To the Director of Manufacturing Organic Chemicals Division
Estimate No. 1119 Dept. No. 826.08 Anniston Plant, Anniston, Alabama
INSTALL SPECIFIC GRAVITY EQUIPMENT ON CHLORINATOR
NO. 6
Capital Additions
$6,950
Repair Expense
$ 450
Total Appropriation
$7,400
Savings
None
DESCRIPTION
This project provides equipment to continually monitor the specific gravity of crude Aroelor production on the continuous Arcelor chlori nation equipment. The equipment is adaptable to process control at a later date.
. 'c y C.
i , *04.
PCB-ARCH-EXT0377902
Estimate No. 1119 Dept. No. 826,08
=2=
October 9, 1961
PRESENT SITUATION
At the present time four of the eight Aroclor chlorinators at Anniston are operated in a cascade continuous system. Controls for this system consist of operators catching gravity samples each hour and checking to assure we are in the correct specific gravity range. Variations in pressures per cent airsand hydrogen in the chlorine feed to these units cause the chlorination rate to change. These changes cause the final product material to vary in the per cent chlorination.
It is proposed to install a constant monitoring radiation analyzer to measure and record the specific gravity of the crude Aroclor from the last stage of the continuous system. These alterations will permit tighter control of equipment to produce a more uniform, better quality product. It will also reduce the workload of the chlorinator operator, allowing time for other work.
A radiation analyzer has been selected for this job after checking with air major instrument companies for equipment to measure specific gravity. Instruments amounting to $4500, or 607, of this project installation cost, are guaranteed on a money-back basis by Industrial Nucleonics should they fail to perform satisfactorily.
NEED FOR PROJECT
The need for up-to-date in-process controls to insure the uniform quality of Aroclor 1242 is of prime inportance in maintaining a major portion of the Aroclor market. The controller is one step in a series of improvements to give this process proper control.
SAVINGS
No savings are claimed for this project. There will be a slight reduction in manpower requirements which will free the operators for other work.
SAFETY
The radiation system considered in this installation is an Accu Ray design. It is constructed with personnel safety and health as a first consideration. The radiation source is incapsulated, hermetically sealed, secured in a shielded housing of Meehanite and locked to all personnel except those authorized to check it. No other safety hazards are involved in this project.
AIR AND/OR STREAM POLLUTION
No change.
PCB-ARCH-EXT0377903
Estimate No, 1119 Dept, No. 826.08
3-
October 9, 1961
STATUS OF PROJECT
General design data for this installation, along with piping and layout sketches are presented in TSD Report 729=22 (1), dated August 28, 1961. Firm quotes have been received on instrumentation equipment and delivery can be made approximately 12 weeks after orders have been placed.
RECOMMENDATIONS
Approval of Estimate No. 1119 is recommended.
Prepared by J. W. Molloy / md
B. 0. Severson
^7 ~Z