Document bB5EpE2E75oRERbaKOL5xmgR6
Uonsaoto
PIOM *** %
P B Hodges - General Offices
^24^69
save @w@jee? NflMSCI
TO
January 23* 19^9 AROCLORS IN PLANT EFPKJBfT
Messrs. E. 0. Wright - ANNISTON C. P. Buckley - KRUM*tRICH
C-O-N-F-I-D-E-N-T-I-A-L
ce Messrs.
W. R. Richard
W. A. Kuhn D. B. Hosmer . E. S. Tucker -------? E. P. Wheeler 0. L. Bratsch
W. B. Papageorge D. W. Jackson/
WHICH
WKUHN DHOSM
S. 2ND ST EWHEE rauwmicH ANNISTON KRUMMRXGH
B. R. Williams
J. C. Landwehr/ - ANNISTON W. Taffee
With the likelihood that the attention now being focused on presence of aroclors In natural waters will draw attention to any aroclor being sewered in our production plant outfalls, we should begin to protect ourselves. Since the problem, if
any, has not yet been defined, I'm recommending at this time only action preparatory to actual clean up. Please arrange
for the following:
1. Waste samples -- Before any clean up action of any kind is taken, we need to know, at least approximately, how much aroclor we are discharging into natural waters
via our waste outfalls.
We do not presently have techniques for analyzing water
for aroclors in low concentrations. It is expected
that these techniques will be developed by late this
coming fall. Therefore, please collect, freeze and
hold indefinitely three 2-3 liter samples of your out
fall as it is discharged to natural surface waters
(entrance to Snow Greek at Anniston; outlet of Village
waste treatment plant at W. G. Krummrich). Scott Tucker,
who is developing the analytical procedures suggests use
of polyethylene bottles. Samples should be taken several
days apart and should represent normal conditions,
including one sample taken at peak loading (e.g. after
dropping spent aroclor from P2S5 heat exchanger at
W. 0. Krummrich).
*
2. In addition to collecting the samples, commence collect ing data on points and amounts of aroclor discharges to
sewers and means of disposal alternate to sewering. This information will help permit us to move rapidly in case a crisis develops. Oo not proceed with abatement
projects at this time except as in (3) below. Publish report on information developed along with roughly
estimated costs. June 1, 1969# appears to be s reason able deadline at this time for the report, but this could change drastically.
m i
WATER PCB-SD0000019555
Meiers. E. Q. Wright C. P. Buckley
2 January 23, 1969
3. In case you discover sewering of large amounts with a low cost alternate disposal method, proceed with the clean up. One example is the sewering of spent aroclor from P2S5 operations at W. Q. Krummrich. From standpoints of possible sewer pluggage plus gummy hard-to-handle solids collected at the waste treatment plant, present practice Is poor. Anniston is drumming and hauling their similar spent aroclor to a dump. We suggest that W. 0. Krummrich find out how Anniston is handling this and proceed with a similar set-up if it appears practicable and reasonably economical.
Let me know if you have questions regarding this.
Paul B. Hodges acd
TRAN 086144 WATER PCB-SD0000019556