Document bB8yrw2JnkO11p2q1NNgwOLa6
Louisiana Division Consolidated Assessment
LOSS PREVENTION / FIRE
PLANT: PQWEBJAUILITJESL____________ _______
BUILDING: 1801
_____________
REVIEW DATE & TIME: March 11, 1992 8:00 A.M.
LOSS PREVENTION TEAM:
SUPERINTENDENT: KEN FOX LOSS PREVENTION: JftucLJBailey________ _____ SAFETY ENGINEER: Gervey Smith____ ___________ TECHNOLOGY CENTER: BotLPieper_____ _____ DEPARTMENT PERSONNEL: JOE RAWLINGS, MARTY MORRISON, KEVIN TAYLOR____________ ______________
SECTION MANAGER: _____ MAJOR MANAGER: PAUL ROZAS
(To be completed by the Superintendent)
7/20/90
DOW CONFIDENTIAL
Do A I)792A confidential
Page 1
Louisiana Division Consolidated Audit LOSS PREVENTION
LOSS PREVENTION
TABLE OF CONTENTS
I. DESCRIPTION OF ASSESSMENT A. Objective B. Introduction C Assessment Team Composition
11. ASSESSMENT MATERIALS A. Materials To Be Sent To Assessors Ten (10) Calendar Days Prior To The Assessment B. Materials To Be On Hand At Plant Site During The Assessment
III. ASSESSMENT AGENDA A. Presentation By Plant B. Facility Tour
IV. ASSESSMENT QUESTIONS
V. APPENDIX A. List of Resource Manuals
VI. FORMS A. Plant Risk Analysis Summary (C-50010) B. Fire & Explosion Index (C-22380)
VII.
FORMAL REPORTS A. Assessment Team Report To Plant Within
One (1) Week of Assessment B. The plant's implementation plan (approved by
Management) should be copied to each member of the Core Assessment Team within 45 days of the Assessment.
PAGE 3
4
5 7 33
3/7/91
DOW CONFIDENTIAL
Page 2 of 33
Louisiana Division Consolidated Audit LOSS PREVENTION
L DESCRIPTION OF LOSS PREVENTION ASSESSMENT
OBJECTIVE:
The assessment is intended to help the plant/
department identify Loss Prevention strengths and weaknesses by
having an outside team review your programs. This assessment also
covers the requirements of our Dow Insurance Inspection program.
INTRODUCTION: The assessment will cover the following Loss Prevention elements:
1. Electrical Systems 2. Fire Protection System & Maintenance Problems 3. Fired Equipment 4. Critical Instruments/Computers 5. Emergency Block Valves 6. Drainage 7. Emergency Plan 8. Storage Tanks 9. Building Location and Fire Risk 10. Warehouse Storage 11. Pressure Vessels and Relief Valves/Glass Devices/Expansion
Joints 12. Critical Equipment 13. Flammable Mixtures/Combustible Dusts 14. Control of Process Change/Safety & Loss Reviews 15. Insurance Package
a. Unit Loss Prevention Summary b. Risk Analysis Package (F&EI, pg- 48)
Prior to the assessment, some material will need to be prepared and sent to the Assessment Team. The pre-assessment questionnaire will be used as a worksheet or outline to prepare for the assessment presentations and discussion. The questionnaire will be used by the plant/department to identify strengths and weaknesses which will be reviewed during the assessmentpresentation. The assessors will use the questionnaire to identify areas for improvement and will bring these up on an exception basis at the appropriate time during the assessment presentation. The questionnaire will be used during the assessment only as reference material (see next page).
DO A 117928 CONFIDENTIAL
3/7/91
DOW CONFIDENTIAL
Page 3 of 33
Louisiana Division Consolidated Audit LOSS PREVENTION
The assessment will require approximately two hours - approximately one hour will be spent inspecting the plant in the afternoon. A plant representative should accompany each assessment team member during the tour.
There will be a verbal feedback session at the end of the assessment. A written report of the Assessment Team's findings and recommendations will be provided.
II. ASSESSMENT MATERIALS
TEN CALENDAR DAYS PRIOR TO THE ASSESSMENT Send a copy of the following information to the Loss Prevention Audit Team in 47 Building.
1. Insurance Package (see enclosure) a. Unit Loss Prevention Summary b. Risk Analysis Package (F&EI, pg. 48). Use the 6th Edition F&EI book for calculating your F&EI's. For assistance with the Risk Analysis package, call Loss Prevention.
2. Completed Loss Prevention Questionnaire. 3. List of loss prevention concerns plus a copy of last Loss
Prevention Audit recommendations and responses. 4. Your Assessment Presentation (see next page).
FOR THE^ASSESSMENT: Have the following on hand:
1. Items 1-3 above. 2. Operating Discipline 3. Emergency Manual 4. Critical Instrument Program Records 5. EBV Test Records 6. Startup and Re-light Procedures for Fired Equipment
(if applicable) 7. Pressure Vessel, Relief Device, Glass Device, and Expansion Joint
Inspection Records
DO A 117929 CONFIDENTIAL.
3/7/91
DOW CONFIDENTIAL
Page 4 of 33
Louisiana Division Consolidated Audit I.OSS PREVENTION
FOR THE ASSESSMENT (Coni.):
Have the following on hand:
8. Electrical Classification Plot Plan
9. Plot Plan
}
10. Fire Protection Plot Plan } Can be on a combined sheet.
1 1. Drainage Plot Plan
}
12. Flowsheets (Simple)
13. P&ID's
14. Smoke Detector Test Records
15. Gas and Spill Detector Test Records
16. Ground Test Records
PLEASE HAVE ALL DOCUMENTATION FOR THE ASSESSMENT QUESTIONS AVAILABLE.
III.
ACTIVITIES (Overhead Transparencies Required)
1. Review the loss experience for your plant for the past two years, or last incident if greater than two years.
2. Review status of items from the previous Loss Prevention Audit which the plant agreed to act upon.
3. Review any Loss Prevention changes in the past two years.
4. Loss Prevention plans for the next 24 months. 5. Major Loss Prevention concerns of the plant.
Approximate Time
Review during overview session on Day 1.
3/7/91
DOW CONFIDENTIAL
DO A 117930 CONFIDENTIAL
Page 5 of 33
Approximate Time__ ______
(Discussion of Exceptions and Plans)
60 Minutes
1. Electrical Systems 2. Fire Protection System & Maintenance
Problems 3. Fired Equipment 4. Critical Instruments/Computers 5. Emergency Block Valves 6. Drainage 7. Emergency Plan 8. Storage Tanks 9. Building Location and Fire Risk 10. Warehouse Storage 11. Pressure Vessels and Relief Valves/Glass
Devices/Expansion Joints 12. Critical Equipment 13. Flammable Mixtures/Combustible Dusts 14. Control of Process Change/Safety & Loss Reviews 15. Insurance Package
a. Unit Loss Prevention Summary b. Risk Analysis Package (F&EI, pg. 48)
FACILITY TOUR:
Tour hosts should be available for a plant tour where the above items can be shown.
45 Minutes
ASSESSMENT CONCERNS AND RECOMMENDATIONS:
1. The Assessment Team will briefly summarize the major concerns in a verbal wrap-up session.
2. The Loss Prevention representative will summarize the team's concerns in a written report within one week.
3. The Superintendent should review the written concerns and submit a response within 45 days to Loss Prevention.
3/7/91
DOW CONFIDENTIAL
15 Minutes
D0 A 117931 CONFIDENTIAL
Page 6 of 33