Document bN56430QkYwYKw4zbX83RQ4Z

PLAINTIFF'S EXHIBIT SHUTDOWN AND DECONTAM I NATION A/G DEPARTMENT 1991 SHUTDOWN LAM 018166 DPMC-11838 05/09/91 Thursday 9;56 am EQUIPMENT : W.O. * : DAYS/HRS : HRS/SHIFT : UNIT CODE : PP-40 031683 6x20 10 IPA-TURNAROUND MAY 1991 Filename: IPA-MAY-91 Page 35 PP-40: REMOVE INSULATION ON 50# STEAM LINE AND CHANGE OUT SASKETS. LOC: WEST OF V-25 IN RACK UNDER PUMP SHED ROOF Area: ADIS E.C.: PP w.c.: JOB NO. I J DESCRIPTION REQUIRED M-H CRAFT CREW 203. 1 5 PP-40: BUILD A SCAFFOLD PRE FOR ACCESS TO FLANGES 9 CARP 3 204. 5 10 PP-40: REMOVE ASBESTOS INSULATION ON STEAM LINE AT FLANGES (LINE MUST BE SHUT DOWN TO REMOVE ASBESTOS INSULATION) 16 INSL 3 205. 10 15 PP-40: OPEN FLANGES AND INSPECT FOR CUTS ON GASKET SURFACE. THEN REPLACE GASKET AND MAKE UP FLANGES Early Restraint: 2/ 1 4 PF 2 206. 15 20 PP-40: HAVE OPERATIONS ENERGIZE STEAM LINE b. INSPECT FOR LEAKS. IF NO LEAKS ARE FOUND! HAVE OPERATIONS KILL THE STEAM TO INSULATE LINE 1 OPER 1 PF 1 1 207. 20 25 PP-40: INSULATE FLANGES Late Restraint 16 INSL 4/20 208. 25 30 PP-40: REMOVE SCAFFOLD POST 9 CARP 3 Resource Manhours : 1 OPER 18 CARP : 32 INSL 5 PF SCHEDULED FROM TO Not Sched 1/1 1/1 2/1 2/1 2/1 2/1 2/1 2/2 Not Sched LAM 018167 DPMC-11839 ************************************************************* A / G DEPARTMENT iQQi QurrmnuN SHUTDOWN AND DECONTAMINATION A DISTILLATION 11] PULLING THE NORTH STEAM CONTROL VALVE ON C-3102 AND SENDING IT TO SHOP, FV-5062. 12] INSTALLING PIPING AND VALVES FOR BACK WASHING C-3102 CONDENSERS. 13] REPLACING THE VALVE AT C-9 WATER REFLUX LINE BACK TO C-9. IT HAS BUSTED PACKING GLAND BOLTS. FEP VALVE #1349. 14] MAINTENANCE WILL BE REMOVING THE ASBESTOS INSULATION ON THE 50 LB STEAM LINE WEST OF V-25. lam oi8i68 DPMC-11840 DPMC 11837.1 LAM 018165 rJo iQ Q lvtfp I bbt O 'Q L L t / N ! r J o p ^ x +, ^ o d o u r? H P