Document bObGrZ8Z6D5MmjzmKNYV2rag1
; *&'KSYAMAMiD
Request For Capital Expendltures/Retlrements
DIVISION OR COMPANY
Organic Chemicals Dept.
LOCATION
J.O. CONTROL POINT
Chi caon PI ant'
JOB TITLE
~
097
1nstal1 gutters and down spouts on buiIding 19-
REPORTING CLASSIFICATION
DATE APPROVED
JOB ORDER NO,
D 5 11/9/78
OC-4359
SUMMARY OF AMOUNTS
DESCRIPTION
LOCAL CURRENCY
U.S. DOLLARS
e s t ima t e d PROJECT c o s t
______
DISMANTLEMENT EXPENSE
1000
TRANSFER EQUIPMENT GROSS AMOUNT FOR APPROVAL
:$66'3S:' 1
LESS TRANSFER EQUIPMENT
L ESS SALVAGE OR TRADE-IN ALLOWANCE NET CASH REQUIREfi topf - 3027)
$6635 ' 1
r e t ir e me n t d a t a
COST D1SMANTLEM &IT LESS SALVAGE
AMOUN T
200 1000
TOTAL - CHARGE RESERVE
1200
DESCRIPTION AND REASONS REQUIRED
ECONOMICS as called for in General Procedure Memo #3
Attachment C. (Attach calculations}
ECONOMICS PERIOD NET- SALES
NAT (PRO FIT/SAVINGS)
TOTAL INVESTMENT
% ROI (o n t o t a l in v e s t .)
INTERNALHATE OF RETURN PAYOUT OF NEW FIXED CAPITAL
REV.#
1 2 3 A 5 6 7
REVISION DETAIL (g r o s s a mo u n t s !
DATE
AMOUNT
CUM. AUTHO R1 Z ATI ON
Funds of---------------------- --------------- ------------------------- --------------------------------- $6635 are requested to fabricate and install gutters and down spouts for
the building 19 roof.
Dismantlements Gutters
6-71
.200
Scrap
i i S Lt<* A3U 900G VN
c y a j v a Jvar x x
OC-4359 11/9/78
Page 2 of 3
DESCRIPTION AND REASONS REQUIRED
A. Proposed Work and Cost
Funds of ------------------ --------------------- ----------------- ---------------$6635
are requested to fabricate and install gutters and downspouts for the building 19 roof.
B. Present Situation
The existing gutters and downspouts, which were installed on Bldg. 19 in 1938, are badly rusted with many sections
missing. During any appreciable rain the water, due to the faulty gutters and downspouts, accumulates on the walkways and dock area and even runs into the operating area creating an unsafe working condition.
C . Justif lcation
The installation of new gutters and downspouts on the building 19 roof will eliminate the unsafe condition of wet and slippery work areas.
D. Commercial Factors
This order supports a 1978 plant budget as follows:
First six (6) months of 1978
Sales - Pounds
Sales - Dollars
Profit on Sales
3,848,320
$1,943,200
496,100 (25.5%)
Budget for 1978
Sales - Pounds
Sales - Pollars
Profit on Sales
7,950,000
$3,985,000
1,071,000 (26.8%)
E. Details of Proposal
Approximately 330 feet of old or missing gutter will be
replaced with 22 gage galvanized commercial box gutter and
350 feet of 5 inch downspout will be installed on the
building 19 roof.
-
F. Production Factors
This proposal will not alter product quality or production rates.
CYWI 24-0006291
gSSSiifi
il m
)
C YA JVA jvr I I>
G. Contingent Future Commttments
OC-4359 11/9/78
Page 3 of 3
Tbis proposal wil1 not require additional funds to complete.
H, Alternatives Considered
Mo additional alternatives were considered.
I. Risks
Mo operating risks are involved.
J. Concise Summary
The replacement of the 40 year old building 19 roof
drainage system will improve drainage and safety for building 19.
CYWI 24-0006293