Document b5v5Y7gZjEGLqK08K27Zjqn03

Region 6 Compliance Assurance and Enforcement Division INSPECTION REPORT Inspection Date(s): Media: Regulatory Program(s) October 25, 2017 Water NPDES Company Name: Facility Name: Facility Physical Location: ~.i!Y, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Contact: - FRS Number: --c---- .. Identification/Permit Number: Media Number: NAICS: SIC: SNF SNF Flopam 26790 Hwy 405 Plaquemine, LA 70764 26790 Hwy 405 Plaquemine, LA 70764 lberville Parish Timothy Kane 225-692-7207 EHS Manager timothyk@snfhc.com 110064592409 -- - - AI # 166443 / permit# LA01252~0 NA -~ -- - 2869-lndustrial Organic Chemicals, 2899 Chemicals and Chemical Preparations, and 4952-Sanitary Personnel participating in inspection: Rachel Matthews EPA- Region 6 Mike Tillman EPA- Region 6 Don Wei nell LDEQ Timothy l(ane - - Paul West --- _g.a_ron Suggs - Danny Burgard -- SNF Flopam SNF Flopam SNF Flopam SNF Flopam Life Scientist 214-665-8589 Environmental Scientist 214665-7 531 Environmental Scientist Ill 225219-2128 EHS Manager 225-6927207 Site Manager Environmental Engineer 225-692-7247 - 225692-7440 . 225-692-7406 . - - EPA Lead Inspector Signature/Date - .. Supervisor Signature/Date - ~ _____k: Rachel Matthews (I~ j/'~ !;;) ;?'- Carol PetersWagnon v 1/b{- IY-:-/::;. Date -- 10!7/'/71 7 Date - 6ENFORM-019-R6 (10/6/14) 1 SNF Flo pam October 25, 2017 Section I -INTRODUCTION PURPOSE OF THE INSPECTION EPA Region 6 inspectors Rachel Matthews and Mike Tillman arrived at the SNF Flo pam chemical plant (Plant) at 9:00am on October 25, 2017 for an unannounced Compliance Evaluation Inspection (CEI). After initial facility entry we met with Timothy Kane, EHS Manager of the Plant, as well as other staff, at the opening conference. We presented out credentials to Mr. Kane and informed him this was an EPA inspection to determine compliance with the facility's National Pollutant Discharge Elimination System (NPDES) permit and Clean Water Act (CWA). The inspection was conducted under the authority of the NPDES permit program, in accordance with the Federal CWA. This report is based on information supplied by the Plant's representatives (the permittee), observations made by the U.S. EPA inspector(s), and records and reports maintained by the permittee, the State of Louisiana, and the U.S. EPA. FACILITY DESCRIPTION The Plant is located on Highway 405, in Plaquemine, lberville Parish, LA. It is a new organic chemical manufacturing facility that is not currently built out. While construction is still underway, and several process units are not built, the plant is permitted for full production capacity. The facility is located on 900 acres, with 85 acres designated for build-out. The primary product made is polyacrylamide powder generally used as a flocculent, but also used in agricultural and mining industries. A more in-depth description of the various processes can be found in the current application. See Appendix 3 for the written description within the current permit application. See aerial photo in the photo log (Appendix 1) as well as the storm water drainage map (Appendix 4) for a full view of the chemical plant. In addition, a more in-depth description of the various processes can be found in the current application. See Appendix 3 for the written description within the current permit application. The current permit (Appendix 2) was effective on November 1, 2016. The permit includes authorization to discharge wastewater from eight (8) outfalls, four (4) of which are internal. Final discharges are to the Mississippi River and the Bayou La Butte. Outfalls 01A and 01B are for intermittent discharges of non-process area storm water, light industrial area storm water, some loading/unloading areas, hydrostatic test waters, equipment wash water, firefighting systems, etc. These outfalls discharge from the storm water detention pond, first going to the Mississippi River (from 01A) and during emergencies to the Bayou La Butte (from 01B). Outfall 002 is also intermittent and discharges monitored wastewaters from all four (4) internal outfalls to the Mississippi River. Internal outfall102 includes the continuous discharge of sanitary wastewater. Internal outfall 202 includes only filter water from the raw water treatment system. Internal outfall 302 includes the intermittent discharge of process wastewaters, process area storm water, and other wastewaters. And, internal outfall402 includes utility wastewaters, scrubber blowdown, cooling tower 2 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Location: SNF Flopam City: Plaquemine County/Parish: Iberville Parish State: LA Google Aerial 1 - View of facility from Google Maps Photo 1 - Outfall 01A at the Detention Pond UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Location: SNF Flopam City: Plaquemine County/Parish: Iberville Parish State: LA Photo 2 - Outfall 01B at the Detention Pond Photo 3 - Sanitary Wastewater Treatment (package) Plant UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Location: SNF Flopam City: Plaquemine County/Parish: Iberville Parish State: LA Photo 4 - Equalization tanks and internal outfall 402 Photo 5 - two frac tanks connected to internal outfall 302 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Location: SNF Flopam City: Plaquemine County/Parish: Iberville Parish State: LA Photo 6 - Lift station with all internal outfalls combining before discharging to 002 Page 14 of 15 Page 15 of 15 Page 14 of 15 Page 15 of 15 Page 14 of 15 Page 15 of 15 Page 12 of 13 Page 13 of 13