Document b9vM9kRmX6KaL1D6gY1w86n1

T. J. TOFFLEMIRE L. J. HETLING S. 0. QUINN JANUARY 1379 MOMS 007785 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION CU-P t44F^Q. I. ' Acknowledgements Credit 1b given to Normandeau Associates, Inc* for the bed sampling and size analyses, to Vincent Blsceglls for core section and coding, to Michael Rafferty and Richard Murdock for hydraulic dredge monitoring, to William Miner and Ken Griggs for dragline dredge monitoring, to O'Brien and Gere Engineers for PCB analyses, to Lawler, Matusky and Skelly Engineers for Mathematical Modeling, to U.S* Geological Survey for river water PCB measurements and calculations, to Malcolm Pirnle, Inc. for sediment and dredging calculations and planning, to Charles McFarland of General Electric Co. for the volatilization studies and to the NY State Department of Transportation staff for assistance In the dredging studies* The Interpretations and conclusions are those of the authors and not necessarily those of the consultants* Disclaimer This report has been reviewed by the Department's staff and approved for publication* Approval does not signify that the comments necessarily reflect the views and policies of the Department, nor does mention of trade namea or commerlcal products constitute endorsement or recommendation for their use* . This Is a version of a paper presented at the 51st Annual Meeting of the Water Pollution Control Federation in Anaheim, California. October, 1978* MUNS 007766 ERRATA'SHEET Technical Paper No. 55 pg. 7, Last sentence should read -- - - a lower estimate of 29,000 kg (63,800 lb) is possible with only 26,500 kg (58,000 lb) in Areas 3, 3A and 5.^^ pg. 58, Figure 19,20 and 21: Air Speeds 1.4 m/s should be: .338 m/s .76 mph 3.7 m/s should be: 875 m/s * 1.96 mph 6.9 m/s should be: 1.62 m/s 3.62 mph MGNS 007787 TECHNICAL PAPER NO. 55 PCB IN THE UPPER HUDSON RIVER: SEDIMENT DISTRIBUTIONS, WATER INTERACTIONS AND DREDGING by T.J.Toffleralre, L.J. Hetllng and S.O. Quinn NY State Department of Environmental Conservation Bureau of Water Research January, 1979 MGNS 00778b TABLE OF CONTENTS Introduction .......................................................................................................................... Sediment Distributions Methods Results Sediment-Water Interactions Dredging Discussion Conclusions References Cited Tables . . . ........................................................................................................................ Figures 1 2 2 3 8 12 16 17 20 23 38 MOWS 007789 LIST OF TABLES 1. Hudson River PCB Study Consultants .................................................... 2. Grab Sample Trends ............................................................................................. 3. Analysis of Variance Log PCB vs Primary Texture Types for Sediment Crabs ..... ............................. . 4. PCB and Volatile Solids on Size Fractions of Grab Samples ... 5. PCB Area and Weight Tabulations for High and Lou PCB Sediments as of Peb. 27, 1978 Data ........... 6. Summary of Jar Test Results Using Typical Hudson River Sediments .................................................................................................. 7. PCB vs Dally Flow at Troy . ........................................................................... 8. Annual PCB Load at Troy vs Year .................................................................. 9. Sediment to Water PCB Partitioning Coefficients ............................. 10. Comparison of K Values for Volatilization of PCB at 25C ... 11. Summary of Dredging Results at 3 Sites .......................................... .... 12. Ft. Edward Dredging Monitoring - Summary Comparison ................... 13. Expected Losses In Hot Spot Dredging ................................................... 14. Summary Description and Evalulatlon of Possible Management Strategies for the Hudson River ...................................... 15. Pour Alternates and Costs ...... ............................................... 23 25 26 27 28 29 30 30 31 32 33 34 35 36 37 MOWS 007290 LIST OF FIGURES 1, Upper Hudson River Basin 2* Map of Remnant Deposits ..................................... . ................................. 3. Upper Hudson River Water Surface Profile .......................................... 4. NAI Boat and Transponder ................................................... .... 5. Rangefinder for Measuring Distances .............................................. 6. Frequency Distribution of Sediment PCB Levels In the Upper Hudson River ................... .................................................. 7. Log: Probability Plot for Reaches 8 and 9 8. PCB Concentrations in Bed Material River Mile 189.2 9. Average PCB Concentration in Sediments of Hudson River - Log Mean and 95X Confidence Interval ................... .... 10. Adsorption of Aroclor 1242 on Different Adsorbents ... 11. PCB Means in ppm at Depth Intervals In Cores 12. January 1977 Winter Cores Analyzed for PCB, Cs 137, and Texture .......................................... *.......................................................... 13. Log PCB - Log Cs Regression Plot ............................................................ 14. PCB Hot Spots >50 ug/g (a,b,c) ................................................................. 15. Suspended Solids vs PCB for 2.8 liter Jar Tests ............................ 16. Hudson River at Schuylervllle: PCB Concentration vs River Discharge March 30 - September 27, 1977 ............................ 17. Evaporative Loss of PCB from PCB Saturated Water Solution . 18. System for Environmental Loss Tests ................................................... 19. PCB Loss for 1242 Saturated Water ....................................................... 20. Total PCB Loss for Tank Containing Sediment-Water Mixture ... 21. Sediment to Air PCB Loss ....................................................... 38 39 40 41 42 43 44 43 46 47 48 49 30 51-53 54 55 57 58 59 60 MOWS 007791 LIST OF FIGURES (cont.) 22. DOT Hydraulic Cutterhead Dredge 23. Scum Behind Oil Boom at Buoy 212 Site 24. Map Lock 4 Spoil Site 23. Lower Basin of Lock 4 Site .................................................................... 26. Dredge Head PCB Loss 27. Fort Edward Maintenance DredgingMonitoring Sites 28. Dragline Bucket at Fort Edward 29. Scud in East Channel at Fort Edward 61 62 63 64 63 66 67 68 MOhS 007792 PCB IN THE UFPER HUDSON RIVER: SEDIMENT DISTRIBUTIONS, WATER INTERACTIONS AND DREDGING* Introduction The purpose of this paper Is to summarize some key data for this case study of PCB In the Hudson River. It will highlight findings of more general Interest dealing with PCB sediment distributions, water Interactions and dredging. Figure 1 shows the upper Hudson River Basin. The 240 km (150 mile) reach from New York City to Albany Is a tidal estuary. The 64 km (40 mile) reach from Albany and the Troy Dam to Fort Edward Is the most highly PCB-polluted reach and Is segmented by a series of low level dams and locks. The river north of the Fort Edvard area is not contaminated with PCB. Figure 2 shows the river at Fort Edvard near the sources of PCB discharge. The arrows indicate the two points where the Ceneral Electric capacitor manufacturing plant discharged over .23 X 10** kg (.5 x 106 lbs) over the last 25 years. PCB loss from these plants ( decreased rapidly from 1974 to 1977 and was phased out completely in 1977. As noted in Figure 2, there was a Niagara Mohawk Power Corp. dam at Fo*t Edvard before 1973 and a 3.2 km (2 mile) river pool In which some PCB-laden sediment accumulated. The dam was removed In mid 1973, and the river cut a channel Into the sediment (primary sand and boards). The sediments remaining were usually above water and termed the "remnant deposits'*. There were large dragline dredging projects In 1974 through 1978 to remove the portion of these sediments (.8 x 10^ m^) that deposited in the Rogers Island area.^*^ Figure 3 Is a hydraulic profile map of the Upper Hudson which has eight dams from Troy to Fort Edvard and also serves as the Champlain Barge Canal. NYS Dept, of Transportation (DOT) maintains a 3.6 m (12 ft) deep by 61 m (200 ft) *T.J. Tofflemlre, L.J. Hetllng ans S.0. Quinn, NYS Dept, of Environmental Conservation, Albany, New York. MGNS 007793 -2- vlde navigation channel by dredging. It was In this 40 nlle length of river consisting of eight reaches, that moat of the PCB became adsorbed to the sediment. However the PCB is slowly being extracted Into the water where down river transport and bloconcentratlon in the fish occurs. Thus, fishing for any species has been banned in the Hudson. PCB is slowly volatilizing from the river and contaminating nearby land areas. Hudson River water supplies are also affected. In September 1976, NYS Dept, of Environmental Conservation (DEC) and the General Electric Company (GE) signed a legal agreement setting up a 7 million dollar fund to study and solve the PCB problem. An independent PCB Advisory Committee was also set up to advise DEC In this effort.As noted In Table 1, many consultants were retained and studies made. This paper will summarize the consultant studies and DEC studies dealing with PCB sediment distributions, water Interaction and dredging for the Upper Hudson. A summary report of broader scope and a detailed report of mapping and sediment relation- (4 5) ships are also available. * Sediment Distributions Methods: Most of the PCB became adsorbed to the sediment and an extensive sampling and mapping program was carried out to determine its locations. There were any sampling expeditions with varying equipment, but Normandeau Associates, Inc. (NAI) did the primary bed sampling and mapping In the summer of 1977, taking 670 grabs and 200 cores. The grabs were taken on transects across the river and the cores in the finer textured sediments near the banks. Sampling MONS 007794 -3- vas more frequent near Fort Edward and leas frequent down river. Figure 4 shows the NAI boat and Motorola mlnlranger and transponder system used to provide quick and accurate sample locations. The pulsed radar signals are timed and Interpolated automatically and printed out on a tape on the boat. For sampling NAI used a shlpek grab sampler and manually forced core tubes while river bottom transects were done with a precision Rayethon DE-719B fathometer. Additional bed sampling was done by DEC. Figure 5 shows the Leltz range finder used for horizontal locations. It has accuracy comparable to a transit and stadia system. DEC also used a ponar grab sampler, manually forced core tubes and a 7 m long Copper probing pipe 1.0 cm In diameter. The probing pipe proved to be a very quick and reliable tool in determining the depth and nature of the sediments. Cores were typically cut Into 5--15 cm (2-6 In.) sections. In reach 8 (Figure 3), 20 DOT clamshell dredge grabs were taken to access the sampling and analysis errors In one location. All sediment samples were given a visual texture code on a scale ranging from 0 for clay to 9 for coarse sand. Sediment analysis Included PCB, total solids, voltile solids and texture. PCB was reported to a 1 ug/g detection limit as three aroclors - 1221, 1016 and 1254 and their total, and a rigorous quality control program was followed^ It appeared that the shaker extraction used for PCB gave about 85 percent recovery compared to the soxhlet method. The data Including exact locations, depths, and texture were entered on the computer^5'6* Results; It was noted from histograms and log probability plota given In Figures 6 and 7 that the sediment PCB values were log normally distributed. There were MCNS 007795 -4- many low PCB values less than 50 ug/g and a few high ones. Thus, for statisti cal analysis log PCB values were used, but for total mass tabulations a dual averaging system for hot areas greater than 50 ug/g and cold areas less than 50 ug/g was used. Figure 8 shows the variation of PCB across a typical river transect* PCB in ug/g was typically higher in the finer textured sediments near the bank and lower In the coarse sediments In the main channel. The down river variation of PCB values was much less than the across river variation as noted In Figure 9 which shows the log mean PCB values for the grab samples by river reaches* Much of the variation indicated by the 95 percent confidence Interval lines Is due to across river variations* The variation of 20 DOT clamshell dredge grabs in one area Is noted for the upper part of Reach 8* It was concluded that Reaches 8, 7 and 6 were significantly higher In PCB than Reaches 2, 1 and 0* The drop in PCB in Reach 5 appeared partly due to the analysis of primarily center of channel samples there and partly due to the nature of the reach which was typically narrower and higher In velocity* A recent tabulation for Reach 5, employing 79 grabs with good distribution across the river, confirmed that the PCB In Reach 5 was significantly lower than for reaches 6, 7 and 8* Some key grab sample trends from correlation and analysis of variance program are given In Table 2* The parameter with the highest correlation with log PCB was percent total sollda (r " -.649), indicating that light, fluffy sediment with a high water content was highest In PCB* For the grab samples, eny clear water was poured off the top of the quart jar immediately after sample collection. Sediment PCB concentrations were significantly higher near the bank than in the main channel* About 75 percent of the PCB in the Upper Hudson was aroclor 1016 or Its close relative 1242 which was reported as 1016* MONS 007796 5- There was no noticeable trend of change In the percent 1016 with distance down river from Fort Edward to Troy, but 1254 Increased relative to 1221. However Individual samples varied considerably In aroclor distribution. In Table 3, the variation of PCB with visual texture codes was examined. Samples classified as primarily silt or muck were the highest In PCB, followed by samples by samples consisting of coarse sand and wood chips. Sands and gravels without wood chips were significantly lower In PCB. For the lower river reaches, the sediment did not generally contain wood chips. In Table 4, three alze fractions for II samples were compared for PCB and volatile solids. The coarsest size fraction contained a significantly higher percent of volatile solids due to wood chips and also the highest average PCB content. PCB was typically skip graded in sieved samples and high in the coarse sand size, low In the sand size, and high again In the silt size. The coarse fractions In the Table 4 with over 90 percent volatile solids were mostly wood chips. Sieve analyses on about 670 NA1 grabs were entered on the consultants' computers but not on the DEC computer which had only texture codes/7'The mean D5Q these grabs was .3 mm/7^ The D50 *s the sieve size that passes 50 percent of the sample. In addition, 20 percent of the grabs had a D5q of greater than 2 mm, while 10 percent of the grabs had a D^q of less than .06 mm (the silt size division). In Figure 10, the adsorption ability of various materials for PCB was compared, and It was noted that silty soil, wood chips and river sediment adsorbed well compared to Ottawa sand. While the grabs were used to assess the spread of PCB across river areas, the cores were used to assess the depth of penetration of PCB. Most core samples were taken in silts and sands near the banks. However, probings were made In both center of channel and near bank regions to determine the depths of M0NS 007797 -6- aedlment present over rock and clay. In Figure 11 all Che core data is summa rized by frequency tabulations and means. In this tabulation, cores shorter than 15 cm (6 Inches) and cores in which all sections had PCB values less than 6 ug/g were omitted to make Figure 11 reflect the depth of PCB penetration in hot spots or near bank contaminated areas. The PCB typically peaked between an 8 and 30 cm depth in the core. In the core sampling it was noted that compres sion of the sediment In the core tube commonly occurred. It Is possible that the actual depth of PCB penetration Is up to 30 percent greater than the stated depth. The PCB results on the depth of PCB In the main channel were not yet available but probing data Indicated that there was roughly less than .52 a (1.7 ft.) of sediment there on the average, and It was coarser textured. From limited data, the mass of PCB in cold areas was estimated over a 3m (1.0 ft.) depth. One set of cores, the NAI winter cores, were sectioned every inch and selected ones analyzed for PCB, Cs 137, heavy metals and size analysis. Two of these are shown in Figure 12, where it was noted that PCB and Cs 137 were cor related. The Cs 137 came from fallout from atomic bomb testing and can be used for roughly dating the sediment layers. It appeared that these near bank areas received 1.5 to 2.5 cm of sediment deposition per year on the average, and this placed the peak PCB deposition period In the 1960s. Cs 137 also followed a log normal distribution In the sediments, so log Cs 137 and log PCB were related for all 12 winter cores In Figure 13, and a correlation coefficient of .82 noted. Certain heavy metals concentrations and percent silt were also posl- (8) tively correlated with PCB. MONS 007798 -7- Areas above SO ug/g In PCB were designated as "hot spots" and a dividing line drawn between the hot and cold areas on the maps* As noted In Figure 14a, b, and c where the hot spots were exaggerated by dark shading, many hot spots were located in river Reach 8. Further down river, the hot spots were fewer and typically located In large, low velocity areas and marshes near the bank. Table 5 totalizes the PCB masses for the hot and cold areas from Lock 7 to the Troy Dam. The average PCB concentration for the cold areas was typically 10-20 ug/g, while for the hot areas it was 75-200 ug/g. There were no hot spots in Reaches 1 and 2, and over 1/3 of the total PCB in Reaches 1 to 8 were in Reach 8. A more recent hot spot tabulation was made by Malcolm Pirnie which compared favorably with Table 5, except for Reach 3 where the new data In creased the hot spot mass to 4,000 kg (8,800 lb) and the total to 135,000 kg (298,000 lb). To this total should be added the PCB from Lock 7 to Fort Edward and the remnant deposits north of this as noted below. Hot Soots Cold Areas Total Mass Hot Sp< Reaches 1-8 -lb 176,100 122,400 298,500 59 Lock 7- Ft. Edward 900 2,100 3,000 30 Remnant Deposits (2) 124,000* 16,000 140,000 88 Total - lb 301,000 140,500 441,500 68 JiS________ 136,800 63,900 200,700 *For removal or Isolation of Areas 3, 3A and 5. 68 In Reaches 1-8, 59 percent of the PCB is contained in 8 percent of the river area. In the remnant deposits, a discrepancy between two sets of PCB analyses occurred and a lower estimate of 25,800 kg (57,000 pounds) is possible with only 23,100 kg (50,000 pounds) in Areas 3, 3A and 5^^ MGN5 007799 -8- Sedlment-Water Interactions Two Hudson River sediments with 15-30 ug/g of PCB were mixed with water In 13, 2*8 liter Jar tests and the supernatant analyzed after various settling times. A sediment to water ratio in the range of 1/10 was used. The data is plotted in Figure 15 which indicates a direct relationship between the PCB and (9) suspended solids in the supernatant. About 100,500 ml jar tests were con ducted to determine the beneficial effects of various coagulants and polymers (10) In removing suspended solids and turbidity. Some of this data is given in Table 6. Without coagulants, the suspended solids ranged from 100-1500 mg/1 after 1.5 to 2.5 hours of settling and 50 to 300 mg/1 after 18 to 24 hours settling. With 120 mg/1 alum, 20 mg/1 of cationic polymer or 5 mg/1 of Chlto- san, the suspended solids were reduced to 20 to 45 mg/1 after 1.5 to 2.5 hours settling. For a few sediments containing 100 to 200 ug/g PCB and a high percentage of aroclor 1221, the water PCB values after polymer coagulation were 50 to 100 ug/1. The most cost effective cationic polymers were Nalco 7134, Calgon Cat Floe B and Magnlfloc 587C. Chltosan also worked well. PCB transport in the river, as calculated by a sediment transport model, Increased at periods of high flow as noted in Tables 7 and 8. It should be noted that the projected annual transport of PCB over the Troy Dam was 3630 kg (8,000 lb)/**^ Annual losses as high as 4,500 kg/yr (10,000 lb/yr) have been measured/11 The lower numbers in the range in table 8 did not take into account desorption of PCB from bottom sediments which would Increase the low flow PCB transport. The bottom of Table 9 provides a summary of desorption of PCB from sediment to water. Aroclor 1221, which is more soluble in water, had HONS 007800 -9- lower partitioning coefficient than 1254. Elutriate tests In which sediment was mixed with water at a 1/10 ratio gave lower coefficients than for river simulation tanks in which the sediment to water ratio was much lower. One would also expect the partition coefficient to vary with the sediment organic carbon, but the values in Table 9 are typical of river sediments. Figure 16 shows river water monitoring data at Schuylerville from which it was noted that the PCB concentration Increased at high flow due to suspended solids transport and also increased at low flow (<5x10^ L/sec) possibly due to bottom desorption or barge traffic. The PCB and flow data can be related by two equations; one for high flow and one for low flow. (13) An alternate regres sion equation for both high and low PCB transport was given by Lawler Matusky and Skelly.^^ The low flow transport behaved like a constant source at 3-5 kg/day. Since the hot spots cover 8 percent of the river area but have concentrations 7 times that of the cold areas on the average, 56 percent of the bottom desorption may be coming from the hot spots* GE performed experiments on PCB volatilization which, according to (14) MacKay is governed by a liquid film transfer coefficient. The mass transfer reduces to the formula N K(C-P/H), where: P is the partial pressure of the hydrocarbon in the vapor, H is Henry's Law Constant, C is the concentration of the hydrocarbon in the water, K or Is the area transfer coefficient-units (L/T). Typically, the atmospheric concentration of PCB is very low and the formula reduces to N KC for which units could be: N - rog/ra2/hr, R * m/hr, C rag/m3 ,, ug/i MGNS 007801 -10- --K The volumetric mass transfer coefficient K - where D Is the depth. The ratio of the It for PCB aroclors to the K2 for stream reaeratlon was relatively con stant under different turbulence conditions noted Paris et_ al.^*^ Suspended solids In the water may effect volatilization by adsorbing PCB and reducing soluble water PCB concentrations.^5^ The results of one GG experiment in s series of sponge stoppered flasks at 25*C employing 14 C labeled PCB was shown in Figure 17. The approximate rate of loss of 1221 was 0.45 mg/m^/hr and of the 1016 was 0.08 mg/m^/hr. A second series of experiments was conducted with a large tank shown in Figure 18 which was .78 m (31 In.) high from the supporting screen to the water surface and .2 m (8 in.) In diameter. The stirrer operated at 60-80 rpm when on. The PCB pickup in the sponges was measured at various time intervals for various wind speeds and temperatures. In the first experiment, the tank was filled with water and an excess amount of aroclor 1242 added to keep the water saturated. The tank was stirred. The volatilization rates increased with temperature and wind speed as noted in Figure 19. In a second experiment, a silty sediment contaminated with PCB in the Hudson River near the Moses Kill waa placed to a 30 cm depth above the supporting screen. Sediment from this river location typically had a total PCB of 800 ug/g, 60 percent of which was 1016 and 1242. The stirred tank trials were run first and gave much higher loss rates than the unstirred tank trials, as noted in Figure 20. The suspended solids and total water PCB samples were much higher In the stirred tank, as were the separated clear water PCB samples (620 ug/1 stirred versus 270 ug/1 unstirred). 06) MONS 007802 -11- Water to air volatilization rates from this experiment and from the liter ature were compared In Table 10 where considerable variation in the K rates was noted. This could be due to different turbulence conditions or to differences between purely theoretical calculations and measured values. For the 64 km (40 mile) reach of the Upper Hudson at a*3 m depth, total volatilization rates of .45-4.5 kg/day (1-10 lb/day) of PCB were calculated from the GE data. Hydroscience(23) previously estimated peak losses of 15 lb/day for the upper Hudson. In a third tank experiment, 47 kg sandy sediment from the Buoy 212 area of the Hudson River was placed on the supporting screen to a .77 m depth and the drain at the bottom of the tank opened. Small amounts of water were periodi cally added to the tank to keep the sediment moist, but drained. Both the rate of PCB loss and the air concentrations of about 1 ug/m^ were shown in Figure 21. Air concentrations of about .1 ug/nf* or one-tenth of the laboratory rates were measured over the new Moreau dredge spoil site which contained scdl- (4) ment similar to that used in the tank study. The rate of volatilization has (24) been shown to Increase with percent moisture, temperature and wind speed. 3 Air concentrations of 1-10 ng/m have been cited for other areas in the United States and 0S11A standards of ,5 and 1.0 rag/m'* for 1254 and 1221 were NI0SH has recommended chat the standards be lowered to a total PCB of 1 ug/m\ Sediment to air volatilization rates from this experiment and from the liter ature were also compared in Table 10 and variations noted. From the GE data at 25*C, initial PCB losses over a .93 ha (2,3 acre) uncapped dredge spoil site as high as .68 kg/mo (1.5 Ib/mo) were calculated for a sediment concentration of 6.4 ug/g, and higher sediment concentrations would yield proportionally higher PCB losses. Over the long term, the rate of PCB loss would be less due to 6now cover and surface PCB depletion. It was observed that ar 3tr concentrations MGNS 007803 -12- greater than or equal to 6 ug/m^ that workers on PCB dump sites developed headaches and nausea. Additional studies by CE indicated that the rate of volatilization of PCB is much.less from silt than from sand and that an organic top soil cap would limit volatilization. Dredging The NY State DOT hydraulic dredge with a 1.2 a (4 foot) diameter cutter- head is shown in Figure 22. It was used for routine channel maintenance dredging on the Upper Hudson and monitored at 3 sites - Lock 1, Buoy 212, and Lock 4 by DEC. The dredge pumped about 34--41 m^/min (20-24 cfs) via a .38 m (15 In.) pipeline to various upland settling lagoons (spoil sites). After settling, the water returned through a wooden box overflow structure to the river. For each of the 3 sites one to two months of dally monitoring data was taken. Measurements of flow, turbidity, suspended solids and PCB on the return water were made along with periodic measurements of Influent percent solids, sediment PCB and lagoon retention time. Cationic polymer at 20 mg/1 was peri odically fed on the dredge to aid in settling the fine solids. The detailed data were given in other reports and summarized in Table The short retention times and the percent silt and clay in the sediment dredged greatly affected the performance of the dredging,lagoons. The polymer typical ly cut the return flow suspended solids and PCB levels In half. At retention times of 15 min. or less, a flushing of deposited sediment fines occurred after dredge start up. It is recommended that a retention time of 1 hr or more be maintained in spoils lagoons to achieve good removals of suspended solids and limit the flushing out of sediment fines. Permeable sand and shale dikes were also found effective In filtering out suspended fines. HONS 007804 -13- Figure 23 shows the scum retained by an oil boom on the Buoy 212 spoils lagoon. This scum had a PCB content of 18,000 ug/g on a dry weight basis which was extremely high/*^ It was roughly calculated that 10-20 percent of the PCB in the return flow equaled the rate PCB accumulation In the scum. Thus, scum removal for the Hudson River dredging projects was recommended. (26 ) Polymer was normally fed on the suction side of the dredge pump, but for the Lock 4 dredging It was alternately fed at an Intermediate box between (27) lagoons with excellent results. Figure 24 shows the multiple stage lagoon system used at Lock 4. The lagoons before Box 1 typically provided a retention of about 23 minutes, while the long narrow channel after Box 1 provided a retention of about 30 minutes. The return flow entered the river after Box 2. Figure 23 shows Box I where 20 rag/1 of Calgon Cat Floe B was fed, and the dredge In the river near Box 2 which was hidden by the trees. When polymer was fed at Box 1, excellent flocculation occurred and the suspended solids were reduced to 20 mg/1 at Box 2, as noted In Table 11. Thus, for future dredging of contaminated sediments where polymer addition may be desired, a 2 stage lagoon system is recommended. For this type of lagoon system on the Hudson, the losses of PCB in the return flow were calculated to be less than 1 percent of the PCB dredged. i Dredge head loss was also monitored at Lock 4. A 1 cm diameter copper sampling pipe was installed terminating .6 m (2 feet) behind the dredge head so that water samples could be withdrawn. This was done with the dredge making swings facing Into the current so that the maximum turbidity plume downstream of the dredge head was sampled. Many turbidity samples were taken during the dredge swings and six PCB and suspended solids samples were taken compositing the swings. The averages comparing the dredge head values to those of the HONS 007803 -14- river cross section sampling at several depths were given In Figure 26. It was difficult to tell any difference In water samples upstream of the dredge from those downstream of the dredge. Even when assuming that all the solids and PCB suspended in the dredge head sample did not settle, the Increase of PCB in the river section and the losses were very low. The swing speed was typically 1.5 m/sec and the sediment silt and clay was 20 to 30 percent. This gsve a projected dredge head loss relative to the sediment dredged of less than .2 percent for PCB suspended Bollds. A DOT clamshell dredge was also monitored In the Lock 4 channel. The dredge head losses for the .3 clamshell appeared greater than for the hydraulic, but were difficult to accurately quantify. In addition, a dragline dredging operation at Fort Edward wa9 monitored dally for 4 months. Figure 27 shows the 2.3 m^ dragline and Figure 28 the even monitoring stations and the area dredged. Vertically Integrated water samples were taken dally from all stations except 4, which was sampled less frequently. Sampling was done In the early morning before dredging and In the afternoon during the dredging. For PCB analysis only, the dally samples were eomposlted Into weekly samples. There was little dredging In the west channel which conveyed 80-90 percent of the river flow. Just above sampling station 3, an oil boom was put across the river to trap and scum for removal as noted lu Figure 29. The wet scum had a PCB content of 2,000 ug/g which was again very high. The rate of PCB accumulation in the scum was calculated to be about 20 percent of the PCB moving in the total water column at stations 4 and 5. The detailed data were given in another report^ and summarized In Table 12. The low flow period and high flow periods covered about 8 weeks each, while the no dredging low flow period Involved 2 weeks. The mean velocity ranged from .045 to ,26 m/s In the east channel and from .14 to .86 m/s in the west channel and MOMS 007806 -15- main river. During low flow, the PCB concentrations were definitely elevated by dredging at the below dredge and east channel stations. There was a consid erable decrease in PCB and suspended solids with distance downstream in the east channel. The PCB transport rates were about the same during the high flow and low flow for most stations, indicating that the dredging losses behaved like a constant source, although the velocity Increased by a factor of 6. The sediment PCB averaged 20 ug/g and the silt plus clay less than 5 percent. The elutriate test soluble PCB values ranged from 2-20 ug/1 for this sediment which had about 30 percent wood. The total PCB losses from dredging at Lock 7 were calculated considering a mass balance of all stations and found to be .34 to 82 kg/day or leas than 2 percent of the sediment dredged, while the solids losses were 2850-6800 kg/day or less than .5 percent. For both the hydraulic and mechanical dredges, there was a trend of the PCB losses being higher chan the solids losses. Table 13 summarizes the expected dredging losses for both the cutterhead and clamshell dredging of PCB hot spots for sediment averaging 50-60 percent silt and 100-150 ug/g of PCB in the Hudson River. The estimate of solids not picked up during dredging was based on experiments In a small laboratory tank with model dredges. Although the projected losses of 13 percent were about equal, the clamshell dredge seemed better suited to control on a precise grid network determined by a minicomputer In the field. For the clamshell, the optimizing factors appeared to be clam bite overlap spacing and depth of grab. For the hydraulic model, the swing speed and overlap spacing appeared to be the key factors. If the dredge boom is swung too fast, hot sediment is missed but the percent solids pumped is high. If the swing speed is too 6lov, the dredge pumps a lot of water. In hot spot dredging a .6 m (2 ft) cut plus a .3 m (1 Ct) HONS 007807 -16- overcut Is planned. The dredge head and return flow losses were determined by the field monitoring data and Jar tests and are In the range of reported liter ature values. For the clamshell, the dredge head losses are higher but the return flow losses lover, than for the hydraulic. Experience with the Duamlsh River PCS spill cleanup yielded about 92 percent recovery of the PCB; however, several removals of contaminated sediment were made and a pneuma dredge em- (29) ployed. Malcolm Pirnie estimated a 94 percent recovery for Hudson River d. red. g.ing. (7) Discussion The alternates for dredging the river are summarised in Table 14. With no management, a portion of the remnant deposits will erode and add to the channel maintenance dredging. For the remnant deposits, removal by land based equip ment was appropriate and 100 percent removal projected; while for alternates 1 and 4, 90 percent removal was used. For the hot spot removal program from Fort Edward to Lock. 2, 85 percent dredging efficiency of the 80,300 kg (177,000 lb) of hot spotB was used. A complicated tabulation of quantities involved was done and modified slightly to give the totals in Table 14. Maintenance dredg ing of sediment at 35 ug/g was Incorporated In alternates 2 and 3.^^ The costs of the alternates are given in Table 15. DEC and the PCB Advisory Committee recommended the pursuit of alternate 3 which, If Implemented, would remove over 60 percent of the PCB from the river for a $29 million cost. A portion of the remnant deposits have recently been removed and put in a clay lined spoil site In the Town of Moreau. If dredged, the hot spots would be placed in one 40 ha (100 acre) secure land burial facility near Reach 8. The site would have a natural clay bottom and clay and topsoil cap. There would be monitoring wells, a leachate collection and pump out system, and a long-term HONS 007808 -17- maintenance plan. Both hydraulic and clamshell dredging systems are being planned for with a single off loading and treatment facility near the proposed poll slte.(7) . If the no action alternative is taken. It is likely that PCB will continue to desorb from the sediment and erode down river at high flow conditions for decades at a 20-year average transport rate of 3,630 kg/yr (8,000 lb/yr). This PCB will continue to contaminate fish, affect water supplies and volatilize. If the hot spots are removed, Che desorption and erosion of highly contaminated sediments would be lessened and water concentrations of PCB In the Upper Hudson cut about in half.(^) Conclusions A. Sediment Distributions 1. In mapping sediment distributions in the Upper Hudson, sampling on transects across the river and obtaining precise locations for chose samples was found essential. The variation of PCB along a transect was extreme, while the variation down river was more gradual. 2. PCB was log normally distributed In the sediments. 3. PCB was generally highest In the silty sediments, next highest in the coarse sands with wood chips, and lowest In the sand and gravels with no wood chips or organics. In sieved samples containing sand, wood chips and silt, the same trend held. 4. The PCB hot spots above 50 ug/g were typically found In low velocity and near bank areas. For the Upper Hudson, about 68 percent of the total mass of PCB was contained In hot spots which covered only 8 per cent of the river area. MQNS OG7dG9 -18- 5. PCB was positively corrlated with Cs 137, certain heavy metals and volatile, solids while negatively correlated with total solids. 6. Cores indicated that the maximum PCB concentrations were typically 8-30 cm below the top. Cs 137 dating put the peak discharge period of PCB in the 1960s. Within the first 10 km of river below the PCB sourcei PCB rarely extended below 90 cm in depth, while for the rest of the Upper Hudson, PCB rarely extended below 60 cm. B. Water Interactions 1. In a concentrated sediment-water mixture, the bulk of the PCB was adsorbed on the solids. In going from a 10/1 elutriate test to a more dilute river system, the sediment to water partition coefficient in creased, and a higher percentage of the PCB in the mixture became soluble in the water. Aroclor 1221 had a lower sediment to water partition coefficient than aroclor 1234. This has significance for groundwater attenuation, river transport and dredging systems. 2. Cationic polymers and chltosan were helpful in rapidly removing the suspended solids in a sediment-water mixture and reducing the water PCB concentration. 3. In the river, high water PCB concentrations occurred at low flows, which could be explained by desorption from the bottom sediment. The highest PCB concentrations occurred at very high flows which eroded and suspended the bed material. At intermediate flows, the water PCB concentrations were lowest. 4. The projected loss of PCB to the Lower Hudson over 20 years averaged 3,630 kg/yr (8,000 Ib/yr), and modeled results indicated that this would go on for decades If no action was taken. MGNS 00 7810 -19- 5. The rate of PCB volatilization from the upper river varies with teoperature, wind speed and turbulence conditions, and is projected at .45-4.5 kg/day (1-10 lb/day). This is in the range of the total river water transport, of PCB at low flow conditions of 3-5 kg/day. C. Dredging 1* For three full scale hydraulic dredging projects on the Hudson, 20 mg/1 of cationic polymer was found effective in boosting the PCB and suspended solids removals in the spoils lagoons. The best results were achieved when the polymer was fed at an intermediate box between two lagoons. 2. For hydraulic dredging In the Hudson, a minimum of one hour retention time is recommended in the spoils lagoon system. 3. Scum removal in the hydraulic spoils lagoons and in the river down stream of a dragline dredge was found essential in the Hudson, because the scum was so high in PCB. 4. Based on monitoring data, hydraulic and mechanical dredging losses to the water column for the hot spot dredging were projected at about 2 percent of the PCB and X percent of the 3ollds. The contaminated solids not picked up by the dredge were projected at 5 percent or greater. This loss could be much greater than 5 percent if the operation of the dredge is not precisely controlled. 5. Dredging of the hot spots and routine maintenance dredging in 8 per cent of the Upper Hudson are projected to remove over 60 percent of the total mass of 200,000 kg (440,000 lb) of PCB in the upper river. MOMS 007811 -20- References Cited 1. Malcolm Pirnie, Inc., "Enginering Report - Investigations of Condition# Associated with the Removal of Fort Edward Dam.'' White Plains, N.Y. (1975). 2. Malcolm Pirnle, Inc., "Environmental Assessment of Remedial Measures at the Remnant Deposits of the Former Fort Edward Pool." White Plains, N.Y, (Mar. 1978). 3. Hetling, L. J. and Horn, E. G,, "Hudson River PCB Study Description and Detailed Work. Plan." N.Y. State Department of Environmental Conservation, Albany, N.Y. (July 1977). 4. Hetling, L. J. et al,, "Summary of Hudson River PCB Study Results." N.Y. State Department of Environmental Conservation, Albany, N.Y. (July 1978). 5. Tofflemlre, T. J. and Quinn S. 0., "PCB in the Upper Hudson River: Mapping and Sediment Relationships." Technical Report (/ 56, N.Y. State Department of Environmental Conservation, Albany, N.Y. (Jan. 1979). 6. O'Brien and Gere Engineers, "PCB Analysis Final Report." Syracuse, N.Y. (July 1978). 7. Malcolm Pirnie, Inc., "Dredging of PCB Contaminated River Bed Materials Upper Hudson River, N.Y., Feasibility Report, Volumes 1,2,3 and Data Base." White Plains, N.Y. (Jan. 1978). 8. Matuslk, J. J., "Unpublished Data on Heavy Metals In Hudson River Sedi ments." N.Y. State Department of Health, Radiological Sciences Laboratory, Albany, N.Y. (Sept. 1978). 9. Tofflemlre, T. J., "Preliminary Report on Sediment Characteristics and Wate Column Interactions Relative to Dredging the Upper Hudson River for PCB Removal." N.Y. State Department of Environmental Conservation, Albany, N.Y (April 1976). 10. Tofflemlre, T. J., "Summary of Data Collected Relative to Hudson River Dredging." N.Y. State Department of Environmental Conservation, Albany, N.Y. (Dec. 1976). 11. Lawler, Matusky and Skelly Engineers, "Upper Hudson River PCB No Action Alternative Study: Final Report." Pearl River, N.Y. (Mar. 1978). 12. Malcolm Pirnie, Inc., "Preliminary Appraisal Sediment Transport Relations, Upper Hudson River." White Plains, N.Y. (April 1976). 13. Turk, J. T. and Schroeder, R. A., "Unpublished Data," U.S. Geological Survey, Albany, N.Y. (1978). *ONS 00 781*; -21- 14. McKay, D. and Lelnonen, P.J., "Rate of Evaporation of Low-Solubility Contaminants from Water Bodies to Atmosphere." Environ. Scl. & Technology 9, 1178 (Dec. 1975). 15. Paris, D. F. t_ al., "Role of Physio-Chemical Properties of Aroclors 1016 and 1242 in Determining their Fate and Transport In Aquatic Environments." Chemosphere 4, 319 (1978). 16. McFarland, C. M., "Unpublished Data on PCB Volatilization." General Electric, Corp. Research & Development, Niskayuna, N.Y. (1978). 17. Halter, M. T. and Johnson, H. E., "A Model System to Study the Desorption and Biological Availability of PCB in Hydrosoils" Aquatic Toxicology and Hazard Evaluation, ASTM STP634, 178 pp. (1977). 18. Lawler, Matusky and Skelly Engineers, "Report to General Electric for Hearing Preparations." Available from N.Y. State Department of Environmental Conservation (1976). 19. Malcolm Pirnie, Inc., "Unpublished Jar Test and Elutriate Test Data." White Plains, N.Y. (1977). 20. Versar, Inc., "A First Order Mass Balance Model for the Sources, Distribution and Fate of PCBs in the Environment." EPA 560/6-77-006, NTIS:PB-270220 (July 1977). 21. McClure, V. E., "Transport of Heavy Chlorinated Hydrocarbons in the Atmosphere." Environ. Scl. 6 Technology 10, 1223 (Dec. 1976). 22. Hague, R. ! "Aqueous Solubility Adsorption and Vapor Behavior of Polychlorinated Biphenyl Aroclor 1254." Environ. Scl & Technology 8, 139 (Feb. 1974). 23. Hydroscience, Inc. "Estimation of PCB Reduction by Remedial Action on the Hudson River Ecosystem" Westwood, New Jersey (April 1968). 24. Hague, R.W, F. and Claith, M. M., "The Solid Air Interface: Transfer of Organic Pollutants Between the Solid Air Interface." Fate of Pollutants in the Air and Water Environments by Suffet, H. I., Wiley Publishing Co. (19 7 7 )T 25. Hutzinger et al.. The Chemistry of PCBs. CRC Press, Cleveland, Ohio (1974). -- 26. Tofflemire, T.J. and Ziramie, T. F,, "Hudson River Sediment Distributions and Water Interactions Relative to PCB: Preliminary Indications." Kcpouc Seminar II, US EPA Region III, Philadelphia, Pa. (Sept. 1976). 27. Tofflemire, T. J., "Results of the Lock 4 Dredge Monitoring Program." In preparation N.Y. State Department of Environmental Conservation, Albany, N.Y. (Dec. 1978). MONS 007813 -2228. Miner, W. J. and Tofflemire, T. J., "Fort Edward Maintenance Dredging Project Monitoring Report and Supplement. N.Y. State Department of Environmental Conservation, Albany, N.Y. (Jan. and July 1978). 29. Pavlou, S. P. and Horn, W., "PCB Removal from the Duvamlsh River Estuary Implications to the Management Alternatives for the Hudson River PCB Problem." Paper from URS Company, Seattle, Wa. (June 1968). 30. Horn, E. C., "Calculations of Management Strategy EffectivenessN.Y. State Department of Environmental Conservation, Albany, N.Y. (May 1978). HONS 007814 TABLE 1. HUDSON RiyiK PCH STUDY CONSULTAYTS CONSULTANT OR. GROUP NORMAKDEAU associates BEDFORD, NH LAMONT-DOHERTY PALISADES. NY USGS - ALBANY RENSSELAER POLYTECHNIC INST. TROY, NY (DR. T. ZIMMIE) HYDROSCIENCE WESTWOOD, NJ LALLER, ilATl'SKY & SKELLY ENG. PEARL RIVER, NY MALCOLM PIRNIE WHITE PLAINS, NY WESTON INC. WEST CHESTER, PA O'BRIEN AND GERE ENG. SYRACUSE, NY RALTECH (WARE) MADISON, WI STUDY BED SAMPLING AND MAPPING (UPPER HUDSON) STATUS REPORT AND MAPS IN BED SAMPLING, PCB ANALYSIS, Cs 137 DATING (LOWER HUDSON) RIVER HYDROLOGY WATER PCB AND SUSPENDED LOAD BEDLOAD SAMPLING (UPPER HUDSON) REPORT IN (1976 & 77) (1978) (1979) DATA AND PAPERS IN SOME DATA IN (1977) DATA IN. PCB MATH MODELING OF UPPER AND LOWER HUDSON (1977) REPORT IN (1978 - 79) BEGINNING MODELING SEDIMENT AND PCB TRANSPORT AND HYDROLOGY FOR UPPER HUDSON (NO ACTION) (DREDGING) REPORT IN BEGINNING DREDGING TECHNOLOGY, PLANS, AND ASSOCIATED IMPACTS 7 REPORTS IN FINAL PLANS ANS SPECIFICATIONS FOR HOT SPOT DREDGING TO BEGIN WHEN FUNDED PCB LANDFILLS AND DREDGE SPOIL SITES, SAMPLING AND COMPLETE ENVIRONMENTAL ANALYSIS REPORT IN 1. PCB ANALYSES SEDIMENT AND WATER MEDIA 2. EFFECT OF PCB ON WATER SUPPLIES (TREATMENT METHODS) (1977 - 78) DATA AND REPORT IN IN PROGRESS PCB ANALYSES - BIOLOCICAL MEDIA IN PROGRESS MONS 0 0 7 8 1 5 CONSULTANT OR GROUP SYRACUSE RESEARCH CORP. NYS DEC BUREAU OF AIR RESOURCES NYS DEC BUREAU OF FISH AND WILDLIFE NYS DEPT. OF HEALTH GENERAL ELECTRIC CORP., RES. & DEV. SCHENECTADY, NY BOYCE THOMPSON ITHACA, NY FORDHAM UNIVERSITY NYU MEDICAL CENTER SUNY, STONY BROOK, NY *MT. SINAI SCHOOL OF MEDICINE NEW YORK, NY CORNELL UNIVERSITY AND AGRICULTURE AND MARKETS ITHACA, NY STUDY STATUS PCB ANALYSES - SEDIMENT AND WATER MEDIA BEGINNING PCB AIR SAMPLING (1977 - 78) DATA IN FISH DATA ANALYSIS (1977 - 78) IN PROGRESS MACROINVERTEBRATE ANALYSIS, HEAVY METALS ANALYSIS, LAB QUALITY CONTROL, SOME PCB ANALYSIS, Cs 137 DATING SEDIMENT INCINERATION, PCB VOLATILIZATION, PCB BIOLOGICAL DEGRADATION, NON-DREDGING PCB RENOVATION OPTIONS ENVIRONMENTAL EFFECTS OF PCB SUBSTITUTEDIELECTROL I, II TOXICITY OF PETROLEUM HYDROCARBONS SAMPLING VEGETATION AND LAND IN FT. EDWARD TO ALBANY AREA BIOLOGICAL SAMPLING, LABORATORY MODELING AND PROJECTIONS FOR LOWER HUDSON IN PROGRESS IN PROGRESS WAITING FINAL REPORT REPORT IN BEGINNING BEGINNING BEGINNING HEALTH EFFECTS OF GENERAL ELECTRIC FACTORY WORKERS ANALYSIS OF CROP AND FOOD DATA WAITING FINAL REPORT PLANNED MQNS 0 0 7 8 1 6 * Not funded by DEC. -25- TABLE 2. GRAB SAMPLE TRENDS A. CORR. COEFF. -R LOG PCB TOT.^LIDS yOL.^fjLIDS SILT ^CDF B. ANAL, OF VARIANCE LOG PCB VS. DISTANCE FROM BANK REACH 8 7.6 ---------------------- LQ.G--MEAN PCB-UG/g, , CHORE. J73. + 121 MAIN CHAN. 1/5 1.45 (28.2)* 1.28 (19.0) 1.48 (30.1) 1.22 (16.6) ZH 3.84* 5.84* C. ANAL. OF VARIANCE LOG PCB VS. WATER DEPTH --------T---| -,-HOG MEAN PCB-UG/G REACH <\l FT (5.65 M) '>12 FT (T.hS m) f all 1.34 (21.9) 1.23 (17.0) 3.08 D. MEAN AROCLPR DISTRIBUTION.: 75% 1016 & 1242. 13.5% 1221, 11.5% 1254 Significant at .05 level. # ( ) values are antilogs. MOWS 007817 -26- Table 3. Analysis of Variance Log PCB vs Primary Texture Types for Sediment Grabs Reaches 6, 7, 8, 9 (North of Lock 5 at Mile 183.2) Texture 0 of Cases ' Antilog Mean Log Mean PCB PCB (ppm) Variance (Sp2) F-Value 0,1,2,3* 8,9* 115 81 1.75 1.19 56.74 15.55 .3148 47.7084 8** 39 1.03 10.82 .2041 14.9504 9** 13 1.59 39.25 8* 61 1.08 11.93 .1855 17.6149 9* 20 1.54 34.87 6* 58 1.04 11.08 .1393 7.6019 7* 28 1.28 19.25 4* 55 1.53 33.61 .2558 .9696 5* 26 1.41 25.59 Reaches 1, 2. 3, 4, 5 (South of Lock 5 at Mile 183.2, to Troy Dam at Mile 153.9) Texture f of Cases Log Mean PCB Antilog Mean PCB (ppm) Variance (Sp2) F-Value 0,1.2.3* 8,9* 32 27 1.41 .72 25.59 5.29 .3744 18.3302 8** 10 .40 2.51 .5278 .0039 9** 3 .37 2.35 8* 22 .69 4.96 .4185 . 2264 9* 5 .85 7.04 * Includes all primary textures, regardless of associated secondary textures. ** Includes only those primary textures with missing secondary textures. Textures Codes: 0 - Clay 1 Silt 2 " Muck 3 Muck and Wood Chips(W.C.) 4 * Fine Sand 5 Fine Sand and W.C. 6 Sand 7 " Sand and W.C. 8 = Coarse Sand 9 Coarse Sand and W.C. MON* 007818 -27- Table 4. PCB and Volatile Solids on Size Fractions of Grab Samples Sample Sieve size fractions* > 2.0 IHIB PCB. ppm V.S. z 2.0 to ..074 mm PCB, ppm V.S. z < .074 mm PCB, ppm V.S. z 7-8-1 98 85.6 10 3.3 43 6.3 7-9-3 106.2 91.0 80 8.4 37.1 8.1 7-9-4 7-10-5 7-17-1A 28.1 19.0 97.5 32.6 96.7 90.9 15.0 37.3 50.0 7.3 6.7 2.3 -- -- 117.0 -- -- 2.3 7-19-6 7-20-4 7-31-5 7-33-6 58.7 -- 45.3 469.1 92.9 -- 94.7 85.5 148.2 32.1 201 61.4 17.2 15.8 77.5 10.7 -- 37.8 -- 313.0 -- 12.5 -- 16.3 9/6 Lock 4i 23.8 42.1 6.7 2.1 17.9 8.2 TOl-Rt.4 36.9 25.7 24.7 4.72 35.6 3.6 Mean 98.26 73.71 Log Mean 1.78 Std. Dev. 134.36 28.27 Log Sx .41 Corr. Coef . R PCB vs. V. S. . 26 60.58 1.58 61.70 .46 14.18 21.60 84 B5.91 1.74 105.06 .41 8.19 8.49 .57 * T values for comparison of the h 2 mo size volatile solids (V.S.) with V.'S. for the other two groups were highly significant at the .01 level. PCB values were not significantly different for the three groups although the mean was lower for the middle size range. HONS 007319 Table 5 PCB Area and Weight Tabulations for High and Low PCB Sediments as of Feb. 27, 1978 Data Reach iMetric 1 2 3 4 5 6 7 8 Total 'Total Mile Pt. 153 .9 1SE1.5 163.4 165.8 168.0 183.2 186 .0 188.4 193.7 Length-mi. 5.6 3.9 2.4 2.2 15.2 2.8 2.4 5.3 mi. 39.8 64.0 km Ave. width-ft. 878 866 990 1142 623 754 752 588 Area-10ft^ 26 17.8 12.5 13.3 50.0 11.15 9.5 16.5 156.7 14.5 m2 Use area 100/ Freq. Dredged Area Freq. Dredged Z Use Area 80% 25.0 .45 1.8 20 18.7 13.7 .07 0 .4 0 15 11 14.0 .64 4.5 11.2 53.8 .13 .2 43 10.6 10.0 .15 0 . 1.5 0 8.5 8.0 18.8 164.6 .58 1.89 3.1 15.0 1.2 132.5 15.3 m2 .17 m2 .11 m2 12.3 m2 Hot Spot Area f xlO"ft2 100% 0 0 .15 1.5 1.75 2.59 .6 4.50 10.9 1.0 m2 Cold Areas- ,, Area 10ft* PCB cone, ppm 20 15 10.85 9.7 41.2 5.91 7.4 10.73 120.8' 11.2 m2 9.6 13.9 22.6 13.4 13- 20.0 20.0 19. lb. KB at 1 ft depth, 65 lb/ft3 12,500 13,500 15,900 8,500 34,800 7,700 9,600 19,900* 122,400 55,600 kg lb. PCB in Hot Spots at 16 in depth Total lb. KB -- 12,500 -- 13,500 2,000 17,900 11,800 10,600 41,200* 6,000* 97,700 1 169,300 77,000 kg 20,300 45,400 48,900 15,600 117,600. 291,700 132,000 kg % of lb. in Hot Spots 0 0 11.5 58.3 23.3 84.2 38.5 79.7 58.1 0 7 8 2 0 0 SNOW - r I * V ----4.1 *0 ,t -n*-h ---- 4 . * r- <1 from HAT nnn Table 6. Summary of Jar Test* Results Using Typical Hudson River Sediments Sediment Location Schuylerville Ft. Hiller Buoy 214 Ft. Edward Behind T.I. Dam Stillwater Lock 1 in canal Waterford Bridge Floatables Z 9 2 2.7 17.5 13.4 18 2.8 Volatiles & 6 4 2 7 3 24 5.4 * 24 hours settling . f 1-2 nm rapid mix, 5-10 flocculation. Silt & Clay Z 2 1 11 45 10 26 54 For Settling Times 1.5-2..5 hr. 18-24 hr. Turb. SS. Turb. SS. 1000 500 500 300 200 150 100 50 800 450 500 200 , 2500 1500 450 300 300 168 - - 1150 715 162 94 675 462 170 150 For Chemical Coagulation* Turb. SS. 37 20 -- 45 20 55 45 32 5 -- 37 30 2 O 2 C/o C o si a> K -30- ' TABLE 7. FCB Vs DAILY FLOW AT TROY (ID FREQUENCY* 15X (55 days/year) FLOW AT TROY DAM (m3/s) (cfs) 620 ` 22,000 . PCB W)- 0.08 PCB LOAD (kg/day) (lb/day) 4.5 10 10X (36 days/year) 780 27,500 0.13 9.1 20 12 (3.6 days/year) 1700 60,000 1.90 270. 600 0.22 (18 hours/year) 2260 80,000 3.90 770. 1700 * Credit: Lawler, Matusky and Skelly Engineers. (11) TABLE 8. ANNUAL FCB LOAD AT TROY Vs YEAR (11) YEAR* NUMBER BASED ON ANNUAL TORY DAM PCB LOAD (kg)(lb) DROUCHT YEAR 9 1965 1140-1050 2520-2300 TYPICAL YEAR 14 1970 10700-2000 23640-4400 JET YEAR 16 1972 11,100 24,572 '0-YEAR AVE. 1-20 2950-3630 6500-8000 Credit: Lawler , Matusky and Skelly Engineers. (11) Estimate may be low, since bottow desorption was not considered. MONS 00 7822 TAELE 9. SEDIMENT TO HATER PCR PARTITIONING COEFFICIENTS ' TYPE STUDY SEDIMENT MIXED AND SETTLED MIXED AND SETTLED WATER FLOWS OVER SEDIMENT IN TANK MIXED AND SETTLED (ELUTRIATE) FLOW OVER IN TANK MIXED AND SETTLED MIXED AND SETTLED FLOW OVER TANK ELUTRIATE TESTS, HUDSON RIVER MIXED AND SETTLED FOR 5 CITIES IN U.S. MIXED AND SETTLED 1 1 ELUTRIATE TESTS 10, 10,000 AROCLOR ' 1242 ,1016 1254 1254 70% (1016) 70% (1016) 70% (1016) 70% (1221) 80% (1016) 70% (1016) 70% (1254) 70% (1016) 70% (1016) COEFF.* AUTHOR 1.3x103 (15) PARIS ET AL. (1878) 6xl04 (17) HALTER AND JOHNSON (1977) 9xl05 (17) HALTER AND JOHNSON (1977) 103-104 (18) LMS-GE,HUDSON RIVER (1976) 104# (18) LMS-GE,HUDSON RIVER (1976) 103-104 (9) TOFFLEMIRE (1976) , 103 (9) TOFFLEMIRE (1976) 2xl05 (9) VEITH.HUDSON RIVER (1976) 103-104 (10) NYS DEPT. OF TRANS, (1976- 103-104 (9) FULK ET AL. (I975) 104 103,3x104 (16) GENERAL ELEC..MCFARLAND (1977-8) (19) MALCOLM PIRN1E (1977) Dry sediment cone./soluble water cone . (.45y filter or centrifuge) ^Here there was 290 mg/1 of suspended solids in the water tested. MQNS 007b23 ELUTRIATE DREDGING SIMULATION FLOW OVER IN TANK - RIVER SIMULATION 1221 103 2 x 104 1016 & 1242 5 x 103 105 1254 2.5 x 104 5 X 105 table 10. Comparison of K Values for Volatilisation of PCB at 2SC Solubility Aroclor Mol. Wt. UR/i For PCB Saturated Water Vapor Pressure KCs mm Hr ma/m^/hr KCs pure PCB mfc/ra2/hr K 1/hr 1221 .192 (1000) (1000-2000)' = (10-2)6 (.055-.090) (3.3)a (.002-.004) 1242 261 240 4.1 x 10"4 13.7 h (80)e, (340)d OxlO-4)', (3xl0"4)d (1.8-5.0) .057, (.002-.006) (.2-.9)d, (.0096-.027)" (.22)d 1016 (175+). (4?nid c.non 01fi)a 1254 321 12 (56)C 7.7xlO"5 .8 Reference (14) Mackay and Leinonen was used unless otherwise noted. (a) GE-Corp. Res. Niskayuna, NY - Brooks et al.(4) (b) GE-Corp. Res. Niskayuna, NY - McFarland, et al.(16) (c) Hague, et al.(22) (d) Paris, t al. (15) e) Huntzinger, et al. (24) (8.35)C {.) \.iy] .067 (V Aroclor 1254. Soil PCB _ .01 KC pg/m2/hr 1.25 1254 10 807.(1016)1 32(1016) 1248 1242. 1254 6.4 20 .04 .05 o 126 T .05 For Sediment or Soil to Air Transfer Air Cone . nf>/n3 half life in top 10 cm - yrs Area or Soils 1-10 6 LaJalla, Calif. .1 Ottawa Sand 1200 <1 Sand & Wood Chips 100 Sand & Wood Chips 10 Lake Michigan Area < .05 Sand >.3 Silt or Top Soil Reference (21) McClure (22) Hague, et al. (16) G.E., McFarland (4) DEC-Air Resources (20) Versar Inc. (4) GE. Brooks (4) GE, Brooks -33- Table 11 Summary of Dredging Results at 3 Sites LAGOON FLOW THRU TIME TYPICAL. BY SALT TRACER LOCK 1 15 min. BUOY 212 45 min. LAGOON INFLUENT Average ? solids PCB in solidB 1* 15 ug/g 5% 100 ug/g LAGOON EFFLUENT Suspended solids, without polymer Suspended solids, with polymer PCB, composite, without polymer PCB, composite, with polymer 2000 mg/1 400 mg/1 40 ug/1 8 ug/l 500 mg/1 250 mg/1 100 ug/l 50 ug/l REMOVAL EFFICIENCIES Suspended solids, without polymer 80? 99? Suspended solids, with polymer 96? 99.5? PCB, without polymer Ti% 98? PCB, with polymer 95% 99? SILT AND CLAY Percent passing #200 sieve (average) 26% 5? LOCK 4 55 min. 3? 20 ug/g 460 mg/1 230, 20* 3-0 <1.5ug/l 98? 99, 99.91 99.5 99.8 20-30? Polymer fed between lagoons MONS 007825 TABLE 12. FT. EDWARD DREDGING MONITORING - SUWARY COMPARISON Parateter -LatFLQH Fean PCB ppb Kean S.S. mg/l Yean PCB kg/day Team S.S. kg/day High Finn Mean FCB ppb tean S.S, mg/l Yean PCB kg/day Team S.S. kg/day Nn fjRFDGlMG Low FLOW f'EAN PCB PPB 'EAN S.S, MG/L 'IEAN PCD KG/DAY *EAH S.S. KG/DAY Below Dredge 3.3L 23.8 1,98 16,600 Si 55.500 1636 8!) East Channel Lock 7 Upstream Downstream 3.00 16.4 .714 13.4 6M .543-.204 7.0 4 7?;Eo i'.m vf 32i20 , 2X6 79,^00 i 109,000 1P u!(S if 5,*S .065 9 aSo _.27 76.800 VfesT Chaniel ,w .78 64,000 s? 106;000 sr 70,(100 C1 ' MQNS 0 0 7 8 2 6 These are instantaaecus rates, for long term rates mjltiply by 10/24. -35- TABLE 13. EXPECTED LOSSES IN HOT SPOT DREDGING MISSED DURING DREDGING-* NOT PICKED UP LOST IN DREDGING PROCESS AT DREDGE HEAD LOST IN RETURN FLOW TOTAL LOSSES IMMEDIATE LOSS TO WATER COLUMN HYDRAULIC PCB SOLIDS ' 13% 13% < 1% < .5 1% .5 15% m 2i 6-* VCM CLAMSHELL PCB SOLIDS 13% 13% <1%# .2% . .1% 15.2% 1H.1% 2.2 1.1% " Shrouding the top of the clamshell could reduce these losses further. Also, on Page 11 of the Japanese reference, "Turbidity ' Generated by Dredging Works" by Osamu Nakai, the clamshell losses are twice the hydraulic losses at the dredge head. These losses were based on results in a small laboratory tank, while the other losses are based on DEC field data and literature data. MONS 007827 Table 14. Summary Description and Evaluation of Possible Management Strategies for the Hudson River Possible Dredged Management from River Action____________________________ (1978-1988) kg PCBs Removed from River System (1978-1988) Types of Technology__________________________ Status Further study Ko management action 916,000 23,000 Modified DOT maintenance dredging program to assure permanent removal of >902 of PCBs dredged from river as part of maintenance program. Continuous DOT maintenance dredging necessary for Barge Canal operation. Stabilize and/or remove remant deposits. 830,000** (680,000)** 75,000* (44,300)** Bank stabilization and/or remove remnant deposits and modified DOT main tenance dredging program as outlined above. Environmental assessment prepared; 2-year program anticipated (1978-79). 3. Remove remnant deposits and remove all river sediments with PCB concentra tions greater than 50 ppm (hot spot dredging) 1,270,000 138,000 Removal of remnant deposits and hct spot dredging tech nology to vary from small specialized hydraulic dredges to large clamshell dredges. Maximum practical PCB containment technology would be used. Remnant deposit environmental assessment prepared; 2-year program anticipated; hot spot environmental assessment under preparation; 3-year program anticipated (1979-81). 4. Removal of all river deposits greater tfian 1 ppm (>5 ppm in rem nant deposit areas). 11,500,000 186,000 Massive clamshell dredging effort. Maximum practical PCB containment technology would be used. Environmental assessment not as yet authorized; 10-year program anticipated (1979-89). Source: Ref (4) modified by the authors. * Assumes area 3, 3A, and 5 are removed from the basin. ** Assumes area 3A and 5 are removed and area 3 is stabilized. MOMS 007828 -37- TABLE 15. FOUR ALTERNATES AND COSTS NO ACTION REMNANT DEPOSITS HOT SPOT + R. D. COMPLETE REMOVAL VOLUME 10s x a3 .70 .68-.83 1.27 11.5 COST OF PCS REMOVED TOTAL ($1,000,000) 2.5 UNIT ($/lb) 49 ($/kR) 108 4.5-6.3 38-46 83-101 29.0 87 192 204 485 1070 HUNS 0Q7629 -39MUNS 007830 -39- MO- n 0* . i 1*3 9 C 7 O o *J OD u> K FIGURE 3 UPPER HUDSON RIVER WATER SURFACE PROFILE Fort Edword to Federal Lock I?. S*pi2,59Te #*#* f r uses. Dn> net to ct* j- iv o y l (Jynetion o f Erl# B Chomekrlo Conolo) , < >---------- 1----- 190 199 ere 8 I i Xv i 179 4T/V /row /A# Stftrry 3 43 * 2 ISO 41 MQNS 0Q7S33 F ig u re 4. NA1 B oat and T ransponder 42 Figure 5. Rangefinder for Measuring Distances MONS 007834 Figur* 6 FREQUENCY DISTRIBUTION OF SEDIMENT PCB LEVELS IN THE UPPER HUDSON RIVER NUMBER OF SAMPLES -c* r--o I--10 20 FT. 0 200 4 00 - +- 6--0< 0 FT 45MONS 0 0 7 8 3 7 PCB CONCENTRATIONS RIVER MILE Figure 8 IN BED 189.2 $ MATERIAL ` Figure 9 AVERAGE PCB CONCENTRATION IN SEDIMENTS OF HUDSON RIVER LOG MEAN AND 95% CONFIDENCE INTERVAL I04 (NUMBER OF SAMPLES) REACH MONS 0 0 7 8 3 8 149.4 F igure 10. A dsorption o f A ro c lo r 1242 on D iffe re n t Adsorbents. MGNi 007839 'I'.MJWf-'rU:!.' :i- ek`- :a:1^ ' :1? !|`t: :; n; 'iat " , :V ( > "ik'UU / r;i :a-;u . ij !! - liti,"' j. ' C'i)~> .. - :l: 5 1- {1 - W'Ji^ j> iH l v v f:f j JJ i Figure II - PCB MEANS IN ppm -48 AT DEPTH INTERVALS IN CORES Depth (in.) 3 6 ---up river 9,8 93 112 REACHES down river -- 7,6 5-1 102 22 153 47 120 12 133 18 130 15.5" 48 i l0" 49 14 75 24 6:3 28" .30.5" 5 69 36 4.7 3.0 3 NOTES"*--0 i$ the depth D for which (average PCB in top 6") X D equals total PCB mass ^D if the depth which accounts for SO % of the total mass MOMS 007840 -49Figut.' 12 January 1977 Winter Cores Analyzed for PCB, Cs 137, and Texture Northeast of T.I. Dam Core 18-8 Northeast of Rt. 4 Bridge Core 12-1 Depth Inches PCB ppm Cs 137 * Pci/gm S&C q Depth Inches PCB ppn Cs 137 Pci/gm X S6C I 2 3 4 5 1973' 6 7 8 9 10 11 12 13 14 15 16 17 18 # 19 mg" 20 21 22 23 24 25 26 27 28 29 30 31 32 75 32 63 45.1 120 161 141 269 383 546 632 422 413 428 321 373 4.9 160 .85 8.9 .23 3.7 1.9 .5 1.5 2.1 1.4 3.4 2.9 4.3 9.0 4.7 10.4 8.3 11.9 19.2 11.7 19.2 1.0 .7 <3 <2 <.2 <.4 80 _3k. * 61 25 1 2 3 4 1973* 5 6 7 8 9 10 11 12 13 14 15 1959' 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 177 47 121 119 126 53.5 4.8 2.5 1.5 5.0 3.0 7.7 5.6 1.2 2.4 1.7 1.0 1.6 1.0 2.1 10.3 1.9 2.6 2.5 3.3 6.1 3.8 2.5 5 4 5 7 3 5 2 58 V IF 69 * 7s 0 1" - 2. 54 cm * The 1973 Dace Is used because of che documented decrease in PCB use at GE after 1973. 9 The 1959 date was used because of the decrease in Cs due to less fallout before 1959. There was still some low level of PCB before 1959 and GE began use of PCB *,1948-51. If these dates are used,sediment deposition In these near bank areas of 3/4-l"/yr is indicated and the maximum PCB levels passing the Thompson Island occurred in 1962-1967 while the maximum PCB passing the Rt A bridge at Northumberland occurred later 1961 thru 1976. . HONS 007841 LOG PCa -50- Figure 13 LOG PCB-LOG Cs REGRESSION PLOT HONS 00 7842 Flgure 14a. PCB Hot Spots ?50 ug/g. -51- VILLAGE OF FORT EDWARD MOWS 007843 Figure 14b. PC2 Hot Spots >50 ug/g. THOMPSON ISLAND THOMPSON ISLAND DAM a as 152 NORTHUMBERLAND DAM MILE I KILOMETER HONS 00 7844 -53 HONS 0076*5 -54- FIGURE 15 SUSPENDED SOLIDS PCB for 2.8 liter JAR TESTS MONS 00 7846 SUPENOEO SOUOS- PCB CONCENTRATION ( jig /I) -55- Figure 16 HUDSON RIVER AT SCHUYLERVILLE PCB CONCENTRATION VS. RIVER DISCHARGE MARCH 30-SEPTEMBER 27,1977 regress.ion1 _P_C__B*--5--.-5-- g*--I-0---4for Q < 5.6 x 10s L/sec SOURCE: TurkTM uses data MQNS 007847 -56- Figure 17 EVAPORATIVE LOSS OF PCB FROM PCB SATURATED WATER SOLUTION SOURCE: General Electric MQNS 007846 57 Figure 18. Ref (16) fl 1242 PCB LOSS mg/m2/h r -58MUNS 007B50 !6f 14 - 12 1.0 88 -59- FIGURE 20. REF. (16) TOTAL PCB LOSS FOR TANK CONTAINING SEDIMENT-WATER MIXTURE AIR VELOCITY3 1.5 m/s WATER PCB CONC.= 270-620 ug/l HONS 007851 QUIESCENT 2V TANK, Suspended Solids`940 mg/I __ -- PCB'1.69 mg/I . 0 _L_ _J_____________I___________ I j 10 20 30 40 50 TEMPERATURE C -60- SEDIMENT TO AIR PCB LOSS SEDIMENT PCB * 6.4 ug/g, 80% 1016 yg/m Figur* 21 Raf. (16) HONS 007852 -63- HUD80N RIVER I HONS 007655 64 Figure 25. Lower Basin of Lock 4 Site. -65- Flgure 26. DREDGE HEAD FCB LOSS Ares Telocity ' Total FCB Suspended Solids Incraase In FCB* Increase In FCB* Incraase in - . Suspended Solids* 149 m2 .198 b/s .1-.4 ppb 15-35 mg/1 .018 ppb 43.5 g/d 1.0 mg/1 * Due to dredge head values 14.9 m2 .198 m/s 2.1 ppb 120 mg/1 MGNS 007857 -66FIGURE 27. FORT EDWARD MAINTENANCE DREDGING MONITORING SITES <T) UPSTREAM LOCK 7 WEST CHANNEL DOWNSTREAM EAST CHANNEL C0 MOBIL MONITOR- BUOY 227 DOWNSTREAM OF DREDGE SCALE 800 400 0 800 FEET HONS 007658 -67Flgura 28. Dragline Bucket at Fort Edward. HONS 007859