALTH, AND TO DECREASE THE OVERFLOW VOLUME OF PARTIALLY TREATED WASTEWATER. AT THE TIME OF THE DIVERSION, THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. THE DIVERSION ENDED AT 12:30 PM. THE BREAKER WAS RESET, AND THE OVERFLOW AREA WAS WASHED AND SANITIZED. 2015 Page 39 Date Event Began 04/01/15 Lift Station Sub Basin LS 4323 Start Time 16:41 Reporting Address 20 BISTINEAU 04/13/15 LS 4200 6:35 3600 CHATEAU 04/14/15 LS 4207 11:38 5212 JANICE 04/14/15 LS 4308 12:00 285 W. ESPLANADE 04/14/15 LS 4303 13:00 908 VINTAGE 04/14/15 PLANT 10:45 #1 W. 30TH STREET 04/14/15 PLANT 10:45 #1 W. 30TH STREET 04/14/15 LS 4100 14:11 2649 DELAWARE 04/14/15 LS 4313 14:28 #1 MOSELLE 04/15/15 LS4313 6:42 CORNER OF SUNSET & MOSELLE 04/15/15 LS 4207 7:26 5220 JANICE Location of Event Cleanout / Manhole / Lift Station LIFT STATION LIFT STATION MANHOLE MANHOLE MANHOLE Date Event Ended 04/01/15 04/13/15 04/14/15 04/14/15 04/14/15 Possible End Time volume of Receiving Surface Water event (gallons) 16:58 2 LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) LIFT STATION DISCHARGE PIPE ELBOW RUPTURED Resolution of Event (Washed Out Line, Repaired Force Main) PIPE ELBOW WAS REPLACED. THE OVERFLOW AREA WAS WASHED AND SANITIZED. 9:28 57,200 LAKE PONTCHARTRAIN PUMP NO. 1 TRIPPED AT THE MAIN BREAKER SWITCH. SCADA UNIT HAD A COMMUNICATION ISSUE; THEREFORE, NO ALARM NOTICE WAS ISSUED. PUMP NO. 1 WAS RESET. THE OVERFLOW AREA WAS WASHED AND SANITIZED AREA 12:15 12:30 13:25 50 2,400 2,250 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAINFALL OF 2.19 INCHES AND GROUND SATURATION FROM PREVIOUS RAIN EVENTS. HEAVY RAINFALL OF 2.19 INCHES AND GROUND SATURATION FROM PREVIOUS RAIN EVENTS. HEAVY RAINFALL OF 2.19 INCHES AND GROUND SATURATION FROM PREVIOUS RAIN EVENTS. ALL PUMPS WERE IN OPERATION AT THE LIFT STATION. ALL PUMPS WERE IN OPERATION AT THE LIFT STATION. THE OVERFLOW WAS CLEAR WATER WITH NO ODOR. WASHED AND SANITIZED AREA. ALL PUMPS WERE IN OPERATION AT THE LIFT STATION. THE OVERFLOW WAS CLEAR WATER WITH NO ODOR. WASHED AND SANITIZED AREA. NP AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH 04/15/15 7:20 LAKE PONTCHARTRAIN PLANT UPSET CAUSED BY HEAVY RAINFALL OF 2.19 INCHES AND GROUND SATURATION FROM PREVIOUS RAIN EVENTS. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 10:45 AM, ON 04/14/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION ENDED ON 04/15/15 AT 7:15 AM. THE TOTAL RAINFALL FOR 04/14/15 WAS 2.99 INCHES. EFFLUENT PUMP STATION 04/15/15 MANHOLE MANHOLE MANHOLE MANHOLE 04/14/15 04/14/15 04/15/15 04/15/15 7:15 14:20 14:34 6:54 7:41 14,236,102 25 1,200 20 20 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN PLANT UPSET CAUSED BY HEAVY RAINFALL OF 2.19 INCHES AND GROUND SATURATION FROM PREVIOUS RAIN EVENTS. HEAVY RAINFALL OF 2.19 INCHES AND GROUND SATURATION FROM PREVIOUS RAIN EVENTS. HEAVY RAINFALL OF 2.19 INCHES AND GROUND SATURATION FROM PREVIOUS RAIN EVENTS. HEAVY RAINFALL OF 0.44 INCHES AND GROUND SATURATION FROM PREVIOUS RAIN EVENTS HEAVY RAINFALL OF 0.46 INCHES AND GROUND SATURATION FROM PREVIOUS RAIN EVENTS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 10:45 AM, ON 04/14/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION ENDED ON 04/15/15 AT 7:15 AM. ALL AVAILABLE PUMPS WERE IN OPERATION. WASHED AND SANITIZED AREA. ALL PUMPS WERE IN OPERATION AT THE LIFT STATION. THE OVERFLOW WAS CLEAR WATER WITH NO ODOR. WASHED AND SANITIZED AREA. WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 2015 Page 40 Date Event Began Lift Station Sub Basin Start Time Reporting Address 04/15/15 PLANT 17:45 #1 W. 30TH STREET 04/15/15 PLANT 17:45 #1 W. 30TH STREET 04/17/15 PLANT 0:15 #1 W. 30TH STREET 04/17/15 PLANT 0:15 #1 W. 30TH STREET Location of Event Cleanout / Manhole / Lift Station NP AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH EFFLUENT PUMP STATION NP AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH EFFLUENT PUMP STATION Date Event Ended 04/16/15 04/16/15 04/17/15 04/17/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 4:00 LAKE PONTCHARTRAIN PLANT UPSET CAUSED BY A STORM EVENT WITH INTENSE RAIN (0.8 INCHES IN 12 MINUTES AND HAIL THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 5:45 PM, ON 04/15/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION ENDED ON 04/16/15 AT 4:00 AM. 4:00 6:10 6:10 7,291,662 4,111,108 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN PLANT UPSET CAUSED BY A STORM EVENT WITH INTENSE RAIN (0.8 INCHES IN 12 MINUTES) AND HAIL PLANT UPSET CAUSED BY A HEAVY RAIN EVENT OF 0.88 INCHES, AND GROUND SATURATION DUE TO PREVIOUS RAIN EVENTS. PLANT UPSET CAUSED BY A HEAVY RAIN EVENT OF 0.88 INCHES, AND GROUND SATURATION DUE TO PREVIOUS RAIN EVENTS. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 5:45 PM, ON 04/15/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION ENDED ON 04/16/15 AT 4:00 AM. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED TWICE FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS FROM 12:15 AM TO 6:10 AM ON 04/17/15. THE SECOND DIVERSION WAS FROM 7:40 AM TO 9T:H3E0 AMP.LANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED TWICE FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS FROM 12:15 AM TO 6:10 AM ON 04/17/15. THE SECOND DIVERSION WAS FROM 7:40 AM TO 9:30 AM. 2015 Page 41 Date Event Began Lift Station Sub Basin Start Time Reporting Address 04/17/15 PLANT 7:40 #1 W. 30TH STREET 04/17/15 PLANT 7:40 #1 W. 30TH STREET 04/18/15 PLANT 9:30 #1 W. 30TH STREET 04/18/15 PLANT 9:30 #1 W. 30TH STREET Location of Event Cleanout / Manhole / Lift Station NP AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH EFFLUENT PUMP STATION NP AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH EFFLUENT PUMP STATION Date Event Ended 04/17/15 04/17/15 04/18/15 04/18/15 End Time 9:30 9:30 14:40 14:40 Possible volume of event (gallons) 1,270,883 3,590,275 Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) PLANT UPSET CAUSED BY A HEAVY RAIN EVENT OF 0.88 INCHES, AND GROUND SATURATION DUE TO PREVIOUS RAIN EVENTS. PLANT UPSET CAUSED BY A HEAVY RAIN EVENT OF 0.88 INCHES, AND GROUND SATURATION DUE TO PREVIOUS RAIN EVENTS. PLANT UPSET CAUSED BY A HEAVY RAIN EVENT OF 1.13 INCHES, AND GROUND SATURATION DUE TO PREVIOUS RAIN EVENTS. PLANT UPSET CAUSED BY A HEAVY RAIN EVENT OF 1.13 INCHES, AND GROUND SATURATION DUE TO PREVIOUS RAIN EVENTS. Resolution of Event (Washed Out Line, Repaired Force Main) THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED TWICE FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS FROM 12:15 AM TO 6:10 AM ON 04/17/15. THE SECOND DIVERSION WAS FROM 7:40 AM TO 9T:H3E0 AMP.LANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED TWICE FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS FROM 12:15 AM TO 6:10 AM ON 04/17/15. THE SECOND DIVERSION WAS FROM 7:40 AM TO 9T:H3E0 AMP.LANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED TWICE FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS FROM 9:30 AM AM TO 2:40 PM ON 04/18/15. THE SECOND DIVERSION WAS FROM 4:00 PM TO 5T:H0E0 PMP.LANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED TWICE FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS FROM 9:30 AM AM TO 2:40 PM ON 04/18/15. THE SECOND DIVERSION WAS FROM 4:00 PM TO 5:00 PM. 2015 Page 42 Date Event Began Lift Station Sub Basin Start Time Reporting Address 04/18/15 PLANT 16:00 #1 W. 30TH STREET 04/18/15 PLANT 16:00 #1 W. 30TH STREET 04/25/15 PLANT 16:45 #1 W. 30TH STREET 04/27/15 LS 4330 131 W. ESPLANADE 04/27/15 PLANT 14:56 #1 W. 30TH STREET Location of Event Cleanout / Manhole / Lift Station NP AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH EFFLUENT PUMP STATION EFFLUENT PUMP STATION 4 MGD LIFT STATION EFFLUENT PUMP STATION Date Event Ended 04/18/15 04/18/15 04/25/15 04/27/15 04/28/15 End Time 17:00 17:00 18:20 Possible volume of event (gallons) 694,444 1,097,222 Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) PLANT UPSET CAUSED BY A HEAVY RAIN EVENT OF 1.13 INCHES, AND GROUND SATURATION DUE TO PREVIOUS RAIN EVENTS. PLANT UPSET CAUSED BY A HEAVY RAIN EVENT OF 1.13 INCHES, AND GROUND SATURATION DUE TO PREVIOUS RAIN EVENTS. PLANT UPSET CAUSED BY A HEAVY RAINFALL EVENT OF 0.83 INCHES IN 2.67 HOURS AND GROUND SATURATION Resolution of Event (Washed Out Line, Repaired Force Main) THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED TWICE FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS FROM 9:30 AM AM TO 2:40 PM ON 04/18/15. THE SECOND DIVERSION WAS FROM 4:00 PM TO 5T:H0E0 PMP.LANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED TWICE FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS FROM 9:30 AM AM TO 2:40 PM ON 04/18/15. THE SECOND DIVERSION WAS FROM 4:00 PM TO 5:00 PM. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION WAS FROM 4:45 PM TO 6:20 PM ON 04/25/15. 5:00 9,722,216 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN STORM EVENT WITH RAINFALL OF 1.23 INCHES IN 55 MINUTES, HEAVY WINDS, A TORNADO, AND CITY-WIDE POWER OUTAGES PLANT UPSET CAUSED BY A STORM EVENT WITH RAINFALL OF 1.23 INCHES IN 55 MINUTEES, HEAVY WINDS, A TORNADO, AND CITY-WIDE POWER OUTAGES. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FOUR TIMES FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS 2015 Page 43 04D/2a7te/15 Event Began PLLAifNt T Station - Sub Basin 1S4t:a5r6t Time #1 W. 30TH STREET Reporting Address 04/28/15 PLANT 6:50 #1 W. 30TH STREET 04/28/15 PLANT 10:00 #1 W. 30TH STREET 04/28/15 PLANT 13:10 #1 W. 30TH STREET EFFLULEoNcaTtioPnUoMf PEvSenTtATION Cleanout / Manhole / Lift Station EFFLUENT PUMP STATION EFFLUENT PUMP STATION EFFLUENT PUMP STATION 04D/2a8te/15 Event Ended 04/28/15 04/28/15 04/29/15 5:00 End Time 9:00 12:10 9,P7o2s2s,ib2l1e6 volume of event (gallons) 812,499 1,506,943 LAKE PONTCHARTRAIN Receiving Surface Water LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN PLANT UPSET CAUSED BY A STORM EVENT WITH RAINFALL OF 1C.2a3usINeCoHf EESveInNt 5(M5 aMinINLUinTeEES, HEBAloVcYkWagINe,DLSif,tAStTaOtiRonNAODuOta,gAeN, D CITY-WIDE POEWtcE.)R OUTAGES. PLANT UPSET CAUSED BY A STORM EVENT WITH RAINFALL OF 1.23 INCHES IN 55 MINUTEES, HEAVY WINDS, A TORNADO, AND CITY-WIDE POWER OUTAGES. PLANT UPSET CAUSED BY A STORM EVENT WITH RAINFALL OF 1.23 INCHES IN 55 MINUTEES, HEAVY WINDS, A TORNADO, AND CITY-WIDE POWER OUTAGES. Resolution of Event (Washed Out Line, Repaired Force Main) PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS ON 04/27/15 AT 2:56 PM TO 04/28/15 AT 5:00 AM. THE SECOND DIVERSION WAS ON 04/28/15 FROM 6:50 AM TO 9:00 AM. THE THIRD DIVERSION WAS ON 04/28/15 FROM 10:00 AM TO 12:10 PM. THE FINAL DIVERSION WAS ON 04/28/15 AT 1:10 PM TO 0T4H/E29/1P5LAATN6T:'3S0 AWM.ET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FOUR TIMES FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS ON 04/27/15 AT 2:56 PM TO 04/28/15 AT 5:00 AM. THE SECOND DIVERSION WAS ON 04/28/15 FROM 6:50 AM TO 9:00 AM. THE THIRD DIVERSION WAS ON 04/28/15 FROM 10:00 AM TO 12:10 PM. THE FINAL DIVERSION WAS ON 04/28/15 AT 1:10 PM TO 0T4H/E29/1P5LAATN6T:'3S0 AWM.ET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FOUR TIMES FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS ON 04/27/15 AT 2:56 PM TO 04/28/15 AT 5:00 AM. THE SECOND DIVERSION WAS ON 04/28/15 FROM 6:50 AM TO 9:00 AM. THE THIRD DIVERSION WAS ON 04/28/15 FROM 10:00 AM TO 12:10 PM. THE FINAL DIVERSION WAS ON 04/28/15 AT 1:10 PM TO 04/29/15 AT 6:30 AM. 6:30 4,559,523 LAKE PONTCHARTRAIN PLANT UPSET CAUSED BY A STORM EVENT WITH RAINFALL OF 1.23 INCHES IN 55 MINUTEES, HEAVY WINDS, A TORNADO, AND CITY-WIDE POWER OUTAGES. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FOUR TIMES FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS 2015 Page 44 Date 04E/v2e8n/1t5 Began Lift SPtaLtAioNnT- Sub Basin 1S3t:a1r0t Time R#1epWo.rt3i0nTgHASddTrReEsEs T 05/01/15 05/05/15 05/12/15 LS4330 LS4203 LS4339 6:42 10:41 13:30 131 W. ESPLANADE 4520 WILLIAMS BLVD. 120 22ND ST 05/15/15 PLANT 23:00 1 W. 30TH ST 05/15/15 PLANT 22:00 1 W. 30TH ST EFFLULEoNcaTtioPnUoMf PEvSenTtATION Cleanout / Manhole / Lift Station Date 04E/v2e9n/1t5 Ended En6d:3T0ime Possible 4v,o5l5u9m,e52o3f event (gallons) RLeAcKeEivPinOgNSTuCrHfaAcReTWRaAtIeNr PLANT UPSET CAUSED BY A STOCRauMseEVoEf ENvTeWntIT(MHaRinAILNinFeALL OFBl1o.c2k3aIgNeC,HLEifSt SINta5ti5onMOINuUtTagEeE,S, HEAVY WINDS,EAtcT.)ORNADO, AND CITY-WIDE POWER OUTAGES. Resolution of Event (Washed Out Line, Repaired Force Main) PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE FIRST DIVERSION WAS ON 04/27/15 AT 2:56 PM TO 04/28/15 AT 5:00 AM. THE SECOND DIVERSION WAS ON 04/28/15 FROM 6:50 AM TO 9:00 AM. THE THIRD DIVERSION WAS ON 04/28/15 FROM 10:00 AM TO 12:10 PM. THE FINAL DIVERSION WAS ON 04/28/15 AT 1:10 PM TO 04/29/15 AT 6:30 AM. LIFT STATION MANHOLE MANHOLE 05/01/15 05/05/15 05/12/15 NP AERATION BASINS NOS. 1- 05/16/15 4 DISCHARGE TROUGH EFFLUENT PUMP STATION DIVERSION 05/15/15 7:45 11:32 14:18 3:30 23:45 500 LAKE PONTCHARTRAIN LIFT STATION OVERFLOWED ON WASHED AND SANITIZED AREA 04/27/15 200 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 1,215,277 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE HEAVY RAIN EVENT OF 4.53 INCHES, WITH A TOTAL OF 5.58 INCHES ON 05/15/15 AND 1.55 INCHES OR RAIN ON 05/16/15 CAUSED PLANT UPSET CONDTIONS HEAVY RAIN EVENT OF 4.53 INCHES, WITH A TOTAL OF 5.58 INCHES ON 05/15/15 AND 1.55 INCHES OR RAIN ON 05/16/15 CAUSED PLANT UPSET CONDTIONS WASHED AND SANITIZED AREA THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 10:00 PM, ON 05/15/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 10:00 AM ON 05/16/15. THE FIRST DIVERSION ENDED AT 11:45 PM ON 05/15/15. THE SECOND DIVERSION WAS FROM 12:45 AM - 2:30 AM ON 05/16/15. THE THIRD DIVERSION WAS FROM 3:30 AM - 5:00 AM ON 05/16/15. THE FINAL DIVERSION WAS FROM 8:30 AM - 10:30 AM ON 05/16/15. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 10:00 PM, ON 05/15/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 10:00 AM ON 05/16/15. THE FIRST DIVERSION ENDED AT 11:45 PM ON 05/15/15. THE SECOND DIVERSION WAS FROM 12:45 AM - 2:30 AM ON 05/16/15. THE THIRD DIVERSION WAS FROM 3:30 AM - 5:00 AM ON 05/16/15. THE FINAL DIVERSION WAS FROM 8:30 AM - 10:30 AM ON 05/16/15. 2015 Page 45 Date Event Began Lift Station Sub Basin Start Time Reporting Address 05/16/15 PLANT 0:45 1 W. 30TH ST 05/16/15 PLANT 3:30 1 W. 30TH ST 05/16/15 PLANT 8:30 1 W. 30TH ST 05/19/15 LS4207 17:54 2800 STAHL Location of Event Cleanout / Manhole / Lift Station EFFLUENT PUMP STATION DIVERSION EFFLUENT PUMP STATION DIVERSION EFFLUENT PUMP STATION DIVERSION MANHOLE Date Event Ended 05/16/15 05/16/15 05/16/15 05/19/15 Possible End Time volume of Receiving Surface Water event (gallons) 2:30 1,041,666 LAKE PONTCHARTRAIN 5:00 1,041,666 LAKE PONTCHARTRAIN 10:30 1,388,888 LAKE PONTCHARTRAIN 18:28 30 LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) HEAVY RAIN EVENT OF 4.53 INCHES, WITH A TOTAL OF 5.58 INCHES ON 05/15/15 AND 1.55 INCHES OR RAIN ON 05/16/15 CAUSED PLANT UPSET CONDTIONS HEAVY RAIN EVENT OF 4.53 INCHES, WITH A TOTAL OF 5.58 INCHES ON 05/15/15 AND 1.55 INCHES OR RAIN ON 05/16/15 CAUSED PLANT UPSET CONDTIONS HEAVY RAIN EVENT OF 4.53 INCHES, WITH A TOTAL OF 5.58 INCHES ON 05/15/15 AND 1.55 INCHES OR RAIN ON 05/16/15 CAUSED PLANT UPSET CONDTIONS MAIN LINE BLOCKAGE Resolution of Event (Washed Out Line, Repaired Force Main) THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 10:00 PM, ON 05/15/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 10:00 AM ON 05/16/15. THE FIRST DIVERSION ENDED AT 11:45 PM ON 05/15/15. THE SECOND DIVERSION WAS FROM 12:45 AM - 2:30 AM ON 05/16/15. THE THIRD DIVERSION WAS FROM 3:30 AM - 5:00 AM ON 05/16/15. THE FINAL DIVERSION WAS FROM 8:30 AM - 10:30 AM ON 05/16/15. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 10:00 PM, ON 05/15/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 10:00 AM ON 05/16/15. THE FIRST DIVERSION ENDED AT 11:45 PM ON 05/15/15. THE SECOND DIVERSION WAS FROM 12:45 AM - 2:30 AM ON 05/16/15. THE THIRD DIVERSION WAS FROM 3:30 AM - 5:00 AM ON 05/16/15. THE FINAL DIVERSION WAS FROM 8:30 AM - 10:30 AM ON 05/16/15. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 10:00 PM, ON 05/15/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 10:00 AM ON 05/16/15. THE FIRST DIVERSION ENDED AT 11:45 PM ON 05/15/15. THE SECOND DIVERSION WAS FROM 12:45 AM - 2:30 AM ON 05/16/15. THE THIRD DIVERSION WAS FROM 3:30 AM - 5:00 AM ON 05/16/15. THE FINAL DIVERSION WAS FROM 8:30 AM - 10:30 AM ON 05/16/15. WASHED AND SANITIZED AREA 2015 Page 46 Date Event Began Lift Station Sub Basin Start Time Reporting Address 05/21/15 PLANT 18:00 1 W. 30TH ST 05/21/15 PLANT 19:05 1 W. 30TH ST 05/22/15 PLANT 3:10 1 W. 30TH ST Location of Event Cleanout / Manhole / Lift Station Date Event Ended NP AERATION BASINS NOS. 1- 05/22/15 4 DISCHARGE TROUGH EFFLUENT PUMP STATION DIVERSION 05/22/15 EFFLUENT PUMP STATION DIVERSION 05/22/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 4:45 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 3.88 INCHES, ON 05/21/15 FROM 4:40 PM - 7:00 PM, CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 7:05 PM, ON 05/21/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 12:00 PM ON 05/22/15. THE FIRST DIVERSION ENDED AT 1:00 AM ON 05/22/15. THE SECOND DIVERSION WAS FROM 3:10 AM - 5:15 AM ON 05/22/15. THE THIRD DIVERSION WAS FROM 8:00 AM - 9:00 AM ON 05/22/15. THE FINAL DIVERSION WAS FROM 11:30 AM - 12:00 pM ON 05/22/15. 1:00 4,111,108 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 3.88 INCHES, ON 05/21/15 FROM 4:40 PM - 7:00 PM, CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 7:05 PM, ON 05/21/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 12:00 PM ON 05/22/15. THE FIRST DIVERSION ENDED AT 1:00 AM ON 05/22/15. THE SECOND DIVERSION WAS FROM 3:10 AM - 5:15 AM ON 05/22/15. THE THIRD DIVERSION WAS FROM 8:00 AM - 9:00 AM ON 05/22/15. THE FINAL DIVERSION WAS FROM 11:30 AM - 12:00 pM ON 05/22/15. 5:15 1,444,444 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 3.88 INCHES, ON 05/21/15 FROM 4:40 PM - 7:00 PM, CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 7:05 PM, ON 05/21/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 12:00 PM ON 05/22/15. THE FIRST DIVERSION ENDED AT 1:00 AM ON 05/22/15. THE SECOND DIVERSION WAS FROM 3:10 AM - 5:15 AM ON 05/22/15. THE THIRD DIVERSION WAS FROM 8:00 AM - 9:00 AM ON 05/22/15. THE FINAL DIVERSION WAS FROM 11:30 AM - 12:00 pM ON 05/22/15. 2015 Page 47 Date Event Began Lift Station Sub Basin Start Time Reporting Address 05/22/15 PLANT 8:00 1 W. 30TH ST 05/22/15 PLANT 11:30 1 W. 30TH ST 05/25/15 PLANT 15:30 1 W. 30TH ST Location of Event Cleanout / Manhole / Lift Station EFFLUENT PUMP STATION DIVERSION EFFLUENT PUMP STATION DIVERSION EFFLUENT PUMP STATION DIVERSION Date Event Ended 05/22/15 05/22/15 05/25/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 9:00 694,444 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 3.88 INCHES, ON 05/21/15 FROM 4:40 PM - 7:00 PM, CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 7:05 PM, ON 05/21/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 12:00 PM ON 05/22/15. THE FIRST DIVERSION ENDED AT 1:00 AM ON 05/22/15. THE SECOND DIVERSION WAS FROM 3:10 AM - 5:15 AM ON 05/22/15. THE THIRD DIVERSION WAS FROM 8:00 AM - 9:00 AM ON 05/22/15. THE FINAL DIVERSION WAS FROM 11:30 AM - 12:00 pM ON 05/22/15. 12:00 347,222 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 3.88 INCHES, ON 05/21/15 FROM 4:40 PM - 7:00 PM, CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 7:05 PM, ON 05/21/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. INTERMITTENT DIVERSION OCCURRED UNTIL 12:00 PM ON 05/22/15. THE FIRST DIVERSION ENDED AT 1:00 AM ON 05/22/15. THE SECOND DIVERSION WAS FROM 3:10 AM - 5:15 AM ON 05/22/15. THE THIRD DIVERSION WAS FROM 8:00 AM - 9:00 AM ON 05/22/15. THE FINAL DIVERSION WAS FROM 11:30 AM - 12:00 PM ON 05/22/15. 21:00 19,097,210 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 5.10 INCHES OF RAIN ON 05/25/15 AND 0.05 INCHES ON 05/26/15 CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 3:30 PM, ON 05/25/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION OCCURRED UNTIL 9:00 PM ON 05/26/15. A SECOND DIVERSION WAS PERFORMED FROM 12:05 AM - 2:10 AM ON 05/27/15. 2015 Page 48 Date Event Began Lift Station Sub Basin Start Time Reporting Address 05/26/15 PLANT 1:15 1 W. 30TH ST 05/26/15 PLANT 4:45 1 W. 30TH ST 05/27/15 PLANT 0:05 1 W. 30TH ST Location of Event Cleanout / Manhole / Lift Station Date Event Ended NP AERATION BASINS NOS. 1- 05/26/15 4 DISCHARGE TROUGH INFLUENT SPLITTER BOX (INTERMITTENT SPLASHING OVER) 05/26/15 EFFLUENT PUMP STATION DIVERSION 05/26/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 14:00 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 5.10 INCHES OF RAIN ON 05/25/15 AND 0.05 INCHES ON 05/26/15 CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 3:30 PM, ON 05/25/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION OCCURRED UNTIL 9:00 PM ON 05/26/15. A SECOND DIVERSION WAS PERFORMED FROM 12:05 AM - 2:10 AM ON 05/27/15. 5:15 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 5.10 INCHES OF RAIN ON 05/25/15 AND 0.05 INCHES ON 05/26/15 CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 3:30 PM, ON 05/25/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION OCCURRED UNTIL 9:00 PM ON 05/26/15. A SECOND DIVERSION WAS PERFORMED FROM 12:05 AM - 2:10 AM ON 05/27/15. 2:10 750,000 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 5.10 INCHES OF RAIN ON 05/25/15 AND 0.05 INCHES ON 05/26/15 CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 3:30 PM, ON 05/25/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION OCCURRED UNTIL 9:00 PM ON 05/26/15. A SECOND DIVERSION WAS PERFORMED FROM 12:05 AM - 2:10 AM ON 05/27/15. 2015 Page 49 Date Event Began Lift Station Sub Basin Start Time Reporting Address 05/27/15 PLANT 17:00 1 W. 30TH ST 07/05/15 Plant 19:30 #1 W. 30TH STREET 08/11/15 08/25/15 08/27/15 09/02/15 09/08/15 09/30/15 10/15/15 LS4303 LS4301 LS4331 LS 4203 LS 4112 LS 4220 LS4335 9:51 7:17 0:00 10:13 16:30 17:13 8:27 1101 SUNSET #91 CHATEAU DU LAC 421 CHAMP ELYEES 4520 WILLIAMS BLVD. 2829 WILLIAMS BLVD. 455 31ST ST. 33RD & WILLIAMS 10/25/15 PLANT 9:30 #1 W. 30TH STREET Location of Event Cleanout / Manhole / Lift Station EFFLUENT PUMP STATION DIVERSION EFFLUENT PUMP STATION MANHOLE MANHOLE LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE o NP AERIATION BASINS NOS. 1-4 DISCHARGE TROUGH o INFLUENT SPLITTER BOX (INTERMITTENT) o NP CLARIFIERS 5 - 6 SCUM WELL AND CENTER SECTION Date Event Ended 05/27/15 07/05/15 08/11/15 08/25/15 08/27/15 09/02/15 09/08/15 09/30/15 10/15/15 10/27/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 21:40 3,243,053 LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 5.10 INCHES OF RAIN ON 05/25/15, 0.05 INCHES ON 05/26/15, AND 0.3 INCHES ON 05/27/15 CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATORS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS, SO THAT THEY ARE NOT DISCHARGED OVER THE WALLS. AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW FROM THE AERATION BASINS. THE PLANT'S EFFLUENT FLOW WAS 50 MGD. AT 5:00 PM, ON 05/27/15, THE TREATED AND NON-DISINFECTED EFFLUENT WAS DIVERTED FROM ITS PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE DIVERSION OCCURRED UNTIL 9:40 PM ON 05/27/15. 22:00 1,736,110 LAKE PONTCHARTRAIN PLANT UPSET DUE TO INTENSE RAIN EVENT OF 0.79 INCHES ON 07/05/15 FROM 5:47 PM - 6:17 PM (0.5 HOURS). THIS EVENT, IN ADDITION TO THE COLLECTION SYSTEM INFLOW AND INFILTRATION, CAUSED UPSET CONDITIONS AT THE PLANT AND POWER OUTAGES AT SEVERAL LIFT STATIONS IN NORTHEAST KENNER. AT 7:30 PM, THE PLANT'S EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. NORTH PLANT CLARIFIERS' WATER LEVELS WERE SEVERAL FEET ABOVE THE WEIRS. THE PLANT'S TREATED AND NONDISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND TO PREVENT PROPERTY AND EQUIPMENT DAMAGE. THE EFFLUENT DIVERSION ENDED AT 10:00 PM ON 07/05/15. LDEQ ONLINE INCIDENT REPORT NO. QJ6K 14365 WAS FILED ON 07/05/15. 10:23 50 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE WASHED DOWN AND SANITIZED AREA 7:48 30 LAKE PONTCHARTRAIN LIFT STATION OUTAGE WASHED DOWN AND SANITIZED AREA 15:15 10:32 17:06 18:00 8:55 4:20 LAKE PONTCHARTRAIN 10 LAKE PONTCHARTRAIN 100 LAKE PONTCHARTRAIN 100 LAKE PONTCHARTRAIN 60 LAKE PONTCHARTRAIN BROKEN FORCE MAIN MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE REPAIRED FORCE MAIN (WORK ORDER 43607) UNBLOCKED AREA UNBLOCKED AREA UNBLOCKED AREA LINE LINE LINE AND AND AND WASHED WASHED WASHED AND AND AND SANITIZED SANITIZED SANITIZED COULD NOT WASH AREA DUE TO TRAFFIC LAKE PONTCHARTRAIN HEAVY RAINFALL (8.65 INCHES ON 10/25/15 AND 1.41 INCHES ON 10/26/15) FROM TROPICAL STORM PATRICIA CAUSED UPSET CONDITIONS AT THE PLANT THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATION BLOWERS WERE TURNED OFF SO THE SOLIDS WOULD SETTLE IN THE BASINS AND NOT OVERFLOW THE TOP OF THE DISCHARGE TROUGH WALL. THE EFFLUENT FLOW WAS 50 MGD, WHICH WAS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. AT 9:30 AM ON 10/25/15, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND TO PREVENT PROPERTY AND EQUIPMENT DAMAGE. 2015 Page 50 Date Event Began Lift Station Sub Basin Start Time 10/25/15 PLANT 9:30 10/26/15 LS4311 8:25 10/26/15 LS4311 8:25 10/26/15 LS 4311 13:42 10/27/15 PLANT 9:20 10/27/15 PLANT 9:20 10/27/15 LS 4344 13:00 Reporting Address Location of Event Cleanout / Manhole / Lift Station #1 W. 30TH STREET PLANT EFFLUENT PUMP STATION DIVERSON 3208 CASTLE 937 RONSON 913 RONSON MANHOLE MANHOLE MANHOLE #1 W. 30TH STREET o NP AERIATION BASINS NOS. 1-4 DISCHARGE TROUGH #1 W. 30TH STREET PLANT EFFLUENT PUMP STATION DIVERSON 27TH STREET AT DAWSON LIFT STATION Date Event Ended 10/27/15 10/26/15 10/26/15 10/26/15 10/27/15 10/27/15 10/27/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 4:20 8:40 8:40 14:09 12:30 29,687,481 60 60 25 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAINFALL (10 INCHES) FROM TROPICAL STORM PATRICIA HEAVY RAINFALL (8.65 INCHES ON 10/25/15 AND 1.41 INCHES ON 10/26/15) FROM TROPICAL STORM PATRICIA CAUSED UPSET CONDITIONS AT CHATEAU CAMERON LIFT STATION HEAVY RAINFALL (8.65 INCHES ON 10/25/15 AND 1.41 INCHES ON 10/26/15) FROM TROPICAL STORM PATRICIA CAUSED UPSET CONDITIONS AT CHATEAU CAMERON LIFT STATION HEAVY RAINFALL (8.65 INCHES ON 10/25/15 AND 1.41 INCHES ON 10/26/15) FROM TROPICAL STORM PATRICIA CAUSED UPSET CONDITIONS AT CHATEAU CAMERON LIFT STATION HEAVY RAINFALL (8.65 INCHES ON 10/25/15 AND 1.41 INCHES ON 10/26/15) FROM TROPICAL STORM PATRICIA CAUSED UPSET CONDITIONS AT THE PLANT THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATION BLOWERS WERE TURNED OFF SO THE SOLIDS WOULD SETTLE IN THE BASINS AND NOT OVERFLOW THE TOP OF THE DISCHARGE TROUGH WALL. THE EFFLUENT FLOW WAS 50 MGD, WHICH WAS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. AT 9:30 AM ON 10/25/15, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND TO PREVENT PROPERTY AND EQUIPMENT DAMAGE. WASHED AND SANITIZED AREA ON 10/27/15 WASHED AND SANITIZED AREA ON 10/27/15 WASHED AND SANITIZED AREA ON 10/27/15 THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATION BLOWERS WERE TURNED OFF SO THE SOLIDS WOULD SETTLE IN THE BASINS AND NOT OVERFLOW THE TOP OF THE DISCHARGE TROUGH WALL. AT 9:20 AM ON 10/27/15, THE PLANT'S TREATED AND NONDISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND TO PREVENT PROPERTY AND EQUIPMENT DAMAGE. 12:30 13:30 29,687,481 4,000 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAINFALL (8.65 INCHES ON 10/25/15 AND 1.41 INCHES ON 10/26/15) FROM TROPICAL STORM PATRICIA CAUSED UPSET CONDITIONS AT THE PLANT HEAVY RAINFALL (8.65 INCHES ON 10/25/15 AND 1.41 INCHES ON 10/26/15) FROM TROPICAL STORM PATRICIA CAUSED UPSET CONDITIONS AT 27TH AND DAWSON LIFT STATION THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE AERATION BLOWERS WERE TURNED OFF SO THE SOLIDS WOULD SETTLE IN THE BASINS AND NOT OVERFLOW THE TOP OF THE DISCHARGE TROUGH WALL. AT 9:20 AM ON 10/25/15, THE PLANT'S TREATED AND NONDISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. THE DIVERSION WAS PERFORMED TO PROTECT EMPLOYEE HEALTH AND TO PREVENT PROPERTY AND EQUIPMENT DAMAGE. PUMP NO. 1 FAILED AND PUMP NO. 2 BECAME CLOGGED. THE WET WELL LEVEL WAS TO THE TOP. SUBMERSIBLE PUMP NO. 1 WAS REMOVED FROM THE WET WELL FOR REPAIR, AND PUMP NO. 2 WAS UNCLOGGED AND RETURNED TO SERVICE. 2015 Page 51 Date Event Began Lift Station Sub Basin Start Time Reporting Address 11/01/15 PLANT 6:25 #1 W. 30TH STREET 11/01/15 PLANT 6:25 #1 W. 30TH STREET 11/02/15 LS 4345 11:23 1354 CARROLL @ BAINBRIDGE AERIAL CROSSING 11/07/15 PLANT 19:00 #1 W. 30TH STREET Location of Event Cleanout / Manhole / Lift Station N. PLANT AERATION BASINS NOS. 1-4 DISCHARGE TROUGH Date Event Ended 11/02/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 7:15 LAKE PONTCHARTRAIN HEAVY RAIN EVENTS OF 0.81 INCHES ON 10/31/15 AND 1.48 INCHES ON 11/01/15, AS WELL AS INFLOW AND INFILTRATION AND GROUND SATURATION FROM 10 INCHES OF RAIN ON 10/25/15 AND 10/26/15, CAUSED UPSET CONDITIONS AT THE PLANT THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 6:25 AM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. EFFLUENT PUMP STATION DIVERSION 11/02/15 FORCE MAIN 11/02/15 N. PLANT AERATION BASINS NOS. 1-4 DISCHARGE TROUGH 11/09/15 7:15 11:38 5:00 17,187,489 LAKE PONTCHARTRAIN HEAVY RAIN EVENTS OF 0.81 INCHES ON 10/31/15 AND 1.48 INCHES ON 11/01/15, AS WELL AS INFLOW AND INFILTRATION AND GROUND SATURATION FROM 10 INCHES OF RAIN ON 10/25/15 AND 10/26/15, CAUSED UPSET CONDITIONS AT THE PLANT THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 6:25 AM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 180 LAKE PONTCHARTRAIN AIR RELEASE VALVE ON FORCE WORK ORDER TO REPAIR AIR RELEASE VALVE MAIN BROKEN (WORK ORDER 43867) LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 2.72 INCHES FROM 11:35 AM - MIDNIGHT ON 11/07/15, WITH THE LARGEST VOLUME FROM 4:00 PM - 7:00 PM AND 0.34 INCHES ON 11/08/15, ALONG WITH INFLOW AND INFILTRATION IN THE COLLECTION SYSTEM CAUSED HIGH INFLUENT FLOWS AT THE PLANT, WHICH RESULTED IN UPSET CONDITIONS. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 7:00 PM, AFTER 1.72 INCHES OF RAIN, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 2015 Page 52 Date Event Began Lift Station Sub Basin Start Time Reporting Address 11/07/15 PLANT 19:00 #1 W. 30TH STREET 11/11/15 11/15/15 LS 4307 LS 4112 16:17 8:23 3404 E. LOYOLA DRIVE 2829 WILLIAMS 11/18/15 PLANT 6:05 #1 W. 30TH STREET 11/18/15 PLANT 6:05 #1 W. 30TH STREET 11/19/15 11/23/15 LS 4311 LS 4100 12:06 9:58 3208 CASTLE DRIVE 2301 IDAHO Location of Event Cleanout / Manhole / Lift Station EFFLUENT PUMP STATION DIVERSION MANHOLE MANHOLE N. PLANT AERATION BASINS NOS. 1-4 DISCHARGE TROUGH Date Event Ended 11/09/15 11/11/15 11/15/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 5:00 16:51 8:52 22,916,652 30 50 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 2.72 INCHES FROM 11:35 AM - MIDNIGHT ON 11/07/15, WITH THE LARGEST VOLUME FROM 4:00 PM - 7:00 PM AND 0.34 INCHES ON 11/08/15, ALONG WITH INFLOW AND INFILTRATION IN THE COLLECTION SYSTEM CAUSED HIGH INFLUENT FLOWS AT THE PLANT, WHICH RESULTED IN UPSET CONDITIONS. MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 7:00 PM, AFTER 1.72 INCHES OF RAIN, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. UNBLOCKED LINE AND WASHED AND SANITIZED AREA UNBLOCKED LINE AND WASHED AND SANITIZED AREA 11/18/15 21:30 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 2.00 INCHES FROM 2:18 AM - 6:15 AM, ALONG WITH INFLOW AND INFILTRATION IN THE COLLECTION SYSTEM CAUSED HIGH INFLUENT FLOWS AT THE PLANT, WHICH RESULTED IN UPSET CONDITIONS. ON 11/18/15, THE CITY RECEIVED 2.00 INCHES OF RAIN SINCE 2:18 AM, AS MEASURED BY SCADA AT GRANDLAKE AND CADDO LIFT STATION. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 6:05 AM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. EFFLUENT PUMP STATION DIVERSION 11/18/15 MANHOLE MANHOLE 11/19/15 11/23/15 21:30 12:28 10:58 10,590,271 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 2.00 INCHES FROM 2:18 AM - 6:15 AM, ALONG WITH INFLOW AND INFILTRATION IN THE COLLECTION SYSTEM CAUSED HIGH INFLUENT FLOWS AT THE PLANT, WHICH RESULTED IN UPSET CONDITIONS. ON 11/18/15, THE CITY RECEIVED 2.17 INCHES OF RAIN FROM 2:18 AM - 9:36 AM, AS MEASURED BY SCADA AT GRANDLAKE AND CADDO LIFT STATION. THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 6:05 AM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 100 LAKE PONTCHARTRAIN 150 LAKE PONTCHARTRAIN HEAVY RAINFALL MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA UNBLOCKED LINE AND WASHED AND SANITIZED AREA 2015 Page 53 Date Event Began 12/05/15 12/17/15 12/19/15 Lift Station Sub Basin LS4110 LS4206 LS4319 Start Time 11:25 10:41 11:55 Reporting Address 2150 VETERANS 4300 ARIZONA 3716 TULANE DRIVE 12/21/15 PLANT 21:55 #1 W. 30TH STREET 12/21/15 PLANT 21:55 #1 W. 30TH STREET 12/23/15 PLANT 0:20 #1 W. 30TH STREET Location of Event Cleanout / Manhole / Lift Station MANHOLE MANHOLE MANHOLE NP AERATION BASINS 1- 4 DISCHARGE TROUGH EFFLUENT PUMP STATION NP AERATION BASINS 1- 4 DISCHARGE TROUGH Date Event Ended 12/05/15 12/17/15 12/19/15 Possible End Time volume of Receiving Surface Water event (gallons) 13:25 30 LAKE PONTCHARTRAIN 11:26 10 LAKE PONTCHARTRAIN 13:07 30 LAKE PONTCHARTRAIN Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE Resolution of Event (Washed Out Line, Repaired Force Main) WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 12/22/15 5:30 LAKE PONTCHARTRAIN HEAVY RAINFALL OF 2.35 INCHES CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 9:55 PM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 12/22/15 5:30 5,847,218 LAKE PONTCHARTRAIN HEAVY RAINFALL OF 2.35 INCHES CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 9:55 PM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 12/23/15 15:30 LAKE PONTCHARTRAIN HEAVY RAINFALL EVENTS OF 0.25 INCHES ON 12/23/15, 0.75 ON 12/22/15, AND 2.35 INCHES ON 12/21/15 CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 12:20 AM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 2015 Page 54 Date Event Began Lift Station Sub Basin Start Time Reporting Address 12/23/15 PLANT 0:20 #1 W. 30TH STREET 12/28/15 PLANT 8:40 #1 W. 30TH STREET 12/28/15 PLANT 8:40 #1 W. 30TH STREET Location of Event Cleanout / Manhole / Lift Station EFFLUENT PUMP STATION NP AERATION BASINS 1- 4 DISCHARGE TROUGH EFFLUENT PUMP STATION Date Event Ended 12/23/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 15:30 10,534,715 LAKE PONTCHARTRAIN HEAVY RAINFALL EVENTS OF 0.25 INCHES ON 12/23/15, 0.75 ON 12/22/15, AND 2.35 INCHES ON 12/21/15 CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 12:20 AM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 12/28/15 15:40 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 1.0 INCHES CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 8:40 AM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 12/28/15 15:40 4,861,108 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 1.0 INCHES CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 8:40 AM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 2015 Page 55 Date Event Began Lift Station Sub Basin Start Time 12/30/15 PLANT 6:40 12/30/15 PLANT 6:40 12/30/15 12/30/15 Total Overflows 2015 LS4209 LS4311 112 8:33 10:45 Reporting Address #1 W. 30TH STREET #1 W. 30TH STREET CORNER OF DRIFTWOOD & WILLIAMS BOULEVARD 3208 CASTLE DRIVE Location of Event Cleanout / Manhole / Lift Station NP AERATION BASINS 1- 4 DISCHARGE TROUGH EFFLUENT PUMP STATION MANHOLE MANHOLE Date Event Ended 12/30/15 Possible End Time volume of Receiving Surface Water event (gallons) Cause of Event (Main Line Blockage, Lift Station Outage, Etc.) Resolution of Event (Washed Out Line, Repaired Force Main) 17:20 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 1.06 INCHES IN 2.5 HOURS CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 9:55 PM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 12/30/15 12/30/15 12/30/15 17:20 10:30 11:06 7,409,717 LAKE PONTCHARTRAIN HEAVY RAIN EVENT OF 1.06 INCHES IN 2.5 HOURS CAUSED PLANT UPSET CONDITIONS THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS ARE TURNED OFF TO ALLOW SOLIDS TO SETTLE TO THE BOTTOM OF THE AERATION BASINS AND NOT TO BE DISCHARGED OVER THE WALLS. AT 9:55 PM, THE NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH BEGAN OVERFLOWING ITS WALLS. FURTHERMORE, THE NORTH PLANT CLARIFIERS' WATER LEVELS WERE ABOVE THE WEIRS. THE EFFLUENT FLOW WAS 50 MGD, WHICH IS 3.7 TIMES THE PLANT'S DESIGN FLOW CAPACITY. IN ORDER TO PROTECT EMPLOYEE HEALTH AND PREVENT EQUIPMENT AND PROPERTY DAMAGE, THE PLANT'S TREATED AND NON-DISINFECTED EFFLUENT DISCHARGE WAS DIVERTED FROM THE PERMITTED OUTFALL AT MISSISSIPPI RIVER SEGMENT 0703 TO JEFFERSON PARISH DRAINAGE CANAL NO. 17. 100 LAKE PONTCHARTRAIN 25 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE HEAVY RAINFALL WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 2015 Page 56 YEAR 2016 Date Event Began Lift Station Sub Basin 01/15/16 LS4206 Time Reporting Address 9:11 1800 VINTAGE 01/31/16 LS4305 14:57 VINTAGE & MEDOC 02/01/16 02/08/16 02/20/16 02/20/16 LS4302 LS4100 LS4206 LS4207 19:34 4301 LOIRE DRIVE 8:35 2301 IDAHO AVENUE 10:30 1800 VINTAGE 16:50 5212 TOBY LANE 03/11/16 LS 4330 7:18 25 W. ESPLANADE 04/13/16 PLANT 11:45 1 W. 30TH ST. 04/30/16 PLANT 17:00 1 W. 30TH ST. 05/01/16 PLANT 12:45 1 W. 30TH ST. 05/04/16 05/06/16 LS 4314 LS 4318 10:49 32 PLATT 15:56 5 OAKLAND RD. CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Location of Event Cleanout / Manhole / Lift Station MANHOLE Date Event Ended 01/15/16 LIFT STATION 01/31/16 MANHOLE MANHOLE MANHOLE MANHOLE LIFT STATION 02/01/16 02/08/16 02/20/16 02/20/16 03/11/16 NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH 04/13/16 NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH 04/30/16 NORTH PLANT AERATION BASINS NOS. 1 - 4 DISCHARGE TROUGH 05/02/16 MANHOLE MANHOLE 05/04/16 05/06/16 Time 9:40 17:30 20:50 9:01 12:04 19:07 8:00 Possible volume Receiving Surface Water Cause of Event (Main Line Blockage, Lift Resolution of Event (Washed Out Line, Repaired Force Main) of event (gallons) Station Outage, Etc.) 60 LAKE LIFT STATION OUTAGE DUE TO WASHED AND SANITIZED AREA PONTCHARTRAIN TRIPPING OF BREAKER 1,000 LAKE PONTCHARTRAIN SEAL GASKET FOR PUMP NO. 2 FAILED AND THE DRY PIT SUMP PUMP COULD NOT HANDLE THE AMOUNT OF SEWERAGE. PUMP NO. 2 WAS REMOVED FROM SERVICE, OVERFLOW AREA WAS WASHED AND SANITIZED. AND THE 100 LAKE MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA PONTCHARTRAIN 100 LAKE MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA PONTCHARTRAIN 50 LAKE LIFT STATIOIN OUTAGE UNABLE TO WASH AREA DUE TO HEAVY TRAFFIC PONTCHARTRAIN 110 LAKE SANDBAG CAUGHT IN MANHOLE WASHED AND SANITIZED AREA PONTCHARTRAIN LAKE AREA POWER OUTAGE CAUSED THE BATTERY TERMINAL WAS REPLACED. WASHED AND 50 PONTCHARTRAIN THE GENERATOR BATTERY SANITIZED AREA TERMINAL TO MALFUNCTION. 14:00 21:00 0:00 12:13 18:30 5,000 5,000 50 10 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN HEAVY, INTENSE RAIN EVENT OF 1.81 INCHES CAUSED A PLANT UPSET THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE IN THE AERATION BASINS AND TO NOT OVERFLOW THE WALLS. IN ADDITION, AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW. THE PLANT EXPANSION AND IMPROVEMENTS ARE UNDER CONSTRUCTION AND WILL BE COMPLETED IN 2017. THE EFFLUENT PUMP STATION UPGRADE WAS COMPLETED IN FEBRUARY 2016. HEAVY RAIN EVENT OF 1.91 INCHES CAUSED A PLANT UPSET THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE IN THE AERATION BASINS AND TO NOT OVERFLOW THE WALLS. IN ADDITION, AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW. THE PLANT EXPANSION AND IMPROVEMENTS ARE UNDER CONSTRUCTION AND WILL BE COMPLETED IN 2017. THE EFFLUENT PUMP STATION UPGRADE WAS COMPLETED IN FEBRUARY 2016. HEAVY RAIN EVENT OF 2.20 INCHES AND GROUND SATURATION FROM THE 1.91 INCH RAIN EVENT ON 04/30/16 CAUSED A PLANT UPSET THE PLANT'S WET WEATHER PLAN WAS ENACTED WHEREBY THE BLOWERS WERE TURNED OFF TO ALLOW THE SOLIDS TO SETTLE IN THE AERATION BASINS AND TO NOT OVERFLOW THE WALLS. IN ADDITION, AN EARTHEN BERM WAS INSTALLED IN JANUARY 2014 TO CAPTURE THE OVERFLOW. THE PLANT EXPANSION AND IMPROVEMENTS ARE UNDER CONSTRUCTION AND WILL BE COMPLETED IN 2017. THE EFFLUENT PUMP STATION UPGRADE WAS COMPLETED IN FEBRUARY 2016. MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA MAIN LINE BLOCKAGE WASHEDAND SANITIZED AREA 2016 Page 57 Date Event Began Lift Station Sub Basin Time Reporting Address Location of Event Cleanout / Manhole / Lift Station Date Event Ended 06/05/16 4106 10:33 900 AIRLINE MANHOLE 06/05/16 07/11/16 07/14/16 07/26/16 08/01/16 08/10/16 LS 4339 LS 4339 LS 4339 LS 4333 LS 4106 8:00 326 22ND ST. 7:50 326 22ND ST. 15:12 2207 GREENWOOD 8:56 KENTUCY AT TAMMY 22:30 14TH AT MARIA MANHOLE MANHOLE MANHOLE MANHOLE MANHOLE 11/05/16 N/A JEFFERSON PARISH CHATEAU TRANSFER 9:02 DRAINAGE CANAL NO. 10 NEAR 36TH STATION EFFLUENT FORCE MAIN AERIAL AND OLE MISS CROSSING 11/14/16 11/26/16 11/26/16 12/12/16 12/16/16 12/20/16 12/23/16 Total Overflows 2016 LS4341 LS4332 LS4332 LS 4109 LS 4109 LS 4307 LS 4304 26 10:05 2740 GADSEN 10:17 2907 TEXAS 10:17 2916 TEXAS 14:33 2601 - 2603 KANSAS 14:19 2714 ROOSEVELT 8:51 3873 E. LOYOLA 2:52 77 CHATEAU PALMER CLEANOUT CLEANOUT CLEANOUT MANHOLE MANHOLE MANHOLE MANHOLE 07/11/16 07/14/16 07/26/16 08/01/16 08/11/16 11/07/16 11/14/16 11/26/16 11/26/16 12/12/16 12/16/16 12/20/16 12/24/16 Time 16:50 8:40 8:00 15:53 10:03 8:30 17:00 11:35 13:20 13:20 16:16 15:00 10:16 15:15 Possible volume Receiving Surface Water Cause of Event (Main Line Blockage, Lift Resolution of Event (Washed Out Line, Repaired Force Main) of event (gallons) Station Outage, Etc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age 58 YEAR 2017 Date Event Began Lift Station Sub Basin Time 01/18/17 LS 4335 12:38 01/23/17 LS 4336 10:12 01/26/17 PLANT 14:30 04/19/17 LS 4330 20:44 04/30/17 LS 4200 12:00 06/06/17 LS 4211 10:15 06/06/17 LS 4323 9:38 06/06/17 LS 4323 9:38 06/06/17 LS 4323 10:35 06/06/17 LS 4323 10:35 06/06/17 LS 4323 10:35 06/06/17 LS 4323 18:15 CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Reporting Address 3300 WILLIAMS Location of Event Cleanout / Manhole / Lift Station Date Event Ended MANHOLE 01/18/17 3335 WILLIAMS 1108 MINDEN MANHOLE EFFLUENT FORCE MAIN AIR RELEASE VALVE 01/23/17 01/26/17 131 W. ESPLANADE LIFT STATION 04/19/17 1200 38TH STREET LIFT STATION 04/30/17 5212 JANICE 3732 E. GRANDLAKE 3730 E. GRANDLAKE 3732 E. GRANDLAKE 3730 E. GRANDLAKE E. GRANDLAKE AT DAUTERIVE 3610 E. GRANDLAKE MANHOLE CLEANOUT CLEANOUT CLEANOUT CLEANOUT MANHOLE CLEANOUT 06/06/17 06/06/17 06/06/17 06/06/17 06/06/17 06/06/17 06/06/17 Time Possible volume Receiving Surface Water Cause of Event (Main Line Blockage, Lift Resolution of Event (Washed Out Line, Repaired Force Main) of event (gallons) Station Outage, Etc.) 15:50 11:07 15:30 21:19 12:45 20:00 9:50 9:50 18:23 100 50 33,150 15,000 25,568 200 40 20 40 20 30 20 LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND SANITIZED AREA. LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND SANITIZED AREA. LAKE PONTCHARTRAIN AIR RELEASE VALVE MALFUNCTIONED REPAIRED THE VALVE. LAKE PONTCHARTRAIN FAILURE OF THE TRANSDUCER PUMPS WERE OPERATED MANUALLY AND THE BOARD QUAD CONTROL BOARD WAS REPLACED. THE OVERFLOW AREA WAS WASHED AND SANITIZED. LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LIGHTNING STRIKE DURING RAIN EVENT CAUSED ELECTRICAL DAMAGE AND RENDERED PUMPS NOS. 1 AND 3 INOPERABLE. PUMP NO. 2 WAS IN OPERATION AND AN EMERGENCY DIESEL PUMP WAS INSTALLED TO AID IN PUMPING. AN INSPECTION OF THE ELECTRICAL DAMAGE HAS BEEN COMPLETED; HOWEVER, THE POSSIBLE DAMAGE TO THE MOTORS AND OTHER EQUIPMENT CANNOT BE ASSESSED UNTIL THE ELECTRICAL DAMAGE IS RESOLVED. INTENSE RAIN OF 1.2 INCHES IN 40 MINUTES (08:20 - 09:00) AND A TOTAL RAIN EVENT OF 1.69 INCHES FROM 07:30 -9:20 INTENSE RAIN OF 0.95 INCHES IN 20 MINUTES (08:00 - 08:20) AND A TOTAL RAIN EVENT OF 1.96 INCHES FROM 06:45 - 10:43 INTENSE RAIN OF 0.95 INCHES IN 20 MINUTES (08:00 - 08:20) AND A TOTAL RAIN EVENT OF 1.96 INCHES FROM 06:45 - 10:43 INTENSE RAIN OF 0.95 INCHES IN 20 MINUTES (08:00 - 08:20) AND A TOTAL RAIN EVENT OF 1.96 INCHES FROM 06:45 - 10:43 INTENSE RAIN OF 0.95 INCHES IN 20 MINUTES (08:00 - 08:20) AND A TOTAL RAIN EVENT OF 1.96 INCHES FROM 06:45 - 10:43 WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA INTENSE RAIN OF 0.95 INCHES IN 20 MINUTES (08:00 - 08:20) AND A TOTAL RAIN EVENT OF 1.96 INCHES FROM 06:45 - 10:43 WASHED AND SANITIZED AREA LAKE PONTCHARTRAIN INTENSE RAIN OF 0.95 INCHES IN 20 MINUTES (08:00 - 08:20) AND A TOTAL RAIN EVENT OF 1.96 INCHES FROM 06:45 - 10:43 WASHED AND SANITIZED AREA 2017 Page 59 YEAR 2017 Date Event Began Lift Station Sub Basin Time 06/06/17 LS 4307 12:49 06/06/17 LS 4307 12:49 06/06/17 LS 4332 17:00 06/06/07 LS 4206 17:45 06/07/17 LS 4323 9:50 06/07/17 LS 4323 10:05 06/07/17 LS 4323 14:22 06/09/17 LS 4207 12:55 06/13/17 LS 4311 17:30 06/21/17 LS 4207 13:24 Reporting Address 3873 E. LOYOLA 3873 E. LOYOLA 2913 TENNESSEE 1405 43RD 3730 E. GRANDLAKE 24 MAUREPAS 14 MAUREPAS 5212 TOBY 937 RONSON 5212 JANICE Location of Event Cleanout / Manhole / Lift Station CLEANOUT CLEANOUT CLEANOUT CLEANOUT CLEANOUT CLEANOUT CLEANOUT MANHOLE CLEANOUT MANHOLE CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Date Event Ended 06/06/17 06/06/17 06/06/17 06/06/17 06/07/17 06/07/17 06/07/17 06/09/17 06/13/17 06/21/17 Time 14:15 14:15 17:20 17:51 10:05 10:20 15:45 13:25 21:00 19:00 Possible volume Receiving Surface Water Cause of Event (Main Line Blockage, Lift Resolution of Event (Washed Out Line, Repaired Force Main) of event (gallons) Station Outage, Etc.) INTENSE RAIN OF 1.95 INCHES IN ONE HOUR (08:10 - 09:10) AND A TOTAL RAIN EVENT OF 2.17 INCHES FROM 06:20 - 10:30. THE LAKE FORCE MAIN FROM FIREHOUSE 20 PONTCHARTRAIN NO. 5 LIFT STATION DISCHARGES INTO THIS STATION'S SUB-BASIN ACROSS FROM THIS ADDRESS. THE OVERFLOW WAS INTERMITTENT. INTENSE RAIN OF 1.95 INCHES IN ONE HOUR (08:10 - 09:10) AND A TOTAL RAIN EVENT OF 2.17 INCHES FROM 06:20 - 10:30. THE LAKE FORCE MAIN FROM FIREHOUSE 20 PONTCHARTRAIN NO. 5 LIFT STATION DISCHARGES INTO THIS STATION'S SUB-BASIN ACROSS FROM THIS ADDRESS. THE OVERFLOW WAS INTERMITTENT. INTENSE RAIN OF 1.2 INCHES IN 200 LAKE 40 MINUTES (08:20 - 09:00) AND A PONTCHARTRAIN TOTAL RAIN EVENT OF 1.69 INCHES FROM 07:30 -9:20 INTENSE RAIN OF 1.95 INCHES IN LAKE ONE HOUR (08:10 - 09:10) AND A 15 PONTCHARTRAIN TOTAL RAIN EVENT OF 2.17 INCHES FROM 06:20 - 10:30 ON 06/06/17 INTENSE RAIN OF 0.95 INCHES IN LAKE 20 MINUTES (08:00 - 08:20) AND A 30 PONTCHARTRAIN TOTAL RAIN EVENT OF 1.96 INCHES FROM 06:45 - 10:43 ON 06/06/17 INTENSE RAIN OF 0.95 INCHES IN LAKE 20 MINUTES (08:00 - 08:20) AND A 20 PONTCHARTRAIN TOTAL RAIN EVENT OF 1.96 INCHES FROM 06:45 - 10:43 ON 06/06/17 INTENSE RAIN OF 0.95 INCHES IN LAKE 20 MINUTES (08:00 - 08:20) AND A 20 PONTCHARTRAIN TOTAL RAIN EVENT OF 1.96 INCHES FROM 06:45 - 10:43 ON 06/06/17 INTENSE RAIN OF 1.2 INCHES IN LAKE 40 MINUTES (08:20 - 09:00) AND A 15 PONTCHARTRAIN TOTAL RAIN EVENT OF 1.69 INCHES FROM 07:30 -09:30 ON 06/06/17 WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA INTENSE RAIN OF 0.34 INCHES IN THE ROTATING ASSEMBLY FOR PUMP NO. 1 WAS 20 LAKE 19 MINUTES (15:33 - 15:52) AND REPLACED. THE OVERFLOW AREA WAS WASHED AND PONTCHARTRAIN AN EMERGENCY PUMP REPAIR SANITIZED. DURING THE RAIN EVENT HEAVY RAIN OF 1.42 INCHES ON 100 LAKE 06/20/16 AND 1.79 INCHES ON PONTCHARTRAIN 06/21/17 DUE TO TROPICAL STORM CINDY. WASHED AND SANITIZED AREA 2017 Page 60 YEAR 2017 Date Event Began Lift Station Sub Basin Time 06/21/17 LS 4200 13:02 06/21/17 LS 4330 15:40 06/21/17 LS 4323 17:50 06/21/17 LS 4311 18:05 06/22/17 LS 4323 9:30 06/22/17 LS 4332 9:35 06/27/17 06/28/17 07/16/17 08/02/17 08/24/17 LS 4318 LS 4203 LS 4211 LS 4312 LS 4339 10:12 11:10 13:01 9:31 11:06 08/29/17 LS 4200 7:00 10/04/17 10/14/17 10/18/17 10/21/17 11/18/17 LS 4104 LS4105 LS 4203 LS 4321 LS 4320 14:30 9:00 16:57 13:42 12:41 Reporting Address Location of Event Cleanout / Manhole / Lift Station 1200 38TH STREET LIFT STATION W. ESPLANADE AT GRANDWOOD LIFT STATION 3610 E. GRANDLAKE 3208 CASTLE 3732 E. GRANDLAKE 2913 TENNESSEE 3601 LOYOLA 44TH AT WILLIAMS 4041 DELAWARE 3400 OLE MISS 2207 GREENWOOD CLEANOUT MANHOLE CLEANOUT CLEANOUT MANHOLE MANHOLE CLEANOUT FORCE MAIN MANHOLE 1200 38TH LIFT STATION KENNER AT HANSON 421 FILMORE 44th AT WILLIAMS 26 INCARNATE WORD 3279 TULANE LIFT STATION MANHOLE MANHOLE MANHOLE MANHOLE CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Date Event Ended 06/21/17 06/21/17 06/21/17 06/21/17 06/22/17 06/22/17 06/27/17 06/28/17 07/16/17 08/02/17 08/24/17 08/30/17 10/04/17 10/14/17 10/18/17 10/21/17 11/18/17 Time Possible volume Receiving Surface Water Cause of Event (Main Line Blockage, Lift Resolution of Event (Washed Out Line, Repaired Force Main) of event (gallons) Station Outage, Etc.) 19:02 16:30 18:00 18:55 9:40 10:20 11:26 12:54 13:45 9:53 11:50 6:00 15:00 11:00 18:30 14:20 13:28 15,000 LAKE PONTCHARTRAIN 1.38 INCHES OF RAIN ON 06/20/17 AND 2.27 INCHES ON 06/21/17, DUE TO TROPICAL STORM CINDY. PUMP NO. 2 AND A 12INCH BYPASS PUMP WERE IN SERVICE. PUMPS NOS. 1 AND 3 WERE OUT OF SERVICE FOR REPAIR DUE TO A PREVIOUS LIGHTNING STRIKE. WASHED AND SANITIZED AREA 1,000 20 50 40 200 10 10 40 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN 1.64 INCHES OF RAIN ON 06/20/17 AND 2.47 INCHES ON 06/21/17, DUE TO TROPICAL STORM CINDY. PUMP NO. 3'S VARIABLE FREQUENCY DRIVE (VFD) WAS OUT OF SERVICE FOR REPLACEMENT. 1.64 INCHES OF RAIN ON 06/20/17 AND 2.47 INCHES ON 06/21/17, DUE TO TROPICAL STORM CINDY 1.38 INCHES OF RAIN ON 06/20/17 AND 2.27 INCHES ON 06/21/17, DUE TO TROPICAL STORM CINDY 1.64 INCHES OF RAIN ON 06/20/17 AND 2.47 INCHES ON 06/21/17, DUE TO TROPICAL STORM CINDY 1.64 INCHES OF RAIN ON 06/20/17 AND 2.47 INCHES ON 06/21/17, DUE TO TROPICAL STORM CINDY MAIN LINE BLOCKAGE MAIN LINE BLOCKAGE LAKE PONTCHARTRAIN MAIN LINE BLOCKAGE PUMP NO. 3 WAS PUT INTO SERVICE MANUALLY. THE WET WELL LEVEL RETURNED TO NORMAL. WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 200 10 1,162,035 70 250 100 60 50 LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN LAKE PONTCHARTRAIN BROKEN FORCE MAIN REPAIRED FORCE MAIN AND WASHED AND SANITIZED AREA MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA TROPICAL STORM HARVEY RAIN EVENTS ON AUGUST 27 - 30, 2017 (TOTAL RAINFALL OF 5.25 INCHES) CAUSED INTERMITTENT OVERFLOWS AT THE LIFT STATION THE LIFT STATION SUSTAINED A LIGHTNING STRIKE ON APRIL 30, 2017. TWO OF THE THREE PUMPS WERE DAMAGED AND ARE BEING REPAIRED. THE ELECTRICAL DAMAGE REPAIR WILL BEGIN SHORTLY. FURTHERMORE, A LIGHTNING GRID WILL BE INSTALLED AT THE STATION SITE, IN ORDER TO REDUCE / PREVENT FUTURE LIGHTNING STRIKES. THE STATION IS OPERATING ON ONE 20-INCH 300 HORSE POWER PUMP AND ONE 12-INCH DIESEL PUMP. PUMP LOST PRIME WASHED AND SANITIZED AREA MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA 2017 Page 61 YEAR 2017 Date Event Began Lift Station Sub Basin Time 11/30/17 11/30/17 12/08/17 12/09/17 12/13/17 12/18/17 Total Overflows 2017 LS 4206 LS 4304 LS 4206 LS 4210 LS 4307 LS 4211 45 14:30 18:30 19:45 12:20 15:05 22:20 Reporting Address 4233 ARIZONA #1 CHATEAU LATOUR 4109 FLORIDA 3601 CALIFORNIA 3661 E. LOYOLA 3917 ARIZONA Location of Event Cleanout / Manhole / Lift Station CLEANOUT MANHOLE MANHOLE MANHOLE CLEANOUT MANHOLE CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Date Event Ended 11/30/17 11/30/17 12/08/17 12/09/17 12/13/17 12/18/17 Time 15:32 21:45 20:45 13:30 18:35 23:10 Possible volume Receiving Surface Water Cause of Event (Main Line Blockage, Lift Resolution of Event (Washed Out Line, Repaired Force Main) of event (gallons) Station Outage, Etc.) 25 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN 20 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN 100 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN 70 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN 30 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN 30 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 2017 Page 62 YEAR 2018 Date Event Began Lift Station Sub Basin 01/04/18 01/19/18 01/31/18 02/05/18 02/14/18 03/21/18 03/23/18 04/07/18 04/24/18 05/12/18 05/12/18 05/22/18 05/26/18 06/15/18 07/02/18 08/13/18 LS 4206 LS 4324 LS 4345 LS 4105 LS 4208 LS 4302 LS 4105 LS 4209 LS 4206 LS 4307 LS 4203 LS 4203 LS 4312 LS 4342 LS 4203 LS 4321 08/24/18 LS 4312 Time Reporting Address 14:37 18:42 15:38 4205 FLORIDA 12 VERRET 1359 VETERANS 13:16 415 WILLIAMS 11:00 4057 IDAHO 14:23 700 VOURAY 17:52 421 FILMORE 13:02 3700 MARTINIQUE 16:07 13:30 15:05 10:45 16:45 14:33 14:53 11:24 4109 FLORIDA 3672 E. LOYOLA 4500 WILLIAMS 44th AND WILLIAMS #4 RUTGERS 2400 MARIETTA 44TH & WILLIAMS 316 DUKE 19:00 3412 OLE MISS 08/27/18 LS 4312 7:30 3412 OLE MISS TOTAL OVERFLOWS 18 01 - 09 2018 CITY OF KENNER WASTEWATER DEPARTMENT LPDES PERMIT NO. LA0066800, AI NO. 19066 OVERFLOW REPORT Location of Event Cleanout / Manhole / Lift Station CLEANOUT MANHOLE CLEANOUT MANHOLE MANHOLE MANHOLE CLEANOUT CLEANOUT MANHOLE MANHOLE MANHOLE CLEANOUT CLEANOUT MANHOLE MANHOLE FORCE MAIN FORCE MAIN Date Event Ended 01/04/18 01/16/18 01/31/18 02/05/18 02/14/18 03/21/18 03/23/18 04/07/18 04/24/18 05/12/18 05/12/18 05/22/18 05/26/18 06/15/18 07/02/18 08/13/18 08/24/18 08/27/18 Time 14:27 8:36 18:00 13:16 12:30 15:08 20:30 14:37 17:32 14:45 16:15 12:19 18:35 16:50 16:28 13:00 19:00 8:30 Possible volume Receiving Surface Water Cause of Event (Main Line Blockage, Lift Resolution of Event (Washed Out Line, Repaired Force of event (gallons) Station Outage, Etc.) Main) 50 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN 75 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN 400 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 100 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA 20 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA 30 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN 400 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA WASHED AND SANITIZED AREA 130 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA 250 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA 100 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA 60 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA 150 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA 200 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA 50 LAKE MAIN LINE BLOCKAGE UNBLOCKED LINE AND WASHED AND PONTCHARTRAIN SANITIZED AREA 150 LAKE MAIN LINE BLOCKAGE WASHED AND SANITIZED AREA PONTCHARTRAIN 30 LAKE MAIN LINE BLOCKAGE PONTCHARTRAIN WASHED AND SANITIZED AREA LAKE THE JOHN HOPKINS AND OLE THE FORCE MAIN WAS REPAIRED, AND THE 500 PONTCHARTRAIN MISS LIFT STATION EFFLUENT AREA WAS WASHED AND SANITIZED. FORCE MAIN WAS BROKEN. LAKE THE REPAIR CLAMP ON THE THE CLAMP WAS TIGHTENED, AND THE AREA 200 PONTCHARTRAIN JOHN HOPKINS FORCE MAIN WAS WASHED AND SANITIZED. NEEDED TO BE TIGHTENED. 2018 Page 63