Document bBMoz4nKx86mxrDJw0bDG37zy

Comments Questions and Answers CAPCO JEN 0005200 The Water Pollution Control Federation was established in 1928 as a non-profit, tech nical membership organization. Its objectives are to advance the fundamental and practical knowledge of all aspects of water pollution control by the dissemination of technical knowledge through publications, technical conferences, improvement of the professional status of those working in the field, promotion of public understanding and participation, and encouragement of the adoption and implementation of sound regulations aimed toward effective water pollution control. 1972 OFFICERS J. Floyd Byrd ............................................. John D. Parkhurst..................................... Sam L. Warrington.................................... Elmer E. Ross............................................ Robert A. Canham.................................... Joseph F. Lagnese, Jr................................ .................President ..... President-Elect .......Vice-President .............. Treasurer Executive Secretary ...... Past President CAPCO JEN 0005201 WORKSHOPS ON P.L. 92-500 THE 1972 AMENDMENTS TO THE FEDERAL WATER POLLUTION CONTROL ACT Comments Questions and Answers WATER POLLUTION CONTROL FEDERATION 3900 Wisconsin Avenue, N.W. Washington, D.C. 20016 CAPCO JEN 0005202 MMSXk**'*'*14 CONTENTS Introduction........................................................ Workshop Host and Co-sponsoring Associations iv v Workshop Program Participants......................... vi Management and Planning................................. 2 Construction Grants.............................................. 12 Permits and Enforcement ................................................................................................................................. 30 State Program Elements Necessary for Participation in the National Pollutant Discharge Elimination System, December 22, 1972, Federal Register Vol. 37, No. 247. National Pollutant Discharge Elimination System--Notice of Proposed Rule Making, January 11, 1973, Federal Register Vol. 38, No. 7. Public Participation in Water Pollution Control Programs--Proposed Rule Making, February 23,1973, Federal Register Vol. 38, No. 36. Construction Grants--EPA Procedures Applicable to Wastewater Treatment for FY 1973; Effective 2-28-73, Federal Register Vol. 38, No. 36. State Continuing Planning Process - Interim Regulations, March 27, 1973, Federal Register Vol. 38, No. 58. Appendix A Appendix B Appendix C Appendix D Appendix E iii CAPCO JEN 0005203 INTRODUCTION The 1972 Amendments to the Federal Water Pollution Control Act became Public Law 92-500 October 18,. 1972. P.L. 92-500 is generally considered one of the most complex pieces of technical legislation ever to emerge from Congress. Hearings on the act were begun early in the 92nd Congress. Measured in terms of numbers of statements received and pages of testimony alone, the hearings were more extensive than all those previously held by the Congress on water pollution control legislation. Further, it required 39 sessions of the Senate and House conferees and finally the overridingjaf-a presidential veto to enact P.L. 92-500. The Board of Control of the Federation, recognizing the need for encouraging Federation member association input, as well as to receive information and provide for participation in developing the processes of implementing the 1972 Amendments, authorized a pilot workshop to be held as soon as possible after enactment of the amendments. The pilot workshop held in Romulus (Detroit), Mich., December 12,1972, was designed to convey the intent of Congress, discuss EPA's and other federal agencies' implementation problems, as well as provide a platform to discuss the various impacts on state and local governments and industry. The Detroit workshop proved highly successful and the Executive Committee, acting for the Board of Control, authorized additional workshops. The pilot workshop, as well as the seven additional workshops held prior to the Federation's National Governmental Affairs Seminar in Washington, D.C., April 3, 1973, were developed in full cooperation with the EPA. Insofar as possible, a workshop was organized to encompass member associations (and states) that were contained within the boundaries of the EPA regions. A member association served as host for each workshop and the program chairman worked closely with the EPA regional office as the Federation headquarters office maintained a continuing contact with EPA-Washington, D.C., as program needs indicated. Almost 2,000 registrants participated in the eight workshops held prior to the National Seminar April 3rd. The programs were designed to encourage comments, questions, and answers. These proved to be the key to the success of the workshop series. The 1973 National Seminar culminates this effort by providing the forum to bring into sharp focus the problems and issues fundamental to progress under P.L. 92-500. This compendium of statements, comments, questions, and answers, given at the several workshops, has been published to facilitate their consideration in the present stage of development of federal and state regulatory and guideline policies vital to effective implementation of P.L. 92-500. April, 1973 iv CAPCO JEN 0005204- t WORKSHOP HOST AND CO-SPONSORING ASSOCIATIONS HOST ASSOCIATIONS Michigan Water Pollution Control Association Romulus (Detroit), Michigan December 12, 1972 California Water Pollution Conjgil Association Los Angeles, California February 8,1973 Georgia Water Pollution Control Association Atlanta, Georgia March 2,1973 New England Water Pollution Control Association Boston, Massachusetts March 7,1973 Rocky Mountain Water Pollution Control Association Denver, Colorado March 7. 1973 New York Water Pollution Control Association New York, New York March 15,1973 Oklahoma Water and Pollution Control Association Tulsa, Oklahoma March20,1973 Water Pollution Control Association of Pennsylvania Pittsburgh, Pennsylvania March 23,1973 CO-SPONSORING ASSOCIATIONS Alabama Water and Pollution Control Association Arizona Water Pollution Control Association Arkansas Water Pollution Control Association California Water Pollution Control Association Florida Pollution Control Association Georgia Water and Pollution Control Association Hawaii Water Pollution Control Association Kentucky-Tennessee Water Pollution Control Association Louisiana Water Pollution Control Association Mississippi Water Pollution Control Association Montana Water Pollution Control Association Michigan Water Pollution Control Association Nevada Water Pollution Control Association New England Water Pollution Control Association New Jersey Water Pollution Control Association New York Water Pollution Control Association North Carolina Water Pollution Control Association North Dakgja.Water Pollution Control Association Oklahoma Water and Pollution Control Association Water Pollution Control Association of Pennsylvania Rocky Mountain Water Pollution Control Association South Carolina Water Pollution Control Association South Dakota Water Pollution Control Association Texas Water Pollution Control Association Utah Water Pollution Control Association West Virginia Water Pollution Control Association v CAPCO JEN 0005205 WORKSHOP PROGRAM PARTICIPANTS i Agardy, Dr. Franklin J., Executive Vice President, URS Research Company, San Mateo, California; WPCF Director and Past President, CWPCA Alushln, Michael F., Attorney, Pennsylvania Depart ment of Environmental Resources, Harrisburg, Pa. Bal]et, Peter P., Department of Air & Water Pollution Control, Tallahassee, Florida Barnes, George, Assistant Director of Public Works, City of Atlanta, Georgia Birmingham, Paul, Attorney, Enforcement Division, Region II. Environmental Protection Agency, New York, N.Y. Blanco, Robert, Acting Director, Environmental Impact Statement Branch, Region III, EPA, Philadelphia, Pa. Bracken, Thomas B., Regional Counsel, Environmental Protection Agency, Boston, Mass. Brown, Daniel, Jr., Shipman & Goodwin, Hartford, Conn. Burt, Robert E., Environmental Quality Department, Director of Fuel and Utilities Departments, California Manufacturers Assn., Sacramento, Calif. Byrd, J. Floyd, Manager, Environmental Control, Procter & Gamble Company, Cincinnati, Ohio; Presi dent. WPCF Cahill, Harold P., Jr., Director, Municipal Waste Water Programs, Environmental Protection Agency, Washington, D.C. Canham, Robert A., Executive Secretary, Water Pollu tion Control Federation, Washington, D.C. Coburn, Darwin L., Chief, Water Wuality Control Divi sion, Office of Water & Air Resources, Department of Natural & Economic Resources, Raleigh, No. Carolina Coddlngton, Richard A., Chief, Programs Evaluation Branch, Air and Water Programs Division, Environmen tal Protection Agency, Region IX, San Francisco, California Cornelius, James, Supervising Water Quality Control Engineer, Clean Water Grant Program, State Water Resources Control Board, Sacramento, Calif. Costel, Douglas, Deputy Commissioner, Department Environmental Protection, Hartford, Conor"' Covington, Frank M., Director, Air and Water Programs Division, Environmental Protection Agency, Region IX, San Francisco, Calif. Coy, Bennett L., General Manager and Secretary, Miami Conservancy District, Dayton, Ohio Cunningham, Robert, Assistant General Counsel,?^ Speciality & Fine Papers Division, Olin, Incorporated, Pisgah Forest. North Carolina Dendy, Bill B., Executive Officer. State Water Resources Control Board, Sacramento, Calif. Denthual, Harless, Attorney in Enforcement. En vironmental Protection Agency, Dallas, Texas Dicksteln, Irwin L., Director of Enforcement, Region VIII, EPA, Denver, Colorado DIMatteo, Louis, Partner, Bowe, Walsh & Associates. Huntington,' N.Y.; Chairman, Legislative Committee, NYWPCA Dysart, Ben, III, Associate Professor, Department of Environmental Systems Engineering, Clemson Univer sity, Clemson, South Carolina Eaton, Bruce P., District Sales Manager. JohnsManvllle Sales Corp., Cambridge, Mass. Flood, Frank J., Superintendent, Operation & Maintenance, Nassau County Department of Public Works, Mineola, N.Y. Flynn, John, Commissioner, Suffolk County Depart-Al ment of Environmental Control, Hauppauge, N.Y. ' Fortney, Glen O., Chief, Engineering Section, Division of Sanitary Engineering, State Department of Health. Charleston, W. Va., Secretary-Treasurer, WVWPCA. Franzmathes, Joseph R., Director, Facilities Branch. Region IV, Environmental Protection Agency, Atlanta, Georgia Glenn, Michael K., Special Assistant to the Assistant Administrator for Enforcement and General Counsel. Environmental Protection Agency, Washington, D.C. Goda, Allan, Deputy Attorney General, State of Hawaii Godsll, Patrick J., Chief, Planning Branch, Air & Water Programs Division, Region VIII, EPA, Denver, Colo. Graves, Major General Ernest, Division Engineer, U.S. Army Corps of Engineers, Chicago, Illinois Green, Wallace, Director. Management Division, En vironmental Protection Agency, Dallas, Texas , Guarlno, Carmen F., Commissioner, Philadelphia City Water Department, Pa. Harper, Fred A., General Manager, County Sanitation Districts of Orange County, California; President CWPCA 'Vf Healy, William, Executive Director, New Hampshire*^ Water Supply & Pollution Control Commission, Con cord, N.H. vi CAPCO JEN 0005206 fl#nnlSan> John, Deputy Commissioner, Onondaga county Department of Public Works. Syracuse. N.Y. Past President. NYWPCA L><?ggln, Harry F., Director of Planning, State Departrment of Economic Planning and Development, ' Phoenix, Arizona Hormberg, William H., Chief. Municipal Wastewater Section, Region VIII, EPA, Denver, Colorado Howard, Richard D., Project Manager, Metcalf & Eddy, Inc., Boston, Massachusetts Hunt, H. Harvey, Partner, John Carollo Engineers, Lafayette, California; Past President, CWPCA: Past Director, WPCF lezzl, Thomas, Sanitary Engineer, Rohm and Hass Co.. Bristol Plant, Pa. Jones, Allen L., Manager, Crestview Water & Sanitation District, Denver, Colorado Jones, Charles H,, Partner, Jordan, Jones & Goulding, Consulting Engineers, Atlanta, Georgia Jones, S. Leary, Technical Secretary, Tennessee Water Quality Control Board, Nashville, Tennessee Kent, Denton, Planning Coordinator, City of Tulsa, Tulsa, Oklahoma Lynch, Victor K., Attorney-Engineer. Litman. Litman, Harris & Specter, Pittsburgh, Pa. Lyon, Walter, Director, Bureau of Sanitary Engineering, Pennsylvania Department of Environmental Resources, Harrisburg, Pa. McCarthy, William, Associate Counsel, Associated .industries of Massachusetts McLean, Farrell, Director of Public Works, Roswell, New Mexico, President NMWPCA McMahon, Thomaa A,, Director, Water Pollution Con trol, Department of Water Resources, Boston, Mass. Matz, John W., President, Peterson & Matz, Inc. Lathrup Village, Michigan; President, Michigan Water Pollution ControJ Association t Means, Warren, Division of Water Resources, Charleston, W. Va. Miller, Perry E., Director of Environmental Programs, Republic Steel Corporation, Cleveland, Ohio Moutrey, Curtis, Chairman, Water Pollution Control Division, Oklahoma Water and Pollution Control Association, Oklahoma City, Oklahoma Mytelka, Alex, Assistant Executive Director, Interstate Sanitation Commission, New York, N.Y. Kimberlfng, Charles L., Assistant Superintendent, Water & Sewer Department, Tulsa, Oklahoma Kirkpatrick, Ken, Grants Coordinator, Environmental Protection Agency, Dallas, Texas Kllppel, Richard, Managing Engineer, Research Divi sion, O'Brien and Gere, Inc., Syracuse, N.Y. Kocerha, Bob, Superintendent, Wastewater Treatment Division, Colorado Springs, Colorado Korbitz, William E., Manager, Metropolitan Denver Sewage Disposal District No. 1, Colorado Krlvak, Joseph, Chief, Planning and Standards Branch, EPA, Washington, D.C. Lagnese, Joseph F., Jr,, Partner, Duncan, Lagnese & Assoc., Inc., Pittsburgh, Pa.. Lang, Martin, Commissioner, New York City Depart ment of Water Resources, New York, New York Laughlln, James E., Partner, Shimck-Roming-JacobsFinklea, Dallas, Texas; President TWPCA Layne, Jack E., Black & Veatch Consulting Engineers, Denver, Colorado Ledbetter, J. L., Deputy Director, EnvironntBht Protec tion Division, Georgia Department of Natural Resources, Atlanta, Georgia jjkj Lubetkln, Sy, Chief Engineer, Passaic Valley Sewerage Commissioners, Newark, New Jersey Luley, Howard G., Reg. Sanitary Engineer, Penn sylvania Department of Environmental Resources, Pittsburgh, Pa. Nash, Norman, Deputy Director for Plants, Bureau of Water Pollution Control, New York City Department of Water Resources, New York, N.Y. Newton, Charles D., Director, Water Quality Control' Division, Oklahoma State Department of Health, Oklahoma City, Oklahoma Nichols, Bob, Partner, Freese and Nichols, Consulting Engineers, Ft. Worth, Texas Norris, William Kenneth, Executive Oirector, California Association of Sanitation Agencies, Sacramento, Calif. Nosenchuck, Norman H., Acting Director, Construction Grants. New York State Department of Environmental Conservation, Albany, N.Y. Novlck, Irwin, Chief, Federal and State Aid Unit, Bureau of Water Pollution Control, New York City Department of Water Resources, New York, N.Y. O'Connell, Richard A,, Director, Enforcement Division, Environmental Protection Agency, Region IX, San Francisco, California O'Connor, Dan, Attorney. King & Spaulding, Atlanta, Georgia Owen, W. Hunter, Associate, Barge, Waggoner, Summer & Cannon, Nashville, Tennessee Pagano, Salvatore, Director, Bureau of Industrial Wastes, New York State Department of Environmental Conservation, Albany, N.Y, Palange, Ralph C., Senior Engineer Advisor, Office of Water Programs, Environmental Protection Agency, Washington, D.C. vii CAPCO JEN 0005207 Parkhurst, John D.t Chief Engineer and General Manager, County Sanitation Districts of Los Angeles County, California; President-Elect, WPCF; Past Presi dent, CWPCA Parthum, Charles A., Senior Vice President, Camp Dresser & McKee, Boston, Mass. Pearson, Edward F., Superintendent, Atmospheric & Water Control, Pueblo, Colo. Pisano, Mark, Acting Director, Planning and Standards Division, Office of Air and Water Programs, En vironmental Protection Agency, Washington, D.C. Porges, Ralph, Head, Water Quality Branch. Delaware River Basin Commission, Trenton, N.J. Prlede, Nllo, Deputy Director of Planning, Region IV, Environmental Protection Agency, Atlanta, Georgia Printz, Albert C,, Jr., Director, Office of Permit Programs, Environmental Protection Agency, Washington, D.C. Pugsley, E. B., Industrial Waste Consultant, Water Pollution Control Division, Colorado Department of Health Purdy, Ralph., Executive Secretary, Water Resources Commission, Lansing, Mich. Quarles, John R., Jr,, Assistant Administrator for En forcement and General Counsel, Environmental Protection Agency, Washington, D.C. Ravan, Jack, Regional Administrator, Region IV, En vironmental Protection Agency, Atlanta, Georgia Reames, Carl J., Superintendent, Water Pollution Con trol, City of Fort Smith, Arkansas Regan, Herman D., Jr., Chief Sanitary Engineer, Ken tucky Water Pollution Control Commission, Frankfort, Kentucky Ricci, Rocco, Director, Division of Air & Water Programs, Environmental Protection Agency, New York, N.Y. Rlcigllano, Anthony R., Supervising Public Health Engineer, New Jersey Department of Environmental Protection, Trenton, N. J. Roble, Ronald B., Vice Chairman, State Water Resources Control Board, Sacramento, California Rozlch, Frank J., Technical Secretary, Colorado Water Pollution Control Commission Sams, Edward, Chief Engineer, Water Pollution Control Division City of Atlanta, Georgia Smith, John, Chief, Waste Water Division, Air & Water Pollution Commission, Jackson, Mississippi Sosewltz, Ben, General Superintendent, Metropolitan Sanitary District of Greater Chicago, Chicago, 111. Spear, Richard, Division of Surveillance and Analysis, EPA-Region II, Environmental Protection Agency, New York, N.Y. Storer, Fred, Director, State of Oklahoma Department j of Pollution Control, Oklahoma City, Oklahoma 1Jfi Stroud, Leonard, Superintendent of Sanitation, City of a Aurora, Colo. ''Sudweeks, Calvin K., Executive Secretary, Utah Water Pollution Committee, Salt Lake City. Stone, Herbert, Manager, Environmental Protection, Del Monte Corporation, San Francisco, California Stovall, James, Head, Environmental Engineering Department, J. E. Sirrene Company, Greenville, South Carolina Sullivan, Ralph, Municipal Waste Water Programs, EPA Washington, D.C. Sutton, Lester, Director, Air and Water Programs Div., Environmental Protection Agency, Region 1, Boston Sutton, Robert L., Jr., Cobb County Engineer, Marietta, Georgia Sweeney, John, Chief Permit Section, Enforcement Division, EPA-Region II, Environmental Protection Agency, New York, N.Y. Taylor, Robert B., Director, Water Compliance, Dept. Environmental Protection, Hartford, Conn. / Tinsley, Ken, South Carolina Pollution Control Authori ty, Columbia, South Carolina Tralna, Paul, Director of Planning, Region IV, En vironmental Protection Agency, Atlanta, Georgia Turner, Billy G., Associate, Jordan, Jones & Goulding, Consulting Engineers, Atlanta, Georgia Vondrlck, Art, Director, Water and Sewers Department, City of Phoenix, Arizona; Past President, WPCF Government Affairs Committee Wagner, Victor G., Associate, Henry B. Steeg & Associates, Inc., Indianapolis, Ind.; Chairman, WPCF Government Affairs Committee Ware, James, Acting Technical Secretary, Alabama Water Improvement Commission, Montgomery, Alabama Warrington, Sam L., Chief Engineer, Adv. Section, Texas State Department of Health, Austin, Texas; Vice President, WPCF White, John, Region IV, Environmental Protection Agency, Atlanta, Georgia Williams, T. C., President, Williams and Works Con- . suiting Engineers, Grand Rapids, Mich. J1 Zeller, Howard, Region IV, Environmental Protection ' Agency, Atlanta, Georgia viii , CAPCO JEN 0005208 MANAGEMENT AND PLANNING OAPCO JEN 0005209 MANAGEMENT & PLANNING TITLES I, II AND III OF P. L. 92-500 The prime mechanism of the water planning program (Section 303 of the Act) as seen by EPA is the concept of program management; in this, the first requirement is developing a national strategy. Such a strategy will describe national objectives and priorities with enough flexibility to allow the states to adjust it to meet their particular problems. ^ A next step in the process is for each state to develop a strategy (Section 106) for meeting its problems. Three elements are involved; identification of the pollution problem, an assessment of priorities, and determination of priorities for issuing discharge permits and awarding construction grants. The strategy developed should be based on sound water quality planning rather than simply on an existent annual state program. The basic plan made under the provisions of Section 303 is the best platform for a state strategy. Following these steps, the next element is submittal by the states of their actual programs. Each state will receive a base-level grant for maintaining on-going overhead to conduct the program. Since the program should be expanded to meet increased state responsibilities, EPA intends to allocate additional funds for operating the permit program, the planning processes, and the expanded construction grant program, particularly engineer's plan and specification review. Grants for state programs (Section 106) are doubled ($20 to $40 million) from fiscal 1973 to fiscal 1974. This reflects EPA's awareness of the importance of the state's role. That role has greatly increased. For example, adequate reporting and evaluation requires a state to submit a semiannual report on program achievement and milestones and an annual report on pollutant reductions and water quality improvement. A vital part of the planning process is the continuing needs assessments on which construction grant allocations will be made. These assessments will be based largely on the Section 303 basin plans. The permit system is closely related to these basin plans. Discharge permits issued in areas having severe water quality problems will be based on water quality standards and will contain an assessment of water quality and the pollutant discharge load that will allow the standards to be met. The basin plans will also include an assessment of non-point source pollution problems. A program including estimated costs will be required. The next level of planning is areawide. The Section 208 areawide plan is where local problems and their solutions will be defined. The major principle here is to gear planning to the level and complexity of local decisions to be made. Governors are to define areas for such areawide planning on the basis of three elemental criteria: that it be the locus of a water quality limited segment where secondary treatment or the best practical control technology will not solve the problem, and that local cooperation has been demonstrated such that the program can be carried out. Comments -- Questions and Answers We are on the threshold of change in water quality management; this change involves both problems and opportunities. New ideas or different approaches must be applied to our concept of a community. This will affect what we think of as home rule. With increasing portions of water pollution control funds coming from nonlocal sources, one roust expect requirements that must be met; this promotes regional solutions to planning and management. The concept of what constitutes adequate water quality management and planning is being redefined and broadened. This involves not only geographic scope but also non-point sources of pollution and goes beyond the more traditional concern with municipal and industrial wastes. The questions of how to accomplish areawide planning and how to involve other factors such as land use and transportation is a matter to be solved by the states and their political subdivisions, who will have to make the necessary decisions through their political processes. California, given sufficient manoo^pr and funding, can comply with the administrative and planning objectives. It is encouraging to see the priority system to determine what will be done first if money and manpower are not adequate to do the complete job. Only about 20 percent of the discharges in California are subject to any EPA permit; the remainder primarily involve discharge to groundwater. We are concerned about some of our groundwater basins, so we will have to seek EPA planning money to attack this problem; we cannot focus our attention solely on discharges to navigable water. 2 CAPCO JEN 0005210 Further, because we lean heavily toward wastewater reclamation, we must have some variation from what is done elsewhere in establishing state priorities. Local agencies and industry will have a difficult time in meeting the planning deadlines imposed. In the continuing planning process, a provision for feedback on adverse factors and experiences is needed; modification of strategies should be allowed as we go along. A very positive aspect of planning, if some of the factors cited can be accommodated, is that firm plans and schedules will be established and municipalities and industry will know what is expected of them over a period of time. However, it is also necessary that the law and theJmplementing regulations become stable. How do the regulations for Section 208 provide for establishing the Intent of the local jurisdictions to follow through In the management? The regulations are in general language. Basically, the intent at this time is that there would be some resolution adopted; for example, by members of a council of governments to follow through. Some indication of allegiance to and capability of cooperative action and coordinated management for the jurisdictional area should be made. One way ERA gets comments on these implementation concerns into the process is through a regulations task force with representatives of regional offices, state water pollution control directors, and interest groups such as are assembled here. Does a grant applicant now a part of a metropolitan region with a certified plan have to requalify under Section 208 before a construction grant offer can be made? If a given existing metropolitan regional plan involves an area selected as having a major pollution problem and if the region has a demonstrated record of regional cooperation, its plan may be accepted basically as is. If these conditions do not exist or if a new regional agency is designated by the state's governor, a new plan may be required. Where does one obtain copies of the draft regulations: what Is the status of funding for planning (all Sections Including 209)? Has ft been released? Draft regulations are generally made available through the state water pollution control agencies. The language under the old Section 3C is now incorporated in Section 102C. EPA does not intend to fund this section of the act, but to fund Sections 303, 201 and 208. Funds for basin planning will come under Section 106 state program grants. Funding for 208 will be made available in FY 74. The Section 209 requirement for level B basin plans and reports was placed on the Water Resources Council. Is there a possibility that federal criteria would advance more rapidly than state criteria, and federal enforcement advance more rapidly than state enforcement, thereby making the federal government the main enforcement agency locally? One of the major purposes of the Water Pollution Control Act is to place responsibility for water quality control at the state and local levels. EPA's intent for enforcement, primarily in the permits area, is to have this program responsibility delegated to. the states as fast as possible. How do you see (he Council of Government's (COG) role In the planning and management related to the act? In any area in which there is a regional or areawide planning agency, it would certainly act as coordinator of the various types of planning, including of course, the wastewater quality control planning. There is a real concern over the flow of paperwork within the EPA regional office. Some offices, In the approval processes, have some dependence on the action of other offices; however, this Inability to expedite paper processing can and has worked to the disadvantage of the applicant. In some cases, the economics of 9 the project are affected by the seasonal fluctuations of labor, material costs, and weather contingencies. This is a problem which EPA has tried to address and is addressing. Actions are being taken to relieve the time restraints; however, it should be noted that in the past several years there has been some very significant national legislation passed including the Environmental Policy Act, which has added to the lead time necessary 3 CAPCO JEN 0005211 to get projects started. Proper planning and good communications among the offices involved should reduce this lead time. Emphasis is on the pre-application conferences among grant applicants, state interests, and EPA regional offices. Another improvement has been the relationship of the areawide planning organization, such as the COG's, in coordinating and resolving local questions before they get to state and EPA levels. Where can we get copies of the "Water Strategy" paper sent to governors? This is new, but ask the regional office. In the past, most of the planning has been oriented toward the municipal area because of the impact of construction grants and qualifying for them. How would new planning requirements affect other than municipalities; for example, what Is the role and responsibility of the industrial sector; what are the Inputs that may be expected by either the areawide agencies, the state agencies, or the federal agencies; and what effects will the plans have once adopted and implementation is begun? The 303 basin plans will contain the discharge information and -jtlso the target abatement dates for ail discharges whether they be municipal or industrial and hopefully, as we know more about it, non-point source discharges. Therefore, the specific effluent limitations and requirements for municipal and industrial discharges will be derived from and contained within the permits. The plans that will be basin and geographically oriented will pull this information together such that we can (1) spell out priorities, (2) insure that there is consistency in limitations on municipal and industrial discharges, and (3) have a basis for tracking progress in abating municipal and industrial discharges. The best alternative for industry waste treatment, whether hooking up to municipal systems or discharging independently should be contained in an areawide plan. The non-point source discharge is one we consider extremely important and one we do not know much about, and it is our hope that through the planning process we will discover more about non-point source causes of pollution and control for non-point source problems. What is the relationship between the planning that will be conducted at the state level versus the planning that will be expected at the local level? Essentially, the basin management plan will be performed by the states. The local level will prepare the areawide plans. Whether planning is done at the state level or the areawide local level is a determination to be made by the governor. He is to designate Section 208 areas. The state can subcontract as the planning agency for 208 authorities. There is an important distinction between the state acting as a planning agency and the state becoming the planning agency. For designated areas, there is a lot of concern over EPA's relationship with the 208 authorities, such as whether or not the contract instruments are agreed directly between EPA and the local area or whether they go through the states. The EPA intends to handle the Section 208 contract power in the same manner that it would handle the contract powers for Title II funds for construction grants, that is, dealing with local communities through the states. It was said that the final planning process must be completed by dune 30 If a community is to be eligible for construction grants. Where does that place municipalities and Industries who are on an implementation schedule for compliance, say by 1974 if they come In and the plan Is not complete because the funds are not available to complete the plan? There are two parts to the question: (1) funding for a construction grant for a municipal facility and (2) how planning requirements relate to construction grant applications. Concerning the first part, the areawide planning program, particularly under Section 201, is not a departure from what EPA has been doing in the past under 18CFR Section 4. The final date for completion of areawide plans was June 30,1973. Many states have proceeded under that date and will achieve it. The EPA recognizes difficulties states are encountering and is attempting to alleviate planning requirements for applications by specifically tailoring the level of planning to the minimum information required to make program management decisions. For larger and more complex areas, that planning pressure cannot be alleviated. The cost-effectiveness considerations are extremely important. Not only are priorities set when there are budget constraints, but a least-cost solution to get the job done is also established. Therefore, EPA wants the planning done. Also, there will be additional funds available for planning by using the first step of construction grants for this purpose. This will enable planning to be done 4 j i CAPCO JEN 0005212 where heretofore there have been financial bottlenecks. In establishing guidelines for the states to structure their priority lists, four general criteria were set up: 1. Water quality and pollution problems in a state, 2. The need for preserving existing high-quality water, 3. Emphasis on highly populated, pollution plagued areas where the grant will have the largest impact, and 4. Other factors that the states believe are important in determining priorities. There might be some states where there will be resource constraints. This will have to be recognized and accepted. Through the 303-106 process, the states and EPA will have to set the priorities and adhere to them with regard to the construction grants program and the NPDES (permit) program. Explain how states and communities are to know what level of planning will be required by the EPA. In the regulations now being prepared by EPA on the 201 planning program, there is a section on level of complexity and level of planning. In the SMSA's, a much more extensive level of planning is needed to meet the basic guidelines contained in the regulations. Ultimately, of course, common sense will tell what planning is needed. In its regulations and requirements EPA points out what it considers important and what factors should be examined. Where there are cost-effective solutions, EPA wants these to be considered. The regulations are structured so that different levels of planning will be required for different problems. The regulations in the past have not been that flexible. Will EPA or the state determine priority for construction? It is clear that the state is the responsible agency, but, needless to say. EPA would like to work with the states in assuring that we get these problem areas defined. Give some examples of agencies that can be designated as responsible for areawide management (assuming that this question applies to 208). First, the intent of this section is for planning to be focused on urban, industrial SMSA's. Hence, criteria emphasize these areas. Second, criteria focus on significant water control problems. If a problem can be solved by a simple facility plan, more extensive planning need not be done there. Section 208 areas will be limited to those areas where secondary treatment or best practical control technologies will not meet objectives. Third, 208 plans are only the first step of a process. The next step is the action implementation of the plans. A specific requirement is that all jurisdictions within the area abide by and conform to the plan. It would be unwise to adopt 208 plans where there will be an appreciable amount of local conflict and where communities and jurisdictions will not be willing to go along with a plan. Regarding the makeup of these planning agencies, one of the major issues is whether the planning board members should be all elected officials or whether there should be some appointed officials on the board. Currently, it is EPA's position that there must be elected officials on the board, but they do not necessarily have to constitute a majority. The EPA allows the governor to designate either general purpose or special purpose planning agencies. . Proposed 40 CFR 130 (303) seems to go beyond planning inasmuch as it would require an immediate state certification of the existence of the power to Implement plans and a commitment to do so. Comment? The law requires that a state authorized to have a permit program must have a continuing planning process. Past history shows a need for this. If we are to meet existing time schedules, EPA must have the information that the Section 303 regulations require. State strategies will be a prerequisite for a 106 program grant. What Information and promulgations required of EPA are in the Federal Register and what is not? Basically, the Register contains 303 regulations that are to be effective soon; the Title 11 regulations published February 28,1973, and the 402 regulations that cover the federal permit program published in proposed form January 11. The EPA does have a list of regulations and required actions and the regional offices are informed weekly on their status. 5 CAPCO JEN 0005213 1 If stream analyses sufficiently broad enough to cover most discharges are not performed, how can the decision concerning water quality limits and effluent limits be made? j Math model techniques--some good, some not quite so good--are available. Probably everyone wants guidance from EPA on this. The basin planning process (303E) is one of the essential elements to be accomplished. Marshaling available data with resources to gather it where it is unavailable is a monumental task. We must establish priorities to determine a starting point. There is some historical information to document the fact that some stream segments and"water bodies are water-quality-limited. Section 303 planning provides guidance but not necessarily the answers. j What efforts Is EPA putting forth In the modeling area? EPA does not have sufficient resources or manpower to do load analyses everywhere and wants states to do these where useful. Where modeling is necessary, it will be done. There has been a tendency to be more concerned with the model than the decisions to be made. Is the deadline July 1,1975, for completion of the plans under 303 required by the law and If not why was this date selected? It is not required by the law. It was administratively determined through discussion with the states. States ability to meet that date is not uniform. Those that had an ongoing program felt they could meet the objective by the end of this year. Other states felt they could not meet the 1975 date. However, EPA feels states must have 303 plans by that date to achieve the 1977-78 goals. May a state participate In planning without using the permit route? The state has to participate in the permit program if it goes the planning route and all states will be required to do 303 planning. What exactly is needed by EPA to be certified by 1974? Are the MR plans still required? Or is the needs assessment the required document? The 303 process with the 106 plan (old state plan) backing it up will be required before EPA can continue program grants to the states. In the 106 document, there will be a needs assessment--an inventory asked of the states. If EPA does not recommend the 208 plan where local support Is fragmented, what Is recommended to achieve regionalization? The state could use the 201 area of Title II. Assuming there are several agencies to perform functions that are not under one governmental authority, what criteria will be administratively utilized to determine the authority of the agency to coordinate all the functions? (This seems to refer to 208.) The gist of the question is the intra-agency and the multiple-local-agency review function. Covering all intraagency review requirements is a real problem in the areawide plans. The last count showed 17 possible federal programs that involved local planning. Several have recently been eliminated. The EPA will attempt to develop intra-agency agreements at the federal level; at the local level there is the clearinghouse review, and that mechanism must be relied on extensively. State regulatory agencies have mdfiy people under orders and court orders. All are trying to move ahead with abatement programs. Are planning requirements to stand In the way of rapid Implementation or grants? What does EPA think will be done to resolve this In favor of moving ahead with actual construction where there Is lack of planning documentation? The EPA is not concerned with planning documents. It is concerned with planning developed information and analysis. A meaningful give-and-take situation between an EPA region and a state would occur if a state or 6 CAPCO JEN 0005214. local community should present an analysis showing that a certain procedure is the most cost-effective way of approaching the objective, although they may not have written or published their procedure. The EPA needs the information. Lack of formal presentation will not hold up the program. The 303 basin plan is to gather together all data available from whatever source to see if there is anything to indicate how best to get the program moving This technique permitted EPA to construct 55 basin plans covering 60 percent of the population and 50 percent of the major industrial discharges in the country at a cost of two-man months per plan. In administering the act, what cognizance will be taken ol4he considerable ecological difference from region to region that creates differences In the land, water, waste assimilation capacities, and land-water benefits and detriments In the disposal of wastewater? The act does provide certain national criteria. In writing guidelines for the Section 303 basin plan, alternative methods of waste disposal, for example, on land, are prescribed for investigation, and they must be explicitly reflected in a state's assessment of its pollution problem in its overall strategy. Implementation strategy can be modified and legislative changes can be requested if necessary. Discuss the present status of limitations in critical areas. For how many years shall we plan? Does it not make more sense to regulate water input Instead of wastewater output? The purpose is not to limit growth in areas with severe pollution problems. The objective is to spread the available grant money as far as possible by reducing the investment made in future capacity. The greatest deterrent to effective wastewater management Is the large number of government agencies involved. What steps are being taken to simplify this problem? There is a very big need for coordination. California expects to run the permit program and the other measures of the act that are delegated to the states. Various memoranda of understanding are being drafted by EPA relative to working with other federal planning programs. Will cities be allowed to Ignore deadlines In their compliances because of Insufficient federal grant money? The EPA testified to the Congress that even with sufficient funds it will be difficult for all communities to meet the 1977 deadlines. We are looking at different alternatives to possibly accelerate compliance and set priorities that will encourage larger and more difficult projects. One alternative is to phase project stages. However, at some point we are going to have to face the legal issue of a municipality not meeting a compliance date. Is It conceivable that discharges to navigable waters will ever be stopped? It is a long range objective. The cost curve for it might be astronomical. The EPA approach to zero discharge is to identify what level of control is cost effective and produces an environmental enhancement. Zero discharge for the sake of zero discharge with no environmental improvement is a needless waste of public and private money. . _ Will construction grant funds be made available for local areawide planning now In preparation? The availability of such funds is now being reviewed by EPA. One of the basic steps a state will have to take is to identify the priorities for plant construction and to determine the level and extent they wish to use allocated construction grant funds for areawide plans. Is the timetable for Sections 106 antf*306 planning a guideline, and what are the consequences to local entitles If the state falls to meet the schedule? It is a guideline. However, if EPA does not follow a schedule we will not be able to effectively process the Section 106 state program grants. This also will effect the development of priority lists for permits and construction grants. 7 CAPCO JEN 000521S ) Does the federal government Intend to get Involved In guidelines for public hearings? Section 101 specifies that the federal government, in conjunction with the states, will develop guidelines for public participation in the development of any program. Regulations have been written and published as proposed regulations in the Federal Register. That was February 23rd. Will a governor be permitted to designate sanitary districts or multicity cooperatives as areawide planning agencies, or are councils of governments going tgjbe Imposed on us? The state is the management agency for the state program. The governor is to designate the area management agency. The EPA will prescribe criteria that a governor can employ in designating the planning agency and the implementation agency. There is a requirement that elected officials representing local government be responsible for the planning process. What federal funds are available for the various planning provisions? Section 106--$40 million, with certain portions earmarked for Section 303 basin plans; Section 208--$25 million; Section 201 funds are dependent on the states and the amount of money they apportion from their construction grant allocation. The funds cited are for fiscal year 1974 beginning next July 1. Will Industries discharging to municipal systems be allowed to Ignore deadlines when the municipality serving them Is not In compliance? EPA is reviewing how to phase the earlier deadlines for pretreatment compliance with the 1977-78 require ments for municipal plants. If the governor determines, under Section 208, not to designate any regional problem areas, will 208 planning money be available directly to the state so that It may conduct the planning under this action? Under 208, is the management plan to be formulated by a regional planning agency, local community or state? Generally, the feeling in EPA now is that 208 planning money would not be available but that states would have to use either 106 funds or any other. To the extent that some 201 planning money can be incorporated under Step-1, that money would also be made available. On the second question, the basic management plan can be done by either a regional planning agency, by contract with a private firm, or by the state. However, it is a requirement that local elected representatives be the responsible officials for developing the plan. Most of our water pollution problems have been "studied to death." Plans, studies, and master plans are available in abundance. When will funds be made available for the construction of facilities that have been needed for years? The EPA seems to be substituting and even delaying action with planning. Is this a planned attempt to pay lip service to a popular national Issue without having to pay the price? EPA recognizes that io many cases a good deal of planning has been done. To the extent that these plans are available then thoseparticular construction grant funds should be available. EPA approved over $500,000,000 worth of projects on March 1, before the user requirements deadline. The user charge cost recovery that will be discussed this afternoon will affect the design considerations in many plants where there is a significant industrial component. Industry will get into a trade-off situation where they will take the least-cost method. Therefore, there may have to be some replanning. How would you suggest that a state obtain a commitment from a community that does not have a pollution problem and yet must be IncludedJn a regional plan upon Insistence by EPA? General feeling is that they would have to participate. EPA will not allow gerrymandering on the 208 areawide basis. If the local situation is such that there is some degree of widespread difficulty in this situation the governor or local officials should take that into consideration at the time of a 208 area designation. Is federal money available for land purchase and family relocation costs as It relates to water pollution control 8 CAPCO JEN 0005216 facility development? There is a provision that construction grant money under 208 can be used for land acquisition, but the land is ` that which is confined to the integral treatment process; that is, you cannot purchase the land under the administration building. However, if a land disposal system was integral to the treatment, that land could be covered by the grant. Family relocation costs are not believed eligible costs as far as federal assistance is concerned. Money for this is apparently available under another law. If project plan and design for an urban/lndustrlal problejn area Is completed before 1975 Is it then exempt from further requirements? If this project is in a 208 area, legislation provides that an initial plan be submitted about 2 years after establishing the planning process and then subsequently at such time as is practicable to upgrade and update the plan to reflect the dynamics of the existing situation. Law permits continuing the planning in the 208 area. If there is a 201 plan for urban complex areas and it is submitted by 1975 that would be satisfactory for purposes of getting construction started under that plan. On the basis of what formula will the Section 106 planning funds be allocated? Under 106, 50 percent of the funds to an individual state would go to general purpose state programs, the remaining 50 percent would be divided. EPA has not yet set up the latter distribution but present thinking is 7.5 percent for a permit program, 7.5 percent for a monitoring program, and 15 percent for a planning program and other additional incurments. Formulation of the allocation of the discretionary program funds has not been finalized. How were the target years of 1977, 1983 and 1985 established? Were they engineering decisions or legal decisions? Enactment of P.L. 92-500 was delayed about 2 years. These dates were established by the Congress on the basis that they were so pleased with the deadlines they had established for the Clean Air Act, with regard to mobile sources, that they felt establishing target dates for the states was the way in which to accomplish the work required. How much money is required to fund the administration of EPA annually? EPA's operating budget exclusive of construction grants is about $440,000,000, of which approximately $100,000,000 goes to state agency assistance. Therefore, $340,000,000 remains for EPA air and water programs, divided among enforcement programs, research programs, and operational programs such as monitoring, permit programs, and general overhead. In developing these water pollution regulations who provides the input, engineers or lawyers? This answer depends somewhat on the nature of the regulation. In the secondary treatment most of the input was provided by engineers, who are still arguing as to what secondary treatment is. EPA still does not have a definition. Some of the-regulations had a good deal of legal impact. General counsel impact on working groups is being included in the regulatory language required in the regulations, but it is generally the programmatic people who are putting the regulations together. CAPCO JEN 0005217 0 CONSTRUCTION GRANTS CAPCO JEN 0005218 CONSTRUCTION GRANTS (TITLE II) Regulations for administering the grant program have been published in the Federal Register (Seei Appendix). The regulations contain a step-by-step guide for applying for a grant, a description of how an application will be processed, and an explanation of how payments will be made. Grants may be made in three: separate stages: Step 1, for preliminary plans and feasibility studies; Step 2, for construction drawings and specifications; and Step 3, for actual construction. This procedure will allow distribution of state allotted funds to projects ready to use them and will allow mord*Prompt payments to municipalities. Federal funds will be allotted to the states based on assessed needs for pollution control rather than on population as in the past. A new needs survey is required to make the fiscal 1975 allotments; it is underway and. is expected to be completed in the summer of 1973. The act provides for a new method of assessing charges for wastewater treatment. Users will be required to pay their fair share of operation and maintenance costs and industry will be required further to repay its proportionate share of the federally assisted capital cost. Discharge'permits will include a description of significant industrial wastewater discharges into a public system in terms of quality and quantity. No grant may be made after July 1,1973, unless the applicant'ean show that the wastewater sewer system j contributory to the treatment plant is not subject to excessive infiltration. Federal assistance is also available I for new collection sewers under certain conditions. However, in the absence of full funding, the emphasis will have to be on treatment plant construction. The proposed definition of secondary treatment specifies a BOD and SS discharge not to exceed 30 mg/I on a maximum monthly average and 45 mg/I on a maximum weekly average. It is not possible to establish a uniform national standard for other pollutants because of the variability in reductions; these will be set on a case-by-case basis. Also, for a publicly owned treatment plant receiving substantial portions of a high BOD waste, provision will be made for adjusting the secondary treatment definition. Conversely, for dilute wastewater the percentage criterion will be applied. Water-quality-related effluent limitations pursuant to Sections 302 and 307 for toxic substances will be applicable when the provisions of the secondary treatment definitions are not sufficient to prevent toxic discharges. Plants that reliably and historically exceed the 85 percent removals will be permitted and enforced at the higher level. Reclamation is now fully recognized, but these projects will be caught in the same situation as collection systems with respect to funding priorities going to treatment facilities. In addition, more research has to be done on reclaiming wastes for reuse. The new needs survey requires across-the-board cooperation if it is to be completed by June 1. In Region IX, EPA intends to list everything from septic tanks on up. Region IX is working with California in an early review of proposed grants. Reviews are being made and conferences are being held before state certification of the project. This is being done to expedite the grant award process with the goal of making an award within 30 days after certification. One of the good points of flexibility in the new provisions is that of staging or phasing projects. California, in October 1972, had projects on its top priority list having an estimated cost of S669 million; the federal allotment for the state is $261 million. Local agencies were told to either stage their project schedules or have the state do jj for them. By the end of fiscal 1974, California will have an accumulated deficit of some $1.25 billion caused by a lack of full federal funding as authorized. Federal funds, under the present allocations, are not adequate and the situation is made worse when we consider the newly eligible activities under the new law. The state is already taking steps to provide matching state funds for all federal monies available. The EPA should plan to release funds in such a way that staged projects could proceed during the next several fiscal years. In this way, local agencies and their bond counsels would feel more at ease in going ahead with the first stage of a staged project. Comments--Questions and Answers The matter of staging may be interpreted somewhat differently than has been stated here. Normally, it means separate construction contracts, and this can create problems in properly treating wastewater. What is needed is a phasing of the paper work. Cooperation among EPA, the states, and local agencies seems to be at an all time high. 12 CAPCO JEN 0005219 Precertification conferences, as previously described, are very helpful in speeding up the grant award process and in working out differences before design and construction. v Because all local agencies have come to expect federal funds, continuity of program has become very t important Communities must know what assistance they are going to get and when they will receive it. Staging of projects can help in this regard. This can help firm up the cash flow picture and permit localities to know when and to what degree they must call on their taxpayers. Another important area of concern is that of the vast amjiynt of paperwork that is required now. It must be reduced and the procedures streamlined. Designers particularly need to have established an even flow of engineering and construction. This would result in reduced engineering costs by eliminating the presently experienced peaks and valleys of work, volume. The EPA is attempting to reduce some of the multiplicity of reviews now required and thereby reduce the paperwork. It is necessary that these new provisions be administered as a national program so that we may have program scheduling and a structured flow of projects, obligations, and. outlay on a national basis. The construction grant program is the largest single public works prograrri in the U.S. today and it must be operated as such. Will there be any consideration of relaxing treatment requirements rather than staging construction in order to adapt to reduced funding? No. A county wastewater treatment plant Is accepting sanitary wastes from a food processor but has not accepted the process wastes. These wastes are nontoxic and biodegradable and would represent about 2 percent of the treatment plant's load. The county is planning a plant expansion. Will It be eligible for a federal grant? What can the food processor do to get the process wastes accepted for treatment? The county would be eligible for a federal grant. Pretreatment would not seem necessary for the food processor's waste, but EPA has no authority to require that the county accept the waste. What are the prospects in California for priority funding for a combined overflow? Presently, such a project would be at the second level of priority. However, this is true of several of the new categories of eligible projects under the new law. Have guidelines been published for the required user charges? No. However, the law requires that no grants be made after March 1,1973, unless a municipality has adopted or will adopt user charges. Guidelines are expected to be released by about the middle of March. Do user charges apply to all system users, domestic and Industrial? * Yes. In staging a project, can construction be in steps or Increments that are, in themselves, not usable, or must a usable portion of a plant be constructed In each stage? There have been various approaches to stretching available funds--stage funding, step funding, step processing, step grants, step projects, and split projects. We are not going to build several foundations around the country. The program will not be related to the point where a state can take its allocation and spend a very small amount of money on a large number of projects and then ask for more federal money. t Will a state's present priority system for project funding apply to 1972-73 projects? In preparing the regulations for the new construction grant program, EPA has attempted to make the transition from existing procedures to the new as easy as possible. A state may use its existing method, it may revise its method, or it may proceed with the Section 303 planning process right away. 13 CAPCO JEN 0005220 =*: Will general fund taxes suffice for a user bearing his fair share of operation and maintenance costs? General taxation or property taxation as a substitute for user charges is not generally acceptable. However, if it can be demonstrated for the particular treatment works that such a system results in a reasonable degree of proportionality to users, then it would be considered for approval. Is It contrary to the Intent of the new law If an Industry finds It more economical to treat Its own wastes Instead of becoming Involved In a user charge and paytag back a share of capital costs? An industry must make its own determination based on its internal economics. Because an industry would have to treat its own wastes to the level of best practicable treatment as established for the particular industry, economics are likely to lead to using joint treatment; it is not mandatory, however. Will grant funds be available to offset potentially expensive contractual arrangements for capacity rights In a regional system? Such costs have not been considered eligible in California. Joint'powers arrangements must all be made and signed before a grant application certification for funding. Are federal grant funds available for Infiltration monitoring equipment, and what level funding will be offered for these studies? Eligible costs for infiltration studies may be aided at 75 percent. Sewer system evaluation normally will be completed as a part of the preliminary plans and studies. Reasonable force account and equipment purchases or rental costs will be allowed if the regional administrator has given prior approval for the use of such forces or equipment. Detailed guidelines for these studies are being developed. Can funds allocated for stage construction be accumulated over a period of years to allow construction to take place in one step? No. The objective is to get as much benefit as possible from available funds and following the state's priority determinations. By what date must a grant applicant have an acceptable sewer use ordinance and a user charge system? The ordinance is required to be enacted and enforced before the end of construction funded by a federal grant. No grant may be made after March 1,1973, unless the applicant has adopted or will adopt an adequate system of user charges. WIILEPA give priority to funding collection systems In rural and unsewered areas with treatment needs? Priorities are established by the states and not by EPA. Most states will probably view this situation in terms of all the needs. Will EPA accelerate construction grant payments to a monthly basis? Grant payments may be made In at least three steps--preliminary plans and studies, preparation of construction drawings and specifications, and actual construction. A detailed payment schedule will be negotiated for each grant. What are the priorities for Issuing construction grants? The state plays the dominant role in setting the priorities. Until July 1,1973, the state can use their present list and present priority system. After that date, which coincides with the state submissions for 1974, the priorities could be the same or could be a new system. It is expected that in most states it will be new to include a way of coming to grips with the new eligibility items. Presumably, each state will have a new priority system that will have to be approved by the regional administrator. Because of the shortage of funds it is expected that the states will look harder at treatment or interceptors to abate a pollution situation. 14 CAPCO JEN 0005221 The community's share of planning and anglnaarlng: doas It hava to ba matched and paid concurrent with BPA payments? (1) Report (2) Plans and specifications (3) Construction Presuming the question refers to Steps 1.2 and 3; the grantee must agree to pay or have funds available for the local 25 percent share of the estimated cost for each grant. Therefore, based on schedule of payments to be worked out with the EPA, the local entity would have to meet its bills pending receipt of these payments. In current projects evaluations Is the percentage of each grant offer negotiable, or will all grant offers be at the 75 percent level? -* Grants must be at 75 percent level of an estimated cost. How many project applications are on hand and pending decision In Region VIII? There are approximately a dozen applications for FY 1973 funds that have been certified by the states. The present status is that, although regulations are on hand, the region is awaiting further guidelines before they proceed. t Are guidelines available for acceptable user charges at the present time? Yes, they are out in draft form for review and can be made available at the regional office When will state offices get guidelines, etc., on Section 206 relating to reimbursements? EPA is expecting these to come out shortly. States will of course get copies of these and they will be published in the Federal Register. Can private Industries apply tor a grant for pretreatment facilities from EPA? No. Grants are made only to public entities. Could funds be made available under the act for municipalities discharging wastewater into an industrial waste system? No, because in order to receive a grant they must have jurisdiction over disposal of wastes or agreement with another entity for disposal. Have allocations of 1973-74 funds In Colorado been based on application or designation? All have been based on applications. Will it be possible to have revenue sharing funds simultaneously with EPA funds? EPA believes that revenue'sharing funds cannot be used for the grantee's share of a matching grant. With respect to user charges, Is the equltabllity of user charges to be determined on the basts of a single agency serving a particular area or are the user charges to be determined equitably over an entire area of a water pollution problem or concern? Charges would be based on cost to each separate entity, not a blanket charge. Each would have to develop its own user charges. Costs such as capital, amortization, and O & M vary with each entity. Would the step grant process require separate applications and be subject to A95 clearance? Yes, but material submitted in one application, such as civil rights, would not have to be resubmitted with subsequent applications. 15 CAPCO JEN 0005222 What Is Industry expected to contribute to a project as far as a replacement fund Is concerned? Is it based on a matching situation, or the total cost of project; and what percent Is industry expected to contribute? Replacement refers to replacement or the costs for equipment as it wears out. The costs will be included in normal user charges for O & M. Considering that there are 3 stages--planning, specifications and construction--can technical services be picked up at a later date? Cost of technical services can be picked up under Steps 1 or 2 or can become payable at Step 3, that is, where a grant agreement is entered into for construction. This means that the consultant or community has to finance total cost of plans and specifications until the grant agreement. Although industry must pay its pro rata share of the 75 percent federal grant to a municipality, can the municipality require or waive participation in the 25 percent cost to it of its share? Yes, that is the understanding of EPA. How is land acquisition eligible? Land that is used as an integral part of treatment, such as a spray irrigation, where the land is used to achieve the necessary degree of removal would be eligible, but land for rights-of-way for sewers or the treatment plant itself is not considered eligible. EPA does not want to get into the real estate business. This is a local matter. With regard to sludge disposal, where land is used for tilling as the ultimate source of disposal, this is still under consideration. Are OSHA regulations to be considered for EPA construction grants for state and municipal projects? Federal law requires following OSHA regulations on all construction projects. These must be included as part of the specifications. What means of financing, If any, are available under the grant program for privately owned facilities on federal lands? Grants are made only to municipalities. Grants are not made to other federal agencies. EPA would not make grants to private developers. For design and construction to be eligible under one contract, is this a part of the law or an EPA regulation? This is an EPA regulation to allow the option of a design/construct contract. Basically, of course, this would apply to major projects where concurrent design and construction would lead to quicker on-line operation than the design and bid procedure. Of course this is subject to state laws and local ordinances because it is public works. * How is cost-effectiveness defined when delays to application processing, planning requirements, and NEPA requirements are considered? This gets back to earlier discussion of assistance in the pre-application stage. Depending on how adequate the application is and how complete the planning is, there is no delay and no problem. With regard to NEPA requirements, if a good in-depth assessment has been prepared to permit EPA to make the decision, delays should be cut back considerably; perhaps approval will be forthcoming in 90 days. What does the definition of secondary treatment have to do with states' effluent standards, especially in Colorado? The law now requires states to provide intrastate standards. Colorado's standards are jointly approved by the government. The EPA will have discussions with a state when it feels the state effluent standards are not as high 16 CAPCO JEN 0005223 i as EPA thinks they should be. Also, under the municipal permit system there will be an effluent prescription written along with staging of construction to meet the standards. The EPA is aiming toward compliance with secondary treatment by 1977. Does the design/construct concept conflict with the earlier "turnkey" concept? Hearings were held on the "turnkey" concept at a number of locations throughout the country, and testimony was evaluated. Regulations as now published are subject to comment until April 30, 1973. These are interim regulations that will be amended from time to time. Is there a chance that FY 1974 allocation to states will be revised by EPA administrators or by congressional action? One cannot predict what action Congress will take. There are certain actions proposed for taking another look at the formula, but as to the method of allocation there does not seem to be any discretionary leeway for the EPA administrator to take any action on it. * Will EPA require state allocation of FY 1974 federal funds to meet specific priorities procedures? A needs survey would cover all eligible items under the act, but the total cost for collection systems or combined stormwater systems will be tremendous, and resources required will never be available. Concentra tion wiU be on the more critical areas. Does the applicant have to submit an operation manual before approval of a grant? If so, what step must thl3 manual Include? The manual is a working manual. It conceivably should be available before construction is completed but not necessarily along with plans and specifications. The major areas to be addressed by the manual are the design concepts, the very important item of recommended staffing, maintenance items, and so on. It should be a working tool and be available to the operators and at start-up to shake out problems to which the manual does not address itself. The manual is, of course, an eligible item under the grant and should come under the classification of Technical Services. Are there any provisions or guidelines In the Act to promote mandatory certification of waste treatment process personnel who are In responsible charge of facilities? This is considered a state matter, although EPA would like to see mandatory requirements set up by the states. When will the guidelines for reimbursement payments be available? That will take several months. Guidelines will probably be available for comment before that. Do not look for windfall grants to be part of initial allocation at least. Some comments were made during the session on zero discharge. Comments? One of the requirements of the present act is that the goal for all industrial discharges is zero discharge by 1985. The original Senate Bill, S. 2770, stated that by 1985 it is federal policy to achieve zero discharge. Policy has the force of law. The present act says that it is the federal goal by 1985 that we will have zero discharge. The word goal is significant. Goal does not have a legal impact and, therefore, not a legal requirement. It is not enforceable in court. The important thing is that we will achieve water quality standards. Regarding Phase 1,2, and 3 grants, can a planning grant be obtained before getting the Interim plan dealing with whole degree of treatment and shvfem standards, because the purpose of the planning will be to set those standards? As this planning applies to a particular project, it is possible to get a Step 1 grant that can be used to fund that type of planning and also preliminary studies. Hopefully, not too many communities will be coming in for the Step 1 grant. When a community applies for a Step 2 grant, it will be immediately eligible for costs incurred up 17 CAPCO JEN 0005224. to that time, so that payment can be made at that time. When a community comes in for a Step 3 grant, the costs incurred up to that time are immediately payable. The new act has no provision for overruns funded under FY 1972 money. Is there any guidance foi communities caught In that situation? Legal opinion is that 1973-74 money cannot be inbred with prior year money. The ERA is trying to get a solution for this overrun problem. In some states where money is no longer obligated it might be used for such grant increases. However, it is a difficult situation that has not yet been resolved. t Can a municipality that has already received a grant but since that time has been required to go to a hlgheti degree of treatment withdraw and make a new application, recognizing, however, that a town cannot withdraw simply to take advantage of the new 75 percent grant authority under the current law? Yes, under the above situation, it can withdraw and the funds thus-freed can be used to fund other projects. In connection with the preliminary plans and final plans applications, how will grant be determined? Grant for construction should be made as close as possible to the time that bids will be taken. Price escalation that can be expected because of inflation, and so on, can be worked out on a practical basis with regions. Documentation would be required to support the costs of preliminary plans and final plans. What will be the magnitude of effort at the state level to manage the new program of grants in three steps? As states revise their method of doing business under the new act, it will probably be 3 or 4 months before the impact is known. Wilt EPA's definition of best practicable treatment address nutrient removal even in areas where it might not be a water quality consideration and, If so, should plants now being designed address that problem?. The EPA is still working on what best practicable treatment means. The EPA will try to get requirements out by mid-year, but differences can be factored in as the project progresses. Has the definition of secondary treatment been determined? There is a proposed regulation, (published April 30, 1973), that allows some flexibility. It would propose secondary treatment based on BOD, SS, fecal coliform bacteria, and pH. The units of measurement refer to monthly average and weekly average effluent concentrations for BOD and SS. For monthly averages, it would be '30, weekly averages 45; for fecal coliform bacteria 200 monthly, 400 weekly; and for pH a range of 6 to 9. Is It the Intent of EPA that cost recovery Is best accomplished through utility rates rather than initial charges at the time of connection to the utility system? The EPA will shortly issue guidelines on cost recovery systems and hopefully this kind of situation will be addressed. In Kentucky, there Is a lack of laws requiring communities to join together for area or regional planning. How can a project that will serve multiple communities be started? How do you divide cost? This is a planning question. Knoek"& few heads together. Use single tree psychology. If a municipality receives a Step 1 grant for completion of construction plans and proceeds to complete these plans, Is the grant for Step 2 construction automatically reserved and assured to the municipality? This is a scheduling problem for the state as to how it will plan the use of its funds. How much money Is actually available to pay off obligations Incurred during FY 1973? 18 CAPCO JEN 0005225 The new act provides that funds could be obligated. However, for the actual payments to be made there had to be specific appropriation by the Congress, and the new budget does request $200 million to get those payments underway, but these funds must be appropriated before payments can be made on new Title II grants. When you say Industry must pay Its proportionate share, exactly what do you mean? Traditionally, rate structures are based on a sliding scale, with decreasing unit cost with Increased use. For example, the minimum sewer bill Is at a rate of $0.48/100 cu ft. Above 7,000,000/cu ft/month, the rate Is $0.12/cu ft. Are you saying that a proportionate share is a flat rate that wttTfcover all O & M expenses, say on the order of $0.30/cu ft for all water discharged to the system? The new guidelines that are being worked on will have a number of actual examples. That type of calculation will be included as an example. Can low priority collection lines be processed through the state to EPA for general approval with the hope that they might be financed later when more EPA funds become available? In the past, regional offices have made exceptions and have allowed applications into the system when there were no funds for them and have held them unduly long. Regional offices will have to establish a priority system for handling applications and also have some certainty of funding. However, if a community goes through with construction without a grant it will not get one later. Are federal funds available to finance construction of tertiary treatment facilities where the effluent from the waste treatment facility will be used by electric utilities as a source of condenser colling water? Under Section 201, studies are being made with regard to recycling and what this means under the law. Will three steps for construction grants require three separate grant applications or one continuing application? It will have to be one continuing application to keep control of the project. Reference Subpart E, Section 35.908 "Advanced Technology and Accelerated Construction Techniques." Is it the intent of this section, for example, to encourage demonstration of new techniques on a relatively small scale, followed by construction grant funding to Implement technique on a full scale? Also, how serious are the EPA and state agencies regarding techniques allowing for accelerated construction when it appears that we are money-limited, not time-limited? Section 908 was included specifically to indicate that some Title I grants for demonstration projects can be combined with actual construction. The Title II grants are limited to funding approved techniques so the experimental part would have to be funded by Title I and the improvement part by Title II. EPA will have to be more imaginative in the future in combining these two types of grants in order to improve the state-of-the-art. In connection with the secondary limits previously referred to, Is there an estimate of the design effluent limit or percent removal that would be required to meet the monthly average figures for BOD removal? EPA has run some estimates to convert monthly averages based on plant operating records to yearly averages. In general in Region IV there is a ratio of about 1.5 between the monthly average and the yearly average so that when talking of yearly average one is talking somewhere in the vicinity of 20 and influent wastewater can be taken to determine reduction. Other than the 85 percent, these are monthly average figures not yearly average figures. In the past, states would have to have thetr program plans approved before construction grants would be made. The new law makes a provision that funds are available for construction grants on January 1. Will the construction grants now be made before approval of state program plans? Until June 30,1973, we are essentially going with the 18CFR. However, after that whatever is in 303 regulations will have to be complied with. 19 CAPCO JEN 0005226 In past years, states had to submit their plans and no construction grant funds could be made available to t grant applicants before they were approved. Now the money Is available on January 1, according to the I which would be six months before start of a fiscal year. Will grants be made by EPA If a state program Is n approved or, In fact, even submitted? As long as plans meet the provision of the current regulations it will be covered if there is a reasonable reason for the delay. The answers relate back to 303 and WE regulations and the interrelationships discussed in the earlier panel discussion. 1973 and 1974 funds are essentially available for grants, not for payment. Unless we reserve 25 percent for overruns and with the limited funds available this would be foolish and correction of pollution would be delayed. Would It be possible to continue 1975 funds with funds for 1973 and 1974? No grants can be made at the present time until user charge regulations are out. While '73, '74 and 75 fundsi may be mixed, 75 funds cannot be obligated until the allotment is made. This is provided for in the legislation. I The cities would have to take the risk that Congress would appropriate the 75 funds. The law requires grants to be 75 percent, therefore nothing can be done to dilute this percentage. Have limits been set on Infiltration allowances In new collection system construction? If not, will they be set? If so, are they available? Excessive infiltration is defined in the regulations. The definition is not an easily understood one. There were t plants built larger than perhaps necessary to handle these additional flows. There were also cases where i bypasses were installed that were not really essential, if the infiltration problem could have been eliminated or ; reduced. On that basis, EPA can participate in infiltration studies and work and believe it valuable. How EPA \ approaches this is tied to definition of regulation, in a simple case of broken pipes, when a normal flow is 100 to 120 gpd per capita, an excessive amount would perhaps be 200 gpd. Somewhere in that range, flow is i excessive and EPA would be alerted to the fact that something is wrong. EPA wants to see a cost analysis, what is the problem and comparison of alternatives. If it turns out to be cheaper to correct broken or leaky pipes j then that would be considered excessive infiltration and EPA would expect that to be done rather than build a | larger plant or a bypass. A separate set of guidelines is due out in a month or so and EPA will have a separate i seminar on it. How is "excessive" infiltration defined? There are no specific limits on infiltration. Please discuss the control of infiltration from private house connections. In this event, what commitments will be necessary to secure a Step 2 and Step 3 grant? Infiltration from house connections is one of the problems. EPA wants an evaluation of such problems to see if it is feasible and economic to correct. Would a town that had expended money In 1972 and 1973 to control infiltration before building a new treatment plant be reimbursed and to what extent? If money was spent in 1972, before enactment of the new legislation, it is not eligible because it was not eligible under the old law. If money spent in 1973 (there is no longer any prefinancing so that if a project goes ahead on its own it cannot be reimbursed) an application for a grant must be made through the state and commitment for : a grant must be had before proceqjling with the project. However, if it is in 1973, there is a possibility that if it was put in as a part of the preliminary engineering report and then came in for design of plans and : specifications EPA could participate in the preliminary work if tt were eligible under the law. Elaborate on the program Connecticut has for Infiltration. ^ < Basically it is an enforcement mechanism. The state has a legal requirement that a town do specific infiltration studies. For the most part, there is no money available for this. 20 CAPCO JEN 0005227 mt*k Why can't Connecticut solve Its combined sewer problems by constructing holding tanks for combined flow* that would be bled back Into the major treatment facility when dry-weather flows return? Isn't this cheaper than sewer separation? The problem Is the same whether you separate or whether you collect and bleed back. The dollars are just not available now In the meantime you piece-meal it and provide that all construction be on a separated basis and that towns undertake projects to separate. If dollars were available, it would be a viable alternative for our larger cities. Combined wastewater overflow treatment facilities seem to be a "poor cousin" In the priority system. If we can demonstrate that separation of collection systems Is the most economical from both first cost and annual cost, can we transfer priority to separation? Yes; EPA wants an analysis of solutions. Solutions might be separation, conservation of leaks, detention tanks, overflow treatment facility, or a larger treatment plant. EPA wants an analysis to see what is the most costeffective solution and then will pay for it. We now have a cost recovery program under old law and plan to also construct future interceptors. Will we have only one cost recovery program formulated under the old law? Region believes that if it is an interceptor the industry would have to pay its share of the cost of that interceptor and not the treatment plant if the plant was constructed under the old law. Are redesign costs eligible for federal grant participation If an industry pulls out? Yes. What is the method of payments of the federal grant under the new 1972 amendments? The major change is in the attempt to accelerate payments; any work done before the grant offer for reports or plans can be paid for immediately. From then on EPA can only pay for work as it is completed. However, EPA is no longer limited to the 25, 50, and 75 percent categories. An agreement can be,made when the grant is accepted for a quicker method of payment such as 10 percent, 20 percent or whatever. There is flexibility in payments but advance payments cannot be made. Will those communities with a grant offer before March 1 be governed by cost recovery and user charge guidelines that are now being promulgated or the old ones? The old ones. That is why there was such acceleration. What happens to those projects that didn't get funded before March 2,1973, that have significant Industrial impact? Is there any hope to get under old rules? No. They will have to be under the new rules. Should cost recovery systems take into consideration capital expenditures made In the past? If there are still outstanding bonds and payments on interest charges are still being made, costs are being recovered either from general taxes or from sewer users. Whether or not that is an equitable allocation and whether or not it will be politically feasible to change from one system to another is a question that can only be answered at the local level, but certainly the alternatives should be explored. Is there some feasible way to determlne-Whether a small Industry has sufficient "impact" on a plant to warrant a recovery charge being levied? If it is an industry according to the definition of an industry then it has an impact, but it should be grouped together with all similar businesses that are classified as industries even though they are small, and a cost recovery system developed to recover appropriate costs from this group. 21 CAPCO JEN 0005228 How large must an Industry be before a contract Is required for Industrial payback of the federal share? This is a controversial question. It has been a problem even under the old regulations as to just where the cut off point will be. Size is not mentioned in the regulations up to now and will have to be included. There has been no definition of size of industry. There has, however, been concern about sanitary discharges from a dry industry that nevertheless falls within the definition of an industrial user as that term is defined in the act. Current EPA thinking is that as long as the discharge* is an industrial user, firm commitments are required regardless of size or nature of the discharge. Will cost recovery (capital costs) be required for hotels, office buildings, apartment houses, etc., because they are also private profit facilities? If not, why are Industries singled out? No. Hotels, office-buildings, apartment houses, etc., are not covered. They are private, profit-making facilities. Congress made the judgment on industries. Under the user charges that cover the O & M everyone pays. The guidelines break those into four categories: residential, commercial,, institutional, and industrial. Does Industrial payback also Include the cost of interceptors and pumping stations as well as STP? These costs are covered by the act that requires payback for the treatment works. Does domestic wastewater Issuing from Industrial plants also require industrial payback? Yes, because there is no distinction between the types of discharges coming from the industrial user. Under the old cost recovery program: If STP was designed and constructed to accommodate industry and municipal wastes, who Is responsible for financing the facility if the Industry decides to treat its own waste? The answer depends on whether the industry agreed in its commitment to the municipality whether or not it remained in the system. Under EPA guidelines, if its discharge represented 30 percent or more of the flow it would have committed itself and is, therefore, bound to meet its commitment. If not, it can pull out at any time.' What portion of Industrial waste need not be considered In payback provisions such as sanitary wastewater and normal clean-up wastewater? Under the law, there is no way of distinguishing between types of industrial discharges. The law provides that construction grant money is reimbursable. Does that mean that a community or agency must obtain financing for a project's construction cost in order to award a contract and to meet payments during the project? The approach under the new law is new in terms of giving EPA the authority to make contract commitments. The present scheme'-of construction grant funding is not new. The federal government makes a grant commitment and the funds are provided when a payment is due. We are attempting to solve the matter of step funding. How will EPA Interpret and Implement contract authority? The mechanics of the administration of the grants program is modeled after those used under the Federal Aid Highway Act. Each stage in the construction of a waste treatment facility is a separate project. Thus, the grant applicant furnishes plans, specifications, and estimates for each stage included in the term "construction" as defined in Section 212 of the act. Upon approval of these for any phase of a project, the U.S. is obligated to pay 75 percent of the costs of that phase, as work is completed. Could you clarify the question of reimbursing earlier projects that went ahead without the full federal share of aid? This money is to be allocated to the states in proportion to the owed balances. 22 CAPCO JEN 0005229 Poes that mean that because a grantee has one year to apply for reimbursement that you will wait the year before making any allocation? No. Each state will get a proportional allocation to cover the outstanding projects. We know what projects are * entitled to these funds. If some eligible grantees do not apply the remaining funds w.ll have to be reallocated. On reimbursement where states such as Wisconsin have been giving 25 percent toward wastewater treatment In addition to the 50 to 55 percent federal share, for a total of 75 percent, will the federal reimbursement bring this to 100 percent or reimburse Upstate for Its 25 percent? No. We are going to try to reimburse a state only for that portion of advance payment that represents what should have been the federal share. If a project received a full 55 percent federal share it will not receive additional funds. Define the principal differences between the discredited "turnkey" and proposed design construct. Is designconstruct In the Federal Register? Yes, the regulation 35.920-3D is basically the same as the old proposal. Under the old proposal there was really no clarification and there is not in the new regulation. It is just an allowance. Assume guidelines or additional details will have to come out to explain how this will be utilized. Would it be possible for a community with a number of marginal industries (for example, metal-plating or tanning) to build a municipal "pretreatment" center In order to keep the Industries alive? It really would not'serve any purpose because under the new law industry would have to pay back the full share of their cost of the project. Pretreatment would be 100 percent industrial, and, therefore, the industry would pay 100 percent of the cost. Is land for ultimate disposal of sludge (that is, landfill) eligible? The regulation specifically states that landfill is not eligible but on the other hand the law and the regulations say that where land is used as part of the treatment processes or for ultimate disposal (or some such wording) it is eligible. It is apparently felt that a landfill, if it is used for disposal of rubbish, etc., would not be eligible. The present regulation is not clear and one having a question regarding it should raise it. What is the basis for the establishment of a 15 mg/I BOD effluent quality? The secondary treatment requirement was 85 percent removal and 30 mg/I because that was reasonably obtainable from existing secondary plants. The 15 figure is being proposed as a definition of best practicable because it can be done. There are activated sludge plants that can and do obtain 92 percent BOD removal and an effluent strength of 15 mg/I BOD or less. What is the anticipated associated suspended solids level In the preceding requirements? Same as the BOD. Are these reasonable goals (BOD = 15 mg/I, SS=?) taking into account the variability of biological treatment on a day-ln day-out basis? The 85 and 30 figures are reasonable; the 92 and 15 are at present a speculation not having yet been determined. For new plants it is not unreasonable, but it will require a good design and a properly functioning plant. When Intermunicipal districts apply for construction grants, will funds for correction of collection systems be administered by the districts or by their constituent municipalities? If the latter, do you foresee a problem of coordinating construction of treatment systems with reconstruction of collection systems? No. This is not excessively different from other projects. Administration could be accomplished either way. The 23 CAPCO JEN 0005230 grant is made to the construction agency if the district system builds the treatment plant that is the agency EP* deals with. They represent all the communities. If work is done within one of the communities, such as pumping station or interceptor from that community, it can be done either by the district if desired or by a separate grant offer to that municipality and EPA would do the same thing in this case. Will "needs" survey include all municipalities or only larger ones, say greater than a population of IO.OOq municipalities? Will the needs Include stormwater separation and treatment, off-stream disposal, collection sewers, and best practical and best available treatment? Region believes it will include all. Again, region has not seen a finalized draft of what will be included. The'old survey was done for communities of 10,000 or more because of shortage of time. It will be done through tha state agency. It will be up to states if they want to estimate or go to the smaller communities. Region recommends that if there is time that states go to every possible source to insure that nothing is left out. The survey will have to include an estimate of some way of estimating the items in the second part of the question. However, best practicable treatment at present refers to secondary treatment. With HUD grants frozen and EPA's low priority for collection systems, could you suggest what avenues are left to a municipality other than financing Itself? State aid, revenue sharing, or do-it-yourself. Define replacement. The word replacement appears in both the amendment and the regulations and Is used In conjunction with user charges. Does this mean that It relates to out-of-pocket replacement costs for equipment as It wears out or does it mean annual payment to an annual sinking fund charge to provide for replacement of the facility at the end of Its useful life? It does not include the latter. The definition in the draft regulations for replacement is "those expenditures for obtaining and installing equipment, accessories or appurtenances during the useful life of the treatment works necessary to maintain the capacity and performance for which such works are designed or constructed." The sinking fund part of the question is clearly covered under the purposes for which the revenues from the industrial payback will be used. What about Industrial payback of the state portions? Will this be left up to the states or will EPA Issue guidelines? The clear intent of Congress is that the federal requirement for industrial payback include only repayment of the so-called federal share; however, Section 4B of the act has a saving provision that reads essentially as follows: "All regulations in effect immediately prior to date of enactment of this Act and pertaining to any requirements under the old Act shall continue in full force and effect." Concern is that this saving clause may be read as perserving old Section 601.34C that had to do with the equitable system of cost recovery with respect to the local share. The regulations published February 28 indicate that the drafters of the regulations intended that the old equitable system with respect to the nonfederal share requirement no longer prevails. There is, however, no federal requirement that a municipality itself require industrial users to pay some portion of the nonfederal share. On reimbursements there Is a difference between projects completed and funds committed. Will the reimbursement be on the basis of where funds have been committed or will the amount of eligibility for reimbursement be figures on the project that has been completed? When a project has been corjjpleted we have a very definite dollar figure. Again, in speaking of reim bursements, we are talking about those projects that went ahead with less than full federal funding during the period of 1966-72. In the case where the project has been completed, EPA knows what the final dollar value is. In other cases, where the project is still under construction, EPA can only go by the presently known estimated cost and will make allocations accordingly, however, when final costs are known, if there are additional funds available, we will make further adjustments. If not, EPA will not be able to make further adjustments. There will be just so much money, some prices may go down and some may go up. 24 CAPCO JEN 0005231 What If all funding was from a local source and there was no federal or state funds available. Would you also be eligible? Whoever advances the federal share of the funds will receive the reimbursement money; state, local entity, or combination. Is sewer separation eligible for grant support? Yes. All projects are subject to a state's setting of priorities and to an evaluation of "cost effectiveness." How will Industrial user charges be determined and what pretreatment will be required for industrial users of a municipal system? Industrial user charges are going to have to be determined on an individual, project-by-project or plant-by plant basis. They must cover operation, maintenance, replacement costs, and industrial capital costs on the industrial portion of the facility. ' Under our previous regulations that went into effect a couple of years ago, industry was required to pay for pretreatment of its waste in order to make them compatible with the municipal system. This remains. Industry was required to. pay its share of the operation and maintenance cost. The third element is really the one that represents a change. Under the old system the community was required to pay its share of the local cost. Let's say local cost was 20 percent in a case of a 55 percent federal grant. Under the new system the industry is required to pay its share of the federal share, which is 75 percent. Industry may arrange to repay this over a period of time and this again will be negotiable on a project-byproject basis, but it will be interest free. EPA would not allow a period of time longer than the anticipated life of the project, and there are other factors that will enter into it. The fact that one may get a 15- or 20-year interest free loan should certainly be a major factor helping industry arrive at a decision. Regarding pretreatment required for an industrial waste, this will be in the guidelines that EPA hopes will be out soon. If Industry must pay for the construction, operation, maintenance, and replacement costs of a treatment plant, will it have any ownership of that portion It pays? Will industry be given a part In the design or operation of treatment plants for which it will have to pay? No. The industry will not have ownership. The community will presumably consult with the industry on pretreatment facilities loadings, etc. What provisions are being made for communities who are served by a large sanitary district and whose collection system Infiltration contributes to the overloading of that sanitary district? The law explicitly states that after July 1, 1973, no grants will be given to facilities with excessive infiltration. Decisions will be made on a project basis and a cost effective analysis will be an important factor in that decision. . What about communities whose present plants are adequate according to population but are overloaded by excess Clearwater? Will they be eligible for grants for Infiltration studies and correction even though a new plant may not be required? Yes, but based on a cost-effectiveness study and state needs priority certification. Will grants be given for the actual reconetructlon of sewerage collection systems of existing municipalities before upgrading of treatment facilities? Yes, depending on state needs priority certification and a cost-effectiveness study. These could be on a firmphased schedule. The construction of a plant could proceed before system upgrading or vice-versa. What priorities will EPA establish for states to follow In allocating construction funds? How will these priorities relate to the permit program? 25 ? CAPCO JEN 0005232 Each state is primarily responsible for priorities. Senator Muskie in a Senate floor speech October 4, explained it is the intent that plants and facilities be funded first. Regarding priorities relating to the permit program, it was stated above there is a relationship but the precise nature is being developed. It should be pointed out, however, that a permit is required on new construction and an environmental assessment must be prepared. These will help establish priorities. Does "best practicable technology" Include any reference to social acceptance, for example, In the case ot land treatment? Environmental assessments are required on all projects. The answer is yes. Will environmental impact statements be required by applicants or agencies as part of the planning process or as a prerequisite to the grant funding? If required, will guidelines be issued on content material and approval procedures to be followed? The present guidelines require that environmental assessment be_developed by the planning agency. The proposed guidelines are the same. An environmental assessment Is as much a part of good water quality management planning as the technical engineering specifications. | What will the construction cost be based upon, e.g., the engineers' estimate or the accepted contractor's bid i price? The engineers' estimate based upon the most realistic contractor's bid price. The estimate submitted with a ' project must be one that can be reasonably expected to incur on that project. Is there an estimate of how long the construction grant program will be stalled pending new rules and ; regulations on secondary treatment, user charges, etc? . Approximately $500 million of contractual obligations of 1973-74 grant funds was made prior to March 1,1973. ! The regulations must be drawn carefully so that grants will not be awarded and federal money invested in a .> project that later could not get a federal discharge permit. Will "best practicable" treatment involve economic evaluation of providing additional degrees of treatment ! beyond secondary? The definition of "best practicable" control technology will include the economics of higher orders of treatment; i economic evaluation is the key to the level of treatment required. * Is dropping of the reimburslble feature a requirement of the law on an EPA regulation? There is no provision for reimbursement in the law. ' Are Infiltration studies mandatory? It is mandatory that a brief report be prepared to establish whether there is or is not an infiltration and/or an inflow problem. If the result of this appraisal indicates there is a problem, then it is mandatory that a study be carried out and a remedial program be developed. The program should be defined and a realistic schedule laid out and a commitment made to proceed. The design of the waste treatment facility then should reflect the results of this program. Are Infiltration funds available for plants built under previous programs? Yes, provided it received the prerequisite state priority certification. In a regional system, who Is responsible for the Infiltration entering a trunk system? Is It the regional authority ] or the community whose Internal system Is causing the Infiltration? Who must make the Infiltration study?] 26 CAPCO JEN 0005233 mmtmm The ERA contract is with the contracting authority. The authority would provide for carrying out the necessary investigations and develop a remedial program. The individual community, however, may apply for a grant for . such a study within a regional system. How do we learn about the status of best practicable technology during the time that ft Is now being defined? National associations such as the Federation as well as individuals have had a part in the development of the regulations and guidelines. Such organizations have a responsibility for keeping their membership apprised of developments. The EPA regional offices will continue to prtflffde such information as soon as it is available, directly and through the state water pollution control agencies. What fs the present and anticipated status of funding for basin planning as provided for under Section 102(c)? There has been no money provided for fiscal year 73. Funding for fiscal year 74'is under consideration. The actual amounts have not been determined. Funding for area-wide and basin-wide planning will be available under sections 201, 208, and 303. ----- Does the planning board of a metropolitan city qualify for recognition (and funds) under the new law? If the governor designates the planning board and the designation is approved by EPA the board can qualify. Would there be one central agency named that would coordinate the other agencies with expertise, or would several agencies be named? There may be several agencies involved. The governor will probably name a lead or coordinating agency, but expertise needed for planning could be obtained through additional agencies. Under Section 208, can areawide management be imposed on a municipality if there is no physical difference in plant construction? For example; a country sewerage authority operating several municipal plants. When the state feels that there is a reason for a regional system to be constructed in a given area, the state can designate that area and thereby impose regionalization. However, designations are subject to public hearings and there is recourse for the local jurisdictions involved. Likewise, if the state doesn't formally designate or does not designate the chief elected officials of the local jurisdictions can submit application for a 208 authority, thereby requiring all the jurisdictions to comply with the 208 plan. Combined wastewater overflow treatment facilities seem to be lost in priority schedule. If separation Is demonstrated as the most economical pollution control can the priority be advanced and funds applied to separation?' The state hopes this can be done. We would like to have EPA tell us that, if an application is received at the state level where separation is necessary to put in a system of treatment for a municipality which will be effective, EPA will put that at.top priority if we give it that priority. The state needs a simple type of definition or explanation from EPA of priority category. The state has about a dozen different projects that must be considered in a high priority category that have a great deal of separation involved. 27 CAPCO JEN 0005234 dTn*1.M * PERMITS AND ENFORCEMENT * CAPCO JEN 0005235 PERMITS AND ENFORCEMENT (TITLES III AND IV) The new law makes a number of changes in the nation's historic approach to achieving clean water, attempts to correct past inactions in both monetary and regulatory aspects. The approach is now moi oriented toward effluent discharges than to the dTTTbient quality of streams. It sets up a national system ( discharge permits. The Congress wants the permit program in the hands of the states as long as the state meets certain minimi requirements. The program covers municipal, industrial, commercial, and agricultural discharges. The EPA met the deadline of issuing guidelines for administering the permit systems. So-called short form for a permit application are out. An application form requiring considerably more detail is being designed fa municipalities having a population over 10,000, those who receive a significant part of their raw wastewatj from industry, or those receiving waste from an industry of significant size. A monitoring report form has also been designed. It will prescribe the parameters to be monitored, th frequency of monitoring, and required records for permitted discharges. A standard permit form is being developed. Some administrative decisions are being made as ti exemptions for permits, because it is not practical to attempt to permit every discharge in the country. There should be no loss of continuity of states with interim permit program authority in converting to fu| operation of the program when final approval is granted by EPA. Permits must be issued before certain other activities can proceed. For now, permits will focus in areai where water quality standards are more stringent than best practicable control technology will provide. For industrial discharges, guidelines will be developed for 27 specific categories of industry; there may be additional categories. Before these are promulgated, however, permits may be issued in cases where EP4 feels it has sufficient data to proceed or in areas where the purposes of the act can be best served by n<* waiting. Such permits would be considered standard with no expectation of re-issue at a later date. Comments---Questions and Answers The California State Water Resources Control Board does not consider the user charge requirement aj permitting the use of property taxes on general fund revenues to suffice for industry paying its share a treatment plant operating, maintenances, or capital costs. Service charges based on quantity and quality mus be utilized for industry. California may be more restrictive in this than is required by federal law. Under the new law, the federal government does not really delegate the discharge permit program to the states. It only suspends the federal program in those states that qualify as having adequate programs; a state must, through its own laws and codes, have authority to carry out the provisions of the federal law. California has such authority. While the new law applies to navigable waters, California is interpreting it to mean all surface waters of the state. The definitions of best practicable and best available control technology are going to be very important. The EPA should be as-precise as possible so that the definitions can be applied to actual situations; California will apply a case-by-case method to each discharger. The net result of the new law in the state will be a joinl . federal-state program. A major, but perhaps barely perceptible, provision in the law requires that no one who receives 10 percent ot more of his income from a waste discharger can be involved in any agency or group that handles any facet o the permit program. In California, a number of the members of the regional water quality control boards wil have to resign. Hawaii is unique. It is land poor but water rich. Hawaii looks on its water as a resource to be utilized in th< best way possible. Hawaii intends to require and enforce permits, schedules of compliance, and performance standards to thi fullest extent possible. All systems will have to provide secondary treatment, but what the state can actually di will depend on the construction grant allocation. Industry, primarily pineapple and sugar, Is the lifeblood of Hawaii. Some industry is going out of busines because of the environmental push. Hawaii feels it must have some measure of local autonomy and self-determination. Water is not just to b looked at, it must be used, and Hawaii hopes it will be allowed to use the water. 30 CAPCO JEN 0005236 There is no way that the California portion of the Los Angeles basin is going to meet federal environmental standards by the legislated dates. The fundamental reason is money. Enforcement too is something of a deterrent. When one begins to talk about taking someone to court, all action stops. A waste discharger will not improve his discharge until the court eventually (perhaps within 2 to 5 years) tells him what to do. Defining best practicable control technology is difficult. There is no such thing as a "typical" industrial plant, each one is one of a kind. It is extraordinarily hard to find two plants that are similar. We also suffer from "paralysis by analysis." The longer a program is studied the harder it is to come up with any answers. One must make the best guess now and go ahead. Everything done in the real world has both good and bad effects. If urban impact areas are defined as those areas where secondary treatment and best practicable control technology are not enough, California will have some odd urban areas. The EPA has a real timetable headache. It Is hoped that they will set standards at a reasonable level with a progressive timetable, that interpretations will be reasonable, and that there will be an ability to comply. We have to see some time period in which we can allow the program benefits that are established or determined to become viable and to evaluate whether a standing can continue to exist. For example, zero discharge is really the only standard to which industry can look. It may riot be a realistic goal. Industry is concerned about the pretreatment guidelines. To reach a specified level of concentration of some parameter may require extremely high pretreatment efficiencies. The incremental cost of removing a pound of BOD, for example, must be considered. Economy and cost are of integral importance. Industry wants to help improve our environment in a realistic manner and at a pace that is both progressive and responsive. Within certain industries there are striking similarities among plants within that industry. From industry to industry situations are unique, but every plant in every industry does not constitute a unique problem. Is EPA or anyone looking at the act's economic Impact on the private sector, that Is, the costs the industrial polluters will bear and the markets opened up by the act for treatment equipment, supplies, and services? In hearings on the act, industry pointed out that the application of additional treatment to remove the last 10 percent of a pollutant is expensive and has a significant effect on the other nonwater-quaiity related environment impacts. In applying additional treatment to either municipal or industrial wastes, we are likely to find that the equipment needed is not as readily available as might be desirable. Are federal installations required to have a discharge permit? Yes. They must apply on a long-form application. Will permits be required for Industrial discharges to a municipal plant? No. To whom Is a refuse act perrpit application that was returned for more Information to be submitted now? Send it to your EPA regional office. When will permits applied for two years ago under the refuse act be Issued? These are considered valid applications under the new law. There are about 20,000 on file and they are being processed. Will treatment plants operated by a federal agency be classified as publicly owned? No, not for the normal context of Section 402 (permits). Publicly-owned plants will generally receive a discharge permit from the state if the state is operating its permit program; federal installation may only be permitted by EPA. 31 CAPCO JEN 0005237 If the administration continues to limit funding, when will EPA or the states begin to adjust compliant, schedules to be consistent with the funding? The statutory requirement is for the 1977 deadline and goals. How will Industrial dischargers be affected by the pretreatment guidelines where they might be In conflict with requirements of the local agency? Will the guidethVBs be enforced Inside a local system to the Industrie discharger? When the pretreatment guidelines are promulgated, any violation is subject to enforcement under the act. if there are additional requirements imposed by a local agency the discharger will also have to meet them. Th, local agency Is required to impose the federal pretreatment requirements on all dischargers to its system. Th, federal guidelines are enforceable within a local jurisdiction by federal and state agencies. What aspect of the amendments give EPA the legislative authority-to regulate deep-well disposal as th, NPDES regulations propose to do? None. The federal statute does not really give EPA authority to regulate deep-welt disposal except as it might : relate to a technique used by a discharger for ultimate disposal of a portion of its waste and for which the other part would require an NPDES permit. But there is no real statutory authority for EPA as it relates to deep-wen I disposal. There is a requirement, however, that a state have statutory authority for regulating deep-went disposal as a prerequisite to receipt of the final permit issuing authority of the national system. Is continuous discharge of oil from an onshore facility within the purview of the permit program or of the Section 311 spill program? A continuous discharge would be under the permit program. Will private domestic waste treatment systems be required to obtain NPDES permits? Yes. What is the probability of certain "minor" discharges (small animal wastewater facilities, small domesticwastewater facilities) being excluded from the NPDES permit program? There is no blanket answer. The act is specific in requiring that all discharges are covered. The new draft of promulgations has a section on exemptions in essence saying that some exceptions may be granted, such as for well-operated motors on boats or certain types of agricultural discharges. What will the timing be to obtain a permit on small discharges such as 25,000 gpd? Would the permS necessarily go through permit procedure? Priorities must be established and lesser discharges will not get top priority for processing, although the application will still go through normal procedures. EPA has established some deadlines for permit applications before commencement of discharge! Application forms are not available at this time. What Is the effect of not complying with the deadline? Everyone should at least get some written submittal into EPA or the state in order to initiate action. This could be in the form of a letter until EPA Issues a short form. Regarding the issuance of the smaller permits, there wil be difficulty in getting programs operating smoothly. As far as EPA Is concerned, the initial thrust would be to hit the major dischargers, recognizing that permits will be required for smaller dischargers. States will havettpermit these until other guidelines are issued and become clear. Short forms will be available shortly at the regional offices and in the states. Standard forms for communities with a population over 10,000 will soon W advertised in the Federal Register. What Is the present status of the Army Corps of Engineers permit program? Will an Industry that M submitted a Corps of Engineers' permit form be required to submit an EPA permit form? 32 CAPCO JEN 0005238 Hew statutes have done away with the permit required under the 1899 Refuse Act. But applicants under the Refuse Act are deemed to be applicants under the national pollution discharge elimination system. A transfer operation of files from the Corps of Engineers has been underway for some time. Anyone having a Corps of' Engineers permit problem can communicate with EPA regarding it. Who has enforcement responsibility and power over pretreatment requirements for Industries discharging to a municipal system? if the state is authorized to operate the program it has the enforcement power that the act gives. States will also operate under state laws compatible with the federal act. Clear authority exists in the act to permit EPA to enforce pretreatment requirements. In what situations is the regional administrator likely to demand a public hearing regarding a proposed state permit Issued under the NPOES? The regional administrator is not likely to make many demands for public hearings, if the state has authorization to operate the program the state director will make those decisions on the general understanding of the situation. Public hearings will not be required unless people requestingThem have some basis in fact for asking and have some standing to bring a law suit. Can a public hearing by a citizen be requested when such suit power is permitted under the act? EPA thinks that they have the authority to deny such a request under the act. Courts, however, could rule otherwise. There must, however, be good basis for the suit. What are the criteria on which EPA will determine proportional industrial capital costs for user charges? Statutes say that EPA will not allow industries to put waste into municipal systems if those facilities cannot adequately handle the load. To make sure that does not happen, the federal government will begin to prescribe what constitutes adequate pretreatment for an industrial waste going into a municipal system defined as secondary. Consultants are now working on the definition of secondary treatment. Congress has said that if you do not discharge to a navigable water but discharge into a municipal plant, industry will have to do sufficient pretreatment so that further treatment by the municipality will equal the same kind of loading going to the river, as if industry does it itself under the national permit system. Until secondary treatment is defined, not much can be done in this area. Is the discharge of Impounded water from a hydroelectric facility subject to permit regulation? Not at this time. Will NPDES permit be required for spray irrigation systems? Not at this time. This has beeri-an area of some problem in determining what is a point source of pollution. EPA is working on this. All organizations irrigating more than 3,000 acres will have to apply for a permit. Difficulty is in determining return flow procedures. Draft regulations will be in the Federal Register within the next 30 days, asking for comments. State requirements relative to agriculture vary widely at the present time and some states (such as cattle raising states) have stringent rules. Please clarify 10-year Immunity? Does it apply both to municipal and Industrial plants? No it does not. It applies only to those new sources of industrial discharges that put in facilities to meet new source performance standards. EPA cannot go back to require more of them than at the time the permit was issued. A 5-year permit would be renewed for another 5 years. Some question exists regarding existing industry meeting new source performance standards, but there have been no test cases in challenge thereof. The law prescribes a 5-year permit limit. > 33 CAPCO JEN 0005239 What will be the units (concentration, lb/day, lb/1,000 lb of product) for NPDES permits? Will these limits { maximum averages or running averages? Monthly or yearly averages? How often will reporting be require Generally in terms of loadings rather than concentration. Some of the larger discharges would require dai monitoring; in other instances at less frequent intervals. It is a matter of judgment, but guidelines are belj developed on the basis of the receiving waters and particular circumstances Involved. Enforcem requirements must be kept in mind. EPA is trying*tfflt>ugh workshops to develop some uniformity in applicatio of monitoring requirements. An instantaneous maximum figure will be developed. From what source other than the Federal Register can we get water quality legislation both proposed n enacted? Write to the regional office involved. Under the NPDES, will EPA's Interpretation of best practicable-treatment always prevail? If not, when, ho and based upon what criteria will other valid evaluation of B0T dictate effluent limitations? In the area where water quality standards govern, that is, where the best practicable treatment is applied to t dischargers, standards cannot be met, dischargers will be required to do something additional to be practicable. With the exception of those instances, EPA determination of best practicable treatment will preval A state would have to show cause for going more stringent on any one discharger. Congress had in mind rather mechanical type of application of these numbers. As engineers we can't quite see that happening, bi there will be adequate input into finalization of these best practicable limits not only by the concerns industries but by the states and the concerned public as well. What Is an Industry? This is a legal question. However, the law applies to all point discharges. In Section 304 that requires development of water quality criteria, the development of factors to presen biological integrity of the water, and the development of guidelines for effluent limitations, all subsections si preceeded by the words "after consultation with federal and state agencies and other Interested persons Are procedures being developed for getting this Input from various sources? EPA is developing procedures for the public input. Public participation regulations were recently published I the Federal Register. The statute also requires formulation of a standards board that has been appointed an met for the first time on March 2, 1973. All changes in standards, performance requirements, etc., will b presented to that board. They will hold meetings across the country to get public input. This question, .because of the length, was not read. It deals with the preservation and protection i marshlands. As we get Into the new treatment technologies and abatement measures for large Industrie located on estuarine areas and large marshlands. It can be expected that these will be sites desired for ns treatment plants. EPA has been working closely with the Department of Interior to assure that valuable marshlands are n destroyed for the purpose of building waste treatment facilities. Regulations will be forthcoming on the parts the statute as they relate to dredging, fill-type permits, ocean dumping programs. Section 404C does provii the administrator the opportunity to veto some activities in these areas and he does intend to invoke the t whenever deemed advisablST' What are the specific requirements that must be contained In state certification for the NPDES permit? A the certification regulations being drafted now, and, If so, when will they be published? At this point regulations are not being developed. They will have to be. As for specific requirements, the state whoever is rendering the certification will in effect certify that what will be done will meet the best practical control technology. There will of course be tie-ins to water quality standards. 34 CAPCO JEN 0005240 imnniri How safe are the present "Interim guidelines" for discharge by the 21 Industry groups for which they were prepared? Should an owner proceed on these or wait for formal regulations of effluent standards (best practicable and best available)? EPA never advises waiting. Slate pollution control agencies generally recommend proceeding with the requirements in existence. The panel believes that permits that have been issued will be good for the period for which they were written. It is essential not to get into delaying situations that will permit pollution to continue. The problem is basically not with states but with small local jurisdictions that have failed to move forward, primarily because of financial problems. EPA will prepare permits on the basis of guidance documents that are deemed to be sound. Effluent limitations on concentrations discourage recycling and discourage water conservation. If a plant reduced water usage 50 percent would the permit allow doubling the concentration levels? Actually, the permits are being written and the guidelines are being prepared primarily on a basis of pounds per unit of production. In this particular case, if the limit would be in pounds and if the water is reduced and the concentration is increased, it would be necessary to calculate the actual water being discharged against the total to see if it means a pound limitation. For example, in the sugar beet industry, one particular plant is based on 1,500 lbs of BOD per day. It makes no difference if water is cut back as long as the BOD limitation is met. Discharge must always be within the stream classification. What is important is the pounds being discharged to the river within the stream classification. The statement was made that geographical advantages would no longer exist, but If one plant discharges to a small stream and Its effluent is restricted more that BPT, Is it not geographically penalized? Yes, it is definitely geographically penalized. The whole concept of the BPT is that there will be a base, but we must look at the water quality standards for the particular stream and the particular discharge must meet those standards. Obviously there is no equity in geography by itself. Will municipalities be required to monitor their plant effluent? Yes, and information will have to be furnished to the state and EPA and will also be available to the public if they wish to see it. What Is meant by no discharge? No return of water, no pollutants to surface or groundwater, etc.? Almost the first words of the law state it is the national goal that the discharge of pollutants into navigable waters be eliminated by 1985. This is the only place in the act where this goal is mentioned. There is no question of zero discharge of water. It is zero discharge of pollutants. Will there be numerical salinity standards Involved with permits for irrigation return flows? In letters sent to the states, EPA requested that numerical standards be set for salinity, especially in the Colorado River. The states have concurred in the request and have until October 1975 when numerical standards will be established for the Colorado River. How do you define a "point source" in relation to "Irrigation return flow"? Irrigation return flow will have to have a pipe or some kind of channel that discharges into a surface water. That will be one of the requirements for the permit. If the water is seeped into the ground a permit will not be required. The states on the upper and lower Colorado River are themselves developing a water management system to address the total irrigation problem. What Is the present status of the permit program as applied to federal facilities and how does it work? Federal facilities permits is the only area that will not be delegated to the states. The federal permits will be issued by the federal government. There are several cases filed in the east where the states are stating that this 35 CAPCO JEN 0005241 is not the proper action for federal government to take, therefore, EPA is awaiting action by federal cour| Thus far the various cases EPA has are being permitted by the government. The permits will spell out a logic) compliance schedule and within a given period of time the permittee will be required to meet the peri conditions. Regarding public hearings on water quality standards, that is, for criteria and use classes as well as pub! hearings on permits, who bears the cost? It depends, if the federal government is issuing the permit the federal government will obviously bear the costj With regard to hearings, will cross-examination of witnesses be permitted? 3 In the federal program the hearing structure can have up to three hearings or meetings once the public notice is issued (there is no requirement for a hearing in every case). If there is reason for a hearing EPA will procee into one of the following: 1. The hearing could be a general prehearing type of conference or a meeting between discharger and anyotv else who would desire to come to discuss the conditions of the perrhit. If a meeting of minds can be reached this hearing the case will end there. 2. If 1 does not solve questions there will be a public meeting. There will be a general hearing with hearinj officers. EPA hopes it would be made up of representatives of the federal government and of the state. Thfc would be an information seeking meeting where the discharger and possibly environmental groups would give their opinions on the permit. Following this, there is a period of 20 or 30 days in which anyone with standing can require a formal public hearing. 3. Public hearing officers called judges, having no association with the area, will hold a formal judicial type of hearing. In such hearings there will be subpoenas, sworn testimony, of a full judicial type of hearing. After the hearing there could be appeals at the appellate level. If municipalities have to monitor their own discharges, do their laboratories have to be certified? Do ; Industries? If not, how much value is placed upon these analyses? There do not seem to be any certification requirements in the act per se. There has been a move in various' states to certify the laboratories feeding the information into the states. Lack of requirements for certification could be a weakness in the federal law. Federal and state levels do expect, however, to take random sampling; or sample splitting on a random basis and should then be able to verify anomalies between the various laboratories and possibly correct them. In one state a discharger's analysis has never been used as a basis fori disciplinary action. The only analyses that are considered for such action are either those obtained by the local; health department, the state health department, or those federal agencies have picked up in one way or another. The federal act does require monitoring. There are provisions against fraudulant information submission. Can you give us an Idea of what analyses and how often analyses will be required for a domestic treatment plant that receives and treats industrial waste? The answer will depend on how the regulations will define secondary treatment. If the definition is on a monthly; average then some provisions would have to be made for a certain amount of samples for a 30-day period and violation would have to be based on that. A sampling schedule will be set on an individual basis depending oni the size of the plant and of the receiving stream. In this permit system each case will be treated on a case-by-j case basis so provisions would thus be set up especially for particular industry classification. When can we expect guidelines on point sources for industries? EPA hopes to have these completed for certain industries by October 1973. Are septic tank drain fields to be considered point sources? If discharge goes into surface water the answer is yes. Otherwise, no. 36 CAPCO JEN 000524-2 safe AMBk What standards wifi apply to Industrie* with their own sanitary treatment facilities, municipal or Industrial? EPA has been considering industrial plants as having industrial wastes even if they do have some domestic ^ waste. Municipal wastes are strictly domestic type operations. In-draft permits, if industry has several point sources, different parameters might be applied to each source. What Is the significance of Section 402K? This section says that if a particular industrial discharger has applied for a permit and the permit has either not been issued or administratively disposed of, no enforcement action can be taken until the end of 1974. However, until that time, states can take action under its regulations. However, there are federal provisions stating that if the discharge is toxic material detrimental to the environment, EPA will take action under other sections of the act. When will California distribute the new "criteria for review of wastewater treatment facilities"? At present a committee is working on this criteria and when complete it will be distributed. What about permits for Indian tribe facilities? Who will Issue these permits and who will be responsible for surveillance? The latest information is that they will be treated as a federal facility. Are effluent standards based on net or gross values? Generally, if the the wastewater is returned to the source from which it came they are net values. If taken from another source and put into the river they are gross values. After March 18 will EPA continue the state Interim permit system, that Is, should industry, say on May 1, submit applications to the state or Just await further word? After March 18 EPA has no statutory authority to continue the state interim authorizations. The law is clear on that point. Consequently, after that date any permits not issued by states must be issued by EPA. EPA will attempt to continue the same working relationships with the states that are provided under interim authorizations. What is actually being done to get low-interest loans at the present time? Has legislation been prepared to provide financial assistance to Industry and, If the answer is yes, please identify. EPA feels that tax incentives are more symbolic than real under the state laws and local property tax incentives. The SBA policies have been found to be much too conservative thus far in guaranteeing loans to industry for industrial pollution control purposes, although the act itself has authorized an $800,000,000 appropriation specifically for water pollution control. There is no assurance that money will be appropriated and easily available for small business-'. What is really needed in Massachusetts is an independent public authority to provide low interest bonds to provide a massive amount of monies for long-term loans to industries that otherwise cannot afford to or cannot borrow money in the conventional money market. Why do you call Industry expenditures for pollution control facilities nonproductive expenditures? Expenditure by industry to achieve required water quality standards is not regarded by industrial managers as an expenditure in productive equipment.-Ar-product for sale is not thereby produced. In the case that pretreated Industrial waste discharged to a municipal sanitary waste treatment system can be shown not to Interfere with the treated sanitary discharges, will EPA or the state agency nonetheless set tighter discharge specifications? Also, what Is the legal status of discharge permits by municipal systems to industrial dischargers and what Is the present Interpretation from the point of view of best available treatment? 37 CAPCO JEN 0005243 In the case of the discharge of a pretreated industrial waste into a municipal system the point is related not on to whether or not there is interference but whether or not there is additional treatment to that discharge. T federal requirements are expected to take this attitude. The program will be geared to accomplish treatme and not only to protect municipal expenditure in treatment works. Defining best practicable treatment cannot be handled on a blanket basis. An industry-by-industry basis is thi intent of the federal law. Are there going to be specific guidelines spelled out In writing defining effluent standards? Have any effluent guidelines yet been released? Comment on effluent guidelines on dissolved solids, and when may we expect EPA to define "best practicable treatment"? Effluent guidelines when issued will be issued for industrial categories. They will attempt to set forth degree of: treatment or control that can be obtained in a group of industries within a.defined category. These will address each of the parameters of the discharge from the particular industry, establishing requirements for each parameter. Therefore, dissolved solids will be defined as will all other parameters. The deadline for this is October 18, 1973. These guidelines will have to be applied to each individual case. Numbers used will be affected by the size of the particular industrial plant. Once the approach becomes clear for basic categories if will then become possible for the professional people at state and federal levels to interpolate from certain: points of reference to the standard that is in harmony with that general theme as they try to apply it to plants that present isolated examples of a distinct industry or specific problem. EPA has been working for a long time on problems of what effluent guidelines should be. Since the fall EPA has : been developing interim guidance numbers and documents covering 18 to 20 industrial categories. Useful commentary has been received. With ongoing contracts, EPA will come out with the numbers about October 1 18. It is hoped that results will be accepted as reasonable and will be effective. Some conservation groups feel that the new law will be chaos unless the citizen suit provision Is used. The permit system seems largely voluntary. Can you enforce a voluntary permit? Are you asking industry for the right type of information? What happens to a state program during this interim period? There is a legal question about enforceability during the interim stages of the permit program, but EPA feels that permits issued during this period will be enforceable. EPA also believes that industry can supply data requested despite some protestations to the contrary. Our objective is to perpetuate existing state programs as much as possible. State programs will have to be amended to meet the basic elements of the new law. Efforts are underway to assist states as much as possible in developing necessary statutory authority and regulatory programs in order to move toward full EPA approval of state permit programs. Can and will states set more stringent discharge requirements than Imposed by the federal guidelines? The law permits them to do so. Is EPA able to administer a permit program In all SO states if the states are unable to qualify their programs? No. A sincere effort is being made to help the states get control over the program. When must the permit application be filed? For dischargers without a Refuse Act permit or application the deadline is 180 days after enactment of PL92500 or approximately April 18. gftort-form applications are out for industrial, municipal, manufacturing, and agricultural discharges. These forms constitute a preapplication submission for those discharges that may require more detailed information but will suffice for many applicants. This method is being used in order to meet the time deadlines; long forms are not yet available. Must commercial establishments have a discharge permit? Do cities with over 10,000 population have to apply? 38 CAP CO JEN 000524.4 ' ................. ....... ..I EPA has been working for a long time on the problem of what effluent guidelines should be. Since the fall EPA has been developing interim guidance numbers and documents covering 18 to 20 industrial categories. Useful commentary has been received. With ongoing contracts, EPA will come out with the numbers about October 18- It is hoped that results will be accepted as reasonable and will be effective. For dischargers without a Refuse Act permit or application the deadline is 180 days after enactment of P.L. 92500 or approximately April 18. Short-form applications are out for industrial, municipal, manufacturing, and agricultural discharges. These forms constitute a preapplicatlSn submission for those discharges that may require more detailed information but will suffice for many applicants. This method is being used in order to meet the time deadlines (long forms became available April 19, 1973). All commercial establishments discharging to a navigable stream must submit a short-form application. EPA then determines whether those discharging 50,000 or more gal.day must submit additional information; if their discharge is to a public sewer they are not required to provide this information. Cities with over 10,000 population do not have to file the short form; their first filing will be the longform. t A municipality receiving industrial wastes must furnish certain information about each discharge, but the individual industries are not required to have a permit. The EPA has enforcement authority over municipal permits to industry. Will permits be required for storm water overflows? Experience in New York City indicates yes. Definitions in the act are very broad. Any pollutant from a point source which enters a navigable waterway and is man made or man induced as a point source is required to file for a permit. When will permits for ocean disposal be required? Point source discharge to the ocean is covered under PL92-500. Ocean disposal requirements are set forth by the Marine Protection Research and Sanctuaries Act of 1972 (PL92-532 enacted October 23, 1972). A permit for ocean disposal must be obtained from EPA beginning April 23, 1973 as provided by PL92-532. 39 CAPCO JEN 0005245 appendixes CAPCO JEN 0005246 FRIDAY, DECEMBER 22, 1972 WASHINGTON, D.C. ENVIRONMENTAL PROTECTION AGENCY State Program Elements Necessary for Participation in the National Pollutant Discharge Elimination System # No. 247--Pt. Ill------1 i i CAPCO JEN 0005247 1 28390 RULES AND REGULATIONS Title 40--PROTECTION OF have an approved continuing planning draft determinations and conditions into process under section 303(e) of the Act a draft permit. Such draft permit is to be before approval of its permit program made available to the public for inspec ENVIRONMENT can be granted. tion and copying. In addition to these requirements, a 4. Comments received indicated Chapter I--Environmental Protection State permit program cannot be ap agreement between citizens and sl Agency proved unless it conforms to guidelines as to the proper length of the perloj Issued under section 304(h)(2) of the public comment following public m PART 124--STATE PROGRAM ELE Act prescribing minimum procedural and It was decided not to require the e: MENTS NECESSARY FOR PARTICIPA TION IN THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM other elements gUany State program under section 402. These guidelines, which are the subject of this notice, must include, but are not limited to, sion of the period for public coi beyond 30 days but to allow the tor to extend such period where, bi discretion, he finds such extension b Notice was published In the Federki. monitoring and reporting requirements sirable. See 5 124.32(b). To save ti. Register issue of November 11. 1972 <37 (including procedures to. make informa however, citizens may now be placed P.R. 24087) that the Environmental Pro tection Agency was giving consideration tion available to the public), enforce ment provisions, and requirements for a mailing list to receive copies of sheets without the necessity of requ to proposed guidelines for State program funding, personnel qualifications, and ing such fact sheets following public elements necessary lor participation in manpower. ' tice. In those cases where fact sheets. the National Pollutant Discharge Elimi Written comments on the proposed prepared, the fact sheet can be sent nation System. The proposed guidelines guidelines were invited and received the same time public notice Is mai described, pursuant to the authority con from interested parties. A number- of See J 124.33(b). tained in section 304(h) <2> of the Fed verbal comments also were received. The 5. Comments from States ad\, eral Water Pollution Control Act Amend Environmental Protection Agency has against the requirement to prepare a fi ments of 1972 <86 stat. 816: 33 U.S.C. carefully considered all submitted com sheet for every application for a pen 1314 <1972)> hereinafter referred to as ments. All written comments are on file Section 124.33 has been modilled to the "Act"), the minimum procedural with the Agency. Certain of these com quire the preparation of fact sheets and other elements of any State pro ments have been adopted or substantially for those discharges which exceed 500, grams under section 402 of the Act. satisfied by editorial changes, deletions gallons bn any day of the year. The pi Section 402 of the Act creates a Na from, or additions to the guidelines. aration and distribution of fact shi tional Pollutant Discharge Elimination These and other principal comments are is thus limited to the larger and System under which the Administrator discussed below. controversial discharges. An infoi . of the Environmental Protection Agency 1. Several commenters pointed out the survey in one of the EPA regions in< may, after opportunity for public hear need to make clear that participating cates that approximately 35 percent ing. issue permits for the discharge of States and interstate agencies should the applications received were for dfe any pollutant or combination of pollut have all procedures required by the charges In excess of 500.000 gallons. Th ants, upon condition that such discharge guidelines established by the State or Director may, of course, prepare lie will meet all applicable requirements of interstate agency in the form of duly sheets for smaller discharges. the Act relating to effluent limitations, promulgated regulations. The delays in 6. Many commenters pointed out tbf water quality standards and implemen herent in the process of promulgating discrepancy between 5 124.35 regardln tation plans, new source performance such regulations, however, should not the handling of confidential informatla standards, toxic and pretreatment efflu delay the Administrator's approval of and EPA's regulations for such data, 4 ent standards, inspection, monitoring an otherwise acceptable program. To im CFR Part 2. Section 124.35(b) has bed and entry provisions, and guidelines plement these concerns, a new 5 124.3 modified to require the Director to pro establishing ocean discharge criteria. has been added to subpart A to make tect information (other than effluea Section 402 also provides that States clear that all authorities required by sec data) shown to constitute trade secret! desiring to administer their own permit tion 402(b) of the Act must be in the Where the determination of confute programs may submit a full and com form of State statutes and regulations tiality by the Director is with regard t plete description of such a program to and must be in full force and effect at information contained in an NPDH the Administrator for approval. The Ad the time of submission of the State form and the Regional Administrate ministrator is to approve a State's pro program. A new 124.4 requires that the disagrees with such determination, pro gram. and suspend issuance of permits procedures required by the guidelines cedures consonant with 40 CFR Part! under.section 402, unless he determines must also be in the form of State statutes apply. See 5 124.35(b). that the State does not possess adequate and regulations but, if the State has the 7. Comments from industry and trot authority to perform certain acts de necessary authority and submits a pro environmental groups pointed out tb tailed in section 402(b) of the Act. In gram which meets the requirement of need for further clarification of publi general terms, the State must have au the guidelines, the State has until Jan hearing requirements. Almost all sud thority to: <a> Issue permits for terms uary 1, 1974, to promulgate such suggestions have been incorporated, in not exceeding 5 years.'upon the same regulations. eluding a requirement, submitted froa conditions relating to effluent limitations 2. Numerous comments suggested environmental groups, that the Directs and water quality standards as are ap means to Improve the requirements for is required to hold a hearing in even plicable to permits Issued by the Ad .dgning NPDES forms. On the basis of case where there is significant public in ministrator; <b> adequately notify mem che comments, corporate signature re terest (including, of course, the filing a! bers of the public, other States, and quirements have been changed to permit requests or petitions for such hearing); the Secretary of the Army of pending signature by authorized representatives Any instances of doubt should be re permit applications: <c> abate viola of principal executive officers where such solved in favor of holding the hearing; tions of permits, including civil and epresentative is responsible for the op See 5 12436. criminal penalties; <d> insure that the eration of the discharging facility. See 8. Much concern has been expre;_ State permitting agency receive adequate 5 124.24(a). Also, the language in sub over the setting of permit schedules ol notice of new introductions or substao*- section (d) is broadened to cover cate compliance and their enforcement, tiat changes in the volume or character gories of point sources other than pub achieve some degree of uniformity ani of pollutants introduced into publicly licly owned treatment works. to assist the preparation of compliano owned treatment works: and <e) insure 3. On the basis of comments received schedule reports, the Director is now re that any industrial user of publicly and after consulting with the States in quired, to the extent practicable, to sel owned treatment works complies with volved in the development of these schedules of compliance so that interim! pretreatment effluent standards and guidelines, a new paragraph was added and final dates fall due on the last day other requirements. The State also must to 5 124.31 to require the compilation of of the months of March, June, Septem- FEOERAL REGISTER, VOt. 37, NO. 247--FRIDAY, DECEMBER 22, 1972 CAPCO JEN 0005248 RULES AND REGULATIONS 28391 ber. and December. Pour times a year the Director shall prepare and transmit to the Regional Administrator a list of all instances of noncompliance with the schedule requirements in a permit. Such list shall be available to the public for inspection and copying. See } 124.44. In cases where good and valid cause <such as an act of Qod, strike, flood, etc.) lies for the failure of the permittee to comply with a schedule of compliance, revision of the permit may be appro vestments are so remote as not to be Income "directly or indirectly from per mit holders or applicants for a permit." It should be emphasized that nothing in these guidelines pertains to the issu ance of permits for the discharge of dredged or fill material into the naviga ble waters. Such permits are to be is sued by the Secretary of the ArmyfSfctin'g through the Chief of Engineers, pursu ant to section 404 of the Act. It also should be emphasized that Subpart F--Duration and Rovlow of NPDES PormHs Sec. 12431 Duration of Issued NPDES permits. 12432 ReIssuance of NPDES permits. Subpart G--Monitoring, Recording, and Reporting 124.61 124.62 124.63 124.64 Monitoring. Recording of monitoring activities and results. Reporting of monitoring results. NPDES monitoring, recording, and reporting requirements. priate. Any such revision must be ap proved by the Regional Administrator and all such revisions must be reported by the Director in his quarterly compli ance schedule report. See 1124.72(b). 9. The requirement (5 124.45(f) in the these guidelines are procedural in na ture and do not attempt to specify the scope of Jurisdiction established under the Act or legislative history pertaining thereto. Because of the importance of promptly Subpart K---Enforcement Provisions 124.71 Receipt and followup of notifications and reports. 124.72 Modification, suspension and revo cation of NPDES permits. 124.73 Enforcement. proposed guidelines) that a permit may making known to the States the neces Subparl 1--Disposal of Pollutant! Into Wells not be transferred to a third party with sary program procedures for participa 12480 "Control of disposal of pollutants out the prior written approval of the tion in the NPDES and because of the Into wells. Director has been taken out. As was 60-day deadline imposed by section 304 pointed out in various comments, the (h) (2) of the Act for the promulgation permit terms and conditions must be ob of State program guidelines, the Admin Subpart J--Rriourcel, Planning and Olhor Requirements served regardless of the Identity of the owner or operator of the facility covered by the permit. Written approval of the Director to any transfers of such facili ties is not necessary for the transferee istrator finds good cause to declare the guidelines effective immediately upon final publication. Dated: December 18,1972. 124.91 124.92 12433 124.94 Availability of resources. Inspection and surveillance support for NPDES permits. Continuing planning process. Agency Board membership. to be subject to the permit requirements. Wiiliau D. Ruckzlsbavs, Subpart K--NPDES Application and Reporting 10. A new standard permit condition Administrator. Forms tRssorvodl has been added to clarify that any au thorized discharge must be consistent with toxic effluent standards or prohibi tions established under section 307(a) Sec. 124.1 124.2 Subpart A--Gunural Definitions. Scope end purpose. Appendix A--Sample Public Notice. Appendix B--Sample Fact Sheet. Appendix c--Sample Public Notice for Pub lic Hearings. of the Act. See new S 124.45(g). 124.3 Form of Authority cited by Attorney Authority : The provisions of this Part 11. Numerous comments were made with regard to the provisions dealing with the disposal of pollutants in wells, 124.4 General. Authority for State progTmm proce dure!. 124 Issued under section 304, 84 Stat. 816, 33 UJSjC. 1314 (1972). Subpart A--General arguing that EPA was exceeding, or not sufficiently exercising its authority under Subpart 4---Prohibition of Oitcfiargss of Pollutant! 124.1 Definitions. the Act. Language has been added to 124.10 Prohibition of discharges Into State As used in this part, the following clarify that permits for well disposals waters. terms shall have the meanings indicated are subject to the same procedures and requirements as other NPDES permits. Subpart C--Acquisition of Data below: (a) The term "Act" means the Fed See new i 124.80(c). The Regional Ad ministrator is directed to distribute to the Director and utilize in his review of well permits any policies, technical informa tion, or requirements specified by the Administrator. See new { 124.80(d). 12. Many comments received concern 124.21 124.22 124.23 12424 Application for NPDES permit. Receipt and use of Federal data. Transmission of data to Regional Administrator. Identity of algnatorlea to NPDES forma. Subpart 0--Notice and Public Participation eral Water Pollution Control Act, as amended, 33 TJ.8.C. 1314, et seq. (b) The term "Refuse Act" means section 13 of the River and Harbor Act of March 3, 1899. (c) The term "EPA" means the DB. Environmental Protection Agency. ing the conflict of interest section, f 124.94 (See section 304(h) (2) (D) of the Act 124.31 Formulation of tentative determina tions and draft permits. (d) The term "Administrator" means the Administrator of the D.S. Environ upon which this section is based), 'indi 124.32 Public Notice. mental Protection Agency. cate widespread difference of opinion as 12433 Fact sheets. (e) The term "Regional Administra to the interpretation of both the lan 12434 Notice to other Government agen guage and the intent of the section. Tbe- cies. guidellnes attempt to specify EPA inter pretation of some of the key terms with out attempting to answer every question 124.33 Public access to Information. 12436 Public bearings. 124.37 Public notice of public hearings. tor" means one of the EPA Regional Administrators. (f) The term "Director" means the chief administrative officer of a State water pollution control agency or Inter raised by section 304(h)(2)(D) of the Subpart E--Tormt and Conditions of NPDES state agency. In the event responsibility Act. Subsection (a) has been modified to Pormlts for water pollution control and enforce clarify the relationship between the board and its administrative counterpart. Any person who has or shares authority to approve permit applications is in cluded within the term "board or body." Subsection (c) has been modified to clarify that it is the State agency--and not the employee of that agency--which is not included in the term "permit holders or applicants for a permit." Fi nally, a new subsection (c) has been added to indicate that payments from 124.41 Prohibited discharges. 124.42 Application of effluent standards and limitations, water quality stand ards and other requirements. 124.43 Effluent limitations Is Issued NPDES peqottta. 124.44 Schedules of compliance In Issued NPDES permits. 124.45 Other terms and conditions of Is sued NPDES permits. 124.46 Transmission to Regional Adminis trator of proposed NPDES permit*. 124.47 Transmission to Regional Adminis ment is divided among two or more State or interstate agencies, the term "Direc tor" means the administrative officer au thorized to perform the particular pro cedure to which reference is made. (g) The term "National Pollutant Dis charge Elimination System (NPDES)" means the national system for the Issu ance of permits under section 402 of the Act and Includes any State or interstate program which has been approved by the Administrator, in whole or in part, mutual funds or certain diversified in- trator of Issued NPDES permits. pursuant to section 402 of the Act. FEDERAL REGISTER, VOL 37, NO. 247--FRIDAY, DECEMRER 22, 1972 CAPCO JEN 0005249 28392 RULES AND REGULATIONS <h> The term "NPDES application" means the uniform national forms (in cluding subsequent additions, revisions, or modifications duly promulgated by the Administrator pursuant to the Act) for application for an NPDES permit. (1) The term "NPDES reporting form means the uniform national forms (in cluding subsequent additions, revisions, or modifications duly promulgated by the Administrator pursuant to the Act) for reporting data and information pursuant to monitoring and other conditions of NPDES permits. (j) The term "NPDES permit" means any permit or equivalent document or requirements issued by the Administra (Comment. The House committee print states: "The committee points out. as It did In the discussion of section 401. that the term 'applicable* used In section 402 has two meanings. It means that the requirement which the term 'applicable' refers to must be pertinent and apply to the activity and the requirement must be In existence by having been promulgated or Implemented.") (r) The term "minor discharge" means any discharge which (1) has a total vol ume of less than*30,000 gallons on every day of the year, (2) does not affect the waters of any other State, and (3) is not identified by the Director, the Regional Administrator, or by the Administrator in regulations issued pursuant to sec tion 307(a) of the Act as a discharge this part, regulations setting forth the-: requirements of this part may be pro-1 mulgated by the State subsequent to the! time the Governor submits the state) program to the Regional Administn if the Administrator finds the foliqJ <l) The State has submitted (i and complete description of procu| to administer its program in coafj ance with the requirements of this t and (2) The State has made a commitment to the Administrate-- promulgate regulations which meet] requirements of paragraph (a) off section by January 1,1974. Subpart B--Prohibition of Dijtho tor, or. where appropriate, by the Direc which is not a minor discharge. If there of Pollutants tor. after enactment of the Federal Water Pollution Control Amendments of 1972. to regulate the discharge of pollutants is more than one discharge from a facil ity and the sum of the volumes of all dis charges from the facility exceeds 50,000 124.10 Prohibition of discharge! ] State waters. pursuant to section 402 of the Act. gallons on any day of the year,.then no Any State or interstate program I <k) The term "NPDES form" means discharge from the facility is a'"minor ticipating in the NPDES must hat) any issued NPDES permit and any uni discharge" as defined herein. statute or regulation, enforceable form national form developed for use in the NPDES and prescribed in regula 124,2 Scope and purpose, State courts, which prohibits disc of poilutants by any person, except ul tions promulgated by the Administrator, (a) This part establishes guidelines tho/lzed pursuant to an NPDES penf Including the Refuse Act application, the NPDES application and the NPDES re porting forms. (l) The term "Refuse Act application" specifying procedural and other elements which must be present in a State or interstate program in order to obtain approval of the Administrator pursuant (Comment). For the purposes of chUq part, a State or interstate program i qualify for participation In the NPDES | prohibits discharges of pollutants to theJ means the application for a permit under to section 402 of the Federal Water Pollu extent such discharges are prohibited inj the Refuse Act. tion Control Act, as amended, 80 Stat. tion 301(a) of the Act. It Is recognized | (m) The term "Refuse Act permit" means any permit issued under the Ref use Act. (n) The definitions of the following terms contained in section 502 of the Act 816, 33 U.S.C.......... (b) A submitted State or interstate program which conforms to the guide lines of this part and which meets the requirements of section 402 of the Act some State or Interstate programs pn exempt or exclude certain categories, or sizes of point sources from the general'ji hlbltlon of the unauthorized dlseharttl pollutant* or from the requirement off tainlng a permit. Other States have in t shall be applicable to such terms as used shall be approved by the Administrator. "grandfather" clauses which either exi In this part unless the context otherwise Upon approval, the Administrator shall discharges already in existence or provide] requires: "State water pollution control agency (referred to herein as 'State agency')," "Interstate agency," "State," "municipality," "person," "pollutant," "navigable waters," "territorial seas." suspend his .issuance of NPDES permits as to those point sources subject to such approved program. (c) Any State program which obtains the approval of the Administrator pursu automatic Issuance of a permit to ex) dischargers. Exceptions to the general pn bitlon cannot be approved. Dependinf| their scope and nature, any such except* will either (1) constitute grounds fori holding approval of the entire subn "contiguous rone," "ocean," "effluent ant to section 402 of the Act shall at all program until such time as the Stats limitations," "discharge of a pollutant," times be in accordance with section 402 Interstate agency revises or modifies Its y "toxic pollutant,"'"point source," "bio logical monitoring," "discharge," "sched ule of compliance." "industrial user," and "pollution." (o) The term "national data bank" means a facility or system established and the guidelines contained in this part. 124.3 Form of authority cited by Attorney General. All authorities cited by the State at torney general as authority adequate to gram to conform to this subpart, or (2) < stltute categories, types, or sizes of p sources for which the Administrator wiU^ suspend the issuance of NPDES permit! the latter case, the Administrator will 1 NPDES permits for those point sources i subject to the State or Interstate ageu` or to be established by the Administrator meet the requirements of section 402(b) authority.) for the purposes of assembling, organiz of the Act (a) shall be in the form of ing, and analyzing data pertaining to lawfully promulgated State statutes and Subpart C--Acquisition of DataJ water quality and the discharge of pollutants. regulations and (b) shall be in full force and effect at the time the Attorney Gen 124.21 Application for NPDES pen (p) The term "applicable water qual eral signs the Attorney General's state Procedures of any State or intersta ity standards" means*_all water quality ment. agency participating in the NPDES! standards to which a discharge is sub ject under the Act and which have been (1) approved or permitted to remain in 124.4 Authority for State program procedures. insure that every applicant for an 2 permit complies with NPDES filing i quirements. Such procedures and effect by the Administrator pursuant to (a) All procedures which the State quirements shall Include the foUov' section 303(a) or 303(c) of the Act. or proposes to establish and administer to (a) A requirement that any pen (2) promulgated by the Administrator conform with the requirements of this discharging pollutants must: pursuant to section 303(b) or 303(c) of part shall be set forth in State statutes (1) Have filed a complete Refuse i the Act. or lawfully promulgated State regula application; or, (q) The term "applicable effluent tions. Such State statutes and regula (2) File a complete NPDES applied standards and limitations" means ail tions shall be in full force and effect at tion no later than 60 days following i State and Federal effluent standards apd the time the Governor submits the State ceipt by the applicant of notice from t limitations to which a discharge is sub program to the Regional Administrator. Director that the applicant's previou ject under the Act. Including, but not (b) Notwithstanding paragraph (a) filed Refuse Act application is so deficit limited to. effluent limitations, standards of this section, if the State or interstate as not to have satisfied the filing \ of performance, toxic effluent standards agency has the statutory authority to quirements; or, and prohibitions, and pretreatment establish and administer the procedures (3) File a complete NPDES appllcatl standards. which conform to the requirements of within a stated period, not to exceed i FEDERAL REGISTER, VOL 37, NO. 247--FRIDAY, DECEMBER 22, 1972 CAPCO JEN 0005250 gaugnfiift RULES AND REGULATIONS 28393 applicable periods specified In Federal regulations Tor persons filing under the NPDES. (Comment. Federal filing requirement* for the NPDES Include the tlmeir filing of a properly completed Refuse Act or NFDES ap plication form. State and Interstate agencies gional Administrator prior to such agency's participation in the NPDES in speh manner as the Director and the Re gional Administrator shall agree. Any agreement between the State or inter state agency and the Regional Adminis trator shall provide for at least the reporting form received by him and to have such deficiency corrected. If the Regional Administrator's objection re lates to an NPDES application, the Di rector shall send the Regional Adminis trator any information necessary to cor rect the deficiency and shall, if the Re may specify, where necessary, additional fil following: gional Administrator so requests, not ing requirements such as the submission of (a) Prompt transmittal to the Direc issue the NPDES permit until he receives engineering reports, plans, and specifications for present or proposed treatment or control of discharges of poUutanta. While duplica tion should be avoided, the Administrator recognizes that the NPDES application form may not by Itself satisfy the needs of every participating program.) tor from the Regional Administrator of copies of any Refuse Act applications, NPDES applications, or other relevant data collected by the Regional Adminis trator prior to the State or interstate agency's participation in the NPDES; notice from the Regional Administrator that the deficiency has been corrected. (e> An opportunity for the Regional Administrator to identify any discharge which has a total volume of less than 50,000 gallons on every day of the year (b) A requirement that any person wishing to commence discharges of pol lutants after the applicable period in paragraph (a) (3) of this section, must file a complete NPDES application either (1> no less than 180 days in advance of the date on which it is desired to com mence the discharge of pollutants, or (2) in sufficient time prior to the com mencement of the discharge of pollutants to insure compliance with the require ments of section 306 of the Act, or with any applicable zoning or siting require ments established pursuant to section 208(b)(2)(C) of the Act, and any other applicable water quality standards and applicable effluent standards and limitations. and (b) A procedure to insure that the Di rector will not issue an NPDES permit on the basis of any Refuse Act or NPDES application received from the Regional Administrator which the Regional Ad ministrator has identified as incomplete or otherwise deficient until the Director receives information sufficient to correct the deficiency to the satisfaction of the Regional Administrator. (Comment. The two purposes of this sec tion ere: (1) To provide for the trsnsfer of data bearing on NPDES permit determina tions from the Federml Government to the participating State or interstate agencies, and (2) to Insure that any deficiencies In the transferred NFDES forma will be corrected prior to Issuance of an NFDES permit. The as a discharge which is not a minor dis charge. If the Regional Administrator so identifies a discharge and notifies the Director, the Director shall require the applicant for such discharge to submit additional NPDES application forms or any other information requested by the Regional Administrator in his notifica tion to the Director. (f) Procedures for the transmittal, if requested by the Regional Administrator, of copies of notice received by the Di rector from publicly owned treatment works pursuant to 124.45 (d> and (e). g 124.24 Identity of Signatories to NPDES forms. Any State or interstate program par ticipating 'in the NPDES shall require (Comment. The purpose of this require ment Is to Insure that the Director has suf ficient time to examine applications from new sources of discharge of pollutants and to apply standards of performance without unnecessarily delaying scheduled startup. The sooner the Director can specify require ments for new sources, the more easily the applicant can modify his plans. If neces sary, without disruption and waste. Those State or Interstate agencies which begin re view at the planning stages of a new project are In the best position to Insure orderly compliance with new source standards.) "agreement" mechanism allows flexibility In achieving both purposes. Time and manner of transfer can be worked out by each par ticipating agency and the Regional Adminis trator. If agreed upon, deficient applications could either be retained b; the Regional Ad ministrator until completed or be transferred with the satisfactory applications. If the Director prefers to receive and correct de ficient applications, the agreement could pro vide for the forwarding to the Regional Ad ministrator of the Information necessary to correct the deficiency.) g 124.23 Transmission of data to Re that any NPDES form submitted to the Director be signed as follows: (a.) In the case of corporations, by a principal executive officer of at least the level of vice president, or his duly au thorized representative, if such repre sentative is responsible for the overall operation of the facility from which the discharge described in the NPDES form originates. (b) In the case of a partnership, by a general partner. (c) In the case of a sole proprietorship, (c) Procedures which (1) enable the gional Administrator. by the proprietor. Director to require the submission of ad ditional Information after a Refuse Act or an NPDES application has been filed, and (2) insure that, if a Refuse Act or NPDES application, is Incomplete or otherwise deficient, processing of the ap plication shall not be completed until such time as the applicant has supplied the missing information or otherwise corrected the deficiency. Each State or Interstate agency par ticipating in the NPDES shall transmit to the Regional Administrator copies of NFDES forms received by the State or interstate agency in such manner as the Director and Regional Administrator shall agree. Any agreement between the State or interstate agency and the Re gional Administrator shall provide for at least the following: <d) In the case of a municipal. State, or other public facility, by either a prin cipal executive officer, ranking elected official or other duly authorized em ployee. Subpart D--Nolle* and Public Participation (Comment. Section 101 (e) of the Act pro vide* that public participation shall be "pro vided for, encouraged, and assisted by the (Comment. The Director may find he needs (a) Prompt transmittal to the Re Administrator and the States." Section 402 information other than that Initially filed by the applicant In order to make a permit decision. The Director should not hesitate to go bsck to the applicant for further In formation. In some cases, nothing less than, an on-tlte Inspection of an applicant's pol gional Administrator of a complete copy of any PDES form received by the State or interstate agency; (b) Procedures for the transmittal to the national data bank of a complete (b)(3) ot the Act further calls upon State and interstate agencies participating In the NFDES "tqjnture that the public, and any other State the waters of which may be af fected, receive notice of each application for a permit and to provide an opportunity for lution control technology and practices will copy, or relevant portions thereof, of any public hearing before a ruling on each such suffice. No NPDES permit should be Issued until the applicant has fully complied with the filing requirements specified In this subpart. If an applicant falls or refuses to correct deficiencies In his NPDES application form, the Director should take timely enforcement action.) appropriate NPDES form received by the State or Interstate agency; tc> Procedures for acting on the Re gional Administrator's written waiver, if any, of hfcrTights to receive copies of NPDES forms with respect to classes, types, and sizes within any category of application." This subpart specifies certain procedures to be followed by all participating State and Interstate agencies to Insure na tional uniformity In the quality of public participation In NPDES permit determina tions. Each State or interstate agency may devise additional procedures and means by which effective and constructive public par 124.22 Receipt and use of Federal data. Each State or interstate agency par point sources and with respect to minor discharges or discharges to particular navigable waters or parts thereof; and. (d> An opportunity for the Regional ticipation may be enhanced.) 124.31 Formulation of tentative deter minations and draft NPDES permit. ticipating in the NPDES shall receive Administrator to object In writing to de (a) Any State or Interstate agency any relevant data collected by the Re ficiencies in any NFDES application or participating in the NPDES shall formu- FEOERAl REGISTER, VOL 37. NO. 247--fRIOAT, DECEMBER 22, 1*72 CAPCO JEN 0005251 1 28394 RULES AND REGULATIONS late and prepare tentative staff determi nations with respect to a Hetuse Act or NPDES application in advance of public notice of the proposed issuance or denial of an NPDES permit. Such tentative de terminations shall include at least the following: (1) A proposed determination to issue or deny an NPDES permit for the dis charge described in the Refuse Act or NPDES application: and. (2) If the determination proposed in paragraph (a) of this section is to issue the NPDES permit, the following addi tional tentative determinations: (1) Proposed effluent limitations, iden tified pursuant to 55 124.42 and 124.43, for those pollutants proposed to be limited: ... ,, (ii) A proposed schedule of compli- ance, Including interim dates and re quirements, for meeting the proposed effluent limitations, identified pursuant to 5 124.44: and (lil) A brief description of any other proposed special conditions (other than comment period shall be retained by the Director and considered in the formula tion of his final determinations with respect to the NPDES application. The period for comment may be extended at the discretion of the Director. (c) The contents of public notice of applications for NPDES permits shall include at least the following (See Ap pendix A to this part for a sample public notice which meets the requirements of this section.): (I) Name, address, phone number of agency issuing the public notice; 12) Name and address of each ap plicant; (3) Brief description of each appli cant's activities or operations which re sult in the discharge described in the NPDES application (e.g,, municipal waste treatment plant, steel manufacturing, drainage from mining activities); (4) Name of waterway to which each discharge is made and a short descrip tion of the location of each discharge on the waterway indicating whether such summer and winter temperatures in de grees Fahrenheit; and (iii) The average daily discharge in pounds per day of any pollutants wh*^ are present in significant quantities ~ which are subject to limitations or n hibition under sections 301, 302. 3oj 307 of the Act and regulations publ ` thereunder; (3) The tentative determinations quired under 5 124.31; (4) A brief citation. Including a br identification of the uses for which ti receiving waters have been classified the water quality standards and efflue standards and limitations applied to proposed discharge; and (5) A fuller description of the pru dures for the formulation of final detc, minatlons than that given in the pubt notice including: (i) The 30-day comment period quired by 5 124.32(b) ; (ii) Procedures for requesting a pubb hearing and the nature thereof; and (iii) Any other procedures by whicb thoserequired in 5 124.45) which will discharge is a new or an existing dis the public may participate in the forJ have a significant impact upon the dis. charge described in the NPDES appli cation. (b) The Director shall organize the tentative determinations prepared pur suant to paragraph (a) of this section into a draft NPDES permit for the Ref use Act of NPDES application. charge; (5) A statement of the tentative deter mination to issue or deny an NPDES permit for the discharge described in the NPDES application; (6) A brief description of the proce dures for the formulation of final deter minations, including the 30-day com ment period required by paragraph (b) mulatlon of the final determinations. (b) The Director shall add the namec,, any person or group upon request to si mailing list to receive copies of fal sheets. 124.34 Notice to other Government! agencies. Any State or Interstate agency partid- 124.32 Public notice, of this section and any other means pating in the NPDES shall notify other' (a) Public notice of every complete application for an NPDES permit shall be circulated in a manner designed to inform interested and potentially inter ested persons of the proposed discharge and of the proposed determination to is sue or deny an NPDES permit for the proposed discharge. Procedures for the circulation of public notice shall include at least the following: (1) Notice shall be circulated within the geographical areas of the proposed discharge; such circulation may include any or all of the following: (1) Posting in the post office and pub lic places of the municipality nearest the premises of the applicant in which the effluent source is located; (il) Posting near the entrance to the applicant's premises and in nearby places; and (ill) Publishing in local newspapers and periodicals, or, if appropriate, in a daily newspaper of general circulation; (2) Notice shall be mailed to any per son or group upon request; and (3) The Director shall add the name of any person or group upon request to a mailing list to receive copies of notices for all NPDES applications within the State or within a certain geographical area. (b) The Director shall provide a pe by which interested persons may influ ence or comment upon those determina tions; and (7) Address and phone number of State or interstate agency premises at which interested persons may obtain further information, request a copy of the draft permit prepared pursuant to 5 124.3Kb), request a copy of the fact sheet described in 5 124.33 and inspect and copy NPDES forms and related documents. 124.33 Fact sheets. (a) For every discharge which has a total volume of more than 500,000 gal lons on any day of the year, the Director shall prepare and, following public notice, shall send, upon request to any person a fact sheet with respect to the application described in the public notice. The contents of such fact sheets shall Include at least the following in formation (see Appendix B to this part for a sample fact sheet which meets the requirements of this section): (1) A sketch or detailed description of the location of the discharge described in the NPDES application; (2) A quantitative description of the discharge described in the NPDES ap plication which includes at least the following: appropriate Government agencies of: each complete application for an NPDES permit and shall provide such agencies an opportunity to submit their written views and recommendations. Procedures for such notification shall include the following: (a) At the time of issuance of public: notice pursuant to 5 124.32, transmission of a fact sheet to any other States whose waters may be affected by the issuance of an NPDES permit and, upon request, providing such States with a copy of the NPDES application and a copy of the proposed permit prepared pursuant to 5 124.31(b). Each affected State shall be afforded an opportunity to submit writ ten recommendations to the Director and to the Regional Administrator which the Director may incorporate into the permit if issued. Should the Director fail to incorporate any written recommenda tions thus received, he shall provide to the affected State or States (and to the Regional Administrator) a written ex planation of his reasons for failing to accept any of the written rec ommendations. (b) A procedure, similar to paragraph (a) of this section, for notifying any in terstate agency having water quality control authority over waters which may be affected by the issuance of a permit. riod of not less than thirty (30) days (1) The rate or frequency of the produring11which dUme,'interested^Cpereons--^OSe<* dIscharge: u the dteharge is con- may submit their written views on the tlnuous, the average daily flow in gal (c) At the time of Issuance of public notice pursuant to 5 124.32, transmission of a fact sheet to the appropriate District Engineer of the Army Corps of Engineers tentative determinations with respect lons per day or million gallons per day; of NPDES applications for discharges to the NPDES application. All written (il) For thermal discharges subject (other than minor discharges) into navi comments submitted during the 30-day to limitation under the Act, the average gable waters: FEDERAL REGISTER, VOI, 37, NO. 247--FRIDAY. DECEMtER 22, 172 CAPCO JEN 0005252 RULES AND REGULATIONS 28395 (1) The Director and the District En considered for confidential treatment such a heating. Instances of doubt should gineer for each Corps of Engineers dis merits such protection, he shall request be resolved In favor of holding the hear trict within the State or interested area advice from the Office of General Coun ing. Any hearing brought pursuant to , may arrange for (i> notice to the District sel, stating the reasons for his disagree this subsection shall be held In the geo Engineer of minor discharges, fill waiver ment with the determination of the Di graphical area of the proposed discharge by the District Engineer of his right to rector. The Regional Administrator shall or other appropriate area, in the discre receive fact sheets with respect to simultaneously provide a copy of such tion of the Director, and may, as appro classes, types, and sizes within any cate request to the person claiming trade priate, consider related groups of permit gory of point sources and with respect secrecy. The General Counsel shall de applications. to discharges to particular navigable waters or parts thereof and (iii) any procedures for the transmission of forms, period for comment by the District En termine whether the information in question would, if revealed, divulge methods of processes entitled tMirotection as trade secrets. In making such 124.37 Public notice of public hear ings. (a) Public notice of any hearing held gineer (e.g.. 30 days), and for objections determinations, he shall consider any pursuant to i 124.36 ab6ve shall be cir of the District Engineer. additional information submitted to the culated at least as widely as was the (2) A copy of any written agreement Office of General Counsel within 30 days notice of the NPDES application. Proce between the Director and a District En of receipt of the request from the Re dures for the circulation of public notice gineer shall be forwarded to the Re gional Administrator. If the General for hearings held under i 124.36 shall in gional Administrator and shall be made Counsel determines that the informa clude at least the following: available to the public for Inspection and tion being considered does not contain (1) Notice shall be published in at least copying. trade secrets, he shall so advise the Re one newspaper of general circulation (d) A procedure for mailing copies of gional Administrator and shall notify within the geographical area of the public notice for upon specific request, the person claiming trade secrecy of . discharge; copies of fact sheets) for application for such determination by certified mail. No (2TiNoUce shall be sent to all persons NPDES permits to any other Federal, sooner than 30 days following the mail and Government agencies which received State, or local agency, or any afTected ing of such notice, the Regional Admin a copy of the notice or the fact sheet for country, upon request, and providing istrator shall communicate to the Direc the NPDES application; such agencies an opportunity to respond, tor his decision not to concur in the (3> Notice shall be mailed to any per comment, or request a public hearing withholding of such information, and the son or group upon request; and pursuant to 124.36. Such agencies shall Director and the Regional Administrator (4) Notice shall be effected pursuant to include at least the following: shall then make available to the public, subparagraphs (1) and (3) of this para (1) The agency responsible for the upon request, that information deter graph at least thirty (30) days in advance preparation of an approved plan pur mined not to constitute trade secrets. of the hearing. suant to section 208(b) of the Act; and (c) Any information accorded confi (b) The contents of public notice of (2) The State or interstate agency dential status, whether or not contained any hearing held pursuant to i 124.38 responsible for the preparation of a plan in an NPDES form, shall be disclosed,, shall include at least the following (see pursuant to an approved continuous upon request, to the Regional Admin Appendix C to this part for a sample planning process under section 303(e) istrator. or his authorized representative, hearing) notice which meets the require of the Act. unless such agency is under who shall maintain the disclosed infor ments of this section: the supervision of the Director. mation as confidential. (1) Name, address, and phone number <e) Procedures for notice to and coordination with 'appropriate public health agencies for the purpose of assist ing the applicant in coordinating the applicable requirements of the Act with any applicable requirements of such public health agencies. 124.35 Public access to information* (a) Any State or interstate agency participating in the NPDES shall insure that any NPDES forms (including the draft NPDES permit prepared pursuant to f 124.31(b)) or any public comment upon those forms pursuant to 124.32(b) shall be available to the public for in spection and copying. The Director, in his discretion, may also make available to the public any other records, reports, plans, or information obtained by the (d) The Director shall provide facili ties for the inspection of information relating to NPDES forms and shall in sure that State employees honor requests for such inspection promptly without undue requirements or restrictions. The Director shall either (1) insure that a machine or device for the copying of papers and documents is available for a reasonable fee. or (2) otherwise pro vide for or coordinate with copying fa cilities or services such that requests for copies of nonconfidentlal documents may be honored promptly. (Comment. Although not required herein, the Director Is encouraged to maintain fa culties for Inspection and copying in more than one location within the State or Inter state area In order to Increase citizen access to NPDES forma and activities.) of agency holding the public hearing; (2) Name and address of each appli cant whose application will be considered at the hearing; (3) Name of waterway to which each discharge is made and a short description of the location of each discharge on the waterway; (4) A brief reference to the public no tice issued for each NPDES application, including identification number and date of Issuance; (5) Information regarding the time and location for the hearing; (6) The purpose of the hearing; (7) A concise statement of the issues raised by the persons requesting the hearing; (8) Address and phone number of premises at which interested persons State or interstate agency pursuant ta its participation in the NPDES. 124.36 Public hearings. may obtain further information, request a copy of each draft NPDES permit pre (b) The Director shall protect any in The Director shall provide an oppor pared pursuant to i 124.31 (b) above, re formation (other than effluent data) tunity for the applicant, any affected quest a copy of each fact sheet prepared contained in such NPDES form, or State, any afTected Interstate agency, pursuant to S 124.33, and Inspect and other records, reports, or plans as confi any affected country, the Regional Ad copy NPDES forms and related docu dential upon a showing by any person ministrator, or any interested agency, ments; and, that such Information if made public person, or group of persons to request or (9) A brief description of the nature of would divulge methods of processes en petition for a public hearing with respect the hearing, including the rules and pro titled to protection as trade secrets of to NPDES applications. Any such re cedures to be followed. such person. If, however, the informa tion being considered for confidential quest or petition for public hearing shall be filed within the 30-day period pre Subpart E--Terms and Conditions of treatment is contained in an NPDES scribed iriTl24.32(b> and shall Indicate NPDES Permits form, the Director shall forward such information to the Regional Administra the Interest of the party filing such re quest and the reasons why a hearing Is 124.41 Prohibited discharges. tor for his concurrence in any deter warranted. The Director shall hold a Any State or Interstate agency partici mination of confidentiality. If the Re hearing If there is a significant public pating in the NPDES shall insure that no gional Administrator does not agree interest (including the filing of requests permit shall be issued authorizing any of that some or all of the Information being or petitions for such hearing) in holding the following discharges: FEDEEAL SEGISTM, VOL 37, NO. 247--ftlOAY, DECEMIEt 22. 1972 CAPCO JEN 0005253 28396 RULES AND REGULATIONS (a) The discharge of any radiological, chemical, or biological warfare agent or high-level radioactive waste into navi gable waters; (b) Any discharge which the Secretary of the Army acting through the chief of engineers finds would substantially im pair anchorage and navigation: (c) Any discharge to which the Re gional Administrator has objected in writing pursuant to any right to object provided the Administrator in section 402(d) of the Act; and (d> Any discharge from a point source which is in conflict with a plan or amend ment thereto approved pursuant to sec tion 208(b) of the Act. water quality standards and must have prepared some explicit verification of that statement. In any case where an is sued NPDES permit applies any more stringent effluent limitation based upon applicable water quality standards, a waste load allocation must be prepared to ensure that the discharge authorized by the permit is consistent with appli cable wateE-qnality standards. 124.43 Effluent limitations in issued NPDES permits. In the application of effluent standards and limitations, water quality standards, and other legally applicable require ments, pursuant to ! 124.42, any State or interstate agency participating in the (1) Applicable effluent standards limitations: (ii) If more stringent, water qua] standards; or, (iii) If more stringent, legally cable requirements listed in {124,^ and (e); or, (2) In the absence of any legalM plicable schedule of compliance. US shortest, reasonable period of time/* period to be consistent with the g* lines and requirements of the Act. 1 (b) In any case where the periofl time for compliance specified in pa graph (a) of this section exceed months, a schedule of compliance stu specified in the permit which wlM forth interim requirements and the* 124.42 Application of effluent stand NPDES shall, for each issued NPDES for their achievement; in no event* ards and limitations, water quality permit, specifly average and maximum more than 9 months elapse bet* standards, and other requirements. dally quantitative limitations, for the interim dates. If the time necessary (a) Procedures for any State or inter state program participating in the NPDES must insure that the terms and conditions of each issued NPDES permit apply and insure compliance with all of the following, whenever applicable: (1) Effluent limitations under sections 301 and 302 of the Act; (2) Standards of performance for new level of pollutants in the authorized dis charge in terms of weight (except pH, temperature, radiation, and any other pollutants not appropriately expressed by weight). The Director may. in his dis cretion, in addition to the specification of daily quantitative limitations by weight, specify other limitations, such as average or maximum concentration limits, for completion of the interim require* (such as the construction of a treat* facility) is more than 9 months a* not readily divided into stages for el pletion, interim dates shall be siwl for the submission of reports of pro* towards completion of the interim quirement. For each NPDES pea schedule of compliance, interim d sources under section 306 of the Act; (Comment. The manner In which effluent and the final date for compliance s (3) Effluent standards, effluent prohi limitations are expressed will depend upon to the extent practicable, fall on the* bitions, and pretreatment standards un der section 307 of the Act; (4) Any more stringent limitation, the nature of the discharge. Continuous dis charges shall be limited by dally loading figures and, where appropriate, may be limited as to concentration or discharge rate day of the months of March, June, a tember, and December. (Comment. Certain Interim requires* Including those (i) necessary to meet (e.g.. for toxic or highly variable continuous such as the submission of preliminary ora water quality standards, treatment discharges). Batch discharges should be more plans often require less than 9 months standards, or schedules of compliance, particularly described and limited In terms of thus a shorter Interval should be spec* established pursuant to any State law or regulation (under authority preserved by section 510). or (li) necessary to meet any other Federal law or regulation, or (lit) required to implement any applicable (1) frequency (e.g., to occur not more than once every 3 weeks), (11) total weight (e,g.. not to exceed 300 pounds per batch dis charge). (Ill) maximum rate of discharge of pollutants during the batch discharge (e.g., not to exceed 2 pounds per minute), and (lv) Other requirements such as the construe of treatment facilities msy require se* years for completion end may not re* subdivide Into 9-month Intervals. Long-* Interim requirements should nonethele* subdivided Into Intervals not longer th* water quality standards: such limitations prohibition or limitation by weight, con months at which the permittee Is reqt* to include any legally applicable require centration. or other appropriate measure of to report his progress to the Director pi* ments necessary to implement total specified pollutants (e.g., shall not cotntaln at ant to i 124.44(e)). * maximum daily loads established pur suant to section 303(d) and incorporated in the continuing planning process ap proved under section 303(e) of the Act and any regulations and guidelines is sued pursuant thereto; - (5) Any more stringent legally appli cable requirements necessary to comply with a plan approved pursuant to sec tion 208(b) of the Act: and (6) Prior to promulgation by the Ad ministrator of applicable effluent stand ards and limitations'pursuant to sections 301, 302. 306, and 307, such conditions as the Director determines are necessary to carry out the provisions of the Act. (7) If the NPDES permit is for the dis charge of pollutants into the navigable waters from a vessel or other floating craft, any applicable regulations promul gated by the Secretary of the depart ment in which the Coast Guard is operat ing, establishing specifications fjy^safe transportation, handling, carriage, stor age, and stowage of pollutants. (b) In any case where an issued any time more than 0.1 p.p.m. zinc or more than one-fourth (!4) pound of zinc In any batch discharge). Other Intermittent dis charges such as recirculation blowdown should be particularly limited to comply with any applicable water quality standards and effluent standards and limitations.) 124.44 Schedules of compliance in is sued NPDES permits. In addition to the application of the effluent standards and limitations, water quality standards, and other legally ap plicable requirements, pursuant to{ 124.42, any State or interstate agency par ticipating in the NPDES shall follow the following procedures in setting schedules in NPDES permit conditions to achieve compliance with applicable effluent standards and limitations, water quality standards, and other legally applicable requirements; (a) With respect to any discharge which is not in compliance with appli cable effluent standards and limitations, applicable water quality standards, or other legally applicable requirements listed in {124.42 (d) and (e). the per (c) Either before or up to fourteen (I days following each interim date and final date of compliance the perm* shall provide the Director with wri* notice of the permittee's compliance noncompliance with the interim or 9* requirement. * (d) On the last day of the months February. May. August, and NovemB the Director shall transmit to the la gional Administrator a list of all a stances, as of 30 days prior to the d of such report, of failure or refusal a permittee to comply with an interim final requirement or to notify the Dl* tor of compliance or noncompliance v each interim or final requirement (as; quired pursuant to paragraph (b) of t section. Such list shall be available the public for Inspection and copying i shall contain at least the following infi mation with respect to each instance noncompliance: (1) Name and address of each at complying permittee: NPDES permit applies the effluent stand mittee shall be required to take specific (2) A short description of each ards and limitations described In sub- steps to achieve compliance with the stance of noncompliance (e.g., failuw paragraphs (1). (2). and (3) of para following: submit preliminary plans, 2 week de graph (a) of this section, the Director (1) In accordance with any legally in commencement of construction must state that the discharge authorized applicable schedule of compliance con treatment facility: failure to notify I by the permit will not violate applicable tained in: rector of compliance with interim FEDERAL REGISTER, VOL 37, NO. 247--FRIDAY, DECEMBER 22, 1972 CAPCO JEN 0005254- RULES AND REGULATIONS 28397 quirement to complete construction by June 30th, etc.}; ' (3) A short description of any actions or proposed actions by the permittee or the Director to comply or enforce compli ance with the Interim or Anal require ment; and (4) Any details which tend to explain or mitigate an instance of noncompliance with an interim or final requirement (e.g.. construction delayed due to materials shortage, plan approval delayed by ob jections from State Pish and Wildlife Agency. (e) If a permittee fails or refuses to comply with an interim or final require ment in an NPDES permit such noncom pliance shall constitute a violation of the permit for which the Director may. pur suant to Subpart K of this part, modify, suspend or revoke the permit or take direct enforcement action. 124.45 Other terms and conditions of issued NPDES permits. In addition to the requirements of 9 124.42, 124.43. and 124.44, procedures of any State or interstate agency partici pating in the NPDES must insure that the terms and conditions of each issued NPDES permit provide for and insure the following; (a) That all discharges authorized by the NPDES permit shall be consistent with the terms and conditions of the per mit: that facility expansions, production increases, or process modifications which result in new or increased discharges of pollutants must be reported by submis sion of a new NPDES application or, if such discharge does not violate effluent limitations specified In the NPDES per mit, by submission to the Director of notice of such new or increased dis charges of pollutants; that the discharge f4) To sample any discharge of pollutants. <di That, if the permit is for a dis charge from a publicly owned treatment works, the permittee shall provide notice to the Director of the following: ill Any new introduction offlUllutants into such treatment works from a source which would be a new source as defined in section 306 of the Act if such source were discharging pollutants: <2) Except as to such categories and classes of point sources or discharges specified by the Director, any new intro duction of pollutants into such treat ment works from a source which would be subject to section 301 of the Act if such source were discharging pollutants; and. <3i Any substantial change In volume or character of pollutants being intro duced into such treatment works by a source introducing pollutants into such works at the time of issuance of the permit. Such notice shall include information on (i) the quality and quantity of ef fluent to be introduced into such treat ment works and (ii> any anticipated im pact of such change in the quantity or quality of effluent to be discharged from such publicly owned treatment works. <ei That, if the permit is for a dis charge from a publicly owned treatment works, the permittee shall require any industrial user of such treatment works to comply with the requirements of sec tions 204 <bl, 307. and 308 of the Act. As a means of insuring such compliance, the permittee shall require of each industrial user subject to the requirements of sec tion 307 of the Act and shall forward a copy to the Director periodic notice (over intervals not to exceed 9 months) Regional Administrator shall provide for at least the following: (a) Except as waived pursuant to paragraph (d) of this section, the trans mission by the Director of any and all terms, conditions, requirements, or docu ments which are a part of the proposed permit or which affect the authoriza tion by the proposed permit of the dis charge of pollutants; (b) A period of time (up to 90 days) in which the Regional Administrator, pursuant to any right to object provided in section 402(d) <2; of the Act, may comment upon, object to, or make rec ommendations with respect to the pro posed permit: (ei-Procedures for State acceptance or r&jection of a written objection by the Regional Administrator; and (d) Any written waiver by the Re gional Administrator of his rights to receive, review, object to, or comment upon proposed NPDES permits for classes, types, or sizes within any cate gory of point sources. 124*47 Transmission to Regional Ad ministrator of issued NPDES permits. Each State or interstate agency par ticipating in the NPDES shall transmit to the Regional Administrator a copy of every issued NPDES permit, immedi ately following issuance, along with any and all terms, conditions, requirements, or documents which are a part of such permit or which affect the authorization by the permit of the discharge of pollutants. Subpart F--Duration and Review of NPDES Permits 124.51 Duration of issued NPDES permits. Any State or Interstate agency par of any pollutant more frequently than of progress towards full compliance with ticipating in the NPDES shall provide or at a level in excess of that identified section 307 requirements. that each issued NPDES permit shall and authorized by the permit shall con cf> That the permittee at all times have a Axed term not to exceed 5 years. stitute a violation of the terms and con ditions of the permit; shall maintain in good working order and operate as efficiently as possible any fa (Comment. The term of an NPDES permit may extend beyond the time for compliance (b) That the permit may be modified, cilities or systems of control installed by specifled pursuant to i 124.44. The time for suspended, or revoked in whole or in the permittee to achieve compliance with compliance shall be that dictated by (1) part during its term for cause including, but not limited to, the following; (1) Violation of any terms or condi tions of the permit; the terms and conditions of the permit. (g) That if a toxic effluent standard or prohibition (including any schedule of compliance specified in such effluent effluent standards and limitations, or (U) If more stringent, water quality standards, or (111) If more stringent, other legally applica ble requirements such as those listed in i 124.42 (d) and (e). The term of the (2) Obtaining a permit by misrepre standard or prohibition) is established NPDES permit may extend beyond the final sentation or failure to disclose fully all under section 307(a) of the Act for a deadline for compliance, except that the relevant facts; and. i3j A change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge; toxic pollutant which is present in the permittee's discharge and such standard or prohibition is more stringent than any limitation upon such pollutant in the NPDES permit, the Director shall revise term may not exceed 5 yean. Failure to comply with the permit schedule of com pliance, Including Interim and final require ments, as provided In {124.44(e). Is a viola tion of the permit for which the Director may take Subpart H of this part enforcement <c> That the permittee shall permit the Director or his authorized representative, upon the presentation of his credentials: (1) To enter upon permittee's premises in which an effluent source is located or in which any records are required to be kept under terms and conditions of the permit; (2) To have access to and copy any records required to be kept under terms and conditions of the permit: (3) To inspect any monitoring equip ment or method required in the permit: or. or modify the permit in accordance with the toxic effluent standard or prohibition and so notify the permittee. 124.46 Transmission to Regional Ad ministrator of proposed NPDES permits. Any State or interstate agency par ticipating in the NPDES shall transmit to the Regional Administrator copies of NPDES permits proposed to be issued by such agency in such manner as the Director and Regional Administrator shall agree upon. Any agreement between the State or interstate agency and the action.) 124.52 Reissuance of NPDES permits. (a) Any State or interstate agency participating in the NPDES shall main tain procedures for the review of appli cations for relssuance of NPDES permits. Such review procedures shall require, and the Director shall so notify the per mittee, that any permittee who wishes to continue to discharge after the ex piration date of his NPDES permit must Ale for relssuance of his permit at least 180 days prior to its expiration. The Aling requirements for reissuance shall FEDERAL REGISTER, VOL 37, NO. 247--FRIDAY. DECEMBER 22, 1972 CAPCO JEN 0005255 28398 RULES AND REGULATIONS be determined by the State or interstate or (3) contains toxic pollutants for ing form, the Director in his discretia agency and may range from a simple which an effluent standard has been may require submission of such otl written request for reissuance to sub established by the Administrator pur suits as he determines to be necessary^ mission of all NPDES and State or inter suant to section 307(a) of the Act, shall information regarding monitoring j state forms. (b) The scope and manner of any re be monitored by the permittee for at least the following: (Comment. Reporting frequency, u i monitoring frequency, depends upon thel view of an application for reissuance of (i) Plow (in gallons per day); and, ture and Impact of the discharge. An an NPDES permit shall be within the (li) All of the following pollutants: report submission Is sufficient for small < discretion of the State or interstate (a) Pollutanhj^ielther directly or in lug water discharges. Discharges tor wlj agency but shall be sufficiently detailed as to insure the following: (1) That the permittee is in compli ance with or has substantially complied with all the terms, conditions, require ments. and schedules of compliance of directly through the use of accepted cor relation coefficients or equivalent meas urements) which are subject to reduc tion or elimination under the terms and conditions of the permit; <b) Pollutants which the Director more frequent, even monthly, reportlr desirable Include variable discharges, m Including municipal, discharges, and charges for which new treatment or coafl methods are being applied. Reporting m quency should correspond with admlnlsu tlve capability to evaluate the reports J the expired NPDES permit; finds, on the basis of information avail they come In.) (2) That the Director has up-to-date information on the permittee's produc tion levels, permittee's waste treatment able to him, could have a significant im pact on the quality of navigable waters; (c) Pollutants specified by the Admin 124.64 NPDES monitoring, recon and reporting requirements. practices, nature, contents, and fre istrator. in regulations issued pursuant Any State or interstate agency pi quency of permittee's discharge, either to the Act, as subject to monitoring;'and, patlng in the NPDES shall adopt pi_ pursuant to the submission of new forms (d) Any pollutants in addition to the dures consistent with any national me and applications or pursuant to monitor above which the Regional Administrator Coring, recording, and reporting reqt ing records and reports submitted to the requests, in writing, be monitored. ments specified by the Administrator: Director by the permittee: and. (c) Each effluent flow or pollutant re regulations issued pursuant to the <3) That the discharge is consistent quired to be monitored pursuant to para with applicable effluent standards and graph (b> of this section shall be moni Subpart H--Enforcement Provision* 1 limitations, water quality standards, and tored at intervals sufficiently frequent to 124.71 Receipt and followup of ag : other legally applicable requirements yield data which reasonably character tifications and reports. listed in S 124.42, including any addi tions to, or revisions or modifications of such effluent standards and limitations, water quality standards, or other legally applicable requirements during the term of the permit. (c) The State or interstate agency shall follow the notice and public par ticipation procedures specified in Subpart D of this part in connection with each request for reissuance of an NPDES permit. (d Notwithstanding any other provi sion in this part, any point source the construction of which is commenced after the date of enactment of the Federal Water Pollution Control Act Amend ments of 1972 and which is so constructed as to meet all applicable standards of performance shall not be subject to any more stringent standard of performance during a 10-year period beginning on the date of completion of such construction or during the period of depreciation or amortization of such facility for the purposes of section 167 or 169 (or both) of the Internal Revenue Code of 1954, whichever period ends first. Subpart G--Monitoring, Recording, and Reporting 124.61 Monitoring. Procedures of any State or interstate agency participating in the NPDES for the monitoring of any discharge author ized by an NPDES permit shall be con sistent with the following: (a) Any discharge authorized by an NPDES permit may be subject to such izes the nature of the discharge of the monitored effluent flow or pollutant. Var iable effluent flows and pollutant levels may be monitored at more frequent in tervals than relatively constant effluent flows and pollutant levels which may be monitored at less frequent intervals. 124.62 Recording of monitoring ac tivities and results. Any State or interstate agency partici pating in the NPDES shall specify the following recording requirements for any NPDES permit which requires monitor ing of the authorized discharge: (a) The permittee shall maintain rec ords of all information resulting from any monitoring activities required of him In his NPDES permit; <b) Any records of monitoring activi ties and results shall include for all sam ples: (1) The date, exact place, and time of sampling; (2) the dates analyses were performed; <3) who performed the anal yses; (4) the analytical techniques/ methods used; and, (5) the results of such analyses; and, (c) The permittee shall be required to retain for a minimum of 3 years any rec ords of monitoring activities and results including all original strip chart record ing for continuous monitoring instru mentation and calibration and mainte nance records. This period of retention shall be extended during the course of any unresolved litigation regarding the discharge of pollutants by the permittee or when requested by the Director or Regional Administrator. (a) Any State or interstate ageim participating in the NPDES shall haq the procedures and the capability for tig receipt, evaluation, and investigate!) followup for possible enforcement q remedial action of all notices and reports required of permittees including, but nq limited to. the following: (1) Reports from industrial users progress towards compliance with rquirements of section 307 of the Acy submitted pursuant to 9 124.45(e); (2) Notifications (or failure to notify): from permittees of compliance or non, compliance with interim requirements: specified in NPDES permit schedules compliance pursuant to { 124.44; and, (3) Data submitted by permittees ia NPDES reporting forms and other forms supplying monitoring data, pursuant t Subpart G of this part. (b) Any such reports or notifications received by the Director pursuant to paragraph (a) of this section shall: (1) Constitute information available to tbs ; Director and (2) if forwarded to the Re gional Administrator pursuant to the provisions of this part shall constitute information available to the Adminlstra- tor within the meaning of .section 309 : of the Act. (c) Any State or Interstate agency participating in the NPDES shall have r procedures and capability similar to paragraph (a) of this section for the : receipt and evaluation of notices (relat- tag to new introductions or changes in the volume or character of pollutants introduced into publicly owned treat- : monitoring requirements as may be rea*'' 124.63 Reporting of monitoring re ment works) submitted by permltteee sonably required by the Director, includ sults. which are publicly owned treatment ing the Installation, use. and mainte Any State or interstate agency partici works, pursuant to 1 124.45(d), for pos nance of monitoring equipment or pating in the NPDES shall require sible violation of the terms and condlH methods (including, where appropriate, periodic reporting (at a frequency of not tions of the NPDES permit. If the DM biological monitoring methods). less than once per year) on the proper rector determines that any condition of] (b) Any discharge authorized by an NPDES reporting form of monitoring the permit is violated, he shall notify the! NPDES permit which (1) is not a minor results obtained by a permittee pursuant Regional Administrator and consider] discharge. (2) the Regional Adminis to monitoring requirements in an NPDES taking action under section 402(h) of] trator requests, in writing, be monitored. permit. In addition to the NPDES report the Act (relating to proceedings to re*| FEDERAL REGISTER, VOL. 37, NO. 247--FRIDAY, DECEMiER 22, 172 CAPCO JEN 0005256 RULES AND REGULATIONS 28399 strict or prohibit the Introduction of pollutants into treatment works). 124.72 Modification, suspension, und an effluent source is located or in which records are required to be kept under terms or conditions of a permit and otherwise be able to investigate, inspect, from such unauthorized discharge of pol lutants. whether or not accidental: and. (3) Procedures which enable the Director to sue for compensation for any loss or de struction of wildlife, fish or aquatic lire, and revocation of NPDES permit#, or monitor any suspected violations of for any other actual damages caused by an fat Any State or Interstate agency water quality standards or effluent stand unauthorized discharge of pollutants, either participating in the NFDES shall provide procedures which Insure that, after notice and opportunity for a public hear ards and limitations or of NPBES per mits or terms or conditions thereof; (e) Procedures which enable the Di for the State, for any residents of the State who are directly aggrieved by the unauthor ized discharge of pollutants, or both.) ing, any permit issued under the NPDES rector to assess or to sue to recover in Subpart I--Disposal of Pollutants Into can be modified, suspended, or revoked court, such civil fines, penalties, and in whole or in part during its term for other civil relief as may be appropriate Wells cause including, but not limited to. the for the violation by any person of (1) 124.80 Control of disposal of pol causes listed in l 124.45(b) or for failure any effluent standards and limitations or lutants into wells. or refusal of the permittee to carry out the requirements of 124.45(c). (b) The Director may, upon request of the applicant, revise or modify a sched ule of compliance in an issued NPDES permit if he determines good and valid cause (such as an Act of God, strike, flood, materials shortage, or other event over water quality standards, (2) any NPDES permit or term or condition thereof, (3) any NPDES filing requirements, (4) any duty to permit or carry out inspection, entry, or monitoring activities, (5) any order issued by the Director under para graph (a) of this section, or (6) any rules, regulations, or orders issued by the Any State or interstate agency partic ipating in the NPDES shall have pro cedures which control the disposal of pollutants into wells. Any such disposal shall be sufficiently controlled to protect the public health and welfare and to prevent pollution of ground and surface water resources. which the permittee has little or no con trol) exists for such revision and if within 30 days following receipt of notice from the Director, the Regional Admin istrator does not object in writing. All revisions or modifications made pursuant to this subsection during the period end ing 30 days prior to the date of trans mission of such list, shall be included in the list prepared by the Director pur suant to } 124.44(d). 124.73 Enforcement. Any State or Interstate agency partici pating in the NPDES shall have such powers and procedures and such re course to criminal, civil, and civil injunc tive remedies as to insure the following ways and means are available to protect, maintain, and enhance water quality: (a) Procedures which enable the Di rector to require compliance with (1) any effluent standards and limita tions or water quality standards, (2) any NPDES permit or term or condition thereof, (3) any NPDES filing require ments. (4) any duty to permit or carry out inspection, entry, or monitoring ac tivities, or (5) any rules or regulations issued by the Director either pursuant to orders issued by the Director, court ac tions, or both; (b) Procedures which enable the Di rector to immediately and effectively halt or eliminate any imminent or sub stantial endangerments to the health or welfare of persons resulting from the discharge of pollutants (1) by an order Director; (f) Procedures which enable the Di rector to seek criminal fines for the will ful or negligent violation by such persons of (1) any effluent standards and limita tions or water quality standards, (2) any NPDES permit or term or condition thereof, (3) any NPDES filing require ments; (g) Procedures which enable the Di rector to seek criminal fines against any person who knowingly makes any false statement, representation, or certifica tion in any NPDES form or any notice or report required by the term and condi tions of any issued NPDES permit or knowingly renders inaccurate any moni toring device or method required to be maintained by the Director; and (h) The maximum civil penalties and criminal fines recoverable by the Director pursuant to paragraphs (e) and (f) of this'section shall (1) be comparable to similar maximum amounts recoverable by the Regional Administrator under section 309 or (2) represent an actual and substantial economic deterrent to the ac tions for which they are assessed or levied. Such civil penalties or criminal fines shall be assessable up to the maxi mum amounts for each violation specified in paragraphs (e) and (f) of this sec tion, or, if the violation is a continuous discharge, assessable for each day the discharge occurs. (Comment. It Is understood that In many States the Director wUl be represented in State courts by the State attorney general (a) If an applicant for an NPDES per mit proposes to dispose of pollutants into wells as part of a program to meet the proposed terms and conditions of an NPDES permit, the Director shall specify additional terms and conditions in the final NPDES permit which shall (1) prohibit the proposed disposal, or (2) control the proposed disposal in or der to prevent pollution of ground and surface water resources and to protect the public health and welfare. (b) A State agency participating in the NPDES shall have procedures to pro hibit or control through the issuance of permits all other proposed disposals of pollutants into wells. Following approval of the Administrator of a State program pursuant to section 402 of the Act, the Director shall permit no uncontrolled disposals of pollutants into wells within the State. (c) Any permit issued for the disposal of pollutants into wells shall be issued in accordance with the procedures and re quirements specified in this part. (d) The Regional Administrator shall distribute to the Director and shall utilize in his review of any permits pro posed to be issued by the Director for the disposal of pollutants into wells, any policies, technical information, or re quirements specified by the Adminis trator in regulations issued pursuant to the Act or in directives issued to EPA regional offices. Subpart J--Resources, Planning and or suit in the appropriate State court to or other appropriate legal offleer. While the Other Requirements immediately restrain any person causing Director need not appear In court actions or contributing to the discharge of pol under this subpart, he should have the power 124.91 Availability of resources. lutants or to take such other action as may be necessary, or (2) by a procedure for the immediate telephonic notice to the Regional Administrator of any actual or threatened endangerments to the to request that such actions be brought. The following enforcement options, while not mandatory, are highly recommended as means not only for compelling compliance but also fowpfovldlng additional funds to State or Interstate program efforts: (a) Any State or interstate agency participating in the NPDES shall, in sub mitting its program description pursuant to section 402(b) of the Act, provide in formation regarding funding and man health or welfare of persons resulting (1) Procedures for assessment by the Di power appropriated for the use of the from the discharge of pollutants; rector or by a State court of any violator for program proposed `to be established and (c) Procedures which enable the Di rector to sue in courts of competent Juris diction to enjoin any threatened or con tinuing violations of any NPDES permits or conditions thereof without the neces sity of a prior revocation of the permit: (d) Procedures which enable the Di the costs of an Investigation, Inspection, or monitoring survey which led to the estab lishment of the violation; (2) Procedures which enable the Director to assess or to sue any persons responsible for an unauthorized discharge of pollutants for any expenses Incurred by the State In removing, correcting, cr terminating any administered under State law or under an interstate compact. Such information shall Include the following: (1>A description of all full-time and part-time employees who will be engaged in carrying out the State permit program, including information on the qualifica rector to enter any premises in which adverse effects upon water quality resulting tions and functions of such employees. FEDERAL REGISTER, VOL 37, NO. 247--FRIDAY, DECEM1ER 22, 1972 CAPCO JEN 0005257 28400 RULES AND REGULATIONS (2) A list of the proposed costs and expenses of establishing and administer* $ 124.92 Inspection and surveillance support for NPDES permits. process is at all times consistent < the Act. tag the program described in the pro Any State or Interstate agency par 124.94 Agency Board membership, S gram description, Including <i> wages and salaries of the personnel iisted in (1) above, (li) cost of administrative sup port (such as office space and supplies, computer time, vehicles, notice and hear ing procedures, etc), and (ill) cost of technical support (such as laboratory space and supplies, vehicles, watercraft, etc.). Such estimate of costs and expenses shall Include the cost and expense of carrying out the procedures and require ments contained in this part; (3) A description of the funding available to the Director to meet the costs and expenses listed in subpara graph (2) of this paragraph including any restrictions or limitations upon such funding; and (4) A list of categories and sizes of all point sources (e.g., major industrial, minor industrial, minor municipal, ma jor feedlot, irrigation return flow, shop ping centers and subdivisions, etc.) to which the Director proposes to issue permits under the Act. For each cate gory, the following information shall be given: (i) Estimated numbers of point sources within such category which are required to file for an NPDES permit; and (ii) Number and percent of point sources within each category for which the State has already issued a State permit or equivalent document regulat ing the discharge of pollutants. (b) The Regional Administrator and the Administrator shall review the in formation submitted by the Director pursuant to paragraph (a) of this sec tion in order to determine whether the Director has resources available to him which will enable him to carry out the program described in the program de scription submitted pursuant to section ticipating In the NPDES shall have the funding, qualified personnel, and other resources necessary to support NPDES permits with inspection and surveillance procedures which will determine, inde pendent of tatermatlon supplied by ap plicants and permittees, compliance or noncompllance with applicable effluent standards and limitations, water quality standards, NPDES filing requirements, and issued NPDES permits or terms or conditions thereof. Such surveillance and inspection support procedures shall in clude the following: (a) A supporting survey program with sufficient capability to make systematic, on-the-spot, comprehensive surveys of all waters subject to the Director's au thority in order to Identify and locate all point sources subject to NPDES filing re quirements. Any compilation, index, or Inventory of point sources shall be made available to the Regional Administra tor or his authorized representative upon request; (b) A supporting inspection program for the periodic inspection (to be per formed not less than once every year for every discharge which is not a minor dis charge) of discharges of pollutants from point sources and facilities for the treat ment and control of such discharges of pollutants. Such inspections shall deter mine compliance or noncompllance with issued NPDES permits or terms or con ditions thereof and, in particular, com pliance or noncompliance with specific effluent limitations and schedules of com pliance in such NPDES permits; (c) A supporting surveillance program with sufficient capability for the random sampling and analysis of discharges for the purpose of Identifying occasional and continuing violations of permit condi tions or terms or conditions thereof and Each State or interstate agency i tlcipatlng In the NPDES shall insure any board or body which appn NPDES permit applications or pop thereof shall not Include as a men any person who receives, or has du the previous 2 years received, a sig cant portion of his Income dlrecUyj indirectly from permit holders or ap cants for a permit. (a) For the purposes of this ; the term "board or body" includes i individual, including the Director, has or shares authority to approve pen applications or portions thereof either! the first instance or on appeal. (b) For the purposes of this sect! the term "significant portion of his j come" shall mean 10 percent of personal income for a calendar yei except that it shall mean 50 percent | gross personal income for a calendar yei if the recipient is over 60 years of i and is receiving such portion pursuant! retirement, pension, or similar arra ment. (c) For the purposes of this sect! the term "permit holders or appllc for a permit" shall not include any < partment or agency of a State goven. ment, such as a Department of Parks i a Department of Fish and Wildlife. (d) For the purposes of this sect! the term "income" includes retlrema benefits, consultant fees, and stock did dends. (e) For the purposes of this sectla income is not received "directly or : directly from permit holders or appll cants for a permit" where it is derive! from mutual-fund payments, or fn other diversified Investments over wh the recipient does not know the identitj of the primary sources of income. 402(b) and the procedures contained In the accuracy of information submitted Subpart K--NPDES Application an this part. Such a determination shall be based upon an examination of criteria which shall Include the following: (1) Whether there are a sufficient number of employees to process NPDES applications and issue NPDES permits in sufficient time to allow permittees to attain effluent limitations which will achieve the July 1, 1977 goal specifled in section -301(b) of- the Act; (2) Whether the employees of the Di rector have sufficient expertise and ex perience for the proper specification of terms and conditions of NPDES permits pursuant to the requirements of sub part E of this part; (3) Whether the employees of the Director have sufficient administrative by permittees in NPDES reporting forms and other forms supplying monitoring data; and (d) A supporting program for the pur pose of following up evidence of viola tions of applicable effluent standards and limitations and water quality standards, NPDES filing requirements, or issued NPDES permits or terms or conditions thereof indicated by reports and noti fications evaluated pursuant to 1124.71 above or by survey, inspection, and sur veillance activities In paragraphs (a)(c) of this section. The taking of sam ples and other information shall be per formed with sufficient care as to produce evidence admissible in an enforcement proceeding or in court should the follow Reporting Forms [Reserved] (Reserved for NPDES application and i porting forme, along with guidelines and ln^ etruetlons for their use by applicants fa NPDES permits and by State and lnteratata programs participating In the NPDES.) Attendee A sautle runirc notice Detaatmxnt or Envieoniiehtal Paorzenoaj DIVISION or WATEE QUALITY AND RESOT7 tele COURT HOU5E DXIVZ. CAPITAL CITT, STAT1 (ZIP) 307-4AI-R222 [Public Notice No. OFP-72-301: Applicant No. CIY-400-60-30lj Accost 13,1973. Notice--Application foe NPDES Pezuit to| Discharge to State Waters and technical support and resources. In up Indicate a violation of applicable ef cluding funding, to enable the Director fluent standards and limitations and to carry out his duties under this part" water quality standards or issued NPDES and section 402 of the Act; permits or terms or conditions thereof. (4) The number, location, and kinds of point sources which constitute major 124.93 Continuing planning process. sources of discharge of pollutants Any State or Interstate program par within the State or interstate area; and ticipating in the NPDES must have an (5) The quality of navigable waters approved continuing planning process Acme Paper Products, Inc., 11345 Nort Fremont Street, Cape Rockeway, State (ZIP)J has applied for a Department of Environ*] mental Protection permit to discharge pollu-| tants Into State waters. Applicant Is a manufacturer of bleache< grades of paper from kraft pulp. Two exlT lng discharges are described In the applla tlon: One of the utuity waste water applicant's steam generating plant and t within the State or subject to the au pursuant to section 303(e) of the Act and other of process wastes from the manufactu thority of the Interstate agency. must assure that its approved planning of pulp and paper. Both discharges are pn FEDERAL REGISTER, VOL 37, NO. 247--FRIDAY, 0ECEM1E1 22, 1972 CAPCO JEN 0005258 mum RULES AND REGULATIONS 28401 end/ Martin Creek one-half-miie up stream from Whitehall Bay. On the basis of preliminary staff review iud application of lawful standards and reg ulations. the Division of Water Quality and Resources proposes to issue a permit to dis charge subject to certain effluent limitations and special conditions. These proposed deter minations are tentative. Persons wishing to comment upon or object to the proposed determinations are invited to submit same In writing to the above address no later than September 12. 1273. All comments or ob jections received prior to September 12, 1973, will be considered In the formulation of final determinations regarding the application. If no objections are received, the Director will Issue his final determinations wLthln 60 days of the date of this notice. A public hearing may be held if response to this notice indi cates significant public Interest. The application, proposed permit Including proposed effluent limitations and special con ditions. fact sheets, comments received, and other information is on file and may be in spected and copied in Room 814, 1616 Court House Drive, Capital City. State (ZIP), at any time between 8:15 a.m. and 4:45 p.m., Monday through Friday. Fact sheets and further Information may be obtained by writing to the above address or by calling the Office of Permit Processing at 307-445-8922. Appendix B SAMPLE FACT SHEET FOR MAILING TO INTERESTED AND POTENTIALLY INTERESTED PERSONS AND GOVERNMENT AGENCIES Department of Environmental Protection generating plant. Average Flow: zoo,000 Gallons per Operating Day Avenge temperatures: Intake Discharge Summer.............................W* F............95 F. Winter............................... 38* F............ 35 F. Discharge 002. Process wastes from manu facture of pulp and paper. facilities at maximum efficiency at all times. The applicant is required to monitor his dis charges on a regular basis and report the results every 3 months. The monitoring re sults will be available to the public. The ap plicant is required to conduct studies of pos sible adverse effects of his heated water dis charge 001 upon free floating marine life and shellfish In Martin Greek and Whitehall Bay. If applicant's study or independent informa tion supplied to the Director Indicate an adverse effect, the applicant will be required DIVISION OF WATER QUALITY AND RESOURCES, ISIS COURT HOUSE DRIVE, CAPITAL CITY, STATE Average Flow: 24,300,000 Gallons Per Operating Dat to take additional measures to minimize the adverse Impact. -9*. (Z1PI SOT--443--6922 Applicable effluent limitations and water } {Public Notice No. OPP-72-301: Application Constituents Milligrams Pounds quality standards. The following are the ef per liter per day fluent limitations and water quality stand No. CIY-400-60-301) ards which were applied to applicant's dis Pact Sheet--Application for NPDES Permit to Discharge to State Waters Acme Paper Products. Inc., 11345 North Fremont street. Cape Rockaway, State (ZIP), has applied tor a Department of Environ mental Protection permit to discharge pol lutants Into State waters. Applicant is a manufacturer of bleached grades of paper from kraft pulp. Two dis charges are described in the application: One of utility waste water from applicant's steam generating plant and .the other of process wastes from the manufacture of pulp and paper. Both discharges are to Martin Creek one-half-mile upstream from Whitehall Bay. The receiving waters are classified for In dustrial and navigation use, contact rec reation. and propagation of fish and wild life. A more complete description of the dl&r charges and a sketch of their location follow below. The application, proposed permit including proposed effluent limitations and special BOD............................... . Suspended solids.............. . Fhcnols............................ Mercury,...... ................... DO 110 0.6 0.00IS 18.000 22,000 100 O.fi Proposed determinations. The Division of Water Quality and Resources has examined the above application. On the basis of appli cable effluent limitations and water quality standards, the State Water Quality and Re sources Act of 1971. as amended, and regula tions issued thereunder, the Division pro poses to issue the Applicant a permit to dis charge subject to effluent limitations and certain other conditions. The following Is a brief description of the proposed effluent lim itations and special conditions: (1) Proposed effluent limitations. Discharge 001. none Discharge 002. visible foam and visible floating solids prohibited. The following dis charge constituents shall be limited as follows: ___ charge in the formulation of the above pro posed determinations: (1) All effluent limitations except mercury are based upon effluent guidelines for the pulp and paper industry, manufacture of bleachfed paper grades from kraft pulp. See 40 CFR 128.74. 128.89. and 128.91(c). (2) The mercury limitation is based upon effluent limitations for toxic substances. See 40 CFR 136.22 (b) and (c). (3) For water quality standards for Martin Creek and Whitehall Bay, See 40 CFR 42.66 et. seq. Both are classified for the following uses: Industrial use, navigational use. con tact recreation, and propagation of fish and wildlife. Written, comments, interested persons are Invited to submit written comments upon the proposed discharge and the Director's proposed determinations. Comments should be submitted by September 12. 1973, either in person or by mall to: Director, Division of Water Quality and Re conditions, comments received, and other information Is on file and may be Inspected and copied In Room 814. 1616 Court House Constituents MlUlgrans rounds per liter per day sources, Attention: Office of Permit Proc essing. 1616 Courthouse Drive, Capital City, State (ZIP). Drive, Capital City, State (ZIP), at any time between 8:15 a.m. and 4:45 pm., Monday through Friday. The proposed staff determinations are tentative. Persons wishing to comment upon BOD............................ Suspended solids........... Phenols........................ Mercury........................ 27. S 25 0.0005 5.500 5,000 20 0.10 The application number should appear next to the above address on the envelope and on the first page of any submitted com ments. All comments received by September or object to the proposed determinations are 12, 1973, will be considered In the formula invited to submit same In writing to the (2) Proposed schedule for compliance. The tion of final determinations. Zf no written above address no later than September 12. applicant shall achieve the effluent levels de objections are received, the Director will Issue 1973. AU comments or objections received scribed In subsection < 2) above in accordance his final determinations no later than 60 prior to September 12,1973, will be considered with the following schedule: days following the date of this notice. f in the formulation of final determinations Submission of final plans to Director by: Information and copying. Persons wishing Jk regarding the application. If no objections November 15.1973. further Information may write to the above are received, the Director will Issue his final Commencement of construction by: Jan address or call the Office of Permit Processing determinations within 60 days of the date uary 15.1974. at 307 445-8922. Copies of the application, of public notice. As described more fully Completion of construction by: Septem proposed permit including proposed effluent below, a public hearing may be held tf re ber IS. 1974. limitations and special conditions, comments sponse to public notice Indicates significant Operational level attained by: November 1. received, and other documents (other than public interest. 1974. those which the Director maintains as con- FE0ERAI REGISTER, VOL 37, NO. 247--FRIDAY, DECEMBER 22, 1972 CAPCO JEN OOOS259 28402 RULES AND REGULATIONS fldenttal) are available at the Office of Permit Processing for Inspection and copying. A copying machine Is available for public use at a charge of $0.15 per copy sheet. Register of interested persons. Any person Interested in a particular application of group of applications may leave his name, address, and phone number as part of the Ale for an application. The list of names jdMe be maintained as a means for persons with an interest in an application to contact others with similar Interests. Public hearings. If submitted comments Indicate a significant public Interest In the application or If he believes useful informa tion may be produced thereby, the Director, in his discretion, may hold a public bearing on the application. Any person may request the Director to hold a public hearing on the application. Public notice of a hearing will be circu lated at least 30 days In advance of the hear ing. The hearing will be held In the vicinity of the discharge. Thereafter, the Director wlH formulate his final determinations with in 60 days. Further Information regarding the conduct and nature of public hearings con cerning discharge permits may be obtained by writing or visiting the Office of Permit Processing. 1616 Courthouse Drive. Capital City, state (zip). Appendix C SAMPLE PUBLIC NOTICE FOR PUBLIC HEARINGS HELD IN REGARD TO NPDE3 APPLICATIONS Department of Environmental Protection DIVISION OP WATER QUALITY AND RESOURCES. 16IS COURTHOUSE DRIVE, CAPITAL CITY. STATE (ZIP! 307-44S-S923 (Public Notice No. OPP-72-301-PH-24; Application No. CIY-400-60-301] Notice--Announcement of Public Hearing on Application or Acme Paper Products To Discharge Pollutants Into Martin Creek Near Whitehall Bay, Cape Rocxaway. Edwards County, Stats Acme Paper Products, Inc., 11345 North Fremont Street. Cape Rockaway, State (ZIP). has applied for a Department of Environmen tal Protection permit to discharge pollutants Into Martin Creek one-half mile upstream from Whitehall Bay. The discharge and the Department's proposed determinations have been previously described In Public Notice No. OPP-72-301, dated August 12, 1973. Due to numerous comments received concerning the application, the filing of several petitions requesting a hearing, and the likelihood that information may be presented which will assist the Department In the formulation of final determinations regarding the appllcation,\thc Director of the Department of En vironmental Protection will hold a public hearing at the time and place stated below: Hearing to be held at 7 p.m.. on Septem ber 30. 1973. in Center High School Gymna sium. 2171 Furlong Avenue, Cape Rockaway, State (ZIP). Some of the Issues to be considered at the hearing are as follows: (1) Do the Department's proposed effluent limitations for the applicant's discharge No. 002 represent a proper application of Indus trial effluent guidelines to the applicant's Industrial processes. (2) Do related water quality or environ mental factors require the specification of stricter effluent limitations, additional re quirements, or particular methods of treat ment or control. In particular, (a) Will the Department's proposed effluent limitations, if met. restore uncontaminated shellfish populations in Whitehall Bay (wa ter quality standards classify Whitehall Bay for propagation of fish and shellfish). (b) Does contamination of subsurface wells and water supplies of adjacent home and cottage owners result from leaks In appli cant's treatment lagoons. If so, does the De partment have the authority to require the applicant (1) to repair the leaks, and (11) to compensate the adjacent home and cottage owners for damages resulting from the con tamination of the subsurface wells and water supplies. (c) Does the Department have the author ity to control the maimer in whtch the applicant utilizes adjoining marshes and wetlands as additional treatment lagoons in order to meet the Department's proposed effluent limitations. If so, what measures can be taken by the applicant to minimize any harmful effects to adjoining wetlands and fish and wildlife habitats therein. All Interested parties are Invited to be present or to be represented to express their views on these and other Issues relating to the above application. Parties making presen tations are urged to address their statements to the above stated Issues. Oral statements will be heard, but, for the accuracy of the record, all Important testimony should be submitted In writing. Oral statements should summarize any extensive written material so there will be time for all Interested parties to be heard. The application, related documents, the Department's proposed limitations, and all comments and petitions received are on file and may be inspected and copied in Room 814, 1616 Court House Drive, Capital City, State (ZIP), at any time between 8:15 a.m. and 4:45 p.m., Monday through Friday. Copies of public notice OPP-72-301 are available at the above address or by calling the Office of Permit Processing at 307--445 8922, Please bring the foregoing to the attention of persons whom you know would be Inter ested in this matter. (FR Doc.72-21987 Filed 12-21-72:8:45 am] 1 fi FEDERAL REGISTER, VOL 37, NO. 247--FRIDAY, DECEMBER 22, 1972 9 CAPCO JEN 0005260 i * j ho. 7--Ft. nr--i THURSDAY, JANUARY 11, 1973 WASHINGTON. D.C. Volume 38 Number 7 PART III ENVIRONMENTAL PROTECTION AGENCY NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Notice of Proposed Role Making i CAPCO JEN 0005261 i 1362 PROPOSED RULE MAKING ENVIRONMENTAL PROTECTION exclusions listed in these regulations, do Subparf A--General not require discharge permits. These proposed regulations do not ap 125.1 Definitions- AGENCY 140 CPR Part 1251 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM ply in any State where the Administra tor has granted authority to a State to carry out a State permit program pur suant to section 402(a) (5) of the Act or where the Administrator has approved a State program pursuant to section 402(b) of the Act. In such cases, the Ad Except as otherwise specifically hm>Jl vlded, - (a) The term "Act" means the Fedei Water Pollution Control Act, as amen* PubUc Law 92-500. (b) The term "Administrator" r _ the Administrator of the U.S. Environ, Notice of Proposed Rule Making Notice is hereby given that the regula tions set forth In tentative form below are proposed by the Environmental Pro tection Agency. The proposed regula tions describe, pursuant to the authority contained in sections 402 and 405 of the Federal Water Pollution Control Act Amendments of 1972 (86 Stat. 816 et seq.; Public Law 92-500 (1972)) (herein after referred to as the "Act"), the policy and procedures for Issuing or denying permits under sections 402 and 405 of the Act. Section 402 of the Act creates a Na tional Pollutant Discharge Elimination System under which the Administrator of the Environmental Protection Agency may, after opportunity for public hear ing, issue permits for the discharge of any pollutant or combination of pollutants, upon condition that such discharge will meet all applicable requirements of the Act relating to effluent limitations, water quality standards and implementation plans, new source performance stand ministrator will suijSend issuance of per mits pursuant to his authority, except with respect to Federal agencies and in strumentalities, for which the Adminis trator will continue to process permit ap plications in accordance with these regu lations and will be the exclusive source of permits. Section 405 of the Act provides that any discharge of sewage sludge that re sults in any pollutant from the sewage sludge, entering the navigable waters Is prohibited, except in accordance with a permit issued by the Administrator un der section 405. These proposed regula tions apply to the discharge of sewage sludge. Prior to the adoption of the proposed regulations consideration will be given to any comments, suggestions, or objec tions thereto which are submitted in writing to the Office of Enforcement and General Counsel, Washington, D.C. 20460 by February 12. 1973. mental Protection Agency. (c) The term "applicable effluent! standards and limitations" means ajj* State and Federal effluent standards am limitations to which a discharge is sub-: ject under the Act, Including, but not limited to, effluent limitations, standards of performance, toxic effluent standards and prohibitions, and pretreatment standards. (d) The term "applicable water qual ity standards" means aU water quality standards to which a discharge is subject under the Act and which have been (l) approved or permitted to remain in effect by the Administrator following submis sion to him pursuant to section 303(a) of the Act, or (2) promulgated by the Ad ministrator pursuant to section 303(b) or 303(c) of the Act. (e) The term "contiguous zone" means the entire zone established or to be es tablished by the United States under Article 24 of the Convention of the Terri torial Sea and the Contiguous Zone. (f) The term "discharge" when used ards, toxic and pretreatment effluent standards. Inspections, monitoring and William D. Ruckelshaus, Administrator. without qualification Includes a dis charge of a pollutant and a discharge of entry provisions, and guidelines estab lishing ocean discharge criteria. January 5, 1973. pollutants. (g) The term "discharge of pollutant" Prior to the promulgation of guide lines specifying the requirements of the Act indicated in the preceding para graph, the Administrator may issue permits under conditions which he deter mines are necessary to carry out the pro visions of the Act. Permit holders (for all point sources, other than publicly owned treatment works) are required to achieve, not later than July 1, 1977, effluent limitations which require the ap plication of best practicable (waste) Sec. 125.1 125.2 125.3 125.4 125.5 Subparl A--General Definitions. Scope and purpose. Law authorizing permits. Exclusions.' Delegation of authority. 125.11 125.12 125.13 125.14 Subparl 8--Processing of Permits General provisions. Application for permit. Access to facilities. Distribution of application permit. and and the term "discharge of pollutants"each means: (1) Any addition of any pollutant to navigable waters from any point source, (2) any addition of any pollutant to the waters of the contiguous zone or the ocean from any point source other than a vessel or other floating craft. (h> The term "effluent limitations" means any restriction established by a State or the Administrator on quantities, rates, and concentrations of chemical, control technology currently available. 125.15 State certification. physical, biological, and other constitu Publicly owned treatment works are re quired to achieve secondary treatment by Subparl C--Terms and Conditions of Permits ents which are discharged from point sources into navigable waters, the waters the same date. In addition, all point 125.21 Prohibitions. of the contiguous zone, or the ocean, in source dischargers must comply with ap plicable water quality standards re quirements. , 125.22 125.23 125.24 12525 Conditions of permits. Schedules of compliance. Effluent limitations in permits. Duration of permit. cluding schedules of compliance. (i) The term "Environmental Protec tion Agency" means the IT.S. Environ All discharges from point sources into 125.25 Special categories of permits. mental Protection Agency. the navigable waters, the waters of the 12527 Monitoring, recording and reporting. (j) The term "Interstate agency" contiguous zone, and the oceans are un lawful unless the discharger possesses a Subparl D--Notice and Public Participation means an agency of two or more States established by or pursuant to an agree valid permit or is excluded from cover age by law or regulation. Dischargers re quired to obtain permits include, among other point sources, munlcipal and other publicly owned waste treatment works, 125.31 125.32 22523 125.34 125.35 Formulation of tentative determina tions. Public notice. Fact sheets. Hearings and appeals. Public access to information. ment or compact approved by the Con gress, or any other agency of two or more States, having substantial powers or duties pertaining to the control of pollution as determined and approved industries discharging directly to navi gable waters, and concentrated animal feeding operations. T25.41 Industrial, commercial, and residential discharges to municipal or other pub licly owned waste treatment works, 125.42 125.43 Subpart E--Miscellaneous Objections to permit by another state. Other legal action. Environmental Impact statements. by the Administrator. (k) The term "municipality" means a city, town, borough, county, parish, dis trict, association, or other public body created by or pursuant to State law and having jurisdiction over disposal of sew properly functioning marine engines, and certain discharges to wells associated with oil and gas production, among other Authority: Secs. 402, 405 of the Federal Water Pollution Control Act Amendments of 1972 (86 Stat. 816 et. seq.: PubUc Law 82500). age, Industrial wastes, or other wastes, or an Indian tribe or an authorized In dian tribal organization, or a designated FEDERAl REGISTER, VOL 38, NO. 7--THURSDAY, JANUARY 11, 1973 CAPCO JEN 0005262 PROPOSED RULE MAKING 1363 and approved management agency under section 208 of the Act. (1) The term `'National Pollutant Dis charge Elimination System" (hereinafter referred to as "NPDES") for the purpose of these regulations means the system for issuing, conditioning, and denying permits for the discharge of pollutants from point sources into the navigable waters, the contiguous zone, and the oceans, by the Administrator of the En vironmental Protection Agency pursuant to section 402 of the Federal Water Pol lution Control Act, as amended. (ml The term "navigable waters" means the waters of the United States including the territorial seas. <n) The term "new source" means any building, structure, facility, or installa tion from which there is or may be the discharge of pollutants, the construction of which is commenced after the publi covert only radioactive materials which are not encompassed In the definition or source, by-product or special nuclear materials as defined by the Atomic Energy Act of 1954, as amended, and regulated pursuant to the latter Act. Examples or radioactive materials not covered by the Atomic Energy Act and, therefore. Included within the term "pol lutant" are radium and accelerator produced Isotopes. (HR. Rep. 92-911, 92d Cong. 2d sess., 131, Mar. 11, 1972: 117 CougTEec. 17401, dally ed., Nov. 2. 1971; 118 Cong. Rec. 9115, dally ed., Oct. 4.1972.)) <t) The term "pollution" means the man-made or man-induced alteration of the natural chemical, physical, biological, and radiological integrity of water. (u) The term "Regional Administra tor" means one of the Regional Adminis trators of the U.S. Environmental Pro tection Agency. (v) The term "schedule of compli ance" means a schedule of remedial process or is used for ultimate disposal of residues resulting from such treatment. 125.2 Scope and purpoee, (a) These regulations prescribe the policy and procedures to be followed in connection with applications for feder ally issued permits authorizing dis charges into the navigable waters, the waters of the contiguous zone, and the oceans, during the periods that the Ad ministrator of the Environmental Pro tection Agency may be authorized to issue such permits pursuant to sections 402 and 405 of the Act. (b) These regulations do not prescribe policy or procedures where the Adminis trator has authorized a State program pursuant to section 402(a) (5) of the Act or where the Administrator has approved a Stpte program pursuant to section 402 (b) of the Act. cation of proposed regulations pre scribing a standard of performance un der section 306 of the Federal Water Pol lution Control Act, as amended, which will be applicable to such source, if such standard is thereafter promulgated in accordance with section 306. (o) The term "ocean" means any por tion of the high seas beyond the con tiguous zone. (p) The term "permit" means any per mit or equivalent document or require ment issued to regulate the discharge of pollutants. (q) The term "person" means an indi vidual, corporation, partnership, asso ciation, State, municipality, commission, or political subdivision of a State, or any interstate body. (r> The term "point source" means any discernible, confined and discrete measures Including an enforceable se quence of actions or operations leading to compliance with an effluent limitation, other limitation, prohibition, or standard. (w) The term "sewage" means human body wastes and the wastes from toilets and other receptacles intended to receive or retain body wastes. (x> The term "sewage sludge" shall mean the solids and precipitates sepa rated from wastewater by unit processes. (y) The term "State" means a State, the District of Columbia, the Common wealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, and the Trust Territory of the Pacific Islands. (z) The term "State water pollution control agency" means the State agency designated by the Governor, having re sponsibility for enforcing State laws re lating to the abatement of pollution. 125.3 Law authorizing permits. (a) Section 301(a) of the Act provides that discharges without permits are un lawful. This section states, in part, that "Except in compliance with this section and sections 302, 306, 307, 318, 402, and 404 of this Act, the discharge of any pol lutant by any person shall be unlawful." (b> Section 402 of the Act establishes the National Pollutant Discharge Elimi nation System (NPDES). This section provides in part that "the Administrator may, after opportunity for public hear ing. issue a permit for the-discharge of any pollutant, or combination of pol lutants, upon condition that such discharge will meet either all applicable requirements under sections 301,302,306, 307, 308, and 403 of (the) Act, or prior to the taking of necessary implementing actions relating to all such requirements, conveyance, including but not limited to (aa) The term "territorial seas" such conditions as the Administrator any pipe, ditch, channel, tunnel, conduit, means the belt of the seas measured from determines are necessary to carry out well, discrete fissure, container, roiling stock, concentrated animal feeding oper the line of ordinary low water along that portion of the coast which is in direct the provisions of (the) Act." (c) Section 405 cf the Act prohibits ation, or vessel or other floating craft, contact with the open sea and the line the discharge of sewage sludge into from which pollutants are or may be discharged. marking the seaward limit of inland waters, and extending seaward a distance navigable waters except in accordance with a permit issued by the Administra (s> The term "pollutant" means of 3 miles. tor under section 405. This section pro dredged spoil, solid waste, incinerator <bb) The term "trade secrets" shall vides in part that "in any case where the residue, sewage, garbage, sewage sludge, mean a secret method or process, not disposal of sewage sludge resulting from munitions, chemical wastes, biolog'lcal patented, but known only to certain indi the operation of a treatment works * * materials, radioactive materials, heat, viduals using it in compounding some (including the removal of in-place sew wrecked or discarded equipment, rock, article of trade having a commercial age sludge from one location and its sand, cellar dirt and industrial, munici value. deposit at another location) would result pal, and agricultural waste discharged (cc) The term "treatment works" in any pollutant from such sewage sludge Into water. It does not mean (1) "sewage means any devices and systems used in entering into the navigable waters, such from vessels" or (2) water, gas or other the storage, treatment, recycling, and disposal is prohibited except in accord material which is injected into a well to reclamation of municipal sewage or in ance with a permit Issued by the Ad facilitate production of oil or gas, or dustrial wastes of a liquid nature to im ministrator under this section." water derived in association with oil or plement section 201 of the Act, or neces (d) Unless specifically noted to the gas production and disposed of in a well. sary to recycle or reuse water at the most contrary, all provisions of these regula If the well used either to facilitate pro economical cost over the estimated life tions concerning permits under section duction or for disposal purposes is ap of the works, including intercepting sew 402 of the Act, are applicable to permits proved by authority of the State in which ers, outfall sewers, sewage collection sys under section 405 of the Act. the well is located, and if such State de termines that such injection or disposal tems, pumping, power, and other equip ment, and their appurtenances: exten 125.4 Exclusions. will not result in the degradation of sion, improvement, remodeling, addi The NPDES does not apply to: ground or surface water resources. tions, and alterations thereof; elements (a) Sewage from vessels (section 502 (Comment. The legislative history ot the Federal Water Pollution Control Act amend essential to provide a reliable recycled supply such as standby treatment units (6)); (b) Any addition of any pollutant to ments resects that the term "radioactive and clear well facilities; and any works, the waters of the contiguous zone or the materials" as Included within the definition including site acquisition of the land that ocean from any vessel or other floating of "pollutant" In section 502 or the Act will be an integral part of the treatment craft (section 502(12) (B)>; FEDERAL REGISTER, VOL. 38, NO. 7--THURSDAY, JANUARY IT, T973 CAPCO JEN 0005263 1364 PROPOSED RULE MAKING (c) Discharges from properly func under sections 301, 302, 306,307,308, and covered under the npdes must apply tioning marine engines 403 of the Act, the Administrator may for a permit on or before April 16.1973. (d) Water, gas, or other material issue permits under such conditions as he (d) Any persons wishing to discharge which Is Injected Into a well to facilitate determines are necessary to carry out the into waters covered by the NPDES on or production of oil or gas, or water derived provisions of the Act. Any permit issued after June 16, 1973 (but who is not now In association with oil or gas production shall include any conditions necessary to discharging into such waters) must and disposed of in a well. If the well used insure compliance with any applicable re apply for a permit not later than 180 either to facilitate production or for dis quirements of sections. 301. 302, 306, 307, days in advance of the date on which it is posal purposes Is approved by authority 308, and 403 thatbecome applicable desired to commence the discharge. If of the State in which the well Is located prior to the issuance of the permit. Fore persons desire to discharge on or before and if such State determines that such most among other factors to be consid June 15, 1973, they shall give at the Injection or disposal will not result In ered prior to the taking of the necessary minimum a 60-day notice; and if such the degradation of ground or surface implementing actions is the requirement notice is impossible they shall apply to water resources (section 502(6)); for abatement measures designed to the Regional Administrator for a (e) Aquaculture projects (section achieve, not later than July 1,1977. best variance. 318); and (f) Dredged or fill material (section practicable (waste) control technology currently available for the particular (e) An application submitted by a cor poration must be signed by an official of 404). 125.5 Delegalion of authority. point source (other than publicly owned the rank of corporate vice president or treatment works) as determined by the Regional Administrator based uponin- above. In the case of a partnership or a sole proprietorship the application must (a) Subject to the appeal provisions of S 125.34 and the national security responsibility provision of S 125.35(c), formation available to him to date and his professional judgment taking into account the intent of sections, 301, 302, be signed by a general partner or the proprietor respectively. In the case of a municipal. State, Federal, or other pub the authority to issue and condition per 306,307,308, and 403 of the Act. Likewise, lic facility, the application must be mits or to deny applications for dis publicly owned treatment works must signed by the official having responsi charges covered by the NPDES and by achieve secondary treatment by July 1. bility for .the overall operation of the section 405 of the Act, is hereby delegated 1977, or in accordance with the period to each of the Regional Administrators specified in section 301(b) (1) (B) of the of the Environmental Protection Agency Act. Furthermore, any permit issued shall for the area which he administers. include any more stringent condition (b) The authority granted to the Ad pursuant to section 301(b) (1) (C) of the ministrator by sections 308(a) and 308 Act necessary to insure compliance with (b) of the Act, is hereby delegated to any limitation, including those necessary each of the Regional Administrators for to meet applicable water quality stand the area which he administers. ards. treatment standards, or schedules of compliance, established pursuant to Subpart B--Processing of Permits any State law or regulation (under au 125.11 General provisions. (a) All discharges of pollutants or combination of pollutants from all point sources into the navigable waters, the waters of the contiguous zone, or the ocean are unlawful and subject to the penalties provided by the Act, unless the discharger has a permit or is specifically relieved by law or regulation of the thority preserved by section'510 of the Act) or any other Federal law or regula tion. or required to implement any appli cable water quality standard established pursuant to the Act. The likely impact or the existing impact of the discharge on the quality and uses of the receiving body of water where no adequate water quality standards exist also may have to be taken into account. In many cases the pos obligation of having a permit. When a sibility of occurrence and the probability permit has been Issued, discharges must of effects of spills of materials from the be consistent with the terms and con point source are very important. In those ditions of such permit. Discharges in cases spills should be considered. The ob violation of permit terms and conditions jections of any State or interstate agency may result in the institution of proceed whose waters may be affected by the dis ings under the Act. charge shall be duly considered when (b) The decision as to whether or on making any permit decision. what conditions a permit authorizing a discharge will Issue will be based upon 125.12 Application for a permit. an evaluation as to how such discharge (a) An applicant for a permit must will meet applicable requirements under secure the required application form(s) the Act, or other applicable laws' and from the Regional Administrator. Appli regulations. Subsequent to the taking of cation form(s) must also be filed with necessary implementing actions relating the Regional Administrator. to such requirements, all discharges in (b) Any person who applied for a per order to receive a permit must meet the mit under the Refuse Act Permit Pro requirements of sections 301, 302, 306, gram operating under rules promulgated 307, 308, and 403, and all regulation" in the Federal Register on April 7,1971 pertaining thereto. (33 CFR 209.131) and whose application <c> In the period of time prior to the has not been denied need not reapply for t,lvalkaintigngof<tno,,ec-ae>lslsa,,arpy,pi-lmic-palbe.lme,e7rnetqi.nug.irea_m_c_teio.n.n.tss-""aHt_h_oepned.rfimo.scr.ithaaurngdeedr.ethsecAsr.iebc.etr.depgienurlma.t.thiitoenh_asa_ps_upn.sl.iluec.,,bsas- facility. (f) Except as provided below, a fee of $100 will be charged in connection with each application for a permit which in volves no more than one outlet from which a discharge will flow. If there is more than one outlet from which the discharge will flow, an additional $50 will be charged for each additional out let. Agencies or instrumentalities of Fed eral. State, or local governments will not be required to pay any fee in connec tion with the filing of an application for a permit. (g) Minor discharges are those whose discharge on every day of the year is less than 50,000 gallons unless their en vironmental impact, as determined by the Regional Administrator, is not insig nificant. If there is more than one dis charge from a facility and the total ag gregate discharge from all discharges exceed 50,000 gallons on any day of the year then no discharge will be considered minor. Minor discharges will pay a fee of $10 per application. Where an applica tion is filed for a permit for a minor dis charge and where after review of the application the Regional Administrator believes that due to the particular char acteristics of this discharge, it should not be considered to be a minor dis charge. the applicant shall be advised of this determination and within a reason able period of time, of not less than 30 days, shall be required to complete the normal application forms and provide the normal fees specified in these regulations. (h) The fee structure set forth above will be reviewed from time to time as experience with the program is devel oped, and such fees may be revised. Fees collected shall be used to help defray stantially changed in nature, volume, or the cost of administering the program. ' See Congressional Record lor Oct. 10.1972; page E84S4. Extension of Remarks; Congress man Robert E. Jones of Alabama, Cbalrman of the Conference Committee "(The Confer ence Committee) would not expect the Ad ministrator to require permits to be ob tained for any discharges from properly func tioning marine engines." frequency. Such Refuse Act permit application shall be considered to be an application under the NPDES and shall be treated accordingly. (c) Any person now discharging whose discharge was not covered by the Refuse Act Permit Program but which is now Checks should be made out to the order of "Environmental Protection Agency." (i) Permittees who wish to continue to discharge subsequent to the expiration date of their permit must apply for reissuance of the permit using proper m t FEDERAL REGISTER, VOL 38, NO. 7--THURSDAY, JANUARY U, 1973 CAPCO JEN 0005264. PROPOSED RULE MAKING 1365 forms, not less than 180 days prior to the permit expiration date. 125.13 Access lo facilities and further information during evaluation of the application. Permit application forms are designed to flt the normal situation for most fa cilities in the United States. Therefore, In many cases, further information In cluding site visits may be necessary in order to evaluate the discharge com pletely and accurately. When the Re gional Administrator determines that either further information or a site visit is necessary In order for the Environ mental Protection Agency to evaluate the discharge, he shall so notify the appli cant and In addition provide a date no later than 60 days hence by which time the requested information will be re ceived and/or the site visit will be ac complished. In the event that a satis factory response is not received the per mit application may be Issued or denied and the applicant so notified. Sections 308. 309, and 402(k> of the Act, also pro vide for sanctions in the event of noncompliance with reasonable requests for additional information. granting of a permit, such pcrmit will be denied and the applicant shall be so notified. Where the District Engineer ad vises the Regional Administrator that the Imposition of specified conditions upon the permit Is necessary to avoid any substantial Impairment of any of the navigable waters, then the Regional Ad ministrator shall Impose upon the permit those conditions so specified by the Dis trict Engineer. Where the District Engi neer notifies the Regional Administrator that more time is needed for his evalua tion, more time will be granted where It appears that the public interest warrants such extension. (c) Upon receipt of an application which does not Include a State certifica tion where such certification is required by section 401 of the Act, the Regional Administrator will make available one copy of the application form to the State water pollution control agency for the State in which the discharge will occur. Accompanying the application will be a statement by the Regional Administra tor that a request for a permit has been received by the Environmental Protec tion Agency, and that before such permit can issue, the State must certify that the discharge will comply with the applicable appropriate, from the interstate water pollution control agency having juris diction over the navigable waters at the point where the discharge originates or will originate, that any such discharge will comply with the applicable provi sions of sections 301, 302, 306, and 307 of this Act. In the case of any such ac tivity for which there is hot an applicable effluent limitation or other limitation un der sections 301(b) and 302, and there Is not an applicable standard under sec tions 306 and 307, the State shall so certify." Where certification Is required, no license or permit shall be granted un til the certification has been obtained or has been waived. A waiver occurs when the certifying agency fails or refuses to act.on a request for certification, within a reasonable period of time (which shall not exceed 1 year) after receipt of such request. Three months shall generally be considered to be a reasonable period of time. If. however, special circumstances Identified by the Regional Administrator require that action on a permit applica tion be taken within a more limited pe riod of time, the Regional Administrator shall determine a reasonable lesser pe riod of time, advise the certifying agency of the need for action by a particular 125.14 Distribution of application :tnd provisions of sections 301, 302, 306, and date and that, if certification Is not re permit. 307 or that there are no applicable efflu ceived by the date established, it will be Ca) When an application for a permit is received Regional Administrators shall determine if the applicant has provided all of the information required by the application form and by this section. (b) In order to assure that the Secre tary of the Army acting through the Chief of Engineers has adequate time to evaluate the impact of the proposed dis charge on anchorage and navigation. Regional Administrators will forward to the District Engineer in the appropriate District one copy of the application form immediately upon Its receipt in the Re gional Office in completed form. Accom panying the application will be notice that the Environmental Protection Agency has received a request for a per mit to discharge and that the District Engineer has a stated number of days to evaluate the impact of granting, such permit upon anchorage and navigation and to advise the Regional Administrator of his evaluation. District Engineere.of the Corps of Engineers will normally be given 30 days to evaluate the Impact on anchorage and navigation. Where the Regional Administrator finds that less time should be allowed he should so ad vise the District Engineer of such lesser period of time while at the same time outlining his reasons for such lesser pe riod of time. In all cases the Regional Administrator should advise the District Engineer that failure to answer within the allotted period of time will be deemed to be a finding that anchorage and navi gation will not be substantially impaired by granting of this permit. Where the District Engineer advises the Regional ent or other limitations under sections 301 and 302 and there are no applicable standards under sections 306 and 307, or deny such certification or waive its right to certify or deny. The Regional Admin istrator must also state that such certi fication or denial must be received within a reasonable period of time or a waiver will be deemed to have occurred. (d) If a permit issues, a copy of the permit and, if not previously transmitted, a copy of the application forms, shall be transmitted to the State in which the dis charge is located. Copies of these docu ments shall be available for observation and reproduction by the public in the Regional Office. (e) Regional Administrators shall as sist applicants for permits in coordinat ing the requirements of the Act, with those of appropriate public health agencies. (f) Whenever the provisions of the Fish and Wildlife Coordination Act, 16 U.S.C. 662, apply, Regional Administra tors shall consult with appropriate offi cials of the U.S. Department of the In terior and the UJ5. Department of Com merce, and with the head of the agency exercising administration over the wild life resources of the State in which the discharge will occur. 125.15 State certification. (a) Section 401(a) (1) of the Act, pro vides thnfaUAny applicant for a Federal license or permit to conduct any activity including, but not limited to, the con struction or operation of facilities, which may result in any discharge into the navigable waters, shall provide the li considered that the requirement for certification has been waived. Similarly, If it appears that circumstances may reasonably require a period of time longer than 3 months, the Regional Ad ministrator may afford the certifying agency up to 1 year to provide the re quired certification before determining that a waiver has occurred. Where such extension of time is made at the request of the certifying agency, the request must be in writing and must Include the rea sons for the request. The Regional Ad ministrator shall check with the certify ing agency at the end of the allotted pe riod of time before determining that a waiver has occurred. (b) Any certification provided shall set forth any effluent limitations and other limitations, and monitoring requirements necessary to insure compliance with any applicable effluent limitations and other limitations, under section 301 or 302 of the Act, standard of performance under section 306 of the Act, or prohibition, ef fluent standard, or pretreatment stand ard under section 307 of the Act, and with any other appropriate requirement of of Slate law set forth in such certifi cation. (c) Discharges from agencies or instru mentalities of the Federal Government, as provided In section 401(a) (6) of the Act, do not require certification pursuant to section 401. Regional Administrators will, however, make available one copy of any application from any Federal point source to the State in which the dis charge is located and will request that the State, within a reasonable time, comment upon compliance of the discharge with Administrator that anchorage and navi censing or permitting agency a certifica the provisions of seotlons 301, 302, 306, gation of any of the navigable waters tion from the State in which the dis and 307 and any other applicable State would be substantially impaired by the charge originates or will originate, or, if and local water quality requirements. FEDERAL REGISTER, VOt. 3, NO. 7--THURSDAY, JANUARY 11, 1973 CAPCO JEN 0005265 1366 PROPOSED RULE MAKING Subpart C--Terms and Conditions of (2) That the permit may be modified, (b> Permits shall also include such Permits suspended, or revoked in whole or in part special conditions as the Regional Ad during its term for cause including, but ministrator considers necessary or appro 125.21 Prohibitions. not limited to, the following: priate to specify and to assure compfi. (a) No permit shall issue In cases where the applicant, pursuant to section 401 of the Act, la required to obtain a State or other appropriate certification that the discharge will comply with the applicable provisions of sections 301, 302, 308, and 307 and such certification was denied (section 401(a)). (b) No permit shall Issue where pur (i) Violation of any terms or condi tions of the permit; (II) Obtaining a permit by misrepre sentation or failww-to disclose fully all relevant facts; and, (III) A change In conditions or the ex istence of a condition which requires either a temporary or permanent reduc tion or elimination of the authorized ance with applicable effluent limitation or other water quality requirements in. al eluding schedules of compliance, treat ment standards and such other condi tions as the Regional Administrator con siders necessary or appropriate to carry out the provisions of the Act. Permits shall also contain such other conditions as the District Engineer of the Corps of suant to section 401(a) (2) of the Act, the Imposition of conditions cannot in sure compliance with the applicable wa ter quality requirements of all involved States. (c) No permit shall Issue if, in the Judgment of the Secretary of the Army acting through the Chief of Engineers, anchorage and navigation of any of the navigable waters would be substantially impaired by the discharge (section 402 (b)(8)). (d) No permit shall Issue for the dis charge of any radiological, chemical, or biological warfare agent or high-level radioactive waste into the navigable wa ters (section 301(f)). (e) No permit shall Issue for any dis charge from a point source In conflict with a plan approved pursuant to section 208(b) of the Act (section 208(e)). (f) No permit shall Issue for any dis charge to the territorial sea, the waters of the contiguous zone, or the oceans prior to the promulgation of guidelines under section 403(c) of the Act unless the Regional Administrator determines It to be in the public interest (section 403(a)). (g) No permit shall issue for any dis charge to the territorial sea, the waters of the contiguous zone, or the oceans after promulgation of guidelines under section 403(c) except in compliance with such guidelines (section 403(a)). (h) No permit shall Issue tor any dis charge to the territorial sea, the waters of the contiguous zone, or the oceans, subsequent to the promulgation of guide lines pursuant to section.403(c) of the Act, where insufficient Information exists to make a reasonable judgment as to whether the discharge compiles with any such guidelines (section 403(c) (2)). discharge; Engineers considers to be ncessary to in (3) That the permittee shall permit sure that navigation and anchorage will the Regional Administrator or his au . not be substantially impaired. Also, con thorized representative, and/or the au ditions recommended by State water pol thorized representative of the State lution control officials or other govern water pollution control agency In the mental officials may be added to permits case of non-Federal facilities, upon the if the Regional Administrator believes presentation of his credentials: such recommended conditions will aid in (I) To enter upon permittee's premises carrying out the purposes of the Act. in which an effluent source Is located or Furthermore, all permits will be condi in which any records are required to be tioned upon achieving compliance with kept under terms and conditions of the any applicable effluent limitations and permit; other limitations, and monitoring re (II) To have access to and copy any quirements set forth on any certification records required to be kept under terms pursuant to section 401 of the Act. and conditions of the permit; (iii) To Inspect any monitoring equip ment or method required in the permit; 125.23 Schedules of compliance in permits. or, Regional Administrators shall follow (iv) To sample any discharge of the procedures below in setting sched pollutants. ules of compliance in permits: (4) That the permit may not be trans (a) With respect to any discharge ferred to a third party without the prior which is not in compliance with applica written approval of the Regional Ad ble effluent standards and limitations, ministrator. Such prior written approval applicable water quality standards, and will be granted by the Regional Admin other applicable requirements, the per istrator where the transferee acquires a mittee shall be required to take specific property interest In the point source and steps to achieve compliance with the fol agrees in writing to fully comply with all lowing: the terms and conditions of the permit (1) Any schedule of compliance con and the Act. Where the discharge is not tained in (i) applicable effluent stand in compliance with the terms and con ards and limitations; or, (ii) water qual ditions of the permit or the Act at the ity standards, if more stringent; or (iii) time of the transfer, the transferee must any other applicable requirements, if agree in writing to bring the discharge more stringent; or into compliance with the terms and con (2) In the absence of any applicable ditions of the permit and the Act, with schedule of compliance in the shortest, in the shortest reasonable period of time reasonable period of time, such period as determined by the Regional Ad not to be extended beyond July 1,1977. ministrator. (b) in any case where the period of (5) That the permittee shall at all time for compliance specified in para times maintain in good working order graph (a) of this section exceeds 9 and operate at maximum efficiency any months one or more interim dates shall facilities or systems of control installed be specified for which the permittee shall by the permittee to achieve compliance achieve interim requirements; in no 125.22 Conditions of permits. with the terms and conditions of the event shall more than 9 months elapse (a) Regional Administrators shall in permit. between interim dates. Interim dates and sure that the terms and conditions of all (6) The issuance of a permit does not the final date for compliance shall fall on issued permits provide for and insure the convey any property rights either in real the last day of February, April, June, following: estate or material, or any exclusive priv August, October, and December. (1) That all discharges authorized by ileges, nor does it authorize any injury (c) Not later than fourteen (14) days the permit shall be consistent with the to private property or invasion of rights, following each interim date and the final terms and conditions of the permit; that nor any infringement of Federal, State, date of compliance the permittee shall facility expansions, production increases, or local laws or regulations; nor does it provide the Regional Administrator with or process modifications which result in obviate the necessity of obtaining State written notice of the permittee's compli new or increased discharges of pollutant*--01' local assent required by law for the ance or noncompliance with the interim must be reported by submitting a new discharge authorized. or final requirements, application; that the discharge of any pollutant not identified and authorized (7) That each permittee shall within 30 days from the day the permit was is g 125.24 Effluent limitations in permits. by the permit or the discharge of any sued agree in writing to comply with all In the application of effluent standards pollutant more frequently than or at a the terms and conditions of the permit and limitations, water quality standards, level in excess of that identified and au gnd the Act. Such agreement of the and other applicable requirements, the thorized by the permit shall constitute permittee may be subject to the reserva Regional Administrator shall for each a violation of the terms and conditions tion of all of the permittee's rights permit, specify average and maximum j of the permit; under section 509 of the Act. daily quantitative limitations for the i FEDERAL REGISTER, VOL 38, NO. 7--THURSDAY, JANUARY 11, 1973 CAPCO JEN 0005266 PROPOSED RULE MAKING 1367 level of pollutants In the authorized dis full compliance with section 307 require charge of terms of weight or other ap ments. propriate expression. Where a schedule of 125.27 Monitoring, recording and re- compliance Is Included as a condition In a permit, effluent limitations shall be In cluded for the Interim period as well as for the period following the final com pliance date. porting. (a) Any permit shall be subject to such monitoring requirements as may be reasonably required by the Regional Ad ministrator, including the installation, 125.2S Duration of permit. use, and maintenance of ^Monitoring (a) No permit will issue for a period longer than 5 years. (b) Permits of less than 5 years dura tion may Issue In appropriate cases and Regional Administrators shall give great weight to the advice of State or Interstate water pollution control officials on the appropriate duration for particular permits. <c) All permits will be for a fixed term. 125.26 Special categories of permits. equipment or methods (Including, where appropriate, biological monitoring meth ods). (b) Any discharge which (1) Averages more than 50,000 gal lons per operating day, (2) The Regional Administrator re quires to be monitored, or (3) Contains toxic pollutants for which an effluent standard has been established by the Administrator pursuant to section 307(a) of the Act, shall be monitored by (a) Disposal ol pollutants into wells. the permittee for at least the following: If an applicant for a permit proposes to (I) Flow (in gallons per day); and dispose of pollutants Into wells as part (II) All of the following pollutants; of a program to meet the proposed terms (A) Pollutants (measured either di and conditions of a permit, the Regional rectly or indirectly through the use of Administrator shall specify additional accepted correlation coefficients or terms and conditions in the permit which equivalent measurements) which are shall (1) prohibit the proposed disposal, subject to reduction or elimination un or (2) control the proposed disposal In der the terms and conditions of the per order to prevent pollution of ground and mit; surface waters and to protect the public (B) Pollutants which the Regional Ad strumentatlon and calibration and maintenance records. This period of re tention shall be extended during the course of any unresolved litigation re garding the discharge of pollutants by the permittee or when requested by the Regional Administrator. (e) The Regional Administrator shall require periodic reporting (at a fre quency of not less than once per year) on the proper NPDES reporting form of monitoring results obtained by a permit tee pursuant to monitoring requirements in a permit. Such reporting periods, whose length shall be determined by the Regional Administrator, shall end on the last day of February, April, June, August, October, and/or December. Subpart D--Notice and Public Participation 123.31 Formulation of tentative deter minations. The Regional staff shall formulate and prepare tentative determinations with respect to a permit in advance of public notice of the proposed issuance or denial of the permit. Such tentative determina tions shall include at least the following: (a) A proposed determination to issue or to deny a permit for the discharge de scribed in the application; and, health and welfare. ministrator finds, on the basis of Infor (b) If the determination proposed in (b) Discharges from publicly owned mation available to him, could have a paragraph (a) of this section is to issue treatment works. <11 If the permit is for significant Impact on the quality of the permit, the following additional ten a discharge from a publicly owned treat ment works, the Regional Administrator shall require the permittee to provide notice to the Regional Administrator of the following: (1) Any new Introduction of pollutants Into such treatment works from a source which would be a new source as defined in section 306 of the Act If such source were discharging pollutants; (11) Any new Introduction of pollutants which exceeds 10,000 gallons on any one day into such treatment works from a source which would be subject to section 301 of the Act if such source were dis charging pollutants; and (ill) Any substantial change In volume or character of pollutants being Intro duced into such treatment works by a source Introducing pollutants into such works at the time of issuance of the permit. (2) Such notice shall include Informa tion on-- (I) The quality and quantity of effluent to be Introduced into such treatment works, and (II) Any anticipated Impact of such change In the quantity or quality of ef fluent to be discharged from such pub licly owned treatment works. (3) The permittee shall require any Industrial user of such treatment works to comply with the requirements of sec tions 204(b), 307, and 308 of the Act. Any Industrial user subject to the re quirements of section 307 of the Act shall be required by the permittee to prepare navigable waters: (C) Pollutants specified by the Admin istrator, in regulations Issued pursuant to the Act, as subject to monitoring; (c) Each effluent flow or pollutant re quired to be monitored pursuant to Pararaph (b) of this section shall be moni tored at Intervals sufficiently frequent to yield data which reasonably charac terizes the nature of the discharge of the monitored effluent flow or pollutant. Vari able effluent flows and pollutant levels shall be monitored at more frequent In tervals than relatively constant effluent flow and pollutant levels which may be monitored at less frequent intervals. (d) The Regional Administrator shall specify recording requirements for any permit which requires monitoring of the authorized discharge consistent with the following: (1) The permittee shall maintain records of all information resulting from any monitoring activities required of him in his permit; (2) Any records of monitoring activi ties and results shall include for all samples; (i> The date, exact place, and time of sampling; (11) The dates analyses were per formed; (ill) Who performed the analyses; (iv) The analytical techniques/meth ods used; and. (v) ThgTesults of such analyses; (3) The permittee shall be required to retain for a minimum of 3 years any tative determinations; (1) Proposed effluent limitations for those pollutants proposed to be limited; (2) A proposed schedule of compliance, as explained In 1 125.23, Including Interim dates and requirements, for meeting the proposed effluent limitations; and, (3) A brief description of any other proposed special conditions (other than those required by { 125.22) which' will have a significant impact upon the dis charge described in the application. 125.32 Public notice. (a) Public notice of every complete ap plication for a permit shall be circulated in a manner designed to inform inter ested and potentially Interested persons of the discharge and of the proposed de termination to Issue or to deny a permit for the discharge. Public notice of public hearings shall be circulated in a manner designed to inform interested and poten tially interested persons of the discharge and of the intention to hold a public hearing on the matter of a permit being Issued for the discharge. Procedures for the circulation of public notice shall In clude at least the following: (1) Notice shall be circulated within the geographical area of the proposed discharge; such circulation shall include any one of the following: (I) Posting in the post office and pub lic places of the municipality nearest the premises of the applicant In which the effluent source is located; and transmit to the Regional Adminis records of monitoring activities and re (II) Posting near the entrance to the trator periodic notice (over intervals not sults including all original strip chart applicant's premises and in nearby to exceed 9 months) of progress toward recordings for continuous monitoring In- places; and, FEDERAL REGISTER, VOL 3S, NO. 7--THURSDAY, JANUARY 11, 1973 CAPCO JEN 0005267 1368 PROPOSED RULE MAKING (ill) Publishing In local newspapers and periodicals, or, 11 the local newspa per Is not a dally newspaper. In a dally newspaper of general circulation; (2) Notice shall be mailed to any per son or group upon request; and (3) The Regional Administrator shall add the name of any person or group upon request to a mailing list to receive copies of notices for all applications within the State or within a certain geo graphical area. (4) Regional Administrators shall no required by section 401 of the Act wish to enter into agreements for joint public notice concerning proposed discharges, the Regional Administrator may, after consulting with Headquarters, approve mutually satisfactory agreements and such agreements, once published In the Federal RECisTER^ehall supersede this S 125.32. (e) Any public notice Issued under this section may describe more than one dis charge except that each discharge will be described separately. tify other appropriate government agen cies of each complete application for a permit and of public hearings and shall provide such agencies an opportunity to submit their written views and recom mendations on each complete applica tion. <b) (1) Where notice is being given of an application for a permit, the Re gional Administrator shall provide a pe riod of not less than thirty (30) days fol lowing the date of the public notice dur ing which time interested persons may submit their written views concerning the tentative determinations or request that a public hearing be held. All written comments submitted during the 30-day comment period shall be retained by the Regional Administrator and considered in the formulation of his final determi nations with respect to the application. (2) Where notice Is being given of a public hearing, the Regional Adminis trator shall provide a period of not less than 30 days following the date of the public notice during which time inter ested persons may prepare themselves for the hearing. (c) The contents of public notice shall Include'at least the following: (1) Name, address, phone number of Regional Office issuing the public no tice; (2) Name and address of each appli cant; (3) Brief description of each appli cant's activities or operations which re sult in the discharge described in the application (e.g., municipal waste treat ment plant, steel manufacturing, drain age from mining activities); (4) Name of waterway to which each discharge is made and a short descrip tion of the location of each discharge on the waterway; -- (5) A statement of the Regional staff's tentative determination to issue or deny a permit for the discharge described in the application; (6) A brief description of the proce 125.33 Fact sheets. Prior to issuance of public notice the Regional Administrator shall prepare and, following public notice, shall send, upon request to any person a fact sheet with respect to the application described In the public notice. The contents of such fact sheets shall include at least the fol lowing information: (a) A sketch or detailed description of the location of the discharge described in the application; (b) A quantitative description of the discharge described in the application which Includes at least the following: (1) The rate or frequency of the pro posed discharge; if the discharge is con tinuous, the average dally flow in gallons per day or million gallons per day; (2) The average summer and winter temperatures of the discharge in degrees Fahrenheit; and,- (3) The average daily discharge in pounds per day of any pollutants which are present in significant quantities or which are subject to limitations or pro hibition under sections 301, 302, 308, or 307 of the Act and regulations published thereunder; (c) The tentative determinations re quired under S 125.31; (d) A brief citation. Including a brief Identification of the uses for which the receiving waters have been classified, of the water quality standards and effluent standards and limitations applied to the proposed discharge; and, (e) A more detailed description of the procedures for the formulation of final determinations than that given in the public notice including: (1) The term of the 30-day comment period required by { 125.32 and the ad dress where comments will be received; (2) Procedures for requesting a public hearing and the nature thereof; and (3) Any other procedures by which the public may participate in theformulation of the final determinations. dures for the formulation of final deter 125.34 Hearings and appeals. minations, including the 30-day com ment period required by paragraph (b) (a) Definitions. (1) "Party" means of this section and any other means by any affected person who files a request which interested persons may influence -f-o--r--a---h--e--a--r-i-n--g---m---e-e--t-ing- the requirements or comment upon those determination**--of paragraph _ (b) ^ofjthis section and and whose request is not denied. (7) Address and phone number of (2) "Affected person" means the En premises at which interested persons vironmental Protection Agency; the may obtain further information, request water pollution control agency of any a copy of the fact sheet described In State or States in which the discharge 125.33, and inspect and copy all ap or proposed discharge shall originate, or plication forms and related documents. which may be affected by such discharge; (d) If individual States in connec the applicant; and any foreign country, tion with applications for certification or other interested person or persons. (b) Initiation of hearing*. Any af fected person may within 30 days of the first day of public notice of an applica tion for a permit pursuant to 9 125.32 re-' quest the Regional Administrator to hold a public hearing to consider the Issuance of a permit under this part. Upon receipt of any such request, stating with particu larity any objections to the issuance of the proposed permit, and the issues of fact, law, or policy which are proposed to be considered at the hearing, the Re gional Administrator shall fix a time and place for the public hearing. After the filing of the initial request, any other affected person may file a request under this subsection. Regional Administrators shall deny any requests not meeting the requirements of this subsection. Such denial shall be accompanied by a brief written statement setting forth the rea sons for his denial. (c) Location of hearings. All proceed ings conducted pursuant to this section shall be held in the State of the dis charge or.other appropriate area. (d) Notice of hearing. Public notice of the public hearing shall be given as pro vided for by {125.32. <e) Presidlnp Officer. After granting a public hearing in accordance with par agraph (b) of this section the Regional Administrator shall appoint a qualified person to serve as Presiding Officer for such hearing. No official who participated in the development of proposed condi tions for the permit to be considered at such hearing may serve as Presiding Officer. (f) Hearing file. Upon his appointment pursuant to paragraph Ce) of this sec tion, the Presiding Officer shall estab lish a hearing file. The hearing file shall include the permit application and sup porting data, the staff recommendation for proposed permit conditions, the re quest or requests for the hearing, any data or material submitted in justifica tion thereof, and'such other material as the Presiding Officer deems relevant to the hearings. The hearing file shall be available for Inspection by any person subject to the requirements of S 125.35. (g) Representation. At the hearing, any party may appear on his own behalf, or may be represented by counsel or by any other authorized representative. <h) Prehearing conferences. (1) In the discretion of the Presiding Officer, prehearing conferences may be held prior to any hearing or hearing on appeal held pursuant to this section. All parties will be given reasonable notice of not less than 10 days of the time and location of the conference. In the discretion of the Presiding Officer, persons other than parties may be included in attendance. At the conference, the Presiding Officer may: (i) Obtain stipulations and admis sions, and Identify disputed issues of fact and law. (11) Mark and admit exhibits. (ill) Set a hearing schedule which in cludes definite or tentative times for as many of the following as are deemed necessary by the Presiding Officer: (A) Oral and written statements. J i t ] ! FEDERAL REGISTER, VOL 38, NO. 7--THURSDAY, JANUARY 11, 1*73 CAPCO JEN 0005268 PROPOSED RULE MAKING 1369 (B) Submission of written direct testi mony as required by the Presiding Officer. ' -(C) Oral direct and cross-examination. If any Is permitted. (D) Oral argument, if any Is permitted. (E) Submission of proposed findings of fact. . .,, (2) The results of any conference snau be reduced to writing by the Presiding Officer and made part of the hearing file. <11 Conduct of hearings. (1) Hearings shall be conducted by the Presiding Offi cer In an orderly but expeditious man ner. Any party shall be permitted to sub mit oral or written statements concern ing the proposed permit, and to present views and recommendations thereon. In the discretion of the Presiding Officer, other persons may be allowed to present oral statements for the hearing record. All persons will be allowed to present written statements for the hearing rec ord. (2) The Presiding Officer shall have discretion to establish reasonable limits upon the time allowed for statements of witnesses, and for arguments of par ties, or their counsel or representatives. (3) In view of the need for an expe ditious hearing, and the cross-examina tion provided In paragraph (1) (5) of this section, no cross-examination shall be permitted In hearings held pursuant to paragraph (b) of this section, except as provided in paragraph (1) (6) of this section, (4) Hearings shall be reported verba tim. Copies of transcripts of proceedings may be purchased by any person from the Environmental Protection Agency. (5) All written statements, charts, tabulations, and similar data offered in evidence at the hearing shall, upon a showing satisfactory to the Presiding Officer of their relevancy and materiality, be received in evidence and shall consti tute a part of the hearing file. (6) In the discretion of the Presiding Officer exercised before the hearing be gins, the hearing may be held In con formity with the requirements of para graphs (1), (m), (n) `of this section. If the hearing is held In conformity with such requirements, no request for a hear ing on appeal may be filed under para graphs (k> and (n) of this section and any issues specified In the requests for hearings shall be considered. . (j) Initial decision. On the basis of the hearing file and the evidence adduced at the hearing, the Presiding Officer shall determine whether the proposed permit conditions meet the requirements of the Act. If he determines that the proposed conditions do not meet such require ments, he shall set forth such conditions as he determines are necessary to com ply with the requirements of the Act, or shall determine that the permit should be denied. The decision of the Presid ing Officer shall be provided to all par ties and be available to the public within 20 days of the completion of the hearing. Such initial decision shall constitute the final decision of the Regional Admlnls- trator with regard to the application for a permit unless within 10 days of the date of the Presiding Official's decision, any party flies with the Regional Ad ministrator a request for a hearing on appeal or for findings and opinion. If no such request is filed, .the Regional Ad ministrator shall Issue the permit promptly with conditions established by the Presiding Officer or shffrtaeny the permit according to the decision of the Presiding Officer. <k) Availability of hearing on appeal. (1) Any party requesting a hearing on appeal shall submit his request in writ ing to the Administrator through the Regional Administrator. Any such re quest shall set forth in detail the basis of the request, and shall identify any ex pert witnesses which are requested to testify, and any Issues of fact concern ing the proposed discharge with respect to which cross-examination of further testimony of witnesses, or further evi dence or argument in rebuttal Is neces sary. The Administrator shall grant the request for a hearing on appeal if he determines: (1) That the request presents material Issues of fact relating to the issuance of the proposed permit: and (li) That such issues require crossexamination or further evidence, testi mony, or argument. (2) Upon granting a request for a hearing on appeal the Administrator shall specify in writing those issues which meet the requirements of para graphs (k) (1) <i) and (11) of this section. (1) Conduct of hearing on appeal. (1) The Administrator shall designate an of ficial of the Environmental Protection Agency to serve as Presiding Officer for the hearing on appeal. No official who participated in the initial hearing and decision under this section, or who par ticipated in the development of proposed conditions for the permit considered at such hearing, may serve as Presiding Officer on appeal. (2) The Presiding Officer shall con duct the hearing on appeal in an orderly but expeditious manner. The parties may offer oral or written testimony, subject to the exclusion by the Presiding Officer of irrelevant, immaterial, and repetitious evidence. (3) The hearing on appeal shall be confined to those issues specified by the Administrator pursuant to paragraph (k) (2) of this section. (4) Witnesses shall be required to make oath or affirmation. <5) Witnesses may. In the discretion of the Presiding Officer, be examined or cross-examined by the Presiding Officer, the parties, or their representatives. Among the factors to be considered by the Presiding Officer In determining whether <jrjot to allow cross-examina tion are: <i) Whether witness credibility, verac ity, and demeanor are relevant to a fair resolution of factual Issues; and (11) Whether, without cross-examina tion, parties would otherwise have an adequate opportunity to rebut opposing evidence. To insure fair and expeditious con sideration of all material issues, the Presiding Officer shall have discretion to limit the time allowed for examination and cross-examination. The Presiding Officer may exclude any testimony not relevant to the Issues specified by the Administrator pursuant to paragraph (k> (2) of this section. (6) Hearings on appeal shall be re ported verbatim. Copies of transcripts of proceedings may be purchased by any person from the Environmental Protec tion Agency. (7) All. written statement-, charts, tabulations, and similar data offered in evidence at the hearing shall, upon a shotring satisfactory to the Presiding Offiqer of their relevancy, and material ity, be received in evidence and shall constitute a part of the hearing file. (8) Parties shall have the right to present for the record oral argument, and argument or evidence in rebuttal, within reasonable time limits set by the Presid ing Officer. (9) The decision of the Presiding Offi cer in a hearing on appeal shall be issued according to the provisions of paragraph (J> of this section. (m) Official notice. In any hearing or hearing on appeal under this section, the Presiding Officer may take official notice of any general, technical or scien tific fact or material within the special ized knowledge of the Environmental Protection Agency. All parties shall be notified of any fact or material so noticed, and shall be afforded an oppor tunity to contest such facts or material. (n) Findings of fact and opinion. At any time prior to 10 days following the issuance of the decision of the Presiding Officer in a hearing or hearing on ap peal held pursuant to this subpart, any party may request the Presiding Officer to issue findings of fact and an opinion with regard to issues raised at the hear ing or hearing on appeal. The party shall specify the issues on which findings and an opinion are requested. In the discre tion of the Presiding Officer, parties may be required to submit proposed findings of fact within a period of not more than 20 days. The Presiding Officer shall Issue his findings of fact and opinion no later than 20 days following the receipt of a request for such findings and opinion un less he requires the submission of pro posed findings of fact. Where the sub mission of proposed findings of fact are required the Presiding Officer shall issue his findings of fact and opinion no later than 20 days following the end of the period he specified for receipt of such proposed findings. The findings of fact and opinion shall become part of the record, and shall be made available to all parties participating in the hearing or hearing on appeal. In the case of a hear ing under paragraph (b) of this section, any party may submit a request for a hearing on appeal within 10 days follow ing the issuance of the findings and opinion. No. 7--Pt. Ill-----2 FEDERAL REGISTER, VOL. 38. NO. 7--THURSDAY, JANUARY 11, 1973 CAPCO JEN 0005269 1370 PROPOSED RULE MAKING 125.35 Public icei to information. (c) Notwithstanding paragraphs (a) (b) Each affected State ohail be af (a) Certifications pursuant to section and (b) of this section, the Adminis trator, when the national security re forded an opportunity to submit written recommendations to the Regional Ad | 401 of the Act, the comments of all gov ernmental agencies on a permit applica tion, and all information and data pro vided by an applicant or a permittee identifying the nature and frequency of a discharge shall be available to the pub lic without restriction. All other informa tion (other than effluent data) which may be submitted by an applicant in connection with a permit application or which may be furnished by a permittee In connection with required periodic re ports shall also be available to the public unless the applicant or permittee specifi cally identifies and is able to demonstrate quires, may withhold any information from the public. Subpart E--Miscellaneous 125.41 Objections to permit by an other Stater (a) Whenever following receipt of the certification described In S 125.14 the Regional Administrator determines that a discharge may affect the quality of the waters of any State other than the State that made the certification, the Regional Administrator shall, within 30 days of such certification, notify such other ministrator which the Regional Admin ' ! istrator may Incorporate Into the permit ' if issued. Should the Regional Admlnlstrator fall to incorporate any written recommendations thus received, he shall provide to the affected State or States a written explanation of his reasons for failing to accept any of the written recommendations. (c) Where an Interstate agency has authority over waters that may be af fected by the Issuance of a permit, it shall be afforded to rights of a State pursuant to paragraphs (a) and (b) of this section. to the satisfaction of the Regional Ad State and the applicant of his determina 125.42 Other legal action. ministrator or his authorized representa tive that the disclosure of such informa tion or a particular part thereof to the general public would divulge methods or processes entitled to protection as trade secrets. (b) Where the applicant or permittee is able to demonstrate to the satisfaction of the Regional Administrator or his authorized representative that the dis closure of the information or a particular part (other than effluent data) thereof tion and shall transmit to such other State a copy of the fact sheet described in {125.22 and upon request a copy of the application. If such other State de termines that the discharge will affect the quality of its waters so as to violate any water quality requirement in such State such other State shall have a period of 60 days beginning with the date notice from the Regional Administrator was re ceived within which to notify the Re gional Administrator in writing of its Except as provided in section 402(k) of the Act, the mere filing of an application for a permit to discharge into waters cov ered by the NPDES will not preclude legal action in appropriate cases for violation of the Federal Water Pollution Control Act. The institution of either a civil or criminal action by the United States may not preclude the acceptance or continued processing of a permit application. would result in methods or processes en titled to protection as trade secrets being divulged, the Regional Administrator shall treat the information or the par ticular part (other than effluent data) as confidential and not release it to any unauthorized person. Such information may be divulged to other officers, em objection to the issuance of a permit and to request a public hearing on the objec tion. Upon receipt of such request, the Regional Administrator shall hold a hearing in conformity with i 125.34 herein. Based upon the record, the Re gional Administrator shall issue a per mit: Provided, That if the imposition of conditions cannot assure compliance with 125.43 Environmental impact statements* Section 511(c)(1) of the Act provides that with the exception of permits for new sources as defined in section 306, no action of the Administrator taken pur suant to the Act shall be deemed a major Federal action significantly affecting the quality of the human environment within ployees, or authorized representatives of the applicable water quality requirements the meaning of the National Environ the United States concerned with carry of all of the Involved States, the Regional mental Policy Act of 1969. ing out the Act. Administrator shall deny the permit. [FR Doc.73-569 Filed 1-10-73:8:45 m] i i I I I FEDERAL REGISTER, VOL 31, NO. 7--THURSDAY, JANUARY 11, 1973 CAPCO JEN 0005270 FRIDAY, FEBRUARY 23, 1973 WASHINGTON, D.C. ENVIRONMENTAL PROTECTION AGENCY PUBLIC PARTICIPATION IN WATER POLLUTION CONTROL PROGRAMS Proposed Rule Making st.n- CAPCO JEN 0005271 5038 PROPOSED RULE MAKING ENVIRONMENTAL PROTECTION AGENCY [40 CFR Part 105 ] PUBLIC PARTICIPATION IN WATER POLLUTION CONTROL PROGRAMS Notice of Proposed Rule Making Notice Is hereby given that the regu lations set forth In tentative form below are proposed by the Environmental Pro tection Agency. The proposed regula tions specify minimum guidelines for public participation in certain processes under the Federal Water Pollution Con trol Act, as amended (Public Law 92-500; 86 Stat. 816: 33 U.S.C.-1251). Section 101(e) of the Act requires the Administrator of the Environmental Protection Agency, In cooperation with the States, to develop and publish such regulations: and to provide for, encour age, and assist public participation In the development, revision, and enforce ment of any regulation, standard, efflu ent limitation, plan, or program estab lished by the Administrator or any State under the Act. 105.1 Scope. This part sets forth minimum guide lines for public participation in the proc esses of development, revision and en forcement of any regulation, standard, effluent limitation, plan or program un der the Federal Water Pollution Control Act, as amended (Public Law 92-500; 86 Stat. 816; 33 UjjgLP. 1251), in accord ance with sectionlOl(e) of the Act. This part is applicable to all Environmental Protection Agency (EPA) components concerned with the Federal Water Pollu tion Control Act, Including EPA Head quarters program units and EPA Re gional Offices, and to States and inter state agencies. These guidelines contain general requirements applicable to reg ulations, standards, effluent limitations, plans and programs. More specific re quirements applicable in specific, areas are contained in existing regulations on public information (Part 2 of this chap ter) and in other regulations that have been or will be issued pertaining to vari ous specific programs under the Act, as well as State and local laws pertinent to the subject. The proposed regulations set forth policy and objectives In regard to public participation, describe the provisions re quired in a minimum public participa tion program at State and Federal levels of governmental activity for water pol lution control, call for a report on public participation efforts in relation to certain actions, and give minimum procedural guidelines for public hearings. Other reg ulations in Chapter 40 give more explicit requirements for public hearings and other procedures related to particular programs under the Act. The proposed public participation regulations have been developed with informal participation of and sugges tions from numerous persons, includ ing representatives of several citizen and conservation groups, trade organizations, governments, and other Interests. The States have had an opportunity to com ment on the proposed regulations in draft form. Further participation and views are sought at this time in order to develop meaningful guidelines for fully effective public involvement in efforts to attain the objectives of the Act. 105.2 Policy and objectives. The opportunity for participation of the public is to be provided to the full est extent practicable, consistent with other requirements of the Act, in Federal and State government water pollution control activities. The major objectives of such participation include greater responsiveness of governmental actions to public concerns and priorities, and im proved popular understanding of official programs and actions. Although the primary responsibility for water qual ity decision-making is vested by law in public agencies at the various levels of government, active public involvement in and scrutiny of the intergovernmental decision-making process is essential to accomplish these objectives. Conferring with the public after an agency decision has been made will not meet the require ments of this part. The intent of these regulations is to foster a spirit of open ness and a sense of mutual trust between the public and the State and Federal agencies in efforts to restore and main tain the integrity of the Nation's waters. Prior to the adoption of the proposed regulations, consideration will be given to comments, suggestions; or objections which may be submitted in writing to the Director, Office of Public Affairs, U.s. Environmental Protection Agency, Washington, D.C. 20460, on or before April 24.T973. 105.3 Required program and reports. Each agency cited in 5105.1 carrying out activities under the Act shall provide for and conduct a continuing program for public participation comprising sub stantially the elements listed in S 105.4. Staff responsibility and budgetary provi sions shall be identified for such pro William D. Ruckelshaus, gram in the annual State program sub Administrator. mission under section 106 of the Act. February 16,1973. Public participation activities shall be reported on annually and in relation to PART 105--PUBLIC PARTICIPATION IN t certain documents and actions as called WATER POLLUTION CONTROL for in 5 105.5. See. 105.1 105.3 105.3 105.4 105.6 105.6 105.7 105.8 . Scope. Policy end objectives. Required program and reports. Guidelines for agency programs. Guidelines for reporting. Guidelines for evaluation. Guidelines for public bearings. Coordination and nondupllcatlon. 105.4 Guidelines forAgency programs. The continuing agency program for public participation shall contain mech anisms or activity for each of the elements listed in this section. The exact mechanism and extent of activity may vary in relation to resources available. public response, and the nature of issues ' involved. (a) Informational materials. Each , agency shall provide continuing policy, 't program, and technical information hi forms and at times and places useful to j Interested or affected persons and or ganizations so that they can make in formed and constructive contributions to governmental decisionmaking. News releases, newsletters, and other publica tions may be used for this purpose. Special efforts shall be made to sum marize complex technical materials for public and media use. (b) Assistance to public. Each agency shall have an arrangement for provid ing, Insofar as possible, technical and informational assistance to public groups for citizen education, community work shops, training, and dissemination of relavant information to communities. (c) Consultation. Each agency shall have standing arrangements for early consultation and exchange of views with interested or affected persons and or ganizations on development or revision of plans', programs, or other significant actions. Advisory groups, ad hoc com- mittees, or workshop meetings may serve this purpose. (d) Notification. Each agency, for its appropriate geographic area, shall de velop and maintain a current list of Interested persons and organizations, in cluding any who ask to be on such list, for the periodic distribution of materials in paragraph (a) of this section. Legisiators and other public officials shall be included. Each agency shall additionally comply, in connection with any public hearing or other proposed action, with any formal or specific requirements for | i | ; . , \ . public notice called for in the Act or in other regulations, to be supplemented wherever possible with informal notice to all interested persons or organizations having requested in advance such notice. (e) Access to information. Each agency shall provide, either directly or through others, in an appropriate location, a cen tral public collection or depository of water quality reports and data pertinent to the geographic area.of the agency. Materials available for public reference shall include grant and permit applicatlons, permits, effluent discharge infor mation, compliance schedule reports and materials specified in section 308(b) of the Act. Copying facilities at reasonable cost shall be available. ; ; (f) Enforcement. Each agency shall develop internal procedures for receiving and Insuring proper consideration of in formation and evidence submitted by citizens. Public effort in reporting viola tions shall not be discouraged. (g) Legal proceedings. Each agency shall provide full and open Information on legal proceedings under the Act. to the extent not Inconsistent with court requirements, and where such disclosure would not prejudice the conduct of the litigation. (h) Rule making. In addition to pro- viding an opportunity for public hear ings on proposed regulations, where appropriate or required under applicable statutes and regulations, agencies shall FEDERAL REGISTER, VOL. 38, NO. 36--FRIDAY, FEBRUARY 23, 1973 CAPCO JEN 0005272 PROPOSED RULE MAKING 3039-5080 ordinarily invite, receive, and consider comments in writing from any interested ;r affected persons and organizations. All such comments shall be part of the public record, and a single copy of each comment shall be routinely nvatlable for public inspection. Notices of proposed rule making, as well as final rules and regulations, shall be distributed to in terested or affected persons and organi zations as quickly as possible after publication. (i) Other measures. The listing of spe cific measures in this section shall not preclude additional techniques for ob taining. encouraging, or assisting public participation. public participation on the matter, he shall take measures, or require the spon soring agency to take measures, to ob tain additional public participation, prior to final action. In evaluation of the Sum mary of Public Participation, factors such as, but not limited to, the following shall be considered: (a) Is the extent of publlgjaarticlpa- tion realized in reasonable scale with the significance of the matter? (b) Has a suitable effort been made to seek out and involve the interested pub lic both at the preliminary stage and dur ing development of the matter? (c) Have the measures taken been such as to facilitate rather than inhibit public understanding of and contribu terested or affected persons and organi zations as soon as the hearing is sched uled by the agency and at least 30 days before the hearing or meeting is to take place. (e) Location and time. In determining the locations and times for hearings, con sideration shall be given to easing travel hardship and to facilitating attendance and testimony by a cross-section of inter ested or affected persons and organiza tions. Accessibility of hearing sites by public transportation shall be considered. (f) Documents. Reports, documents and data to be discussed at the public hearing shall be available to the public at the hearing location, for a reasonable time prior to the hearing. For complex 105.5 Guidelines for reporting. The annual report of each EPA unit or office, and the annual State program sub mission under section 106 of the Act as required under Part 35 of this chapter, shall include a general description of public participation provisions and ac tivities. In addition, and in order that the pubic and reviewing or approving officials may be fully aware of the actual extent of public input and involvement, a "Summary of Public Participation" re lated to particular actions or documents shall be presented as follows: (a) In the case of regulations, stand ards and, effluent limitations required to be published by the Administrator in the Federal Recister or required to be pub lished by a State agency in an official form, the Summary of Public Participa tion shall be published as part of the introductory material. <b) In the case of statewide or areawide plans or portions thereof (includ ing the continuing planning process under section 303(e) of the Act and plans developed under such process), or comparable matters required to be ap proved by the Administrator, the Sum mary of Public Participation shall be submitted as a part of the plan or of the public transmittal document. (c) In the case of applications for grants for construction projects other tion to resolving the matter? (d) Has adequate Information been provided and has enough time been al lowed for public understanding and re sponse? (e) Are there unusual time, cost, or technical constraints affecting public participation? (f) Are there unresolved conflicts be tween the public and the agency remain ing or anticipated? (g) Have all foreseeable affected in terests been given the opportunity for public participation? 105.7 Guidelines for public hearings. Any public hearing, whether manda tory or discretionary, to be held under the Act shall be in conformity with this section. If conflict exists between the minimum guidelines of this section and requirements of State or Federal law or other regulations pertaining to a particu lar hearing, the more stringent require ments shall be observed. (a) Purpose. Generally, a public hear ing gives persons and organizations a formal opportunity to be recorded on a matter prior to decisionmaking. Although public hearing testimony may focus on the prospective action to be taken, in the form of a tentative plan or decision, the final action shall benefit from and re flect consideration of the public hearing matters, a fact sheet outlining major is sues, tentative staff determinations if ap propriate, bibliography, and procedures for obtaining further information, for requesting a public hearing, and for other appropriate actions shall be prepared and Its availability made known in the notice called for In paragraph (d) of this section. (g) Agenda. The elements of the public hearing, proposed time schedule, and any constraints on statements shall be speci fied in the notice of the hearing. (h) Scheduling. Witnesses shall be scheduled in advance in order to ensure maximum participation and allotment of adequate time for- testimony, provided that such scheduling is not used as a bar to unscheduled testimony. Blocks of time shall be scheduled for major cate gories of witnesses. Evening and weekend schedules shall be considered. (i) Statements. Public hearing pro cedures shall not inhibit free expression of views by requirements of more than one legible copy of any statement sub mitted, or for qualification of witnesses beyond that needed for identification. (j) Records. Public hearing proceed ings shall be promptly summarized, re produced and copies made available to the public at cost. The record shall be held open for a reasonable time to receive supplementary statements. than those undersection 206 of the Act. or for planning or annual program grants content. (b) Public meetings. Formal public 105.8 Coordination tion. and nonduplica (including grants under sections 102(c), 106, and 208 of the Act), the Summary of Public Participation shall be a part of the application. (d) Each Summary of Public Partici pation shall describe the measures taken by the agency to provide for, encourage, and assist public participation in rela tion to the matter: the public response to such measures: and the disposition of significant points raised. 105.5 Guidelines for evaluation. The Administrator or other approving hearings are often not the best means of public participation. Agencies are en couraged to hold public meetings or workshops. Jointly where feasible, on sig nificant matters or proposed actions. Such meetings shall not supplant public hearings when such are required, and shall be informational in nature with opportunity for public response. (c) Discretionary hearings. Where the opportunity for public hearing is called for In the Act. and in other appropriate instances, a public hearing shall ordinar ily be held if requested by interested or Public participation activities and ma terials required under the Federal Water Pollution Control Act or these regula tions may be combined with related pro grams or activities of the agencies con cerned, wherever such combination will enhance the economy, the effectiveness, or the timeliness of the effort, enhance the clarity of the issue and not be detri mental to participation by the widest possible public. Hearings and meetings may be held jointly by more than one agency or may deal with more than one official shall review and evaluate each affected parties or if the hearing official related matter, where such procedure Summary of Public Participation in re lation to the matter submitted. He may call for additional information, or for the records of meetings or hearings. If he finds sufficient public Interest or perti nent information to be gained. (d) Hearing notices. In addition to any other formal legal requirements, a notice of each hearing or public meeting shall does not conflict with other provisions. Interstate agencies particularly are en couraged to develop combined proceed ings with the States concerned. finds that there has been inadequate be well publicized and be mailed to in [FR Doc.73-3394 Piled 2-20-73;3:00 pmj FEDERAL REGISTER, VOL. 3S, NO. 3--FRIDA?, FEBRUARY1 23, 1973 CAPCO JEN 0005273 WEDNESDAY, FEBRUARY 28, 1973 WASHINGTON. D.C. 5 Volume 38 Number 39 Pages 5323-5447 PART U (Part II begins on page 5385) CONSTRUCTION GRANTS--EPA procedures applicable to wastewater treatment for FT 1973; effective 2-28--73......... S329 CAPCO JEN 0005274 5329 Rules and Regulations This section of the FEDERAL REGISTER contains regulatory documents having general applicability and legal effect most of which are keyed to and codified in the Code of Federal Regulations, which Is published under 50 titles pursuant to 44 U.S.C. 1510. The Code of Federal Regulations is sold by the SuperintengacU of Documents. Prices of new books are listed in the first FEDERAL REGISTER issue of each month. Title 40--Protection of Environment CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY SUBCHAPTER O--GRANTS ered prior to promulgation of final con struction grant regulations. Suggestions for changes to EPA regulations promul gated in this Subchapter are solicited on a continuous basis pursuant to 40 CFR Sec. 35.925-7 35925-8 35925-9 35.925-10 Design. Environmental review. ClvU rights. Operation and maintenance pro gram. PART 35--STATE AND LOCAL ASSISTANCE 30.106. 35925-11 User charge system. Grants for Construction of Treatment Effective date. The interim construc 35.925-12 Sewage collection systems. tion grant regulations promulgated 35.925-13 Alternative techniques and tech The Federal Water Pollution Control Act Amendments of 1972 authorize the award of construction giants for waste treatment works which constitute a con tractual obligation of the United States for payment of the Federal share of the hereby shall become effective offTebruary 28, 1973. All Environmental Pro tection Agency contract grant authority construction grants pursuant to Public Law 92-500 shall be subject to these in terim grant regulations. It Is necessary that these regulations take effect prior 35927 35.928 35930 35930-1 35.930-2 35.930-3 35930-4 nology. Sewer system evaluation. User charger system (Reserved) Grant award. Types of grants. Grant amount. Grant term. Project scope. construction costs of such projects. Reg to a 30-day period after promulgation 35.930-5 ' Grant percentgae. ulations to Implement this grant/con tract authority are hereby promulgated. Previous construction grant regula tions (40 CFR 35.800 et seq.) are ap plicable to previously awarded construc tion grants and will remain in efTect. because of the necessity to expedite award of construction grants In order to meet water quality requirements. William D. Ruckelshaus, Administrator. 35.935 35.951-1 35935-2 35.935-3 35935-4 35.935-5 35935-6 Grant conditions. Nonxestrictive specifications. Procurement. Bonding and insurance. State and local laws. Davls-Bacon and related statutes. Equal employment opportunity. The new regulations hereby promulgated February 23,1973. 35.935-7 Access. establish policies and procedures appli cable only to construction grant awards from fiscal year 1973 and later contrac tual obligation authority. A summary of the grant process for contract authority grants is contained within the regulations (40 CFR 35.903). Part 35 of title 40 Is amended by re serving Subpart D and adding Subpart E which contains the material formerly codified as Subpart D (37 FR 26282, Dec. 8.1972). Subpart D--[Reserved] 35.935-8 35.935-9 35.935-10 35935-11 35935-12 35.940 35940-1 35.940-2 Supervision. Project completion. Copies of contract documents. Project changes. Operation and maintenance. Determination of allowable costs. Allowable costs. Unallowable costs. ! While new procedures and requirements are established pursuant to title H of the new statute, an effort has been made to conform the new grant system to the former method of awarding grants to provide for as smooth a transition as possible and also to permit funding with out delay of meritorious applications al ready forwarded to State and EPA Re gional Offices. Subpart E--Grants for Construction of Treatment Works--Federal Water Pollu tion Control Act Amendments of 1972 Sec. 35.900 35.901 35.903 35.905 35.905-1 Purpose. Authority. Summary of construction grant program. Definitions. The Act. 35.940-3 35.940-4 35.940-5 35945 35.950 35955 Costs allowable. If approved. Indirect co6ts. Disputes. Grant payments. Suspension or termination of I grants. Grant amendments to Increase grant amounts. Authority: Secs. 201 through 205, 207, 210 ' through 212. and 501(a) of the Act. Section 201(g) (3) of the new Act re quires that no grant be awarded after July 1, 1973 unless the applicant satis factorily demonstrates that the sewer collection system discharging Into the works Is not subject to excessive infil 35.905-2 35.905-3 35.905-4 35.905-5 35.905-6 35.905-7 35,905-8 Combined sewer. Construction. Excessive infiltratton/lnflow. Infiltration. Inflow. Inflltratlon/lnflow. Interstate agency. Subpart D--[Reserved] Subpart E--Grants for Construction of Treatment Works--Federal Water Pollu tion Control Act Amendments of 1972 35.900 Purpose. tration and section 201 (fc) (4) authorizes 35.905-9 Municipality. This subpart supplements the EPA Federal assistance for sewer system eval uation studies necessary to determine whether there is excessive infiltration. Procedures to permit Federal assistance under these requirements as a part of the usual construction grant process are Incorporated in these regulations and 35.905-10 35.905-11 35.905-12 35.905-13 35.905-14 35.905-15 35.908 Project. Sanitary sewer. State. State agency. Storm sewer. Treatment works. Advanced technology and accele rated construction techniques. general grant regulations and proce dures (Part 30 of this chapter) and es tablished policies and procedures for grants to assist the construction of pub licly owned waste treatment works In compliance with the Federal Water Pol lution Control Act. will be applicable to grants awarded after 35.910 Allocation of funds. June 30.1973. 35.920-2 Allotment. 35.901 Authority. Separate regulations will be promul gated to implement the provisions of saa>*~ 35.910-2 35.915 tion 208 of the Federal Water Pollution 35.920 Control Act Amendments of 1972. 35.920-1 Reallotment. State determination and certifica tion of project priority. Grant application. Eligibility. This subpart Is promulgated pursuant to sections 201 through 205. 207, 210 through 212, and 501(a) of the Act. 35.903 Summary of construction grant Interested parties are encouraged to 35.920-2 Procedure. program. submit written comments, views, or data concerning the interim regulations pro mulgated hereby to the Director, Grants Administration Division, Environmental Protection Agency. Washington, D.C. 20460. All such submissions received on 35.920-3 35.925 35.925-1 35.925-2 35.925-3 35.925-4 35.925-5 Contents of application. Limitations on award. Facility planning. State plan. Priority certification. State allocation. Applicant's funding capability. (a) The construction of federally fi nanced waste treatment works generally Is accomplished in- three steps--(1) pre liminary plans and studies. (2) prepara tion of construction drawings and speci or before April 30, 1973 will be consid 35.925-6 Permits. fications, and (3) fabrication and build FEDERAL REGISTER, VOL 38, NO. 39--WEDNESDAY, FHRtMRT 25, 1973 CAPCO JEN 0005275 5330 RULES AND REGULATIONS ing of a complete and operable treatment works. Although in most cases comple tion of preliminary plans and studies will be a prerequisite to award of a grant, in order to allow State and Federal of ficials an adequate basis to determine the merits of proposed projects, the EPA Regional Administrator may award a grant for completion of preliminary plans and studies (the first step). A grant for a project will Include an Initial payment for the Federal share of the unreimbursed allowable costs of completed work (e.g. preliminary plans and studies, prepara tion of final construction drawings and specifications), if such prior costs are within the scope of tiie proposed project and the grant amount certified by the State agency. In no case may a grant be awarded unless the proposed project has received a priority certification which ac cords with an approved State system for determining the priority of needed treat ment works. <b> The scope of a project may in clude one or more construction steps and will be determined by the definition of the project in the grant application submitted to the State agency, by the scope of the project for which State pri ority certification is given, and finally by the scope of the project for which the Regional Administrator awards a grant. Funding of a complete treatment works may (but need not) be "split" into a project or grant for each step. The State is responsible for determining the amount and timing of Federal assistance to each municipality for which treatment works funding is needed. (c) Upon award of a grant under this subpart, the grantee may submit a re quest for payment for the unpaid Federal share of allowable project costs incurred prior to the award, and the grant shall constitute a contractual obligation of the United States to pay the Federal share of allowable project costs up to the amount approved in the grant agreement (in cluding amendments). (d> No grant may be awarded under this subpart for a project for the build ing and erection of a treatment works (Step 3) if initiation of the project con struction has occurred, that is. if a notice to proceed has been issued under a con struction contract for any portion of the project work or. if notice to prqceed is not required, if the construction con tract has been executed. (e) Applications for grants and grant amendments must first be submitted to the State agency, and the State agency may then forward to the appropriate EPA Regional Administrator complete project applications or grant amend ments which have been certified by the State agency as entitled to priority. (!) Sewage collection systems-for new communities, new subdivisions, or newly developed urban areas must be addressed in the planning of such areas and must be included as a part of the development costs of the new construction in these areas; they are not to be covered under the construction grant program. 3S.90S Definitions. As used in this subpart, the following words and terms shall have the meaning set forth below: any other agency ol two or more States, having substantial powers or duties per taining to the control of water pollution. 35.905--9 Municipality, 35.905--1 The Act. The Federal Water Pollution Control Act, as amended by. the Federal Water Pollution Control Act Amendments of 1972 (Public Law 92-500) 35.905--2 Combined sewer. A sewer Intended to serve as a sani tary sewer and a storm sewer. 35.905--3 Construction. Any one or more of the following: Pre liminary planning to determine the feasi bility of treatment works, engineering, architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings, specifications, procedures or other necessary actions, erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works, or the inspection or supervision of any of the foregoing items. The phrase "initiation of construction," as used in this subpart, means the issu ance of a notice to proceed, or. if none is required, the execution of a construc tion contract. 33.905--1 Excessive infiliralion/itifiow. The quantities of infiltration/tnflow which can be economically eliminated from a sewer system by rehabilitation, as determined by a cost-effectiveness analysis that (for the design life of the treatment works) compares correcting the infUtration/inflow conditions with increasing the treatment works capacity to provide the required waste water treatment for the quantities of infiltration/tnflow. A city, town, borough, county, parish, district (but excluding a school district), association, or other public body (includ ing an lntermunlcipal agency of two or more of the foregoing entities) created by or pursuant to State law. or an Indian tribe or an authorized Indian tribal or ganization, having jurisdiction over dis posal of sewage, industrial wastes, or other wastes, or a designated and ap proved management agency under sec tion 208 of the act. 35.903--10 Project. The scope of work for which Federal assistance is awarded by a grant pursu ant'to this Subpart. 35.905--11 Sanitary sewer. A sewer intended to carry only sanitary and industrial waste waters from resi dences. commercial buildings, industrial plants, and institutions. 35.905--12 State. A State, the District of Columbia, the Commonwealth of Puerto Rico, the Vir gin Islands, Guam, American Samoa, and the Trust Territory of the Pacific Islands. 35.905--13 State agency. The State water pollution control agency designated by the Governor hav ing responsibility for enforcing State laws relating to the abatement of pollution. 35.905--14 Storm sewer. A sewer intended to carry only storm waters, surface run-off, street wash waters, and drainage. 35.905--5 Infiltration. 35.905--15 Treatment works. The water entering a sewer system and service connections from tile ground, through such means as, but not limited to. defective pipes, pipe joints, connec tions, or manhole wails. Infiltration does not include, and is distinguished from, inflow. 33.903--6 Inflow. The water discharged into a sewer sys tem and service connections from such sources as, but not limited to, roof lead ers, cellar, yard, and area drains, foun dation drains, cooling water discharges, drains from springs and swampy areas, manhole covers, cross connections from storm sewers and combined sewers, catch basins, storm waters, surface run-off, street wash waters, or drainage. Inflow does not include, and is distinguished from. Infiltration. 35.905--7 Infillration/inflow. Thaiotal quantity of water from both Infiltration and Inflow without distin guishing the source. Any devices and systems used in the storage, treatment, recycling, and recla mation of municipal sewage or industrial wastes of a liquid nature to implement section 201 of the act, or necessary to recycle or reuse water at the most eco nomical cost over the estimated life of the works, including intercepting sewers, outfall sewers, sewage collection systems, pumping, power, and other equipment and their appurtenances: extensions, im provements, remodeling, additions, and alterations thereof; elements essential to provide a reliable recycled supply such as standby treatment units and clear well facilities: and any works, including site acquisition of the land that will be an Integral part of the treatment process or is used for ultimate disposal of residues resulting from such treatment: or any other method or system for preventing, abating, reducing, storing, treating, sep arating, or disposing of municipal waste, including storm water run-off, or indus trial waste, including waste in combined storm water and sanitary sewer systems. 35.905-8 Interstate agency. 35.908 Advanced technology and ac An agency of two or more States estab celerated construction techniques. lished by or pursuant to an agreement or It is the policy of the Environmental compact approved by the Congress, or Protection Agency to encourage and. fEOEKAL KEGISIIlt, VOL 33, NO. 3?--WEDNESDAY FEMUAIY 23, 1973 CAPCO JEN 0005276 RULES and regulations 5331 whero possible, to assist In the develop ment of advanced technology and ac celerated construction techniques for the construction of waste treatment works. New technology may be developed or demonstrated with the assistance of EPA research or demonstration grants awarded under title I of the act. New State Nebraska Nevada New Hampshire...___________ -- New Jersey..._______ ____ ________ New Mexico------...----------------. New York......................... North Carolina..._________ ....... Per- centage .3708 .2877 .8309 7.7040 .2108 11.0578 .9229 (c) Allotments for fiscal years which begin after the fiscal year ending June 30,1974, shall be made only in ac cordance with a revised cost eattmatejz?-- quired to be submitted to and approved by Congress. (d) Allotments shall be made not later than the January first preceding the be-' technology which has been successfully demonstrated under comparable condi tions may be utilized in the construction of treatment works under this subpart. In addition, the Regional Administrator, with the concurrence of the appropriate Assistant Administrator(s), may award a comprehensive grant (5 30.205 of this North Dakota------------------- Ohio--------------------Oklahoma______ ........--------- Oregon _____________________ _____ Pennsylvania __________ ... Rhode Island......................................South Carolina--_... South Dakota..._____ ____________ Tennessee ________ ______ ________ . 0467 5. 7737 .4608 .8494 5.4214 . 4889 .6455 . 0948 1.1605 ginning of the fiscal year for which au thorized, except for the allotment for fiscal year 1973 which is made herein. 35.910-2 Rcallotmcnl. (a) Sums allotted to a State under } 35.910-1 shall be available for obliga tion on and after the date of such allot-: chapter) to include the application or Texas _______ 2. 7694 ment and shall continue to be available demonstration of new technology assisted under title I of the act in any portion of a treatment works constructed princi pally with assistance under this subpart, pursuant to this subchapter and such conditions and procedures for EPA as sistance as the Director, Grants Adminis Utah ...........................................-................ 1408 Vermont -________________________ . 2218 Virginia ............................................... 2.9143 Washington8008 West Virginia....................................... .4999 Wisconsin 1.7415 Wyoming - . 0263 Guam--- .0872 to such State for a period of X year after the close of the fiscal year for which such sums are authorized. Funds re maining unobligated at the end of the allotment period will be immediately re- allotted by the Administrator, generally on the basis of the ratio used in making tration Division, may approve. Puerto Rico . 8845 the last allotment. 35.910 Allocation of funds. 35.910-1 Allotment. Virgin Islands_____________________ American Samoa__________________ Trust Territory of Pacific_________ .0893 <b) Any sums which have been obli . 0048 .0378 gated under section 203 of the Federal' Water Pollution Control Act Amend- , (a) The Administrator shall allot among the States, funds authorized to be appropriated pursuant to section 207, In the ratio that the estimated cost of con structing all needed publicly owned treatment works In each State bears to the estimated cost of construction of all needed publicly owned treatment works in all of the States. For fiscal years end ing June 30, 1973, and June 30. 1974, sums not to exceed $2 billion and $3 bil lion, respectively, have been determined to be the actual amounts authorized to be appropriated within the correspond ing maximum amounts specified in sec tion 207 and will be allotted on a ratio determined on the basis of Table III of House Public Works Committee Print No. 92-50. Computation of a State's ratio shall be carried out to the nearest tenthousandth percent (0.0001 percent) and allotted amounts will be rounded to the nearest thousand dollars. The applicable percentages to be used in computing State'allotments for fiscal years 1973 and 1974 are as follows: State Per. centage Alabama . 3812 Alaska_____________ ____ *_________ Arizona _________________ Arkansas ________________________ California 9.8176 Colorado____ -____________________ Connecticut __________________ Delaware_____ ____________________ District of Columbia______________ Florida ___________________________ Georgia , 9730 Hawau _______ Idaho , 2177 Illinois __________________ ________ Indiana_______________________ ___ Iowa --------------------------------------------Kansas _____ Kentucky __________ _____ Louisiana 2____ Maine ...____ Maryland Massachusetts 3.7576 Michigan ____...______ .... Minnesota ________________________ Mississippi___....________ _______ Missouri .2252 . 134s . 3536 ,3166 1,6810 , 6565 .7114 3.6264 . 3303 6.2489 3.3A6C* 1.1857 . 374a . 6599 . 9423 . 9675 4.2582 7.9814 2.0319 .3935 1.6556 100. 0000 (b) Based upon the applicable per centages, the sums allotted to the States for fiscal years 1973 and 1974 are as follows: Stale Fiscal year 1973 Fiscal year 1974 Alabama................. AJ**k.............................. Arkansas.......................... California.............. .......... Colorado................. . Connecticut.................... Palawan*.......................... District of Columbia... Flornln................. (teorfia........................... Hawaii.............................. JiJaho............. ............ . Illinois......................... Indiana.............. ............. Iowa.................................. Kentucky........................ Louisiana......................... Massachusetts................. Michigan.......................... Minnesota.............. Mississippi....................... Montana........................... Nebraska.......................... New Hampshire............. New Jersey...................... New Mexico..................... New York.................... .. Ohio................................... Oklahoma.............. Oregon.............................. Pennsylvania.................. Rhode Island................ .. South Dakota................. Tennessee....................... . Utah.................................. Virginia............................. Washington........... .......... West Virginia Wisconsin............... . American Samoa-....-. Trust Territory of Pacific........... 7,224,000 4,504,000 2. 692, ooo 7.072,000 V.*. 352.000 6.332,000 33,620,000 13.130.000 I4.22ti.000 72.328.000 10,460,000 6.606,000 4.354.000 124,978,000 67,324,000 23.114,000 7.484,000 13.198,000 18,856,000 19.350,000 85,164,000 75.162.000 259.628,000 40,633,000 7.870.000 33,112.000 3,324,000 7,416,000 6.754,000 16.618.000 154.060.000 4,216,000 221.156,000 18,468,000 934,000 116.474,000 9.216,000 16,968,000 108,428,000 9,778.000 12,910,000 1.896,000 23,210.000 56,388,000 2.616,000 4,436.000 68,286,000 17,812.000 <*.996,000 34.830.000 536.000 1.744.000 17,690,000 J. 786,000 96,000 756,000 Total.... .................. 2,000,000,000 10.836,000 6.756.000 4,038.000 10,608,000 294,528,000 0.498,000 50,430,000 19.695,000 21,342,000 108.792.000 loo.ooo P. 909, ooo 6,531,000 187.467,000 300,986.000 34.671.000 11.220,000 19.797.000 28.284,000 2V.025,000 127.746.000 112,728,000 239,442,000 60.957,000 11.805.000 49.668.000 4.986,000 11,124.000 8,631.000 24,927,000 231,120,000 6,324.000 331,734.000 27,687.000 1.401,000 173,211.000 33,824,000 26.482.000 162.642.000 14,667,000 19,365.000 2.844,000 34.815.000 83.062.000 4.224,000 6.654.000 87.429.000 21718.000 14.997.000 62.245,000 804,000 2,616.000 26,535,000 2,679,000 144,000 1,134.000 3,000,000,000 ments of 1972 (Public Law 92-500) and which are released by the payment of the final voucher for the project shall be immediately credited to the State to which such sums were last allotted. Such released sums shall be added to the amounts last allotted to such State and shall be Immediately available for obliga tion in the same manner and to the same extent as such last allotment. (c) Reallotted sums shall be added to the last allotments made to the States and shall be In addition to any other funds otherwise allotted. 35.915 Slate determination and certi fication of project priority. Construction grants will be awarded from allotments available pursuant to i 35.910 In accordance with a State sys tem for the certification of priority for construction grant projects. (a) State priority system. Each State agency must submit for the approval of the Regional Administrator a description of the State priority system, including the criteria used by the State in deter mining priority for construction grant projects. The Regional Administrator shall be notified of each significant re vision to an approved State priority sys tem no later than 30 days prior to the effective date of the revision. The Re gional Administrator may disapprove the State priority system or any revision thereto, provided that he shall first notify the State in writing of the specific re spects in which he has determined that the system, or the administration thereof, falls to meet the applicable requirements of sections 301 and 302 of the Act. (b) List of municipalities. The State agency shall prepare. In accordance with the approved State priority system, a list of municipalities, consisting of an inventory and ranking, in order of priority, of municipalities not meeting applicable requirements of sections 301 and 302 of the Act, and must submit such listing to the Regional Administrator prior to the award of a grant for any project after 1 1 Montana...__________ .1662 No. 39--Ft. 1------2 FEDERAL REGISTER, VOL 31, NO. 39--WEDNESDAY, FEBRUARY 28, 1973 CAPCO JEN 0005277 5332 RULES AND REGULATIONS June 30. 1973: Provided, (1) That the 35.920 Grant application, (8) Required comments or approvals Regional Administrator may approve the list Included with the annual 8tate pro gram plan submission (Part 35, Subpart B of this part); and (2) notwithstanding Orant applications will be submitted and evaluated in accordance with Part 30, Subpart B of this chapter. of relevant State, local, and Federal agencies (Including compliance with "clearinghouse" requirements of OMB Circular A-95); the foregoing, the Regional Adminis 3S.920-1 Eligibility. (9) Environmental assessment. In ac trator shall approve the Ust, or any por Municipalities, lntermunlclpal agen cordance with Part 6 of this chapter un tion thereof, which is prepared in ac cies. States, or Interstate agencies may less the Regional Administrator deter cordance with any State plan approved apply for grants. mines, at the request of the applicant, pursuant to section 303(e) (3) (H) oi the act for the certification of projects after 35.920-2 Procedure. *** that there Is insufficient data available to prepare such assessment, provided the date of approval of such plan. Preapplication assistance, including, that the environmental assessment must (c) Project list. The State agency shall submit tor the approval of the Regional Administrator a listing of all where appropriate, a preappllcation con ference. may be requested from the ap propriate EPA Regional Office. An appli then be submitted to the Regional Ad ministrator at or prior to the time of sub mission of plans and specifications for projects for which Federal assistance will be requested, from current allotments, the priority for which shall be derived from the list of municipalities. Such project list shall set forth a tabulation of funding priorities and requirements Including, as a minimum, the following cation must be submitted to the State agency for each proposed project. The State agency will submit to the Regional Administrator those applications for con struction grants which are complete and which relate to projects which have re ceived priority certification in accord the building and erection of a treatment works; (10) Statement regardng the appli cant's financial, legal. Institutional, and managerial capabilities to insure the con struction, operation, and maintenance of the.treatment works; Information for each project: (1) Name of municipality: (2) brief description of type of project and anticipated scope of project; (3) the estimated total project cost: (4) estimated dates of Initiation and completion of preliminary plans and studies; (5) estimated dates of comple tion of construction drawings and speci fications; (6) estimated dates of initi ation and completion of building and erection; and (7) estimated amount of EPA assistance required to complete the project, Including identification of the 6-month period (July 1-December 31, January 1-June 30) when a grant award will be required. Such project list shall be submitted for the approval of the Regional Administrator annually as part of the State program submission pur suant to Part 35, Subpart B of this part, and may be revised as necessary, with the approval of the Regional Administrator upon compliance with the public partici pation requirements of paragraph (e) of this section: Provided, That the State agency may elect to rely upon the 1-year list submitted In accordance with i 35.575(f) to satisfy the foregoing proj ect list requirements with respect to grants awarded prior to July 1, 1973. (d) State priority certification for projects. The State agency must for ward with each application submitted to the Regional Administrator a certifica tion that the proposed project Is entitled to priority in accordance with the State ance with 5 35.915. 35.920-3 Contents of application. (a) Project for preliminary plans and studies (Step f). An application for a grant for preliminary plans and studies shall include but not be limited to: (1) State priority certification In ac cordance with 5 35.915; (2) A brief description of the nature and scope of the proposed project; (3) Required comments or approvals of relevant State, local, and Federal agen cies (Including "clearinghouse" require ments of OMB Circular A-95); (4) An estimate of the proposed proj ect cost; and (5) Proposed subagreements, or an ex planation of the Intended method of awarding subagreements for perform ance of any substantial portion of the project work. (b) Project for preparation of con struction drawings and specifications (Step 2). An application for a grant tor preparation of construction drawings and specifications shall Include but not be limited to: (1) State priority certification In ac cordance with 5 35.915; (2) Sewer system evaluation in accord ance with 5 35.927; (3) Feasibility report; (4) Engineering report, including, but not limited to: (I) Facility design data Incorporating: (a) Results of sewer system evalua '(ID Statement regarding compliance with other applicable Federal statutory and regulatory requirements (see 40 CFR Part 30, Subpart C); (12) Statement regarding compliance with title VI of Civil Rights Act of 1964; (13) Statement, regarding applicant's proposed operation and maintenance program: (14) Proposed subagreements, or an explanation of. the Intended method of awarding subagreements for perform ance of any substantial portion of the project work. (c) Project for building and erection of a treatment works (Step 3). An appli cation for a grant for the building and erection of a treatment works shall in clude the Items In paragraph (b) of this section, and in addition shall include two complete sets of the construction drawings and specifications, suitable for bidding purposes: Provided, That if any such Information has been furnished with an earlier application, the appli cant need only incorporate by reference and update or revise such Information. (d) Design/construct project. An ap plication for a grant for a design/con struct project shall Include the items In paragraphs (b> and (c> of this section, except that, in lieu of construction drawings and specifications, the pro posed performance specifications and other relevant design/construct criteria for the project shall be submitted. priority system, and requires the speci fied funding requested from allotments currently available. The State agency Is responsible for defining the scope of treatment works projects and determin tion; (b> Estimated effluent quality, with re spect to all parameters required by ap plicable effluent limitations and water quality standards; and 35.925 Limitations on award. Before approving a grant for any proj ect for any treatment works, the Re gional Administrator shall determine: ing the time when such projects are to (c) Proposed method for ultimate dis 35.925--1 Facility planning. receive Federal financial assistance. (e) Public participation. The Regional Administrator may not approve a State priority system or revision thereof in ef fect after June 30,1973, unless he deter mines that the State agency has afforded adequate opportunity for oral or writ ten municipal and public comment upon the State priority system, the list of mu nicipalities, and the project list, or re visions, prior to submission to the Re posal of sludge. (II) Cost estimates for design and con struction; and (III) Schedule for completion of design and construction. (5) Description of proposed user charge .system In accordance with 5 35.925; (6) Statement regarding availability of proposed site. If relevant; (7) Statement regarding ability of applicant to obtain discharge permit for That a current basin plan and regional or metropolitan plan as required In accordance with 55 35.150-1 and 35.150-2 have been adopted (facility planning re quirements will be an eligible construc tion grants cost as provided for in 55 35.905-3 and 35.940-l(d>). g 3S.92S-2 State plan. That such works are In conformity with any applicable State plan approved in accordance with section 303(e) of the gional Administrator. proposed facility; act. FEDERAL REGISTER, VOL 3, NO- 39--WEDNESDAY, FEIRUARY , 1973 CAPCO JEN 0005278 RULES AND REGULATIONS 5333 33.925-3 Priority certification. That such works have been certified by the State agency as entitled to pri ority in accordance with 35.915. and that the award of a grant for the pro posed project will not jeopardize the funding of any treatment works of higher priority. 35.925--10 Operation and maintenance program. That the applicant has made satisfac tory provision for assuring proper and efficient operation and maintenance of the treatment works, including the em ployment of trained management and operations personnel. through an lnflltration/inflow .analysis and where appropriate and approved by the Regional Administrator, a sewer sys tem evaluation survey. (a) In/lltration/injlow analysis. Each applicant for a grant must show that it has performed or will perform, in con junction with preliminary plans and studies (Step 1), and analysis demon 35.923--1 Slate allocation. That the award of the grant will not result in the total of all grants awarded to applicants of a State, including grant increases, to exceed the total of all allot ments and reallotments available to such State pursuant to 5 35.910. 35.925--5 Applicant's funding capabil ity. That the applicant has agreed to pay the non-Federal project costs. 35.925-5 Permits. That the applicant has provided assur ance acceptable to the Regional Admin istrator that any necessary discharge permit has been or will be obtained in accordance with section 402 of the act. 35.925--7 Design. If the application is for a project which includes the building and erection of a treatment works (Step 3), (a) That the design, size, and capac ity of such works are cost effective and relate directly to the needs to be served by such works, including adequate re 35.925-11 User charge system. strating the existence or nonexistence That, prior to award of any grant after March 1, 1973, for a project which in cludes the building and erection of a treatment works (Step 3) the applicant (a) has adopted or will adopt a system of charges to assure that each recipient of waste treatment service will pay its' proportionate share of the costs of op eration and maintenance (Including re placement) ; (b) has received - firm written commitments satisfactory \o the Regional Administrator for the payment to such applicant by the industrial users for their proportionate share of the Fed eral share of capital costs of the project allocable to the treatment of such in dustrial wastes to the extent attributable to the Federal share of the cost of con struction; and (c) has legal, institu tional. managerial, and financial capa bility to insure adequate construction, operation and maintenance of treatment works throughout the applicant's juris diction. Grants awarded prior to March 2, 1973, are subject to 5 35.835-5 requirements in lieu of the above. of excessive lnflltration/inflow in each sewer system tributary to the treatment works. The analysis shall identify the presence, quantity, and type of infiltra tion/inflow conditions which exist in the sewer systems. Information to be ob tained and evaluated in the analysis shall include but not necessarily be limited to the following; < 1 > Flow data for all flows in the sewer system including overflows and bypassed flows. (2) Location, frequency, and cause of overflow conditions in the collection/ treatment system caused by infiltration/ inflow. (3) Relationships of existing popula tion and industrial contribution to flows in the sewer system. (4) Geographical and geological con ditions which may affect the present and future quantities or correction costs of the infiltration/inflow. (5) A general discussion of age, length, type, materials of construction, and known physical condition of the sewer system. serve capacity; (b> That such works will meet appli cable effluent limitations and applica ble water quality standards and attain r,ot less than secondary treatment as defined, by the Administrator pursuant 35.925--12 Sewage collection systems. That, if the project is for, or includes, sewage collection system work, such work is for replacement or major rehabilita tion of an existing sewer system and is necessary to the total integrity and per For determination of possible excessive infiltration/inflow in the analysis, pre liminary estimates shall be developed'of the relative costs (for the design life of the treatment works), both for correct ing the infiltration/inflow conditions, to section 301(b)(1)(B) and 304(d)(1) of the act; (c) That alternative waste treatment techniques have been studied and evaluated; formance of the waste treatment works servicing.such community, or is for a new sewer system in a community in existence on October 18.1972, with sufficient exist ing or planned capacity to adequately and increasing the treatment works ca pacity to provide the required degree of waste water treatment for the quantities of inflltration/inflow. (b) Sewer system evaluation survey. (d) And, if the grant is to be awarded from funds authorized for any fiscal year beginning after June 30, 1974, that such works will provide for the application of treat such collected sewage. 35.925--13 Alternative techniques and technology. It the inflltration/inflow analysis demon strates that the sewer system may be sub ject to excessive inflltration/inflow, the analysis and a detailed plan for a sys the best practicable waste treatment technology over the life of the works consistent with the purposes of title n of the act; That, for grants made from fiscal year 1975 or later funds, for the erection, building, acquisition, alteration, remodel ing, improvement, or extension of treat tematic sewer system evaluation survey, which elucidates the tasks to be per formed and the estimated costs, shall be submitted to the Regional Administrator. (e) And, if the grant is to be awarded ment works, the applicant (a) has stud (1) Upon approval of the survey pro after July 1, 1973. that epch sewer sys ied and evaluated alternative waste posal by the Regional Administrator, the tem, including interceptor-and collection management techniques to insure that grantee shall conduct the sewer system sewers, discharging into such treatment the proposed works will provide for the evaluation survey, which shall be a sys works is not subject to excessive application of the best practicable waste tematic examination of the sewer sys infiltration/inflow, in accordance with treatment technology over the life of the tems to determine the location, flow rate 35.927; and works; and (b) has, as appropriate, taken and cost of correction for each definable (f) That the design for the project meets or exceeds such guidelines as the Administrator has published concerning treatment works design. 35.925--5 Environmental review. into account and allowed to the extent practicable for the application of tech nology. at a later date, which will pro vide for the reclaiming or recycling of water or otherwise eliminate the dis charge of pollutants. element of the total inflltration/inflow problem. The sewer system evaluation survey shall normally be completed prior to establishment of facility design data for the engineering report. The evalua tion survey shall be conducted in accord That the applicant has complied with-- 35.927 Sewer system evaluation, ance with such guidelines as the Ad applicable NEPA requirements (Fart 6 of this chapter). 35.925--9 Civil rights. That the applicant has complied with Applicants for grants awarded after July 1, 1973, must demonstrate to the satisfaction of the Regional Adminis trator that each sewer system discharg ministrator shall publish from time to time. <2) The sewer system evaluation sur vey report shall state the specific loca-' tion, condition, estimate of rate of flow the applicable requirements of title VI ing into such treatment works Is not sub and cost of rehabilitation for each of the Civil Rights Act of 1964. ject to excessive lnflltration/inflow. defined element of lnflltration/inflow FEDERAL REGISTER, VOL 38, NO. 39--WEDNESDAY, FEBRUARY 28, 1973 CAPCO JEN 0005279 5334 rules and regulations system- The report shall lhe Quantities of defined lnmtratlon/inflow and propose a program oi rehabilitation to correct the excessive infiltration/inflow. The i eliabliltatlon program for the sewer system shall be accomplished on a selective cost-effective basis for each defined element of infil tration/inflow. (3) The sewer system evaluation sur vey report and rehabilitation program for the sewer system shall be submitted to the Regional Administrator for ap proval prior to initiation of construction for Step 3. (2) Preparation of construction draw ings and specifications (Step 2): Pro vided, That he determines that the ap plicant has satisfactorily completed appropriate preliminary plans and stud ies and has submitted the items re quired pursuant to 5 35.920-3(b); (3) Building and erection of a treat ment works (Step 3): Provided, That he determines that the applicanMias satis factorily completed appropriate prelimi nary plans and studies and has submit ted the items required pursuant to 5 35.920-3(c>; or (4) A combination of design (Step 2) 9 30.305-1 of this chapter, subject to ex cusable delay. 35.930--4 Project scope. The grant agreement must define the scope of the project for which Federal assistance is awarded under the grant. The grant agreement shall define the project as the construction of an iden tified complete treatment works. 35.930--5 Grant percentage. The amount of any grant awarded under this subpart shall be 75 percent of the allowable cost of the project. (ct Sewer use ordinance. Each appli cant tor a treatment works grant shall demonstrate to the satisfaction of the Regional Administrator that a sewer use ordinance or other legally binding re quirement shall be enacted and enforced in each jurisdiction served by the treat ment works before the completion of construction. The ordinance shall pro and construction (Step 3) for a treat ment works in the case of grants award ed after March 1, 1973: (i> Where the Regional Administrator determines that compelling water quality enforcement considerations or serious public health problems warrant award of such a grant to assure expeditious 35.935 Grant conditions. In addition to the EPA General Grant Condition's (Appendix A to Subchapter B of this title and Part 30. Subpart C of this chapter), each grant for treatment works involving building and erection (Step 3) shall be subject to the following conditions: hibit any new connections from inflow construction of such treatment works, or 35.935--1 Nonrcstrictive specifications. sources into the sanitary sewer portions of the sewer system and shall require that new sewers and connections from waste water sources to the sewer system are designed and constructed in accord ance with such guidelines as the Admin istrator may publish from time to time. <d) Force account and survey equip ment costs. Reasonable force account and equipment purchases or rental costs for all or part ot a sewer system evaluation survey conducted by an applicant in ac cordance with 5 35.927(b) will be allow able costs if the Regional Administrator has given prior approval for the use of such forces and equipment. (1) The applicant must demonstrate to the satisfaction of the Regional Ad ministrator the necessary technical com petence required to conduct all or part of the evaluation survey. The applicant must also demonstrate that the use of force account and purchased or rented survey equipment will be the most eco nomical method of conducting the evalu ation survey. (ii) Where the Regional Administra tor determines that award of such a grant will minimize administrative re quirements in the case of projects not requiring a substantial amount of Fed eral assistance: Provided, That the Regional Administra tor determines that the applicant has satisfactorily completed appropriate pre liminary plans and studies and has sub mitted the items required pursuant to 5 35.920-3(b): And further provided. That any such grant award may be an nulled unless detailed construction draw ings and specifications are submitted to the Regional Administrator and approved prior to initiation of construction for the building and erection of the Project (Step 3). (5> Design/construction of treatment works (Steps 2 and 3), Provided, That he determines that the applicant has satis factorily completed appropriate prelimi nary plans and studies and has sub mitted the items required pursuant to 35.920-3 (d): And further provided, No specification for bids or statement of work in connection with such works shall be written in'such a manner as to contain proprietary, exclusionary, or dis criminatory requirements other than those based upon performance, unless such requirements are necessary to test or demonstrate a specific thing or to pro vide for necessary Interchangeability of parts and equipment, or at least two brand names or trade names of compa rable quality or utility are listed and are followed by the words "or equal." 35.935--2 Procurement. Construction work will be performed by the fixed-price (lump sum) or fixedrate (unit price) method, or a combina tion of these two methods, unless the Re gional Administrator gives advance writ ten approval to use some other method'of contracting. The cost-plus-a percentage of cost method of contracting shall not be used. Adequate methods of advertising for and obtaining competitive sealed bids will be employed prior to award of the 35.928 User charge system. [Re served! 35.930 Grant award. Approval by the Regional Administra tor of an application shall constitute a grant award for the project, and shall That any such grant award is subject to submission of detailed construction drawings and specifications to the Re gional Administrator prior to initiation of and during construction. 35.930--2 Grant amount. construction contract. Tire award of the contract will be made to the responsible bidder submitting the lowest responsive bid, which shall be determined without regard to State or local law whereby pref erence is given on factors other than the specification requirements and the constitute a contractual obligation of the The amount of a grant shall be set amount of bid. The grantee must United States for the payment of the forth in the grant agreement and may promptly transmit to the Regional Ad Federal share of the allowable project not exceed the amount of funds available ministrator copies of bid protests, deci costs, as determined by the Regional Ad from the State allotments and reallot- sions on such protests, and related cor ministrator, subject to execution of a ments pursuant to 3 35.910 and may not respondence. The Regional Administra grant agreement in accordance with exceed the amount certified by the State tor will cause appropriate review of 3 30.305-2. agency in accordance with 9 35.915. Grant grantee procurement methods to be 35.930--1 Types of grants. (a) The Regional Administrator may award a grant for the following types of projects pursuant to 5 3S.925: (1) Preliminary plans and studies (Step 1): Provided, That he determines payments will be limited to the Federal share of allowable project costs Incurred within the grant amount or any increases in such amount effected through grant amendments in accordance with { 35.955, pursuant" to the negotiated payment schedule included in this grant agree made. 35.935--3 Bonding and insurance. On contracts for the building and erec tion of treatment works (Step 3) exceed ing $100,000, each bidder must furnish a bid guarantee equivalent to 5 percent of that the applicant has submitted the ment. items required pursuant to 9 35.920-3(a> and the State agency has determined 35.930--3 Grant term. the bid price. In addition, the contractor awarded either a design/construct con tract or a construction contract for Step that the applicant is unable to Complete The grant agreement shall establish 3 must furnish performance and pay the necessary preliminary plans and the period within which the project ment bonds, each of which shall be in an studies without Federal assistance; must be completed, in accordance with amount not less than 100 percent of the FEDERAL REGISTER, VOL 3, NO. 39--WEDNESDAY, FEBRUARY 2B, 1913 CAPCO JEN 0005280 RULES AND REGULATIONS 5335 contract price and shall remain In effect g 35.935-9 Project completion. and determined to be allowable in ac- M for 1 year beyond the date of the final The grantee agrees to expeditiously inspection and acceptance of the treat construct and complete the project or cordance with i 30.701 of this chapter, this subpart, and the grant agreement. S ment works. Construction contracts less cause It to be constructed and completed 35.940-1 Allowable project coals. H than *100,000 shall be subject to State In accordance with the grant agreement and local requirements relating to bid and plans and specifications approved by guarantees, performance bonds, and pay the Regional Administrator. ment bonds. In all cases, the contractor must maintain adequate fire and ex 35.935-10 Copier'W contract docu- tended coverage, where appropriate, ments. workmen's compensation, public liability In addition to the notification of proj and property damage, and ''all-risk" ect changes pursuant to i 30.900-1 of this builders risk insurance (Including blast chapter, a copy of any construction con ing, where appropriate) during the con tract or modification thereof (Including struction phase of the contract. subcontracts) and of revisions to plans 35.935-4 Slate and local laws. and specifications must be promptly submitted to the Regional Administrator. The construction of the project, in Allocable project costs of the grantee which are reasonable and necessary are allowable. Necessary costs may include, but are not limited to: (a) Costs of salaries, benefits, and ex pendable material incurred by the grantee. (b> Costs under construction con tracts. (c) Professional and consultant serv ices. .(d) Facility planning directly related to the treatment works. cluding the letting of contracts In con 35.935-11 Project changes. (e) Sewer system evaluation <} 35.927). nection therewith, shall conform to the In addition to the notification of proj applicable requirements of State, terri ect changes required pursuant to S 30.- torial, and local laws and ordinances to 900-1 of this chapter, prior approval by the extent that such requirements do not the Regional Administrator and the State conflict with Federal laws and this Sub agency Is required for project changes chapter. which may (a) substantially alter the 35.935--5 Davls-Bacon and related statutes. The grantee must consult with the Re design and scope of the project, (b) alter the type of treatment to be provided, (c) substantially alter the location, size, capacity, or quality of any major item gional Administrator prior to Issuance of Invitation for bids concerning compli ance with Davis-Bacon and related stat of equipment; or (d) Increase the amount of Federal funds needed to complete the project: Provided, That prior EPA ap utes required pursuant to 5 30.403 (a), proval Is not required for changes to cor (b), and (c) of this chapter. rect minor errors, minor changes, or 35.935--d Equal employment oppor emergency changes. No approval of a tunity. project change pursuant to 9 30.900 of Generali, contracts Involving Step 3. of $10,000 and above, are subject to equal employment opportunity requirements under Executive Order 11246, including rules, regulations and orders issued there under. The grantee must consult with the Regional Administrator concerning equal employment opportunity require ments prior to Issuance of Invitation for this chapter or this section shall commit or obligate the United States to any In crease in the amount of the grant or payments thereunder unless an approved request has been made. The preceding sentence shall not preclude submission or consideration of a request for a grant amendment pursuant to 3 30.901 of this chapter. (f) Project feasibility and engineering reports (5 35.920-3(b) (3) and (4)). (g) Relocation and land acquisition costs required pursuant to the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, 42 U.S.C. 4621 et seq., 4651 et seq., and regulations issued thereunder. Part 4 of this chapter. (h) Environmental assessment <5 35.- 920-3(b) (9)), including costs of public notices and hearings. (i) Preparation of construction draw ings, specifications, estimates, and constructlon contract documents. (]> Landscaping. (k) Supervision of construction work. (l) Removal and relocation or replace ment of utilities, for which the grantee is legally obligated. <m> Materials acquired, consumed, or expended specifically for the project. , (n) A reasonable inventory of labors-' tory chemicals and supplies necessary to initiate plant operations. (o) Development and preparation of an operation and maintenance manual. (p) Project identification signs | J ; 1 , bids where the cost of construction work 35.935--12 Operation and mainte (5 30.604-4 of this chapter). is estimated to be more than *1,000,000, nance. or where required by the grant agree ment. 35.935--7 Access. Any construction contract must pro vide that representatives of the Environ mental Protection Agency and the State will have access to the work whenever it Is in preparation or progress and that the contractor will provide proper facilities for such access and Inspection. The con tract must also provide that the Grants Officer, the Comptroller General of the United States, or any authorized repre sentative shall have access to any books, documents, papers, and records of the contractor which are pertinent to the project for the purpose of making audit, examination, excerpts, and transcriptions thereof. 35.935-8 Supervision. The grantee will provide and maintain The grantee agrees that the treatment works will be maintained and operated in accordance with such requirements as the Administrator may publish from time to time and in accordance with ap propriate methods, techniques, and prac tices for economic, efficient, effective maintenance and operation of such treatment works consistent with the de sign of such works, including, but not limited to, (a) an operation and main tenance manual for each facility, (b) an emergency operating and response pro gram, (c) properly trained management, operations and maintenance personnel, (d) adequate budget for operation and maintenance, (e) operational reports, and (f) provisions for laboratory test ing adequate to determine influent and effluent characteristics and removal efficiencies. ' 35.940 Determination of allowable 35.940--2 Unallowable costs. Costs which are not necessary for the construction of a treatment works project are unallowable. Such costs include, but are not limited to: (a) Basin or areawide planning not directly related to the project: <b) Bonus payments not legally re quired for completion of construction in advance of a contractual completion date; (c) Personal injury compensation or damages arising out of the project, whether determined by adjudication, arbitration, negotiation, or otherwise; (d) Fines and penalties resulting from violations of, or failure to comply with. Federal, State, or local laws; (e) Costs outside the scope of the ap proved project; (f) Interest on bonds or any other form of indebtedness required to finance the grantee's share of project costs; i ! 1 i competent and adequate engineering su pervision and Inspection of the project to Insure that the construction con forms with the approved plans and coats. The grantee will be reimbursed, upon request, in accordance with { 35.945, for the Federal share of all necessary costs <g) Ordinary operating expenses of local government, such as salaries and expenses of a mayor, city council members, or city attorney, except as pro- ^ * specifications. within the scope of the approved project vided in 5 35.940-4; FEDERAL REGISTER, VOL 38, NO. 39--WEDNESDAY, FEBRUARY IB, 1973 CAPCO JEN 0005281 5336 RUt.ES AND REGULATIONS sewer- U^,t 0n (tor example. "8"ts-of-way, sewer treatment '? TM s`tes' sanitary landfills and sludge disposal areas), except as otherwise pro vided In 5 35.940-3 Ca>, 3a,940--3 Costs sllsriblr. If approved. Certain direct costs are sometimes ne cessary for the construction of a treat ment works and are allowable If reason able and approved by the Regional Ad ministrator In the grant agreement or a grant amendment. Such costs include, but are not limited to: (a) Land acquired after October 17, 1972, that will be an Integral part of the treatment process or that will be used for ultimate disposal of residues resulting ments to the grantee for the project is equal to the Federal share of the actual or estimated allowable project costs In curred to date, as certified by the grantee In its most recent request for payment. (c) Adjustment. At any time or times prior to final payment under the grant, the Regional Administrator may cause any request(s) for paymeHT'to be re viewed or audited. Each payment there tofore made shall be subject to reduction for amounts included in the related re quest for payment which are found, on the basis of such review or audit, not to constitute allowable costs. Any payment may be reduced for overpayments or in creased for underpayments on preceding requests for payment. Provided. That the State agency shall be concurrently notified In writing of any such suspension or termination action. 35.955 Grant amendments to increase grant amounts. Grant agreements may be amended In accordance with (30.901 of this chapter with respect to project changes which have been approved In accordance with S 30.900 of this chapter: Provided, That no grant agreement may be amended to Increase the amount of a grant unless the State agency has Issued a priority certification for the grant Increase from available State allotments and reallot ments in accordance with i 35.915. (FR Doc.73-3756 Filed 3-27-73:8:45 m| from such treatment (for example, land for spray irrigation of sewage effluent). <b) Acquisition of an operable portion of a treatment works. (c) Rate determinations studies re quired pursuant to 3 35.925-11. (d> Refund, rebates, credits, etc. The Federal share of any refunds, rebates, credits, or other amounts (Including any interest thereon) accruing to or received by the grantee with respect to the proj ect, to the extent that they are properly 35.940--4 Indirect costs. allocable to costs for which the grantee Indirect costs of the grantee shall be allowable in accordance with an Indirect cost agreement negotiated and incor porated In the grant agreement. An in direct cost agreement must identify, those cost elements allowable pursuant to 35.940-1. Where the benefits derived from a grantee's Indirect services cannot be readily determined, a tump sum for over head may be negotiated based upon a determination that such amount will be approximately the same as the actual in direct costs that may be incurred. has been paid under a grant, must be credited to the current State allotment or paid to the United States. Reasonable expenses incurred by the grantee for the purpose of securing such refunds, re bates. credits, or other amounts shall be allowable under the grant when ap proved by the Regional Administrator. (e) Final payment. On receipt and ap proval of the request for payment desig nated by the grantee as the "final pay ment request" and upon compliance by the grantee with all applicable require ments of this part (including paragraph 35.940--5 Disputes. (d) of this section) and the grant agree The grantee should seek to resolve any ment. the Regional Administrator shall questions relating to cost allowability or cause to be disbursed to the grantee any allocation at its earliest opportunity (if balance of allowable cost which has not possible, prior to execution of the grant been paid to the grantee. The final pay agreement). Final determinations con ment request must be submitted by the cerning the allowability of costs shall be grantee promptly following completion conclusive unless appealed within 30 days of the project work but In no event later in accordance with the "Disputes" article than 1 year (or such longer period as (Article 7) of the EPA General Grant the Regional Administrator may in his Conditions (Appendix A. Subchapter B discretion approve in writing) from the of this title). date of such completion. Prior to final ' 35.945 Gram payments. payment under the grant, the grantee must execute and deliver an assignment The grantee shall be paid on a reim to the United States, in form and sub bursable basis for the Federal share of stance satisfactory to the Regional Ad allowable costs incurred within the scope ministrator. of the Federal share of re of an approved project: Provided, That funds. rebates, credits or other amounts such payments may not exceed the pay (including any Interest thereon) prop ment schedule and the grant amount set erly allocable to costs for which the forth In the grant agreement and any grantee has been paid by the Govern amendments thereto. ment under the grant, and a release dis (a) Initial payment. Upon award of a charging the United States, its officers, grant, the grantee may request payment agents, and employees from all liabili for the unpaid Federal share of allowable ties, obligations, and claims arising out project costs, e.g.. preliminary plans and of the project or under the grant, sub studies, sewer system evaluations, or ject only to such exceptions which may preparation of final construction draw ings and specifications. (b) Interim payments. The grantee may submit requests for payment tar al be specified in the release. 35.950 Suspension or termination of fonts. lowable costs Incurred In accordance with Grants may be suspended, in accord the negotiated payment schedule ln- ance with { 30.902 of this chapter and eluded in the grant agreement. Upon re- Article 4 of the General Grant Condi A ceipt of a request for payment, the tions (Appendix A to Subchapter B of ' Regional Administrator shall cause to be this title), or terminated. In accordance disbursed from available appropriated with { 30.903 of this chapter and Article funds such amounts as are necessary so 5 of the General Grant Conditions (Ap that the total amount of Federal pay- pendix A to Subchapter B of this title): FEDERAL REGISTER, VOL 31, NO. 39--WEDNESDAY*, FEBRUART It, 1973 CAPCO JEN 0005282 TUESDAY, MARCH 27, 1973 ENVIRONMENTAL PROTECTION AGENCY s STATE CONTINUING PLANNING PROCESS Interim Regulations CAPCO JEN 0005283 8034 RULES AND REGULATIONS Title 40--Protection of Environment Specify the requirements for, and withdraw his approval of the process, CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY schedule the completion of, section 303 after consultation with the Adminis basin plans for all waters. trator, if he finds that the process Is Insure public participation in the de grossly deficient. Such finding may be PART 130--STATE CONTINUING velopment of the planning process and based, among other things, on a substan PLANNING PROCESS of plans. tial failure of plans developed pursuant Notice of Interim Regulations The complexity and timing of a plan to the process to conform with the re Notice Is hereby given that these reg ulations are set forth as Interim regula tions by the Environmental Protection for a specific area will be,tailored to the problems of the area.'No process need require Individual plans to be more elab orate than Is necessary for sound water quirements of the Act, or on a substantial failure of the State to meet the approved phasing of planning, or on a substantial failure of the State to Implement plans. Agency (EPA). Section 303(e) of the Federal Water Pollution Control Act, as amended (88 Stat. 816; 33 US.C. 1314 (1972)), re quires each State to submit a continuing planning process which is consistent with the Act. These proposed regulations de scribe the necessary elements of a State's continuing planning process. They also set forth procedures governing planning process adoption, submission, and revi sion and EPA approval. These regula tions also provide a mechanism for States to satisfy portions of sections 208,303(d) (Critical waters and maximum daily loads); 305(b) (State reports on water quality and related information, Includ ing nonpoint sources); 314 (Clean lakes); after June 30,1973,516(b) (Fed eral/State estimate of publicly owned treatment works construction needs); and they provide data for 305(a) and 104(a)(5) (Federal report on water quality). Purpose. The purpose of the continu ing planning process Is to provide the States the water quality assessment and program management Information nec essary to make centralized coordinated water quality management decisions; to provide the strategic guidance for de veloping the State program submittal under section 106 of the Act; and to en courage water quality objectives which take into account overall State policies and programs, Including those for land quality management. Federal properties, facilities, and ac Classification of waters. To establish tivities are subject to Federal, State, In priorities, and to assist the State In as terstate, and local standards and effluent sessing water quality problems, the proc limitations for control and abatement of ess provides that the waters of each State will be classified according to the severity pollution. The State's planning process should include provision for Federal of pollution and the anticipated difficulty of developing and Implementing remedial efforts. Waters will be classified Into two- sources. It Is contemplated that Federal agencies will provide information to the Btates In accordance with procedures classes: * (1) Water quality class: Any segment where It is known that water quality does not meet applicable water quality stand ards and is not expected to meet water quality standards even after the appli cation of the effluent limitations required by sections 301(b) (1) (A) and 301(b) (1> (B) of the Act. (2) Effluent limitation class: Any seg ment where water quality is meeting and will continue to meet applicable water quality standards or where there Is ade quate demonstration that water quality will meet applicable water quality stand ards after the application of the effluent limitations required by sections 301(b) (1) (A) and 301(b) (1) (B) of the Act. Content of the planning process. The State continuing planning process pro vides for the development of basin plans. The process will: Delineate planning areas and Identify planning agencies. Classify waters Into water quality or effluent classes. established by the Administrator. Plan content. Companion regulations under section 303(e), Fart 131 of this chapter, describe the preparation of plans pursuant to the planning process; Fart 131 should be consulted during the development of the planning process under Part 130. In effluent limitation classes the plan should contain discharge priorities, com pliance schedules for discharges with permits and target abatement dates for other dischargers and other management Information as may be necessary; while In water quality classes, in addition to the above information, the plan should establish maximum daily loads and should determine the greater effluent re ductions required for dischargers to at tain the water quality goals. Similarly, the monitoring and surveillance program will focus primarily on those areas where water quality problems are most severe and where existing Information Is most deficient. Identify the elements to be included Publication of regulations governing use and other related natural resources. In the plans in accordance with provi Fart 131, Preparation of Plans Pursuant Cools of the State process. The goals sions of Fart 131 of this chapter. to State Continuing Planning Process, of such a State process are to: Provide a phased schedule for the com has been delayed. Publication of these Provide a basis upon which the State's overall program (106) will be developed. This will be accomplished by developing an annual strategy, which will be based upon basin plans where they are com pleted and upon available Information where the plans are not completed. This annual strategy will assist thf State: In directing resources--planning, mon itoring, permitting, and financial assist ance against water quality problems on a priority basis. In establishing a coordinated schedule pletion of plans. Establish a mechanism whereby the State's priorities tor construction of pub licly owned treatment works, for process ing waste water discharge permits and for other program priorities will be es tablished. The program priorities will be reported In the section 106 State program. Provide a mechanism for determining Investment requirements on publicly owned treatment works. regulations Is expected shortly. Prior to the adoption of final regula tions within 180 days from this date, consideration will be given to comments, suggestions, or objections which may be submitted In writing to: Chief, Planning and Standards Branch; Office of Air and Water Programs; Room 1007, Crystal Mall Building No. 2, Environmental Pro tection Agency, Washington, D.C. 20460. All comments, suggestions, or objections received on or before May 11, 1973 will be considered. of action. In reporting on progress In achieving program targets and scheduled mile stones. Insure that applicable water quality standards are attained. Where water quality standards violations occur an as Provide a basis for assessing achieve ment of interim program milestones and final ambient results to be reported as part of the section 106 State program. Each State will prepare Its plans pur suant to the approved process schedule forplan preparation. If after his approval These Interim continuing planning process regulations shall become effec tive on March 27, 1973. It Is necessary that these regulations take effect prior to a 30-day period after publication be cause States have begun to seek EPA ap sessment will be made whether the ap of the process the Regional Adminis proval of a State operated permit pro plication of Best Practical Control Tech trator finds that the State's approved gram as provided under section 402(b) nology (BPT) for Industry and secondary process is deficient, he will confer with of the Act, and because no such approval treatment for municipalities will correct the water quality problem. If not, a maxi mum pollutant load will be calculated and Individual discharge allocations will the State as to his findings and may request the State to revise its process as appropriate. If the State fails to make the necessary revisions In a timely man can be made unless a State's continuing planning process under section 303(e) of the Act has been first approved. See be made to meet these loads. ner, the Regional Administrator may 40 CFR 124.93. For the same reason, FEDERAL REGISTER, VOL 3*, NO. S--TUESDAY, MARCH 27, 1V73 CAPCO JEN 0005284 RUIES and regulations 8035 notice of proposed rule making and pub lic comment thereon, prior to the effec tive date of these regulations. Is Imprac ticable and contrary to the public In terest. eludes specification of levels of compli ance which shall be achieved prior to that date. . At_ ... Cb) The purpose of the continuing planning process Is: To provide the States the water quality assessment and (el The terms "continuing planning process," "planning process," and "proc ess" mean the continuing planning process required by section 303(el of the Act. Such process develops the State focal point for water quality management William D. Ruckelskads, Administrator. program management information nec decisions. This includes phasing of plans essary to make centralized coordinated to be prepared during fiscal years 1973, Marcs 20,1073. Subpart A--Scop* and Purpose; Definition* water quality management decisions; to 1974, and 1976. provide the strategic guidance for devel (fl The term "plan" means the water oping the State program subtfflUal under quality management plan for each 8c. 130.1 130.3 Scopo and purpose, Definition*. Subpart B--General Requirement* section 106 of the Act; and to encourage hydrologic basin or other approved basin water quality objectives which take Into unit within a State. Such plan constitutes account overall State policies and pro a mechanism for implementing applica grams, Including those for land use and ble effluent limitations and water quality 130.10 Procesa coverage. 130.11 Classification of segments. 150.12 Planning agencies. 130.13 Legal authorities. 130.14 Public participation. 130.16 Separability. Subpart C--Contents of Batin Plans 130.20 130.21 130.22 130.23 Level of complexity of plans. Establishment of planning areas (basins). Relation between plans and other planning provisions. Water quality standards. other related natural resources. (c> The State continuing planning process is'directed toward the attainment of water quality standards established pursuant to sections 301 and 302 of the Act to achieve the goals set forth in the Act. The planning process will develop an annual strategy for directing re sources, establishing priorities, schedul ing of actions; and reporting programs toward achievement of program objec tives. standards, and will consist of such com ponents as are necessary for sound plan ning and program management in the basin covered by the plan. Requirements for the preparation of such plans are described in Part 131 of this.chapter. '(g) The term "effluent limitation" means any restriction established by a State or the Administrator on quantities, rates, and concentrations of chemical, physical, biological, and other constitu 130.24 Total maximum dally loads. (d) The total State planning process ents which are discharged from point 130.25 130.26 130.27 130.28 Individual point source discharge al location; Impact on water quality. Schedules of compliance. Inventory of Individual dischargers. Assessment of municipal needs for publicly owned waste treatment works. is comprised of: (1) The annual State strategy, which sets the State's major objectives and priorities for preparing basin plans and its annual program plan. (2) Individual basin plans, which sources into navigable waters, the waters of the contiguous zone, or the ocean, but does not Include schedules of compliance. (h) The terms "schedule of implemen tation" and "schedule of compliance" are synonymous and mean a description 130.29 Nonpoint sources of pollutants. establish specific targets for controlling for each source of remedial measures to 130.30 Monitoring and surveillance. 130.31 Intergovernmental cooperation. 130.32 Adoption of plans. pollution in individual basins. be accomplished and a sequence of (31 The annual program plan (section actions or operations leading to compli 1061, which establishes the results' ex ance with applicable effluent limitations, Subpart D-^-Preparation of Annual State Strategy pected and the resources committed for water quality standards and other re 130.40 State strategy. the State program each year. The an quirements of State and Federal law. 130.41 Problem assessment and priorities. nual plan is developed from the objec (i) The term "municipal needs" means 130.42 Schedule for plan preparation. tives and priorities of the annual State the total capital funding required for 130.43 State municipal discharge Inventory* 130.44 State industrial discharge Inventory. strategy, and, when available, from the specific targets developed in basin plans. construction of publicly owned treatment works, as defined in section 212(2) (A) Subpart E--Requirements for Approval of Plan* (41 Reports, which measure program and (B) of the Act, that are required to mng Process; Reports performance in achieving programmed meet national water quality objectives 130.60 Submission of process. 130.51 Contents of proceas submittal. 130.62 Planning proceas review; approval or disapproval. 130.63 Prohibition of 'approval of certain planning processes. 130.M Revision*. 230.65 Reports. Subpart P--Relationship of Process to Permit and Construction Grant Programs 130.60 130.61 Relationship of continuing planning process with State participation In National Pollutant Discharge Elim ination System. Relationship of continuing planning process with construction grants. Autkojutt: Secs. 303 and 501. 86 Stat. 816; 83 US.O. 1314 (1972). results. The "continuing planning process'' is the process by which the State develops the foregoing plans and reports. (el This part describes: (11 The general requirements for the planning process (Subpart B1. (21 The content of the basin plans (Subpart Cl. (31 The preparation of the annual State strategy (Subpart D1. (4) The requirements for approval of the planning process (Subpart El. (SI The relationship of the process to permit and construction grants programs (Subpart FI. of sections 301 and 302 of the Act. (j) The term "National Pollutant Dis charge Elimination System" means the Federal permitting system authorized under section 402 of the Act Including any State or Interstate program which has been approved by the Administrator, in whole or in part, pursuant to section 402 of the Act. (k) The term "phasing of planning" means the State schedule approved by the Regional Administrator for the preparation of plans, pursuant to the continuing planning process, during the fiscal years 1973, 1974, and 1975. (l) The term "basin" means the streams, rivers, and tributaries and the Subpart A--Scope and Purpose; Definitions 130.1 Scope and purpose. (a) This part establishes regulations specifying procedural and other elements which must be present in a State con tinuing planning process to obtain ap proval of the Administrator pursuant to section 303(e) of the Federal Water Pol lution Control Act, as amended, 86 Stat. 816, 33 XT.S.C. 1314. This part provides that each State must achieve compliance with the requirements of this regulation 130.2 Definition*. As used In this part, the following terms shall have the meanings set forth "below. (al The term "Act" means the Federal Water Pollution Control Act, as amended, 33 UJ3.C.------ , et seq. (bUPhe term "EPA" means the US. Environmental Protection Agency. (cl The term "Administrator" means the Administrator of the US. Environ mental Protection Agency. (d! The term "Regional Administra tor" means the appropriate EPA Regional total land and surface water area con tained in one of the 287 major and minor basins defined by EPA, or other basin unit as agreed upon by the State(s) and the Regional Administrator. Unless spec ified otherwise, "basin" shall refer only to those portions within the borders of a single State. (m) The term "segment" means a portion of a basin the surface waters of which have common hydrologic charac teristics (or flow regulation patterns); common natural physical, chemical, and biological processes, and which have common reactions to external stresses, not later than June 30, 1975, and in- Administrator. e.g., discharge of pollutants. FEDERAL REGISTER, VOL 3, NO. SR--TUESDAY, MARCH 27, 1973 CAPCO JEN 0005285 8036 RULES AND REGULATIONS (n) The term "cluster" means two or quality standards or where there Is ade from time to time, such designations more dischargers which discharge pol quate demonstration that water quality and delegations shall be accomplished by lutants In such a way that the combina will meet applicable water quality stand revising the process as provided to tion of their effluents causes or may cause ards after the application of the effluent 5 130.54. water quality standards violations. limitations required by sections 301(b) (o) The term "significant discharger" (1) (A) and 301(b)(1)(B) of the Act. 130.13 Legal authorities. means any discharger who Is causing (3) Any classification shall reflect any The State shall specify that It has or serious or critical water quality prob necessary allowano&4er anticipated eco will seek to obtain legal authority, as lems relative to the segment to which it nomic and demographic growth over at necessary, to prepare and adopt plans discharges. least a 5-year period and an additional pursuant to the planning process. (p) The definitions of the following terms contained in section 502 of the Act shall be applicable to such terms as used In this part unless the context otherwise requires: "State." "State water pollution control agency," "navigable waters," "point source," and "discharge." Subpart B--General Requirements 130.10 Process coverage. (a> The process shall provide for the preparation of plans for all waters within the State, as provided In Subpart C. (b) The process shall establish phas ing of plans to be accomplished during the fiscal years 1973, 1974, and 1975, as provided In Subpart D. (c) The process shall provide for the method by which the State shall coordi nate all water quality planning, pro graming and management. (d) The process shall provide the method by which the State shall coordi nate Its water quality management plan allowance reflecting the degree of pre cision and validity of the analysis upon which the classifications are based. Where the analysis Is less precise or there Is uncertainty concerning growth pro jections, a greater margin of safety shall be required for the assignment of any segment to an Effluent Limitation Class. In determining the additional allow ance, consideration should be given-to economic and demographic projections that are utilized in other State programs. (See S 131.210.) (e) The classification of ail waters should be included in the submission of the planning process by the Governor of each State to the Regional Admin istrator. (1) Submission and approval or dis approval shall also be In accordance with li 130.50 and 130.52. (2) Review and revisions of such clas sifications shall be made in accordance with ! 130.54. 130.14 Public participation. Each process or any revision thereof shall be developed with provision for public participation In accordance with section 101(e) of the Act, and any regu lation Issued by the Administrator there under. Public participation with ade quate opportunity for public hearing upon proper showing shall be required on significant elements of the planning process Including proposed State strategy and priority lists developed under the continuing planning process pursuant to section 106 regulations. 130.15 Separability. If any provision of this part, or the application of any provision of this part to any person or circumstances, Is held Invalid, the application of such provision to other persons or circumstances, and the remainder of this part, shall not be affected thereby. ning with related State and local com 130.12 Planning agencies. Subpart C--Contents of Basin Rians prehensive, and functional and project planning activities. Including land use and other natural resources planning activities. (e) The process shall provide the method by which the State shall co ordinate its water quality management planning with that of Its neighboring States. (a) (1) The Governor of a State shall designate a State agency responsible for conduct of the required planning. The Governor may designate a local or Inter state agency to conduct all or any portion of the planning within each basin and may assign planning responsibilities under the process and Part 131 of this chapter to any such designated agency. 130.20 Level of complexity of plans. (a) The process shall provide that plans for water quality segments will contain all the following parts while" plans for effluent limitation segments shall Include items (4), (5), and (6). See { 130.11 for segment classification. (1) An assessment of total maximum dally loads necessary to meet water qual 130.11 Classification of segments. (2) The process shall set forth the ity standards for the specific criteria (a) This section establishes a classi fication system which the process shall employ to categorize segments for pur poses of preparing a plan. The require ments of this part and Part 131 of this chapter "vary according to the classifi cation of each segment, so that the time and resources to be expended In de veloping the plan for that segment, as well as the substantive content of the plan, will be commensurate with the severity of the water pollution problem- lb) This classification of segments shall also be utilized in constructing the State Discharge Priority List developed In Subpart D of this part. (c) The classification shall be based upon measured in-stream water quality, where available. (d) Each segment shall be classified as follows: (1) Water quality class. Any segment where It Is known that water quality does not meet applicable water quality standards and which Is not expected to meet water quality standards even after criteria followed in designating planning agencies pursuant to paragraph (a) of this section and In determining the juris diction thereof. Locally elected officials of general purpose units of governments, and other pertinent local and areawide organizations within the jurisdiction of the potentially designated agency shall be consulted prior to any designation. The criteria for such determinations shall be included. (b) (1) The Initial submission shall Include a specific designation of each planning agency responsible for conduct ing all or any portion of the planning pursuant to the process within each basin. Each designation shall Include: (1) The agency's name, address, and name of director. (11) The agency's jurisdiction (geographical coverage and extent of plan- nlng responsibilities) (2) In the event that all or a portion of a plan is to be undertaken by an agency other than the State water pollution control agency, evidence from such other being violated: (2) An assessment of nonpoint source pollution and, where applicable, needed control measures; (3) Already established effluent limit requirements for significant dischargers and target limits, not previously estab lished, for significant dischargers that are required to achieve water quality standards; (4) An assessment of needs for pub licly owned treatment works; (5) An inventory and categorization of significant individual discharges; (6) Already established schedules of compliance and target dates of abate ment for significant dischargers not on a compliance schedule. (b) The process will allow for basin plans containing one or more water qual ity segments and/or one or more efflu ent limitation segments. The level of planning shall be related to require ments of segments within the basin. 130.21 Establishment of planning areas (basins). the application of the effluent limitations agency shall be supplied which shows The process shall provide for estab required by sections 301(b)(1)(A) and acceptance of such designation and that lishment of planning areas, as follows: 301(b) (1) (B) of the Act. agency's Intent to comply within the (a) Each planning area (basin) shall (2) Effluent limitation class. Any seg times set forth in the process. be the area within the basin boundary. ment where water quality Is meeting and (3) The State may make additional (b) Except as provided in paragraph will continue to meet applicable water assignments, as set forth In this section. (c) of this section, the basin boundaries FEDERAL REGISTER, VOL 3*, NO. 5S--TUESOAr, MARCH 27, 1973 CAPCO JEN 0005286 rules and regulations 8037 shall be those Identified as minor basins In the EPA water quality Information system. * (c) The process may provide for the establishment of planning boundaries differing from those Identified In the EPA basin system. Any such differing boundaries shall be submitted to the Regional Administrator for approval. <d> The initial submission shall In clude a map of adequate scale clearly de lineating the boundaries of each pro posed basin within the State and an Identification of the basin's segments. (See $ 131.201 of this chapter.) 130.22 Relation between plans and 130.27 Inventory of individual dis charger*. (a) The process shall provide that each plan will Include an Inventory of significant dischargers and categoriza tion of these dischargers by segment. Such inventory and categorization shall be used: (1) In determining projects for con struction, with Federal financial assist ance, of publicly owned waste water facilities required to meet the applicable requirements of the Act. (2) For the Issuance of permits to municipal, industrial, and other point source discharges. the analyses and planning pertinent to such area including but not limited to, problem assessment and priorities and schedule for plan preparation. (See S3 130.41 and 130.42.) (2) That when a plan is under devel opment In another State for an area af fecting or affected by waters of the State, the State will cooperate with such other State In the analyses and planning per tinent to such area. (d) The use of interstate agencies in all phases of Interstate cooperation in water quality management planning is encouraged. (e) The process shall describe the mechanism for approval of water quality other planning provisions. 130.28 Assessment of municipal needs management plans involving Interstate The process shall provide that each for publicly owned water treatment waters. basin plan will be coordinated with each applicable water quality subplan (see 5 131.204 of this chapter) and other ap plicable State and local plans Including land use and natural resources plans for the basin. works. ..130.32 Adoption of plan*. The process shall provide that each plan will assess the needs for publicly owned waste treatment works in the basin, as prescribed in 5131.210 of this chapter. * The process shall provide that the plans will be officially adopted, after ap propriate public hearings, as the official water quality management plans of the State and that the plans may be re 130.23 Water quality standards. 130.29 Nonpoint sources of pollutants. vised, after public hearings, as appropri The process shall provide that each The process shall provide that in water ate. Hearings will be held on the plan basin plan will set forth the water qual quality segments each plan will identify, except for those portions of the plan ity standards applicable to the navigable evaluate, and, to the extent possible, where hearings were previously held: for waters covered by the plan. (See 5131.202 of this chapter.) The process, in cluding the basin plans developed as part of the process, shall be the one used by the States to assist in making the necessary revisions of water quality establish controls over nonpoint sources of pollutants, as prescribed in 5 131.211 of this chapter. 130.30 Monitoring and surveillance. (a) The process shall provide for a example, on segments where public hear ings were held In conjunction with the issuance of permits. (See 33 131.401 and 131.404 of this chapter.) Subpart D--Preparation of Annual Strategy standards to bring them Into conform monitoring and surveillance program 130.40 State strategy. ance with the goals of the Act. which is designed to assure collection of (a) The planning process shall provide 130.24 Total maximum daily loads. The process shall provide that for each water quality segment the plan will es tablish total maximum permissible daily loads, Including consideration of non point source contributions, required to meet the applicable violated water qual ity standard as provided in 3 131.205(a) of this chapter. data necessary to establish and review water quality goals, determine maximum daily loads, load allocations and effluent limitations, as described In IS 130.24 and 130.25; establish the relationship be tween water quality and Individual dis charges and identify non-point sources of pollutants. (b) Each monitoring and surveillance program shall Include a program for pro for the preparation of an annual State strategy. The Governor or his designee(s) shall be provided with the opportunity for involvement in the identification and resolution of significant Issues in the for mulation of the State strategy. The strategy shall contain: (1) A statewide assessment of water quality problems and the causes of these problems: 130.25 Individual point source dis ducing the annual reports required under (2) A listing of the geographical or charge allocation; impact on water section 305(b), beginning with the report discharger priorities of these problems; quality. required by January 1, 1975. (See (3) A listing of the priorities and (a) The process shall provide that each plan will identify, locate, and de scribe each significant point source of pollutants and any other point source as is appropriate in accordance with 5 131.206(a) of this chapter. (b) The process shall provide that in water quality segments in each plan tar get pollutant discharge allocations and thermal discharge allocations for point, and nonpoint sources where feasible, will be established as provided in 5 131.206 3 130.55.) 130.31 Intergovernmental cooperation. (a) The process shall provide that In the preparation of basin plans, areawide and local planning inputs will be re viewed and will be Included in the basin plan as appropriate. (See 3 130.22.) (b) The process shall provide that local governments within the State will be encouraged to utilize existing or carry out appropriate institutional or other ar scheduling of permits, construction grants, basin plans, and other appro priate program actions; (b) The strategy should be based upon information derived from completed plans when available and from avail able Information in areas where plans are not complete. (c) The strategy shall be submitted as part of the section 106 State program submittal as required pursuant to 3 130.55. (b) of this chapter. (c) The process shall provide that each plan will establish controls over the disposition of all residual waste from any municipal. Industrial, or other wa ter or waste water treatment processing, as prescribed in 3 131.203(e) of this chapter. 130.26 Schedule* of compliance. The process shall provide that each plan will develop schedules of compli rangements with other local govern ments, in the same State, for cooperation in the development and Implementation of plans. (c) The process shall provide for inter state cooperation whenever a plan invoWSS the interests of more than one State. Such provision shall Include the following assurances: (1) That when a plan is under devel opment In the State for an area affecting or affected by waters of one or more 130.41 Problem assessment and prior, itie*. (a) Based on the annual statewide as sessment of the water quality problems and causes of these problems developed pursuant to 3 130.40(a)(1), the State shall rank each segment In priority order, taking Into account: (1-) Severity of pollution problems. (2) Population affected. (3) Need for preservation of high quality waters. ance or target dates of abatement as pre other States, the planning agency will (4) National priorities as determined scribed in 3 131.207 of this chapter. cooperate with each such other State in by the Administrator. FEDERAL REGISTER, VOL 3, NO. SS--TUESDAY, MARCH 27, 1973 CAPCO JEN 0005287 8038 RULES AND REGULATIONS (b) Segments of the same basin need maintain, a State industrial Discharge of this chapter, relating to such plans. not be listed together; however, their Inventory. The procedures used in 1130.- Substantial failure of any plan or plans ranking In the State list shall be con* 43 for constructing and submitting the prepared pursuant to the process to con sistent with their ranking In any ap municipal Inventory shall be used In de form with such applicable requirements proved plan. veloping the Industrial discharge Inven may Indicate that the planning process (c) This ranking shall generally gov tory. The State Industrial Discharge In by which such plan or plans were devel ern the development of plans, construc ventory shall be used In establishing oped was deficient and should be revised. tion of publicly owned treatment works, priorities and output-estimates for Issu Failure to accomplish necessary revisions Issuance of permits, and other program ing Industrial permits to be developed as of the planning process may result in activities. part of the State program submittal re withdrawal of approval of part or alt of 130.42 Schedule for plan preparation. (a) The process shall establish a schedule for plan preparation. The sched ule shall provide a sequence for phasing the completion of plans to assure the orderly Implementation of the planning process, consistent with existing plan ning efforts and needs and the expand ing capabilities for planning In the State. Such schedule shall determine the State's priorities for the development of plans pursuant to the process during the pe riod covered by the schedule. It shall pro vide for an initial number of plans to be quired under section 106 of the Act. Subpart E--Requirements for Approval of Planning Process; Reports 130.50 Submission of process. (a) The Governor of each State shall submit to the Regional Administrator the continuing planning process pursuant to section 303(e) of the Act. ____ (b) Submission shall be accomplished' by delivering five copies of the planning process to the Regional Administrator and a letter from the Governor notifying him of such action. the process. The approval of the State participation In the National Pollutant Discharge Elimination System will be withheld or withdrawn if the process Is not approved. (See 1 130.60.) 130*54 Revisions, (a) The State shall annually review its continuing planning process and shall revise the process as may be necessary to assure the development and mainte nance of current plans which will ac complish national water quality objec tives in conformity with the requirements of the Act. completed not later than June 30, 1973; 130.51 Contents of process submittal. (b) (1) The Regional Administrator an additional number of plans to be com () The submittal shall at a minimum shall from time to time review each pleted not later than June 30, 1974; and for remaining plans to be completed by June 30,1975. Cb) The schedule of basin plans shall be determined following consideration of: (1) The ranking of segments pursuant to 5 130.41 and the number of water quality segments in the basin; and contain the following: (1) A map of the State showing basins and segments. (2) A listing of the classifications of segments. (3) A description of the planning method employed to formulate plans. (4) A listing of the planning agency or agencies that will perform the planning. State's approved planning process for the purpose of insuring that such plan ning process is at all times adequate to assure the goal of paragraph (a) of this section. (2) Hie State shall revise its process as necessary upon a finding by the Re gional Administrator and notification by him to the State that the process Is sub (2) Any other factors that the State (5) A schedule for plan preparation. stantially Inadequate to assure the goal may deem appropriate in developing and () A description of participation of of paragraph (a) of this section. scheduling plans for sound water quality the public in the development of the (3) The State shall revise its process management. process. Including participation of local within 60 days following notification by 130.43 Slate municipal discharge in ventory. (a) Each State shall establish not later than June 30.1973, and shall there after maintain, a State Municipal Dis charge Inventory. Such an Inventory shall set forth for the State a ranking of significant munclpal dischargers. The governments. (7) A specification that legal authori ties required to prepare and adopt plans required by the planning process exist or will be obtained. (S) A description of reports including the State strategy that will be submitted under section 106 of the Act. the Regional Administrator pursuant to subparagraph (2) of this paragraph or by such later date as may be prescribed by the Regional Administrator after con sultation with the State. (c) Revisions of the process shall be submitted in accordance with 1 130.50. (d) Review and approval or disap proval of revisions of the process shall State Municipal Discharge Inventory 130.52 Planning process review; ap be carried out in accordance with shall be used in establishing priorities proval or disapproval. } 130'.52. and output estimates for municipal facil ities construction and in issuing mu The Regional Administrator shall ap prove or disapprove the planning process g 130.55 Reports. nicipal permits to be developed as part of submitted pursuant to i 130.50 within 30 Hie annual State strategy including the State program submittal required under section 108 of the Act. This list shall become the list of municipalities re quired in {35.915(b) of this .chapter for award of construction grants. (b) The State Munclpal Discharge In ventory shall be revised and submitted at least once each year as required pur suant to 1 130.55. (c) The State Municipal Discharge In ventory shall be prepared as follows: days after the date of submission, as follows: (a) If the Regional Administrator de termines that the planning process con forms with the requirements of the Act and this Part 130, he shall notify the Governor by letter. (b) If the Regional Administrator de termines that the process fails to con form with the requirements of the Act and this Part 130, he shall so notify the the State Problem Assessment and Prior ities described in 1130.41, the State Municipal Discharge Inventory described in { 130.43, and the State Industrial Dis charge Inventory described in i 130.44, as well as any other program progress report which may be required, shall be submitted as port of the State program submission under section 106 of the Act Subpart F--Relationship of Process To Per mit and Construction Grant Programs (1) The State shall rank and cate gorize significant municipal dischargers consistent with the segment rankings contained in i 130.41. (2) Dischargers of the same basin need not be listed together; however, their ranking and categorization in the State list shall be In accordance with their ranking and categorization in any approved plan. 130.44 State industrial discharge in ventory. Governor by letter and shall state: <1) The specific revisions necessary to obtain approval of the process; and (2) The time period for resubmission of the revised process or portions thereof. 130.53 Prohibition of approval of cer tain planning processes. The Regional Administrator shall not approve any continuing planning process which will not result in timely plans, for all navigable waters within the State, 130.60 Relationship of continuing planning process with State partici pation in National Pollutant Dis charge Elimination Syatetn. (a) State participation in the National Pollutant Discharge Elimination System, other than the interim participation pro vided in section 402(a) (5) of the Act, shall notbe approved for any State which does not have an approved continuing planning process. <b) Approval of State participation in Each State shall establish not later that conform with the requirements of the National Pollutant Discharge Elimi than June 30, 1973, and shall thereafter section 303(e) of the Act and Part 131 nation System may be withdrawn from FEDERAL REGISTER, VOL. 31, NO. St--TUESDAY, MARCH 27, 1973 CAPCO JEN 0005288 RULES AND REGULATIONS 8039 any State if approval of the continuing planning process Is withdrawn following approval, Including withdrawal of proc- v eas approval based on gross failure to comply with the schedule for plan prep aration (({ 130.40 and 130.41) or on fail ure of plans to conform with the process <1130.53). <c> In connection with any permit Is sued to a significant discharger In a cluster where water quality violations occur, or are suspected to occur, and for which no plan has been approved by the Regional Administrator, the water qual ity Impact of the discharges of all mem bers, municipal and Industrial, of the cluster to which such major discharger belongs, dust be considered In connec tion with the Issuance of such dlsharger's permit. 130.61 Helatioruhip of continuing planning process with construction grants. (a) Before approving a grant for any project for any treatment works under section 201(g) of the Aetrafter June 30, 1973,-the Regional Administrator shall determine, pursuant to 40 CFR 35.925-2, that such works are In conformity with any applicable plan approved In accord ance with this part and Part 131 of this chapter. Disapproval by the Regional Administrator of a plan, or relevant por tion thereof, for the area where a project Is to be located may constitute grounds for not approving a grant for such project. <b) The Regional Administrator may suspend or terminate a grant for any project for any treatment works In ac cordance with 135.950 of this chapter If he determines that such grant is Incon sistent with a plan, for the area of the project, approved subsequent to approval of the grant. {PR DOC.73-SM1 FUed 3-3S-73;8:48 am] FEOEKAL REGISTER, VOL 3*. NO. 5*--TUESDAY, MARCH 27, 1973 CAPCO JEN 0005289