Document bObe9rLzVG36JKZo0RERq1Mbk

Gypsumboard Enclosure Systems Descriptions Georgia-Pacific Shaft Liner is a solid gypsumboard parti tion for enclosing elevator shafts, stairs, smoke towers and other such shafts. It is a non-load bearing wall, designed for resistance to uniform wind loads without excess deflection. Important advantages of the system are: 1. Much lighter weight than masonry. 2. Non-combustible and economical. 3. Can be completely erected from one side. 4. Practically eliminates the need for scaffolding. 5. Non-progressive system, panels can be individually removed for backside maintenance (prior to face layer application). 6. Minimum clean-up. 7. Full length panels not required^j^4 Metal Components "J" Track T" Spline ^I x r/ 2 HOUR SHAFT WALL PARTITION The partition consists of a basic pre-laminated panel 1%" thick by 24" wide, which fits into a top metal "J" track and bottom "L" runner. Metal "T" splines are inserted between each panel. The panels are subsequently secured to the "T" splines, and top and bottom runners. Installation of the fac ing layers and surface finishing can be accomplished later to coincide with interior partitions. This system meets the ATSM El 19 requirements for 1 & 2 Hour Fire Resistive Classifications. It is also designed and tested to meet a variety of wind loads at various heights. The standard gauge of the metal components is 20 gauge. However, other than the 20 gauge may be used, as shown in the table on the following page for various wall heights, deflections and wind loads. The facing generally consists of 2 layers of Vz" or 5/s" G-P gypsum board. The exposed layer may be Dens-Cote Base and Dens-Cote Veneer Plaster, or G-P Tile Backer. G-P Shaft Liner System has passed the following fire tests: 1 Vz Hour System--Ohio State Univ. T-4982 2 Hour System--Ohio State Univ. T-4958 2 Hour Chase Wall--Ohio State Univ. T-4991 2 Hour Alternate Wall Underwriters Lab. Design 42--2 Hr. (U503) Components of the Georgia-Pacific Shaft Liner conform to the following specifications: Wallboard, Vz" and 5/s" Wallboard, 1" Dens-Cote Base, Vz" and 5/e" Dens-Cote Veneer Plaster Tile Backer Metal for Components ASTM C 36 ASTM C442 ASTM C588 ASTM C587 ASTM C630 ASTM C446 Angle Runner Installation SGP 0025477 Basic 2 Hour System (T-4958) Install the perimeter framing first, this consists of the top metal "J" and bottom "L" tracks. These components are to be secured with power driven fasteners, or equivalent, at 24" maximum centers. The 15/e" Shaft Liner panels are in serted top first into the "J" track and pushed flush against the bottom angle runner. These panels are separated by the "T" splines, which are positioned so the flat, or flange, side faces the shaft. Type S-12 drill point screws 2"-23/b" long are used, 24" o.c., to fasten the panel to the "T" splines. At the extreme top and bottom, screw the core to the runners, at points 2" on each side of the spline, using the drill point screws. Screws will protrude slightly on the unfinished shaft side. Two layers of Vz" Georgia-Pacific Regular Wallboard, 4 ft. wide by partition height are applied to the face side. Each is installed parallel to the Shaft Liner panels. The first layer is offset from the "T" spline by 12", and the second layer staggered 24" from the first. Installation is by %" beads of adhesive, or full lamination. For improved sound isolation, adhesive should fill the joints at each "T" spline. Caulk around perimeter of panel. The facing sheets are also se cured with 1V2"-15/b" type G screws spaced 24" o.c. at edges and center (1st layer) and 16" o.c. at edges and cen ter (2nd layer). Finish joints and screw heads in normal man ner in preparation for the final decoration. Alternate 2 Hour System U503 (UL 42-2 Hour) The "L", "J" and "T" metal components and the 1%" core unit are erected in the same manner as the basic system. Angle runner with 1V2" flat metal strip may be substituted for "J" track. To splice panels, use 2' section of "T" spline at all horizontal butt joints. Stagger butt joints min. of 24". Two layers of 5/s " G-P Firestop wallboard 4' wide by wall height are then applied to face side. Laminate using pre-mixed vinyl base adhesive and screws as described in the basic system. Use 1%" type S screws at extreme top and bottom. See page 8 for details. 2 Hour Chase Wall (T-4991) After erecting metal components and 15/e" panel, attach G-P "L" angle runner horizontally at levels approximately 40" apart through core unit into "T" spline. Erect 2V2", 25 gauge steel studs and track a minimum of 3" from core unit. Brace studs with angle runner. Apply one layer of 5/a" Firestop" to studs. See page 8 for details. IV2 Hour Wall (T-4982) The "L", "J" and "T" components and the 15/b" panel are erected in the same manner as in the basic 2 Hour system. The one layer of 5/a" G-P Firestop is laminated to the panel and secured with G screws 16" o.c. and 1" S-12 at extreme top and bottom. Offset joints from "T" splines by 12". The Georgia-Pacific Shaft Liner System is designed for ver satile performance. Ease of construction from one side also makes this wall ideal for use in locations other than vertical openings (such as stairwells). The system takes much less space than masonry or stud walls. Both sides can be finished by adding a layer of regular board over the "T" flanges on the back side. However, if the back side is to be finished, the wallboard should be applied first before screw attaching the Shaft Liner panels to the metal components. 1. INSTALLING FLOOR TRACK. 3. ATTACHING CORE TO T-SPLINE. 2. INSTALLING CORE PANEL. 4. APPLYING FINISH LAYERS. SGP 0025478 System 1V2 Hour Wall T-4982 2 Hour Wall T-4958 and U511 2 Hour Chase Wall T-4991 2 Hour Alternate Wall (with 5/e" Firestop facing layers) UL42-2 Hr. (U503) Vertical "T" Spline Gauge 22 20 22 20 18 16 14 16 ga. 35/8" Steel Stud 25 ga. 21/2" Steel Stud 16ga.3%" Steel Stud 22 20 Deflection L/120 L/240 L/120 L/240 L/120 L/240 L/120 L/240 L/240 L/240 L/240 L/120 L/240 L/120 L/240 L/120 L/240 LIMITING HEIGHT SELECTION TABLE* HEIGHT BASED ON POUNDS PER SQUARE FOOT 5= 7.5- 10= 12.5= 15= 10' 10' 9' 9' -- 9' 8' -- -- 14' 4" 11'4" 12' 10" 10' 1" 11' 4" 9' 10' 7" 8' 1" 9' 10" 7' 10" 10' 10' 10' 10' 9' 10' 10' 9' 8' -- 17' 13'9" 15' 4" 12' 3" 13' 8" 10' 11" 12' 10" 9' 7" 12' 8'6" 14' 12' 6" 11' 9'6" 8' 6" 15' 13' 12' 10' 9' 16' 14' 12' 6 11' 10 23' 20' 7" 18' 3" 17' 1" 15' 11" 14' 18' 3" 10' 10' 19' 15' 1" 12' 16' 4" 10' 10' 17' 6" 13' 6" 10' 14' 6" 10' 9' 15' 11*11" 8' 13' 7" 10' 8' 14' 11'2" -- 12' 8" 10' -- 13' 2" 10' 5" NOTE: 22 ga. "T" splines are not recommended for unsupported vertical spans exceeding 10' in height. `Height selection table based on tests by Wiss, Janney, Elstner & Associates General Working Conditions During cold weather, temperatures in the building should be maintained at not less than 50 F during application of acoustical sealants, adhesives, or joint treatment. There should be adequate ventilation to dispose of excessive mois ture during these periods. For steel frame construction, installation of top "J" track should be completed before application of any spray-on fireproofing. The poured concrete floor should be reasonably smooth in the area where the track is to be installed. If the track is in stalled close to the edge, the concrete may spall unless a fastening plate is set into the concrete to which the track can then be applied.* The "T" spline and Shaft Liner panels should be no shorter than %" less than height of the shaft opening. The "J" track is provided to eliminate top fastening of panels during initial placement. Working conditions and contractor preference may speed installation by substituting an angle at the top. Equivalent performance is anticipated provided the angle is formed with 20 ga. having a top leg 1%" wide and back leg 2%" deep. Panels are initially attached with one screw at the center both top and bottom. This is followed by attachment of a 11/2" flat 22 ga. strip secured with 23/e" screws 2" either side of the "T" spline. When a separate plate is used it should be 12 ga. and the "J" and "L" may be attached with V2" S-12 No. 8 pan head screws 24" o.c. Limitations SGP 0025479 1. Georgia-Pacific Shaft Liner walls are non-load bearing. 2. Do not use in areas of unusually high moisture conditions. 3. Voids created to accommodate mechanical piping, wir ing, etc. should be filled with mineral fiber insulation. As an alternate, furred construction may be used. 4. Adhere to gauges and heights shown in table. 5. Provide control joints at maximum 30 ft. intervals. 6. When hand rails or other heavy items are anchored to the Shaft Liner System, install 20 gauge metal strip be tween the Shaft Liner panels and facing layers. 7. 1" side of 15/8" core panel must face shaft opening. :IF DETAILS 2 HR. FIRE RATED WALL Concrete Beam Wall Intersection Aa G-P ANGLE RUNNER OR --------------------- ------------------------------- H ' ' ' ' ' i > fop -- --- i ( /. i VA -------- CAULK AS REQUIRED -- SCREW ATTACH - G-P -J" TRACK 1 % " G-P SHAFT LINER PANEL Bottom y2" g-p GYPSUM WALLBOARD G-P ANGLE RUNNER SCREW ATTACH CAULK AS REQUIRED End Corner SGP 0025480 Steel Beam G-P ANGLE RUNNER SECURED 24" O.C. BEFORE FIREPROOFING (MASK WITH 2" x 4" BEFORE SPRAYING) SPRAY ON FIREPROOFING G-P "J ' TRACK SECURED 24" O.C. BEFORE FIRE PROOFING Handrail Attachments Column Bypass Corner Column Rough Door Opening Duct Opening Section "A" Elevator Door Head Section "A-A" Duct Opening NOTE: ELEVATOR FRAME. DOORS, & OPERATING ACCESSORIES TO BE SUPPORTED SEPARATELY SGP 0025482 Expansion Joint Wall Assemblies Outlet Box AND INSULATION Chase Wall TOP 2 HOUR WALL GYPSUM DIVISION PORTLAND, OREGON SGP 0025483 SL 14 4/72 5-GAC