; *&'KSYAMAMiD Request For Capital Expendltures/Retlrements DIVISION OR COMPANY Organic Chemicals Dept. LOCATION J.O. CONTROL POINT Chi caon PI ant' JOB TITLE ~ 097 1nstal1 gutters and down spouts on buiIding 19- REPORTING CLASSIFICATION DATE APPROVED JOB ORDER NO, D 5 11/9/78 OC-4359 SUMMARY OF AMOUNTS DESCRIPTION LOCAL CURRENCY U.S. DOLLARS e s t ima t e d PROJECT c o s t ______ DISMANTLEMENT EXPENSE 1000 TRANSFER EQUIPMENT GROSS AMOUNT FOR APPROVAL :$66'3S:' 1 LESS TRANSFER EQUIPMENT L ESS SALVAGE OR TRADE-IN ALLOWANCE NET CASH REQUIREfi topf - 3027) $6635 ' 1 r e t ir e me n t d a t a COST D1SMANTLEM &IT LESS SALVAGE AMOUN T 200 1000 TOTAL - CHARGE RESERVE 1200 DESCRIPTION AND REASONS REQUIRED ECONOMICS as called for in General Procedure Memo #3 Attachment C. (Attach calculations} ECONOMICS PERIOD NET- SALES NAT (PRO FIT/SAVINGS) TOTAL INVESTMENT % ROI (o n t o t a l in v e s t .) INTERNALHATE OF RETURN PAYOUT OF NEW FIXED CAPITAL REV.# 1 2 3 A 5 6 7 REVISION DETAIL (g r o s s a mo u n t s ! DATE AMOUNT CUM. AUTHO R1 Z ATI ON Funds of---------------------- --------------- ------------------------- --------------------------------- $6635 are requested to fabricate and install gutters and down spouts for the building 19 roof. Dismantlements Gutters 6-71 .200 Scrap i i S Lt<* A3U 900G VN c y a j v a Jvar x x OC-4359 11/9/78 Page 2 of 3 DESCRIPTION AND REASONS REQUIRED A. Proposed Work and Cost Funds of ------------------ --------------------- ----------------- ---------------$6635 are requested to fabricate and install gutters and downspouts for the building 19 roof. B. Present Situation The existing gutters and downspouts, which were installed on Bldg. 19 in 1938, are badly rusted with many sections missing. During any appreciable rain the water, due to the faulty gutters and downspouts, accumulates on the walkways and dock area and even runs into the operating area creating an unsafe working condition. C . Justif lcation The installation of new gutters and downspouts on the building 19 roof will eliminate the unsafe condition of wet and slippery work areas. D. Commercial Factors This order supports a 1978 plant budget as follows: First six (6) months of 1978 Sales - Pounds Sales - Dollars Profit on Sales 3,848,320 $1,943,200 496,100 (25.5%) Budget for 1978 Sales - Pounds Sales - Pollars Profit on Sales 7,950,000 $3,985,000 1,071,000 (26.8%) E. Details of Proposal Approximately 330 feet of old or missing gutter will be replaced with 22 gage galvanized commercial box gutter and 350 feet of 5 inch downspout will be installed on the building 19 roof. - F. Production Factors This proposal will not alter product quality or production rates. CYWI 24-0006291 gSSSiifi il m ) C YA JVA jvr I I> G. Contingent Future Commttments OC-4359 11/9/78 Page 3 of 3 Tbis proposal wil1 not require additional funds to complete. H, Alternatives Considered Mo additional alternatives were considered. I. Risks Mo operating risks are involved. J. Concise Summary The replacement of the 40 year old building 19 roof drainage system will improve drainage and safety for building 19. CYWI 24-0006293