Document bBGVXmpZwKE6XDorLKnR6MJvo

Monsanto FROM (NAME A L DATE SUBJECT REFERENCE TO C. F. Buckley - WGK February 7, 1973 . Status - PCB Environmental Control Program - 4- - J. R. Savage - B2SL G. L. Bratsch CC: W. C. Engman P. E. Heisler C-. A. Hippe P. B. Hodges - E1SP Grant W. R. Richard - T3A E. E. Stewart Starting this month the status of the PCB environmental control program will be reported by the environmental control group at VICK. This report for Feb. 1, 1973 follows the same format as earlier reports. I. PCB Level in Sewers January losses at 3.3 #/day from the operating departments and the incinerator area are 83^ higher than in December. The Taste Treatment influent losses of 12 AVday is 1^0^ higher than last month but the loss in the effluent has remained low at 3 #/day. A. Aroclor Department. PCB losses 'from the department increased to 3.25 #/day from 1.63r/day last month. This reflects an l8ir/day loss for 3 days due to a mist eliminator failure, however the current level appears to have risen to 3-^^/day ` since air blowing had to be restarted because of corrosion problems. B. Incinerator. Down all month and losses fell to 0.05 r/day. C. Total Plant. Influent losses average 12#/day however the individual samples show a peak at 5^#/day corresponding to a peak of 18 #/day from the department. A subsequent peak at 21 #/day was not related to a department loss. No conclusion regarding background levels can be made from January results. _ D. Treatment Plant Effluent. This level of losses remained low at 3#/day spite of the higher influent load. 3# day is equivalent to about 0.003 ppb in the Mississippi River at average flow and about 0.002 ppb at the present river level. IN - 10- *&v. t/ DSW 247369 STLCOPCB4054018 J. R. Savage - B2SL Status - PCB Environmental Control Program Page 2 WGK 2/7/73 II. Project Status Project 3972 - "Rework North Basin Sewer". Project completed during month. Essentially all flows which could contain PCB's are flowing through one source where the effluent flow rate is measured and a composite sample obtained for analysis. Project 3$p6 - "Alteration to HC1 Distribution System", to eliminate possibility of sewering Dept. 246 HC1 off-gas. EDC 5/1/73. Project 4438 - "Reduce Y/ater Flow to Sewer". Estimate approved 1/24/73 $5000 Capital, $9000 Expense. Y/ill not only permit water reduction as related to chemical treatment of plant waste stream, it will also permit elimination of air blowing. III. Program Status Re Engman/Bratsch 4/24/72 1. HC1 Off-Gas . a. Aroclor - Continuing to coordinate production with chlorosulfonic acid ' production to minimize sewering off-gas at Dept. 246. b. Design in progress to "Install PCB Off-Gas Scrubber", $73000 capital, $5000 expense. 2. Blow Tank Off-Gas ' Estimate approved to permit elimination of air blowing. See above re project 4438. 3. Aroclor DepartmentCatch Basin Project 3972 completed and put in service in January. 4. Incinerator Scrubber. No work planned. 5. Incinerator Catch Basin . No activity to reduce losses. Incinerator idle during January for repairs. ' DSW 247370 STLCOPCB4054019 J. R. Savage - B2SL Status - PCB Environmental Control Program Page 3 WGK 2/7/73 III. Program Status (Continued) 6. Rip Track Washes No activity to reduce losses in January. From data at UTP Influent would indicate possible losses from this area. To review in February. WGK Strategy Plant strategy meeting to be held again when additional information is received from EPA with regard to specifics or with regard to formulation of government effluent standards with regard to PCB's. dy DSW 247371 STLCOPCB4054020 '* STLCOPCB4054021 2 0 X 2 d TO THE IN C H 4 6 1 2 4 0