Document bB9N23km5xBZaXyeNk4OxxEpZ
SUBCONTRACT
Brown GTRcx?tlna
P. O. fro* 1, Houtton, Tx 77001
PAGE 1 OF 2
EFFECTIVE DATE
8-13-79
BROWN * ROOT JOB NUMBE.R/ACCOUNT ING CODE
( -41060
27-4060 (5)
- . aTE CONTRACTOR'S LICENSE NUMBER (It Required)
B/A
REQUISITION NUMBER
SUBCONTRACT NUMBER
------------ --
27-14-4815
27-4060-5037
PROJECT NAME
--------- ----------
ETHYL CORP. "CENTRAL PLANT IMPROVEMENTS"
sw
DATE OF ISSUE
M/a-:-
> TSUBCONTRACTORT
C 03866134 7 CONSTRUCTION SERVICES, INC. -p. O. SOX 96407
^HOUSTON, TEXAS 77013
THE SUBCONTRACT TERMS APPEARING BELOW TO"1 CETHER WITH THE ATTACHMENTS HERETO FORM THE
PROVISIONS OF THE ENTIRE SUBCONTRACT.
AS OF THE EFFECTIVE DATE OF THIS SUBCONTRACT. PAYMENT AND PERFORMANCE BONDS ARE NOT REI OUIRED BUT MAY BE REOUIRED PURSUANT TO GEN-J ERAL CONDITIONS.
- ' l.ir- ,
1. SUBLET WORK
, SUBCONTRACT TERMS
1.1- SUBCONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, INSURANCE, SU PERVISION AND ALL OTHER THINGS NECESSARY TO COMPLETE INSULATION OF THE REACTOR BEADS AND PIPING IN AREA 1903", ETHYL CORP. PLANT, PASADENA, TEXAS.
1.2 SUBCONTRACTOR SHALL PERFORM THE SUBLET WORK IN STRICT ACCORDANCE WITH THE DIRECTIVES OF THE GENERAL CONTRACTOR'S JOB SUPERINTENDENT OR HIS DULY AUTHORIZED REPRESENTATIVE AND SHALL MAINTAIN CONTACT WITH GDIERAL CONTRACTOR'S PROJECT MANAGEMENT FOR THE PURPOSES OF COORDINATING THIS SUBCONTRACT. _ '
2. SPECIFICATIONS
^ 2.1 JACKETING SHALL BE .010 SMOOTH STAINLESS STEEL. 2.2 STAINLESS"STEEL JACKETING TO BE INSTALLED ON THE BOTTOM HEADS OF R-7201-A, ESC AND R-7301-A 6 B.
2.3 STAINLESS STEEL FLASHING TO BE INSTALLED OVER THE INSULATION SUPPORT IV ACCORDANCE WITH GENERAL CONTRACTOR'S DIRECTIVE.
3. SUBCONTRACT PRICE
GENERAL CONTRACTOR AGREES TO PAY SUBCONTRACTOR FOR COMPLETE, SATISFACTORY, AND TIMELY
PERFORMANCE OF THE SUBLET WORK THE FOLLOiTNC FIFJI TOTAL LIE-IP SUM PFJCEX^P^5 INCLUDES
ALL APPLICABLE SALES/USE TAXES:
FOURTEEN THOUSAND, FIFTEEN DOLLARS AND NO CENTS (WORDS)
$14,015.00 (FIGURES)
TIME OF PERFORMANCE
28 e oo oo c: 2T
m
I> rrjO SC "T _,cn
--
W JT
--*>*
JF ~D r*
to CO
r--*i
rr* C* o
20 U o
--1 c
as o
SUBCONTRACTOR SHALL INITIATE AND COMPLETE SUBLET WORK IN STRICT ACCORDANCE WITH THE SCHEDULE AID TD-E FRAME AS SET BY GENERAL CONTRACTOR'S PROJECT KANAG DENT.
ATt'ACHIAENTS (AS CHECKED)
3 P-SO GENERAL CONDITIONS SPECIAL CONDITIONS 0 p-7 AFFIDAVIT (2)
OTHEfti
te-X
,
Iiar.CURE
SUBCONTRACTOR AUTHORIZED REPRESENTATIVE
/
\/*a*r
D7A/T/C/ShlGt/EDi
BROWN & ROOT, INC. - GENERAL CONTRACTOR
signature
AUTHORIZED REPRESENTATIVE . date signed
/j/~. fj-r/-r 'TY'n-ft.'ss /SV-
:n <?-//-"7^
JCESITE FILE COPY
r-21 (0S-7|
00415
ETCO-8J8
. .PAGE NUMBER
2 OF 2
t.. . xlibcontract nuwuhr ;
SUBCONTRACT/CHANGE ORDER CONTINUATION j 27-4060-5037
INSURANCE CERTIFICATES
5.1
SUBCONTRACTOR SHALL FORWARD ITS INSURANCE CERTIFICATE STATIRC THE HAKES OP ITS INSURANCE CARRIER (S) AND CERTIPTING THAT ITS INSURANCE COVERAGE MEETS WITH TEE REQUIREMENTS OP GENERAL CONDITION 21.
- 5.2 SUBCONTRACTOR INSURANCE CERTIFICATES SHALL REFERENCE THE PROJECT AND SUBCONTRACT NO., AND SHALL KAIL ONE COPY TO THE FOLLOWING ADDRESS WITH THIS SUBCONTRACT:
BROWN t ROOT, INC. ' P. 0. BOX 3 HOUSTON, TEXAS 77001
ATTN: D. L. SEIFERT (01-129C)
6. AFFIDAVIT
TWO COPIES OP THE GENERAL CONTRACTOR'S "AFFIDAVIT FOR SUBCONTRACTOR" (FORK P-7) ARE ATTACHED. CONTRACTOR SHALL EXECUTE AND RETURN ONE COPY WITH HIS PINAL OR RETAINAGE' INVOICE.
7. INVOICES
7.1 SUBCONTRACTOR SHALL RENDER ALL INVOICES IN QUADRUPLICATE TO THE FOLLOWING ADDRESS: ^ ~ BROWN l ROOT, INC.
8. 9.
209 N. MAIN PASADENA, TEXAS 77506
SUBCONTRACTOR'S REPRESENTATIVE
ATTN: J. W. HOEROW
SUBCONTRACTOR SHALL DESIGNATE A SHE REPRESENTATIVE TO THE GENERAL CONTRAC TOR PRIOR TO CCMMENCIMENT OP AP0E2U5NT30KED TORE. HE, OR ES BIS TSCPORAKI ABSENCE, ELS DESIGNATED ASSISTANT, SHALL BE "05 CALL" AT ALL HOURS, PROM C0MME5CBCEST OF SUBLET VORK TO COMPLETION.
LABOR RELATIONS
THE FOLLOWING SUPPLB-CE5TS PARAGRAPH BO. lk OP TEE GENERAL CONDITIONS.
SUBCONTRACTOR REPRESENTS THAT ITS PKE-ELKUJG COLLECTIVE BARGAINING AGREEMENTS, IF ANY, CONTAIN, OR WILL CONTAIN, PROVISIONS THAT, C3R SUBCONTRACTOR HAS ENTERED INTO, OR WILL ENTER INTO A PROJECT AGREEMENT MODIFYING SUCH COLLECTIVE BARGAIKIBG AGREEMENT TO PROVIDE THAT THERE SHALL EE HO STRIFES, SLOW-DOWNS, PICKETING, SECONDARY BOYCOTTS, OR WORK STOPPAGES DURING TEE PERFORMANCE OF THE SUBLET WORK. SUBCONTRACTOR WILL FURTHER SUBCONTRACT -ONLY TO LOWER-TIER CONTRACTORS BAYING ' SIMILAR PROVISIONS IS THEIR COLLECTIVE BARGAINING AGREEMENTS, IF ANY.
THIS SUBCONTRACT/CHANGE ORDER CONSISTS OF PAGE 1 BEARING SIGNATURES AND AS MANY ADDITIONAL NUMBERED PAGES AS SHOWN ABOVE. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
JOBSITE Flic COPT
Ml*
00416