any, *nd flowing air and liquids are potential sources of noise and vibration. The first, and frequently the least expensive and most effective measure in noise reduction, is to put dis tance between the noise and the listener. Installations of cool ing equipment in basements, crawl spaces, utility rooms or attached garages are preferable to those in alcoves or closets adjacent to bedrooms and living rooms. Mounting of units on concrete floors is preferred. Further steps which may be tnlfpn to achieve an acceptable low noise level are as follows:
1. Minimise the production of noise and vibration. Use only true, concentric pulleys with smooth belts at the proper tension and use properly balanced blower wheels and other rotating parte, operated at the minimum practical speed. Provide an
duct system which promotes smooth air flow at
reasonable velocity and is sufficiently rigid in construction so
that it does cot vibrate unduly.
2. Prevent transmission of noise and vibration to the
house structure
to duete and piping. Use property loaded
isolation mounts for compressors, even when on concrete floors,
and provide vibration isolators on blowers and refrigerant lines
and vibration loops in tiie refrigerant system. Install flexible
connections between the cooling unit and the ductwork.
3. Control airborne noise with sound-absorbing material or
other
treatment. Tn<rfjJl sound-absorbing material
within ductwork and, where practicable, use one or more elbows
between the equipment and the registers or grilles.
AIR DISTRIBUTION METHODS
Systems should be designed and installed by competent
engineers in accordance with authoritative information such
as given in tbp design manuals of the Air-Conditioning and
Refrigeration Institute* and the National Warm Air Heating
nd Air Conditioning Association.4 The sizes of the ducts of
year-round air-conditioning systems are often larger than
those of equivalent winter beating systems once large quanti
ties of cool air, at 55 F to 65 F, must be circulated through
them. Several manufacturers have developed reliable methods of
duct d^g" Such methods should be used when recom
mended,
they take into account the specific air-flow and
static pressure characteristics of the systems to which they
apply. They should, however, be applied with caution to sys
tems and equipment other than those for which they were
developed. Cooled air admitted to rooms from ducts through supply
outlets is from 15 F to 25 F colder, and therefore heavier, than the air in the room, and has a natural tendency to drop
toward the floor. Unless the supply outlets are property se
lected, located, and adjusted, the air distribution is likely to result in a low velocity of cool air falling on the occupants or
a high velocity stream of cool air striking a wall or other obstruction and deflecting on the occupants. A further
complication is introduced when the same outlets are used for Kftftting in which case the delivered air at temperatures
considerably above room temperature has a tendency to
rise. Where cooling is installed with ducts and air outlets that
: serve the cooling function only, the practice and experience
of comfort air conditioning for offices and commercial build
ings apply directly to residential installation. Although cool
ing and heating by means of the same ductwork and air out
lets has been common practice in commercial and industrial
applications, greater care must be taken in residential appli
cations. It has been found that low air-flow rates (much lower
than would be used for cooling systems) are desirable for
warm air heating systems* It is therefore recommended that,
in a residence located in a moderate or cold climate, provision
be for different air-flow rates for summer and winter. In warmer climates, however, where air conditioning is the primary consideration, the summer air-flow rate may be used
the year around. The registers may be placed either in the high side-wall or
in the perimeter location. For the high side-wall applications, it is necessary that the deflection of the air be different for summer than it is for winter to prevent the jet from dropping into tiie living zone (60 in. above the floor and below) where the velocity should be not greater than 35 fpm. For registers located at the perimeter of the residence,' it is not necessary to change the deflection from summer to winter.
The air distribution system should be designed for the largest air-flow rate that is to be used, as outlined in Manual 9 of the National Warm Air Heating and Air Conditioning Association. For snail-pipe perimeter systems, it is necessary to have .more outlets than for the larger duct systems. In some applications, it may be necessary to close off some regis ters during the winter so that adequate register air velocities will be obtained. These registers would then be opened during the summer to give a sufficient number of outlets.
Recent investigations have shown* that the use of perim eter-duct systems for air conditioning gives excellent results, anH that objectionable air motion does not occur within the living zone except in the immediate vicinity of the registers. Care must be taken, however, to use only registers or diffusers that are specifically designed for perimeter application. This is necessary to permit the introduction of the air into the room in a pattern that does not cause drafts. Floor diffusers which distribute the air in a fan-shaped pattern along the wall or low side-wall diffusers which blanket the wall are recommended. For supply-air temperatures not more than 15 deg below room-air temperatures, diffuser face velocities of 500 fpm are recommended.' For supply-air temperatures 20 deg below room-air temperature, the diffuser face velocity should not be less than 700 fpm.
Many registers designed for outside wall application may not be satisfactory foT cooling when applied to low-velocity systems because the coo] air is apt to remain at the floor.
Ceiling diffusers may also be used, but they may lead to difficulty during the heating season if the warm air remains at the ceiling, resulting in cold floors.
High return locations at inside walls are very effective with outside wall or floor perimeter distribution systems for both the heating and cooling season. In multi-story or split-level dwellings there should be a minimum of one return on each level with a high central return on the upper level to minimize the effects of hot air rising through halls and stairways to up per levels. With ceiling or high-inside-wall distribution, the returns should be located on the outride walls under windows for best results.
CONTROLS
Control devices and systems and their application in resi dential air conditioning are discussed in Chapter 43, Auto matic Control.
OPERATING COSTS
The operating cost of residential cooling equipment during a particular summer depends on variables such as the amounts of gnghim> and rain, the number of abnormally hot or cool days, the efficiency of the equipment, and the local power rate. It is also influenced by human factors such as operation of equipment only during the hottest weather, opening windows at night* and difference in preferred indoor
Residential Summer Air Conditioning
655
Table 1 ... Approximate lew input per 12,000 Btuh Cooling Capacity
ttem of Power Load
Type of Heat Rejection* Wafer Coaled Condeater
City Water
Atmot-
ptoric Coofag Tower
Medton*- Aircat Draft Cooled Cooling Con
Tower denser
Refrigeration Compressor....... Blower for Air Conditioner . .. Blower for Rejection Air......... Pump, Cooling Water...............
1.00 0.10
--
--
1.00 0.10
--
0.15
1.00 0.10 0.15 0.15
1.35 0.10 0.15
--
Total kw per 12,000 Btuh 1.10 1.25 1.40 1.60
Otfc*a lea* rejection mean* include well*, tprmy pond*, orspccalira coo-
damere, water coilsin the troasd,
water ooili in air, etc.
temperatures." Nevertheless, it is important that tending agencies and prospective buyers of equipment be given a rea
sonably accurate estimate of the operating cost during nor
mal summer weather and under usual operating conditions.
Adjustments can then be made for any special conditions
anticipated. The approximate electrical power inputs for the
various motorized components in mechanical cycle air condi tioners are shown in Table 1.
Power cost per hour can be estimated by multiplying the
estimated power per ton, the cooling capacity in tons the
cost per kilowatt-hour. Thus the estimated cost per hour
for a 3-ton air conditioner cooled with city water will be 1.1
kw X 3 tons x the power rate. It is wwmtial to use the cor
rect step of the utility residential rate structure to get a good
estimate. The basis of the method used11 requires the use of a
table of the estimated annual hours of operation for properly..
sized equipment in typical cities. See Table 2.
-'
The values in Table 2 have been substantiated by utility
records of actual performance in several major cities when
the average indoor temperature is maintained at 80 F. Low
indoor temperatures increase operating cost as do weather conditions above normal.
Water usage is another important factor with water-cooled
equipment. Various manufacturers have published water us age data for their equipment at varying summer water tem
peratures. Representative water consumption values are given in Table 3.
For a given application the power rate and water rate may be obtained from the local utilities. Since the average power
requirement depends on the particular equipment used and
Table 2 .... Estimated Annual Hours of Operation for Properly Sized Equipment in Typical Cities during Normal Cooling Season
Otr Hour*
Cty Hours
Table 3 .... Water Usage for Water-Cooled Equipment
Summer Water
Temperature, Normal Extreme*
F
Gallon* Per (Hoed (Ton)
Summer Water Temperature,
Normal Extreme* f
Gafoa* Per (Maori (Ton)
55 34 75 58 60 39 80 70
65 44 85 88 70 50
the condensing method, values obtained from the manu facturer should be used in preference to those in Table 1.
If the evaporator fan cycles with the compressor, the power requirement as found from Table 1 also represents the total power requirement for air-cooled condenser applications. For continuous fan operation the number of hours of compressor operation should be subtracted from the number of hours in the cooling season to obtain the extra hours of fan opera tion. This value may then be used with the appropriate value of power consumption and power cost for the fan motor only, to find the added power cost for continuous fan operation and the result should then be added to the power cost during compressor operation.
For water-cooled condenser applications the water cost, as determined from the operating hours, water rate, and manu facturer's data on equipment water usage, is added to the power cost to obtain the estimated total operating cost.
Another method has been developed using cooling degree days above 70 F as a criterion but tabulated values of cooling degree days, for various localities are not available." Approxi mate values can be obtained from degree-day maps."' " The daily range of temperatures for various localities is alan required with this method." It is important that the method used in estimating operating cost be consistent with the method used in calculating the heat gain of the structure.
EFFECTS ON FUTURE HOUSE DESIGN
Air conditioning, like automatic beating, ha? brought about improved practice in residential construction, particularly in those regions where cooling is of primary importance. Al though it is true that construction practices which reduce the heating load also reduce the cooling load, there are certain considerations that are unique in their effect upon the cooling load. Special attention should be paid to window orientation and shading. South windows may be shaded by awnings or roof overhangs, but it is not practicable to shade large win dow areas having an east or west orientation except by ex terior solar screening of some type. The use of insulation in the walls and ceiling of the residence will reduce the cooling load appreciably. In addition, attention should be paid to adequate ventilation of the attic. Double-glazed and weatherstripped windows, heat-ab6orbing glatm, planned ahyte tree locations, and light-colored exterior wail and roof surfaces, also help to reduce the cooling load.
Boston Moos Chicago, IU................... Cleveland, Ohio .
Fresno, Calif
900 Washington, D. C.......
800
REFERENCES
1T. N. Willcox, C. T. Oergel, 8. G. Reque, C. M. toeLaer, and W. R. Brisken: Analogue computer analysis of residential cooling loads (ASHVE Transactions, Vol. 60, 1954, p. 505).
*H. T. Gilkey, D. R. Bahnfleth, and R. W. Roose: Cooling a email residence with a two-horsepower mechanical nundenninp unit (ASHVE Transactions, Vol. 59, 1953, p. 283).