As soon ss It became apparent that polychlorinated biphenyls (KB) wire being Identified ss environrasntal pollutants, Monsanto re viewed its practices and aodifisd its manufacturing faeilities to further assure that losses to the environment are prevented.
Our initial technical work was in two areas, first, sources of actual and potential KB losses were identified and appropriate projects were undertaken, these projects had the objective of elimination or containment of the loss.
1. Catch basins were installed in the producing department to contain accidental spills and department clean-up.
2. Paving and curbing was installed around PCB storage and loading areas again to prevent accidental loss.
3. Projects were completed to the manufacturing equipment and
c
faeilities themselves to bring all known points of loss
under tight control and to reduce these losses to their a
absolute practical minimum.
4. All heat transfer units in the plant were modified and changed to substitute non-PCB heat transfer fluids.
Our second area of technical effort has been in establishing a monitoring program. Bare we have met with considerably less success. Let ms illustrate.
0**3702
PCB-ARCH0744522
2
First triad to balance our plant KS loim with PC8 levels entering tho Sauget Vi1lag# Municipal troatwant facilitiaa. We usod our elaborate asapling eystone which hm boon highly su0eessful.tgn othor plant pollution applleationo. Our objootivn worn to uoo our nain plant aowar outgrow* as a baaa to back-trask through our plant sowars to points of origin of loss. Ms onoountorod difficulties in achieving a natorial balanoo. PCS levels woro difforont by factors of l.S to 2.
Us than did sons experinentation.
a. We first ran profiles down aach of tho two main sowars leaving tho plant. By this X naan wo sampled four adjaoant sower bc^os along oadh sowar lino in a short space of time. Results wont sonothing like thlsi in ona sowar, tho third ample point down tho lino had 20 tines loss PCB then tho othor thrao points. On tho othor sowar lino* tho fourth sauplo p^lnt down tho lino had a A tines hlghar PCS level than tho first throe sanpla points.
b.
b. Wa tried a second oxporinont. At one sowar bon wo sampled tho sower lino at tho top. botton. sides and
Middle, wo did this for both tho sower lino entering
and leaving the box. On tho exit flow* we found tho level in tho cantor flow about 1% to 2 tines higher than the othor points. Xn the entering flow, tho sample taken at tho botton of tho pipe had a level 200 to 400 tines higher than the othor points.
0443703
PCB-ARCH0744523
- 3 -
e. Wa next took a nunbar of samples both in-plant and in
tha axit stream to tha Miaaiaaippi Rivar
tarad
a portion of tha sample in tha laboratory* I* *11 caaaia
tha filtarad samplaa showed a 70 to 90% raduetion in
K9 lavel whan compared to tha corresponding unfiltarad
sample.
Tha problem at thia point bacaaa obvious. Ha vara attempting to obtain raprasantativa aamplaa whara aolida concentration waa tha moat important variable in tha aaapla. Thia problem was and la compounded by aolida atratifieation in tha aawar linea theaaalvea.
Proa thia point wa have gone through an evolution of sampling devices with tha objective of obtaining what wa feel is a truly raprasantativa sample from our sewers. At this time, this ob jective haa not bean fulfilled. A number of factors are involved.
a. Do you point tha eampler upetreaa or downstream?
b. Do you pump tha sample fast or ilow?
c. Where do you place tha sampler in tha aawar line? Middle? What is tha sensitivity of moving slightly laft or right or up or down?
continuing our efforts to resolve them. 1 think it goes without saying that, as wa reach vary low discharge lavala, wa are keenly
044370*
PCB-ARCH0744524
-4 -
aware of tha need to obtain trua representative aamples and ao-
ourata results in order to continua carrying out an effective
further reduction program.
'
fhls brings us to where we are today.
1. Although all our in-plant sources of loss are Sssentially eliminated or contained through projects that have been complatent we ara continuing to change and modify our opera tion to further minimise potential losses.
2. Our on-going sampling control program is confined to the in-flow and out-flow from the Sauget Village Municipal treatment facilities as we feel this gives us the most accurate data.
3. We are continuing to improve and upgrade our techniques of sampling.
4. In the producing department we are installing a Parshall flume which is a device to measure sewer flow. This trill improve our ability to monitor and control at this point.
What are present level of losses?
1. From our KB manufacturing facilities they bangs from 2 to 4 #/day at our current production rate of 3 to 3% million #/month.
0**3
PCB-ARCH0744525
- 3-
2. Front tha Mlnleipal treatment facilities to tha Mississippi Alvar, loaaaa ara S to 10 #/day average depending on tha typa
, of aamplar usad. * '
Why tha difference? tha problem la aga. wa hava been producing and using KB's at tha plant for orar 30 yaara. wa have a eom-
plloatad old sewer system lnaida tha plant. Although wa hava a continuing plant program to rapalr and upgrada plant sewers, at no tima do wa expeet that tha aawars ara leak fraa. Zn fact, it would ha naarly impossible to tall. Wa ara confidant that this situation eontrlbutas significantly to tha PCB lossaa wa saa in tha out-flow to tha rivar. Th3,s sourca of loss should d daclina with tins. In summary, activity has, is and will remain high in carrying out our PCS loss control program. As a result of our efforts tha losses hava baan reduced to tha 3 to 10 #/day level. Ifforts to reduce the 2 to 4 #/day resulting from tha currant production activities will continue. Tha remaining 6 to 8 #/day result
from currently unknown sources but with tha controls in PCS losses these should eventually decrease.