REPORT FORM FOR TEST OF LOW PRESSURE HEATING BOILER
1.--Name and catalogue rating..................................................,
2.--Grate surface; width..................... , length....................... area
3.--Date of test.............................. ......................... No. of test.........
4.--Normal operating firing periods.............................................. .
5. --Duration of test .............................................. . ............................................
6. --Times fired ........................... .................. .................... .................. :------?
7. --Longest interval between firing.................. .,............ ...................................
8. --Fuel, name ............ ........................ ..............................Size............ .................
9. --Fuel, calorific value..................................... ............ ......... v----- *.....................
10. --Fuel capacity pounds ....................................................................................
11. --Fuel available (less re-kindling reserve).............................. ...................
12. --Fuel available. Time will last, hours.........................................................
13. --Fuel weight as fired, lb.............................. ............ .......................................
14. --Fuel moisture, per cent........................................... ........................... .
15. --Fuel weight fired, less moisture, lb.- = (13)-(14)......'.........................
16. --Fuel weight unburned (including., lb. recovered from ash pit)., lb.
17. --Fuel burned in test, lb. = (15)-(16).........................--V......................
18. --Fuel burned per hour, lb..........................................................."..............
19. --Fuel burned per sq. ft grate per hour, lb............................................ ..
20. --Ashes, lb.......................... ...............................................................................
21. --Clinker, lb................................................... ........................................................
22. --Combustible, per hour, lb..............................................................................
23. --Temperature, steam or flow, fahr............................................................ .
24. --Temperature, feed water or return, fahr........................ ....................
25. --Temperature, gases leaving boiler...............................................................
26. --Temperature boiler room......... ........... --..................................... .............
27. --Temperature outside air ................................................................................
28. --Draft intensity in smoke pipe ............................................... :................ .
29. --Draft intensity over fire ...............................................................................
30--Draft intensity in ash pit ..................................................... ..........................'
31. --Friction loss through flue ................... ..................... .....................................
32. --Friction loss through fuel --1.........................................................................
33. --Friction loss through inlet ............w............................................................
34. --Steam pressure in boiler hy gage............... '............................... . ................
35. --Steam pressure in receiver by. gage......................................................... . .
36. --Percentage of moisture in steam...................................................................
37.--Percentage of COi in escaping gases................................................per cent.
38.--Weight of water fed to boiler............................................................... ....... 39_Weight of water evaporated, corrected for moisture in steam............. .. 40.--Equivalent evaporation from and at 212 degrees -- (39) x total heat in
steam .above feed temp, -f- 970..
.......... ................... ........................
41. --Evaporation per hour of test.......... ................................................... ........ : 42. --Evaporation per lb. of coal as burned = (41) (18)............................
43. --Evaporation per lb. of combustible = (41) -f- (22).......... _............ .
44. --Capacity, total available B.t.u: = (41) x total heat above feed temp.
45. --Capacity per hour, B.t.u....................................................................... .
46. --Capacity per sq. ft. radiation = (45) -f- 240....................... ........................ 47-- Efficiency of boiler = (45) -f- (22) x B.t.u. per lb. combustible......
48-- Efficiency of boiler and grate = (45) (18) x B.tu. per lb. coal
49.--Losses, grate ......................................... ................................................
50.--Losses, stack gas ............... .................................................................. 51.--Losses, incomplete combustion ...........................................................
52.--Losses; unaccounted for.................................. ....... .. -........................
53.--Smoke pipe, size ........................ ......... .........
' ' ............
54.--Chimney, size-.............................................. . Height.........
55--Draft ............... ................................................. Inches....................
30
Am. Sac. of Heat.-Vent. Encikeers Guide, 1922
31
BATING
The rating as determined hy this test shall he calculated by the following
formula,--
CxH
------ -- = Boiler capacity per hour in B.tu. T
C -- Number of pounds of dry fuel consumed (18) T = Duration of firing period.
H -- Total B.tu. available at the boiler outlet per pound of dry fuel as
shown by test, or (18) x (9) x (48)
Note.---The length.of firing period will depend upon the size of boiler, kindof fuel and purpose of test
REPORT OF COMMITTEE ON UNIFORM CONTRACT AND SPECIFICATIONS
(Transactions of A. S. H. V. E., Vol. IX, p. 336.)
The Society approved a revised uniform contract and specifications with the conditions classified as follows:
Qualifications of Bidders Drawings and Specifications Assigning or Subletting Intention Architect or Engineer Material and Workmanship Alteration Delay Care of Work
Removal of Rubbish Rules, Permits and Responsibilities Insurance Patent Devices Final Tests and Acceptance Payments Rejection of Material Temporary Use of Apparatus Arbitration
REPORT OF COMMITTEE ON CODE FOR TESTING DIRECT
RADIATION HEATING PLANTS
(Transactions of A. S. H. V. E., Vol. IX, p. 347.)
The two fundamental requirements upon which the Code is based are: 1. That during the test the temperature of steam or water maintained in the
radiators shall be the same as that allowed by the contract to be maintained in order to maintain a temperature of 70 deg. in the building when it is zero outside.
2. That, during the test the difference between the temperature of the steam or water in the radiator and the temperature maintained inside of the building, shall not be less than 0.8 of the difference between the temperature of the steam or water in the radiator and the temperature maintained in the building when it is zero outside.
NOTE.--There is also a third requirement, viz., "that no test to determine the heating capacty of a system, to mantain a temperature of 70 deg. in a building during zero weather, shall be made when the temperature outside is greater than 48 deg., even although the allowable temperature under requirement 2 of the Code should be greater than 48 deg."
REPORT OF COMMITTEE ON STANDARD SIZES OF STEAM AND RETURN MAINS
(Transactions of A. S. H. V. E., Vol. XIII, p. 24.)
The standard recommended is "the use of such a velocity as will require a differ ence of pressure of not more than 1 oz. to 100 ft. in straight pipe to maintain it."
NOTE.--A new Committee, the Committee on Steam and Return Main Sizes was appointed
at the recent Annual Meeting to review this former standardization work and brine it un