Document b5kMrVp04JbawgKQQqMnqB7y0
PCB BUSINESS PLAN BOOK - COPY #5
Property of Thomas H. Lafferre Location: B2SB
Phone:
2072
HONS 071741
Monsanto
J. J. Zeman - B2SK
February 3> 1976
Dielectrics Business Plan
to : R. G. Potter
Enclosed is the business plan for the replacement of PCBs in dielectric fluids. The basis of the plan is to develop Monsanto compounds which satisfy our customers' needs and protect our existing market position and profitability, if possible.
The timing of the plan changed from an initial goal of phasing out at the earliest feasible time to the present goal of phasing out in a planned and orderly manner. The plan is designed in such a fashion that it provides for a stair-step approach to go/no-go decision points for all facets of the capacitor and transformer dielectric businesses.
This document is also a working document and it is by no means intended to be in its final version. It is so con structed that as things change, the plan can be easily up dated and still provide the basic control needed.
The key components of the plan are the strategic summary; the capacitor U.S.-, the capacitor Europe-, and the trans former worldwide - tactical approaches; and the potential problem analysis. All of the planning within this document is based on these items.
Each involved department should take this plan and prepare their own individual detailed work plans. The dielectric business plan is the instrument which provides the overall direction for this program.
/bh Enclosure
J. Jr. 2eman
MQNS 071742
CONftPiNUAl IWFORf.*ATIOIj
This rnfurmation is confidcr.:.;:l m ns rolim to m. in U rmnn'o s buMnos; It shall be retained by the roci1,>:n! ml crnmd rn ien m V '."i-is. at l.n company. All requests tor dupiinKtn cop.?.- m mnE sopirs tor mrirviCuals or departments not included in the drsliibulisu ialics. oust be Icnvartled to the originating department.
BUSINESS PLAN FOR DIELECTRIC FLUIDS
I I
The PCB Planning Task Force
Chairman: Coordinator:
- J.J. Zoman - J.R. Savage
Functional Representatives
Commercial Development - R..K n.-ivlr.
Corporate Engineering - C. P. Orr
Law
- T. H. Bottlni
Manufacturing
- J. R. Savage
Marketing
- D. Wood
Patent
- W. H. Duffey
Planning & Control
- R. E. Beal
Prdt Acceptability
- J. C. Weber
W. B. Papageorge
Public Relations
- D. R. Bishop
Research & Development - M. J. Gibbs
European Input
- J. S. Haggart
Copy No,
HONS 07X743
TABLE OF CONTENTS
Page No.
I. Business Plan
A. Strategic Summary B. Results and Goals C. General Summary of Action Steps D. Business Position Identification/Analysis
U. S. and ROW E. Critical Assumptions F. Technical G. Capital Program H. Manufacturing Capacity I. Business Position identi./Anal. - Europe J. Financial
XI.
Capacitor Action Plan
A. U. S.
- 1.
2.
3.
Tactical Approach Alternatives Events Chart
.B. Europe - 1 Tactical Approach
2. Alternatives
3 . Events chart
1-1 1-1-2 1-3
1-5 1-9 I-10 1-14 1-16 1-17 1-20
II-l II-2 II-4
11-14 11-15 11-16
III. Transformer Action Plan
A. Tactical Approach B. Trichlorobenzene Issue
C. Europe D. Events Chart (Worldwide)
III-l III-l III-l III-2
IV. impact on Related Business
A. Economic Dependence
1. U. S. Manufacture 2. Polyphenyl Tree 3. Europe
IV-1 IV-3 IV-4
V. Appendix
1. 2. 3. 4. 5. 6. 7.
8.
9. 10. 11. 12. 13.
Potential Problem Analysis - Capacitors Capacitor Dielectric Fluid Potential (chart 1) Monsanto Capacitor Sales Forecast (Chart 2)
Transformer Fluid Market (chart 3) Capacitor Fluid Sales (U. S . Produced)(chart 4a) Capacitor Fluid Sales (U. K . Produced)(Chart 4b) Transformer Fluid Sales (U. S. Produced) (Chart 5a) Transformer Fluid Sales (u. K. Produced) (Chart 5b) Toxicological Program Retrofit Opportunity
Patent Position
G. E. Timetable and Regulatory Situation Price Plan
V-l V-12 V-13 V-14 V-15 V-16
V-17
V-18 V-19 V-47 V-51 V-53 V-56
</
a *
BUSINESS PLAN
HONS 071745
I. Business plan
A. Strategic Summary
1. Withdraw from supply of chlorinated biphenyl dielectrics (PCB) in u.S.A./Canada when a suitable replacement is available, from whatever source. Date to be established by 8/1/76.
2. Establish MCS 1238 as the major replacement for PCB in capacitors in U.S.A. and Canada.
3. On the basis of (2), establish MCS 1238 as a major re placement for PCB in capacitors in Europe, japan, and other major markets as they move away from PCBs. Diccontinue production of PCB in Europe. Date to be established by 8/1/77.
4. Achieve worldwide performance income for total dielec trics of $4.4M in 1976 and $4.5M in 1979, which maintains the performance income through the transition period.
5. Continue transformer PCB replacement evaluation until late in 1976 and, if at that time no strong candidate can be supported, phase out PCB transformer fluids without a Monsanto replacement, at the same time as PCB capacitor fluids.
6. Resolve by mid-1976 the need for a second supplier for MCS 1238 in Europe, e.g. Prodelec or Bayer.
7. investigate growth opportunities in dielectric fluids through developmental programs, such as cable dielectric/ coolants and transformer oil modifiers.
B. Results and Goals
1. Results
a. Phase out of PCB production when a suitable replace ment is available, from whatever source.
b. Replace our present PCB capacitor fluid with a nonPCB fluid (MCS 1238), and:
1) Achieve in 1979 a .1. of $4.5M worldwide total dielectrics ($4.05M US-produced, $0.45m Europe). Position the business for future growth beyond 1979 .
2) Achieve sales volume in 1979 of 19.5M pounds worldwide.
MONS 071746 1-1
c. if we have a viable product, replace present PCB transformer fluids with a non-PCB fluid generating a minimum of 32% PI on sales, and with a sales volume of 6-10M pounds per year by 1979 in U.S.A. and Canada.
d. Maintain Monsanto image as a responsible company during transition from PCBs and in the clean-up phase following discontinuation of PCB production; while recovering the costs for this involvement, e.g. perform incineration of waste fluids on a break-even basis.
e. Be in a position to supply MCS 1238 in Europe in 1980 from a local blending facility, earning 40% gross profit minimum.
(Note:
Volume was estimated at 3M pounds per year, but Monsanto Europe requested a change to 5M to 6M pounds, which would adjust long range forecast in years 1979-85.)
2. Goals
a. Achieve a worldwj.de performance income in 1976 of $4,4M. ($4.0m US-produced, $0.4M European produced) .
b. MCS 1238 blending facility in U.S.A. demonstrated at design rate (11m pounda^ear) six months after G.E.'s commitment.
c. Obtain customer commitment to MCS 1238 early enough to support AR submission for project 3023 (non-PCB Dielectrics) by 12/1/77.
d. Reach a decision by late in 1976 on whether to continue a transformer fluid replacement program.
e. Obtain European customer commitment to support approval of an AR for European blending by January 1, 1978.
1-2
MQNS 071747
C. General Summary of Action Steps
1. Capacitors MCS 1238
a. Complete environmental study on MCS 1238 (excl. 2-year feeding study) by July 1976.
b. Obtain G.E. commitment to MCS 1238 sufficient to:
1) Support an interim blending facility (in production six months after commitment).
2) Justify a major plant (CEA 3023).
c. Cooperate as needed with capacitor industry/ insurance groups to obtain approval for MCS 1238 capacitors - in terms of fire safety.
d. Establish raw material supply sufficient for forecast volumes of MCS 1238 in interim blending facility; MCS 1238 supply to commence six months after G.E. Commitment.
e. Complete construction of interim MCS 1238 blending facility and start up six months after G.E. com mitment .
f. Obtain AR approval for CEW 3023 project (M1PB/ TXS/blending) by December 31, 1977.
2. Transformers MCS 1866*
a. Cooperate with G.E./Vjestinghouse to complete test transformer evaluation of MCS 1866 by June 1, 1976.
b. cooperate with G.E. and Westinghouse/insurance groups to establish fire resistance rating for MCS 1866.
c. Establish by March 1, 1976 an environmental test ing program which will completely evaluate MCS 1839 and MCS 1866 by March 1, 1977, (excl. 2-year feed ing study) .
d. Make decision by late in 1976 whether to continue a transformer replacement fluid program.
* A blend of 60% MCS 1839 (alkylated biphenyl) and trichlorobenzene (TCB).
HONS 071748
1-3
C. General Summary of Action Steps (continued) 3. International Involvement a. Establish Canadian/Latin American MCS 1238 capacitor evaluation programs to support a request for their commitment in 1977 - June 1976. b. Establish agreement with 7-8 Key European capacitor producers to schedule MCS 1238 trials sufficient to make a commitment by October 1977 - May 1, 1976. c. Complete training of European technical personnel and provide technical documentation on MCS 1238 to support key customer and government activities in Europe - March 15, 1976. d. Set up a program for transformers only when we have a viable product. 4. Pricing a. increase dielectric fluid domestic pricing March 1, 1976, and later in the year to cover the expenses of commitment and changeover from PCB. b. Increase U.S. export price by at least 10% March 1, 1976 to achieve 1976 P.I. of $0.70M. 5. Growth Programs a. Determine if there is opportunity for growth in new dielectric programs such as cable oils and transformer oil modifiers.
HONS 071749 1-4
D. Bus iness Position Identification/Analvsis - U.S. & RCW
1. Our current range of products serve two major markets:
a. Dielectric liquids in capacitors (devices for storing electrical energy).
b. Dielectric/coolant in special* fire resistant power transformers, e.g. those in the 500-10,000 KVA range commonly used in factory and residential installations.
* Special - e.g., U.S.A. annual usage o^f PCB transformer fluids is approximately 1M gallons compared to usage of mineral oil transformer coolants of 90M gallons.
.2 Capacitor Market
a. The worldwide potential expressed as M pounds of Aroclor is;
1974 1975 1976 1977 1978 1979 I960 1985
50 37 43
46 47
49 50
56
b. A geographic breakdown is given in Chart 1 in the Appendix v-12 (Capacitor Dielectric Fluid Potential)
c. In 1975 Monsanto held 58% of worldwide market.
d. Our major competitors outside of U.S.A. are:
Prodelec (France) - Monsanto Relative Share
Bayer (Germany)
- Monsanto Relative Share
3.2 6.4
e. U.S. market (40% of world market) is under pressure to convert to non-PCB dielectric.
f. Other world markets are forecast to follow later because they are not under the same environmental pressure.
g.
MCS .12 31 i Aroclor
we plan to progressively replace Aroclor worldwide with MCS 1238 (M pounds).
1974 1975 1976 1977 1978
1979 19801985
32.5 21.5
1.3 11.0 23.3 12.2
16.5 4.0
19.5 20.523.5 000
Chart 2 in the Appendix v-13 Blows details of Monsanto Capacitor Fluids Sales Forecast.
1-5
M0NS 071750
D. Business Position Identification/Analysis (continued)
h In converting to non-PCB replacement capacitor fluids, major competition will not be with other producers of identical products to MCS 1238, but with alternative technologies.
E.g.
Dow Fluid XFS 4169L
Phthalate Ester
Metallized Plastic Film
Chloralkylene 12) Bichlorobiphenyl)
Europe
3. Transformer Market
a. The worldwide potential expressed as M pounds of Aroclor-Trichlorobenzene blends is:
1974 1975 1976 1977 1978 1979 1980 1985
51 53 50
47 56 59
62 76
(Note: Aroclor on average represents 60% by weight of the blend.)
b. A geographic breakdown is given in Chart 3 in the Appendix V-14 (Transformer Fluid Market).
c. In 1975 Monsanto held 42% of the worldwide market.
d. Our major competitors outside of U.S.A. are:
Prodelec (France) - Monsanto Relative Share 1.8
Bayer (Germany)
- Monsanto Relative Share 4.9
(Note: Both of these are basic in chlorinated benzene, while Monsanto purchases.)
e. The u.S. market (30% of world consumption) is under pressure to convert to non-PCB replacements. The French market (30%) and other European markets (22%) are not under the same pressure.
f. We presently seek to replace PCBs with an alternative fluid in U.S.A. and Canada only.
M Poundr*
PCIJ trnnsl'o mu'r lUuici
Non-PCP f.ransformer fluid
1974 1975 1976 1977 1978 1979 1980 1985
21.5 20.7 17.2 10.2
2.2
0
0
0
-
-
-
-
4.2
6.0
7.5 10.0
1-6
MGNS 071751
D. Business Position Identification/flnalvsis (continued)
g. in the transition from PCB competition will be:
- Silicones
- High flash point oil distillates
- Air-cooled designs
- Redesigned fire protected oil systems
4. Based on our market in chemical base dielectric fluids, we can seek growth opportunities for non-PCB fluids in new dielectric market segments, which we expect to arise from a world shortage of naphthenic-based oils, e.g. cable dielectrics/coolants and transformer oil modifiers.
5. Price Trend
a. Capacitor Fluids
1) Prices domestically have tended to follow costs to yield a gross profit in the range 40-45% (see Chart 4a in the Appendix V-15 - Capacitor Fluid Sales, U.S. Produced).
2) Prices in export markets have in recent years been relatively lower reflecting specifically French attempts to move volume. (See Chart 4a)
3) The cost of Aroclor represents 4-5% of the total capacitor cost so that capacitor cost is compara tively insensitive to fluid price.
4) We plan to price MCS 1238 to yield a 25% minimum performance income return on replacement capital (45% G.P. minimum).
1-7
MOMS 011152
D. Business position identiEication/Analysis (continued) b. Transformer Fluids 1) Prices domestically have tended to follow coats to yield a gross profit in the range 35-40% (see Chart 5a in the Appendix v-17 - Transformer Fluid Sales, U.S. Produced). 2) Prices in export markets have, while following costs, yielded relatively lower gross profits reflecting both the competitive edge of our competitors' basic position in chlorinated benzenes and the French intention to move volume. (See Chart 5a) 3) The cost of transformer PCB represents 20-25% of the cost of the transformer so that this market is much more sensitive to price change. Additionally, there is an ultimate ceiling on fluid price related to the cost of competing transformer installation designs. 4) To achieve the desired volume, our cost for any non-PCB replacement material must permit pricing no higher than 1.5 times 1975 PCB-blend price per gallon. At this level, we must be able to satisfy performance income criteria. 5) After product changeover to non-PCB fluids, there will not be the present relationship between capacitor and transformer prices because replacements are not from a common base stock.
1-8 071753
E. Critical Assumptions
1. The capacitor industry will design around the reduced fire resistance of MCS 1238.
2. There will not be any government ban on PCBs in u.S.A. for capacitor/transformer use through 1977.
3. Some level of fire resistance below that of PCBs is acceptable for replacement transformer fluids and MCS 1866 meets such standards.
4. There will be no ban on electrical use of PCBs in Europe through 1978, but that European governments will move to support non-PCB requirements.
5. There will be no major growth in capacitor fluid volume usage 1976-1980.
6. MCS 1238 priced for 32% margin on sales performance income minimum maintains a cost/performance advantage over Dow XFS 4169L.
7. Phthalates will not be accepted as functionally suit able dielectrics for wide scale use in capacitors.
8. No major capacitor design changes which would rule out use of fluids are within two years of commerciali zation.
9. The transition timetables given us by our customers are reliable.
1-9
HONS 071754
F . Technical
1. Capacitor Fluids
a. Function. A capacitor is a device to store elec trical energy. It consists of two electrodes separated by a dielectric medium. The functions of the medium are to store electrical energy between the two charged electrodes and to insulate one electrode from another. The ability to store energy is deter mined by dielectric constant (DK) and dielectric strength. The ability to insulate against complete electrical breakdown is measured by dielectric strength, against temporary breakdown by corona inception voltage, and against current leakage by dissipation factor (Dg) . Dielectric constant varies over a range of 1 to 100 with molecular structure while dielectric strength and corona voltage are less sensitive to structure. Low frequency dissipation factor measures ionic impurities, present initially in the fluid or resulting from breakdown in use, which conduct current across the medium.
Fluid impregnated paper or plastics have been the dielectric medium of choice because of their much higher dielectric strength as opposed to gases and their much greater ability to completely fill the void between charged surfaces as opposed to solids.
Capacitor designers seek fluids optimizing high di electric constant, high dielectric strength, high corona inception voltage and low dissipation factor with safety and low cost.
b. industry Standard. Monsanto Aroclor 1016 with a high DK, high dielectric strength, low dissipation factor, historical low cost, and excellent fire resistance is the industry standard. It will eventually be re placed because of hazard to the environment.
c. Monsanto Replacement Fluid. MCS 1238 has the same high dielectric constant and strength as Aroclor and gives equivalent electrical performance in capacitors. Fire resistance is the only significant deficiency. Lack of fire resistance in MCS 1238 will be circum vented by capacitor manufacturers' use of fused designs. MCS 1238 biodegrades rapidly, does not bioaccumulate and has a low order of mammalian and aquatic acute toxicity, thus rectifying the environ mental objections to PCBs. Chronic toxicity studies are underway. Accelerated life tests in our labora tories demonstrate substantially equivalent life to
T-10
HONS 071755
Aroclor based capacitors. These results have been duplicated at General Electric and Electrical Indus tries. Successful operation and performance has also been demonstrated in commercial processing equipment at GE, Cornell Dubilier and Electrical Utilities.
MCS 1238 is a blend of TXS (toylyl xylyl sulfone) and MIPB (monoisopropyl biphenyl). TXS is a very high dielectric constant material developed by us in sufficient purity to be usable in conjunction with stable low dielectric constant materials to give desired capacitor performance. We have use patent coverage which claims capacitors containing TXS with hydrocarbons. The biphenyl base of the IPB hydro carbon is significant to our family tree viability which also involves heat transfer and encapsulent fluid products, processes for the MCS 1238 blend and raw material have been demonstrated. Final definition for full scale design is nearing completion.
Competitive Fluids and Technology
1) DOP and DINP esters (dioctyl phthalate and diisononyl phthalate) have been actively promoted as PCB replacements and are low cost products, but have the following deficiencies which are prevent ing their acceptance: low dielectric constant (75% of MCS 1238 and Aroclor) tendency to hydrolyze with use increasing dissipation factor, low corona inception and extinction voltages, inability to be used at all in power capacitors (30% of total market) .
2) Dow XFS 4169L, a chlorinated aromatic, is the only other replacement candidate being significantly promoted. Although it does have good corona in ception and extinction voltages, its dielectric constant is also low (85% of MCS 1238); it has a 7% density penalty to the customer and does not biodegrade as readily as MCS 1238.
3) Technologies which could impact use of MCS 1238 include tight wound metallized polypropylene film construction requiring no fluid impregnant (for low voltage capacitors) and all film construction where fluid impregnation does not increase capaci tance as much as for paper (for power capacitors). Both methodologies involve significant technical problems not resolved to date.
1-11
MOMS 071756
2. Transformer Fluids
a. Function. A transformer is a device for converting power at one voltage to equivalent power at a different voltage. The functions of a transformer medium are to insulate the electrical components from each other and to remove thermal energy from power losses. Fluids have been widely used in power transformers because of their good dielectric strength and their superior ity over gases and solids in transferring heat by convection. Dielectric strength and heat transfer properties, in particular viscosity at low ambient temperatures, are the most important functional prop erties. Other properties important in practice are resistance to oxidative or hydrolytic deterioration in use, fire resistance in case of a catastrophic failure and safety in the environment.
b. Industry Standards
1) Mineral oils are the most widely used transformer oils because of their good electrical and heat transfer properties, stability and low cost. They are not used in fire-risk areas because they are combustible.
2) Askarels (mixtures of Aroclors and tri- and tetrachlorobenzenes added to reduce low temperature viscosity) are used in fire-critical areas because they do not support combustion, in addition to having good electrical and heat transfer properties, excellent stability and reasonable costs.
c. Monsanto Replacement Fluids for Askarels. MCS 1866, a mixture of alkyl biphenyl and TCB (trichlorobenzene) which has dielectric strength and heat transfer char acteristics similar to current Aroclor based products. Fire resistance is less than Aroclor/TCB, but slightly better than mineral oils. While biodegradation rate is slow, the acute toxicity is very low. Bioaccumula tion and fish toxicity studies are underway.
General Electric has rated the fluids as promising based on laboratory tests, and we have supplied them with fluid for the next phase of testing.
we have a process for production of development samples and are progressing toward a process of engineering design.
d. Competitive Fluids and Technology
1) Mineral oil is used in the majority of applications where fire hazard is low and can replace askarels
1-12
MONS 071757
3 . Technical Programs (1976 Budget $960 M)
a. Capacitors
1) Provide development quantities of MCS-1238 at a rate of at least 40,000 pounds/month ($200 M).
2) Complete process for engineering design of MIPB,
TXS and MCS-1238 ($100 M) .
'
3) Obtain toxicity and environmental data required for approval of MCS-1238 by industry and govern ment agencies ($100 M).
4) Support commercial development of MCS-1238 ($200 M).
b. Transformers
1) Complete process and property optimization of MCS-1866 ($100 M) .
2) Provide development quantities and develop process for engineering design for MCS-1866 ($110 M),
3) Evaluate alternates for TCB in blends with alkyl biphenyl ($50 M).
c. Long Range
1) Provide fundamental information leading to modified fluids of improved dielectric performance to solve future dielectric system problems ($75 M).
4. Risk Because of Voids
Lack of accepted fire resistance standards for transformer fluids may lead to lack of acceptance of MCS-1866.
1-13
HONS 071758
G. Capital Program (1976-1980)
1976 1) Over $2m 2) 500m - ?2m 3) 0 - 500
List Projects
Total NFC Only
Location
Priority
AR Date
NFC $M
650*
1977 1) Over $2m 2) 500M- $2M
3) 0-500
CEA 3023
Europe KCS 1238 blending
Total NFC Only
Undecided
2 12/77 10,500
12/77
600
155
1978 1) Over $2m 2) 500m- $2M 3) 0-500
WGK Historical Replacement
165
1979 1) Over $5M (Only)
1980 1) Over $5M (Only)
* Europe NFC incl .
1-14
HONS 071759
G. Capital Program (continued)
1976 1) 0-500
Project
WGK Blending Plant
WGK Blending Ex pansion
Newport Effluent/ Waste Handling
WGK Misc. Aroclor Projects
AR No.
AR Date NFC ($M)
Req. 8683
450 100
76 25
76 75 $650M
* After receiving commitment from G.E. ** 6 months after the initial blending project
1-15
M0NS 071760
H. Manufacturing Capacity (Product Mix Basis)
Location 1 Aroclor WGK
M Lbs. Capacity M Lbs. Sales % Occupancy
1975
1976
1977
1978
59,800 30,700
51.3
59,800 29,800
49.8
50,200 12,100
24.0
50,200 0
Location 2 Aroclor Newport
M Lbs. Capacity M Lbs. Sales % Occupancy
13,200 7,500 56.8
13,200 7,400 56.8
13,200 7,500 56.8
13,200 5,500 41.7
Location 3
MCS 1238 Interim WGK
M Lbs. Capacity
-
2,360
13,500
20,000*
M Lbs. Sales
1,300
11,000
16,500
% Occupancy
55 81 82
* After completion of the $100M Expansion Project.
1-16
MOMS 071761
I. Business position Identification/Analysis - Europe
1. Our current range of products serves two major markets, namely dielectric liquids in capacitors and special dielectric coolants in transformers.
2. Capacitor Market
a. The European potential for dielectric liquids in capacitors expressed as M pounds Aroclor is:
1974 1975 21 17
1976 20
1977 20
1978 21
1979 21
1980 1985 21 21
The growth is negligible because improvements in capacitor design which reduce the amount of liquid used are absorbing the normal growth of 5-1096 p.a.
b. The split between Western and Eastern Europe is given in chart 1 in the Appendix V-12 (Capacitor Dielectric Fluid Potential).
c. In 1975 Monsanto held approximately 2596 of the European market.
d. Our major competitors in Europe are Prodelec, France (Monsanto relative share: 0.64); Bayer, Germany (Monsanto relative share: 1.25); with minor competitors, Caffaro, Italy and Coquisa/ Flix, Spain.
e. use of our product in western Europe (7096 of the _ total European market) is limited by OECD recom mendations, but there is no immediate pressure to convert to a non-PCB dielectric. Events in the U.S.A. however, together with pressure that can be brought into the OECD by the U.S. government, is likely to create the need for conversion.
In Eastern Europe, there is concern over worker safety and an increasing use of Western technology; to the extent that Western capacitor technology will in the future be based on non-PCB dielectric fluids, the same demand should be present in Eastern Europe.
1-17
HONS 071762
3 Business Position identification/Analysis - Europe (cont'd)
f. We plan to_progressively replace Aroclor with MCS 1238 (M pounds):
MCS 1238* Aroclor
1974 6.8
1975 5.5
1976 5.9
1977 0.2 6.0
1978 1.0 4.0
1979 5.7
-
1980 6.0
-
1985 6.5
-
g. In converting to replacement fluids for capacitors, major competition will not come from products iden tical to MCS 1238, but from alternate technologies.
E.G., Prodelec's Chloroalkylene 12 (Alkylated Dichlorodephenyl, which might be ruled out because of its similarity to a PCB).
Dow Fluid XFS-4169L (Butylated Monochloro Diphenyl Oxide and Esters.
3. Transformer Market
a. The European potential expressed as M pounds of Pyroclor (Aroclor + Trichlorobenzenes) is:
1974 28
1975 1976 27.5 25
1977 23
1978 25
1979 26
1980 28
1985 30
b. Our market is in Western Europe, as the Eastern bloc is self-sufficient with locally manufactured askarel.
c. In 1975 Monsanto held approximately 10% of the European market.
d. Our major competitors in Europe are:
Prodelec, France - Monsanto relative share 0.19
Bayer, Germany -
"
" " 0.27
Caffaro, Italy -
"
" " 0.44
Coquisa/Flix, Spain- "
" " 0.47
e. The European market is not under the same pressure as the U.S. market to convert the non-PCB replace ments. However, events in the U.S.A. will affect Europe, both via the media and the OECD.*
* Volumes do not agree with business group results. See note on page 1-2.
1-18
HONS 0717*3
I. Business Position Identification/Analvsis - Europe (cont'd)
f. We will decide whether to seek to replace our current PCB business with an alternative only when replacements acceptable to the U.S. market are defined.
There are already higher cost alternative safety transformer systems, e.g., dry type transformers, cast resin transformers, specially protected mineral oil filled transformers, etc. Any new replacement fluid must be able to compete on a cost/performance basis with the existing systems.
4. Profit Trends
a. Traditionally this business yielded 25-30% gross profit (see Chart 5b), but in the last two years, price controls and competitive activity have kept market prices low.
b. The cost of Aroclor represents 5-10% of the cost of most capacitors. The impact of fluid cost is minor. However, in the case of transformers, the fluid cost is 25-35% of the cost of the transformer and there is a limit on fluid price since alterna tive safety transformer systems already exist.
c. Non-PCB Capacitor Fluids
MCS 1238 to yield 30% G.P. and P.l. minimum 20% on replacement capital.*
d. Non-PCB Transformer Fluids
Position to be defined.
* These targets, as supplied by Monsanto Europe, must reconcile with Corporate goals. These are under discussion with Europe and will be resolved before the final European plan is published.
1-19
MOhs
J. Financial (To be provided)
1-20
MGNS 07176S
II. CAPACITOR
ACTION PLAN
HONS 071766
II. Capacitor Action Plan - U.S.
A.l - Tactical Approach
The detailed events on the following pages are premised upon the "main line" course of action. At certain points in the program there are alternative routes that may prove better and, if they are taken, then some of the detailed action plans must be modified.
The "main line" can be summarized as follows:
1. Our choice of product for replacing PCBs in capacitors is MCS 1238, a blend of monoisopropyl biphenyl (MIPB) and tolyl xylyl sulfone (TXS).
2. We will move rapidly to establish an interim blending and treating operation at Krummrich Plant within 6 months of a customer commitment. This project could readily be debottlenecked to permanently serve our needs, but may prove to be a temporary installation if another site is chosen for 6elf-manufacture of MIPB and TXS.
3. We will complete and sign contracts for toll manufac ture for MIPB and TXS blend components in time to begin shipments within time parameters defined by major customers.
4. The Monsanto pricing plan will be completed by March 1, 1976 detailing interim and long-term pricing for MCS 1238, as well as an escalation schedule for PCBs as phase-out approaches.
5. We will determine the target date to cease manufacture of PCBs by August 1, 1976.
6. Documents and activities leading to self-manufacture of TXS and MIPB will be timed to postpone major capital commitments until results of 2-year medical studies can be foreseen with greater evidence.
Tentaive Dates: PIR 6/77; AR 12/77.
Alternative courses and circumstances which might lead to considering adopting them are discussed under "Alternatives U.S ."
II-l
MCNS 071767
II. Capacitor Action Plan - U.S.
A. 2 - Alternatives
1. Products
From a technical standpoint, there probably a number of hydrocarbon base stocks that could serve the role of MIPB, which was selected because it will be low in cost and supports the polyphenyl investment. The role of TXS as an enhancer of dielectric constant is more unique. There may be slightly different sulfones that would work, but all should be covered by our patent. Another area of chemistry which has not been fully explored is in aromatic ketones, but they would be much more expensive.
From the standpoint of meeting our timetable for com mercialization, we must remain with MCS 1238, if some unforeseen weakness is found in the product, at least one year will be lost in changing to something else. Therefore, if MCS 1238 fails, we would question the viability of a continuing effort in capacitor fluids.
2. Plant Sites
Most of the site evaluation work has concerned adapta tion of Aroclor equipment at Krummrich Plant and phosphate ester/Santosol 100 equipment at Delaware River Plant, which was rejected because of lack of capacity in existing equipment. Capital requirements and available time favor Krummrich -- but at Krummrich we are faced with a potential problem of PCB contamination of at least the first few batches. The "main line" plan has assumed that the contamination can be held to a level that is low, temporary, and acceptable, and a blending project using PCB equipment is underway using pre-approved authority funds.
A third alternate, using potentially idle Silica and plasticizer equipment at Everett, is under evaluation. MIPB manufacture and MCS 1238 blending could be done in this equipment. This could be the lowest capital route to in-house manufacture of MIPB and without any question of PCB contamination. Based on preliminary capital estimates, it has been decided to have both raw materials, TXS and MIPB, made by converters. However, Everett remains a potential site for blending. A decision is expected by mid-March.
II-2
MOWS 0 21768
3. Timing of Major Investments
The main line plan calls for deferral of commitments to major investment until interim results of two year feeding studies are known, specifically the Master List calls for approval of a $10.5M project in December 1977. However, if evaluation shows that capital for the Queeny site for TXS is low (<$1M), then earlier implementation should be considered. To get adequate quantities of TXS at acceptable cost through toll manufacture, we must commit to a lump sum of $600M to set up facilities. If the capital for internal manufacture is not much more, it seems more desirable to spend the money to build our own unit rather than someone else's, provided payback time on the increment is short. A recommendation on this point is scheduled for February on the Events Chart.
A similar situation may exist in an Everett project for MIPB. If both these possibilities materialize, no Master List project would be needed.
The European capacitor action plan starts on II-14.
II-3
HONS 071769
II. A.3 - Capacitor Action Plan (Events Chart - u.s.)
TIMING____________________________________ACTIONS jan. 1976 I
DECISIONS/APPROVALS
1/31 Research geared to 4QM pounds/month production
Feb. 1976
2/11 Presentation completed on medical/ environmental package
2/17 visit to g.E. to quote price for research volumes of MCS 1238
2/28 Detailed storage trials underway x o X ts> o
o
TIMING March 1976
ACTIONS
3/1
Complete pricing study for both short and long term, based on replacement capital
DEC IS IONS /APPROVALS
3/8 Visit to G.E. to quote interim and long term pricing
3/22 Potential visit to Yiestinghouse on transformer blend grade change to facilitate interim blending (if WGK is selected)
3/15 Decision on location for interim MIPB and TXS
3/15 Decision on site for interim blending
April 1976
4/1 Present test data and protocol to
federal agencies
.
4/1
Recommendation to Management on potential in-house interim manufac ture of TXS and MIPB (assumes low capital)
4/15 Complete contract signing for toll manufacture (MIPB and TXS)
* oT (/> 4/15 Complete business/economic review
for go/no-go recommendation to CAC O j K*
4/15 issue report on various acute - toxicity tests
4/1 Decision "from G.E. Need favor able response
4/15 AR approval of WGK or Everett project
4/15 Decision on sites for in-house manufacture of MIPB and TXS and companion blending facility
4/22 Favorable CAC decision
TIMING May 1976
ACTIONS
5/1 Final shipments of 100-42 to Westinghouse (if WGK chosen)
DECISIONS/APPROVALS
June 1976
6/1 Approved PED`s for TXS and MIPB to CED
6/15 Decontamination of used equipment for MCS 1238 blending complete (if WGK chosen)
HONS 0 7 1 7 7 2
TIMING July 1976
ACTIONS 7/1 Results of various feeding studies
7/15 Determine need to debottleneck blending
DECISIONS /APPROVALS
Aug. 1976
8/15 Complete AR to debottleneck blend ing to 20M lb/yr (if needed)
8/15 Establish patent licensing policy
U t U O SNOW
TIMING Sept 1976
ACTIONS
9/1 Start up toll manufacture of TXS and flashed MIPB
9/1 90 day feeding test results on MIPB and TXS
DECISIONS/APPROVALS
9/1 AR approval for debottlenecking of blending system (if needed)
9/15 Release tank cars as needed from Aroclor 1016 service for decontamin ation and conversion to MCS 1238 service
Oct. 1976
10/1 Start up WGK blending
10/15 Demonstration of rate and quality at WGK
10/15 Begin shipments from WGK O T
i/i
a o *
HONS 0 7 1 7 7 5
TIMING
ACTIONS
DECISIONS/APPROVALS
TIXING 1st Qtr '77
ACTIONS
PEC ISIONS/A PPROVA LS
3/1 Demonstrate debottlenecked blending rate at WGK.
1 1 -1 0
2nd Qtr '77
o T in o
5/77 Customer long-term commitment to 1238.
6/77 FIR approval on project for in-house manufacture of MIPB and TXS.
6/77 90-day results from chronic feeding study.
TIMING 3rd Qtr '77
ACTIONS
DECISIONS/APPROVALS
S/77 ARDT from CED to Roger Beal. *
AR grade sales forecast to Roger Beal.
C t t u . 0 SNOW
Hh Qtr '77
11/77 Final draft AR complete.
12/77 12/77
CED begin Project Definition Report.
Final shipments of Aroclor 1016.
Begin final decontamination of equipment and tank cars.
12/77 AR approval for ln-house manufacture of MIPB and TXS.
TIMING 1st Qtr '78
ACTIONS
3/78 Decontamination work complete.
DECISIONS/APPROVALS 1/78 6-month inhalation study results.
2nd Qtr '78 3rd Qtr '78 kth Qtr '73
V78 Results of 2 year chronic studies on MIPB & TXS.
MONS 071778
TIMINGACTIONS________________________________
1st Qtr '79
1/79
Begin field construction of MIPB and TXS facility
DECIS IONS/APPROVALS
2nd Qtr '79
3rd Qtr '79
4th Qtr '79
12/79 Start up in-house manufacture of .MIPB and TXS
1st Qtr '80
2/80 Demonstrate rate and quality
HONS 0 7 1 7 7 9
Capacitor Action Plan - Europe B.l - Tactical Approach
The European plan targets the same result as the U.S. plan -- complete withdrawal of PCBs from the market -- but differs in tactics because of the existence of major competition and a less emotional regulatory climate. The "main line" plan for Europe can be summarized as follows: 1. Create a climate for regulatory action against
PCBs by making MCS 1238 visible as a viable replacement. 2. Supply European requirement for MCS 1?38 (3R pounds in 1979) from the U.S. to build market share pending local manufacture. 3. Decision by July 1976 on need to establish a licensed 2nd supplier in Europe. A. Submit A.R, for local blending (and potentially MXPB manufacture) by January 1978, 5. Cease manufacture of PCBs in Europe by a target date of 1/1/79. 6. Supply solely from local manufacture (but using TXS ex-U.S.) by 1/1/80. A discussion of potential modifications of this course is given under "Alternatives".
HONS 071780
11, capacitor Action Plan - Europe
B.P - Alternatives
1. Products
Monsanto will totally follow the U.S. technical route In Europe.
?.. Market Approach
We have two major competitor:- in ^Uropc.
Bayer produce in multi-purpose equipment and will be relatively unscathed by a withdrawal from dielectric supply. If they withdraw protection of their Diphyl (Biphenyl/Diphenyl Oxide) heat transfer fluid supply may be required.
Prodelec have a much larger proportion of their total income dependent on a dielectric future. They will seek to protect this by promotion of lower chlorinated biphenyl technology, and by typifying Nfcnsanto withdrawal as a U.S over reaction to political pressures which Europe should not follow. An offer to Prodelec of some form of participation in the dielectric future an a r.econd supplier licensee could lead to a more rapid and successful achievement of our European objectives.
3. Sites/Sources
Since biphenyl is made at Newport, it seems logical to consider installing dedicated facilities there for MIPB, although our lower-overhead Antwerp site also merits consideration. We should first determine Justification vs. possible toll conversion. Justifi cation may Include credibility as a true local source In addition to economics. TXS volume is relatively small and probably should be supplied from the U.S. Blending in existing PCB equipment at Newport is prob ably feasible, but raises the same potential contamina tion problem as at Krummrich and should be similarly resolved. One alternate blending site would be an idle Pydraul blending unit at Antwerp.
4. Timing
European competitors are unlikely to abandon PCB's unless there is a governmental regulation to force the issue. European customers have done little testing of non-PCB fluids and G.E. has not released 1?38 data to their licensees. For these reasons, we do not believe that Europe could be accelerated to the U.S. timetable by unilateral Monsanto action on PCB withdrawal without Jeopardizing our ability to attain the preliminary sales forecast. Therefore, our timing considerations should be premised entirely on the rate of progress toward regulation by OECD.
XCNS 071781
11-15
II, 3.3 - Capacitor Action Plan - (Events Chart - Europe)
'i j:'.: t Jar*. '76
ACTIONS
DECISIONS/APPROVALS
Z 8 1 U 0 SNOH
Feb. ' 7o
2/20
3cc~~.er.dation on European approach to OECD March 15 meeting.
2./15
Complete Europe product evaluation
plan,
.
i 2/28 Approval of European product evaluation plan.
Acmoirs 76
3/7
Completed action for OECD March 15 meeting.
3/15
-Complete technical training of European personnel.
-Support technical documentation. -Including 3 sets of slides of
environmental presentation.
HI I|
Apr '75
DECISIONS/APPROVALS
MGNS 0 7 1 7 8 3
1
0/
acticxs
Evaluation program agreed v/ith 7 Key capacitor producers.
ECISIONS/APPROVALS
2/12 Development forecast MCS 1238 requirel ments for Europe for balance 1976.
1
n
M
1
H
CO
June '?c
i
1
i
1
MOMS 0 7 1 7 8 4
I
duly ' 76
7/1
actio:
I.ccg rrcr;datior. or. I.1ISP, approach and recurred resources (and riu.par.ia).
DECISIONS/APPROVALS
7/30
Environmental data presented to European Agencies.
Aug. '76 I
i
HONS 0 7 1 7 8 5
l
i II i
ac?ic::s
:c ISIONS/A PPROVA LS
MONS 0 7 1 7 8 6
I I
ACTIONS
CECISIOKS/APPROVALS
t.
I
i
! 12/15 Complete evaluation of government
zi
oz </>
!
j
attitude? towards PC3 replacements.
i
i
I I
:?7 J
ac?io:;s
completed results and confirm schedule s for capacitor trials.
DECISIONS/APPROVALS
1 i
I
i
2 O 2
Co
o XI
I I
xi i
<to
ft)
11-23
Mar 'll
ACTIONS
I
Apr HI
i
o o \
!
a>
DECISIONS/APPROVALS
TICKS 77
D) ;CIS IONS/APPROVALS
June '7?
HONS 0 7 1 7 9 0
I I-r*5
actions
DECISIONS/APPROVALS
Sept. '77 I
actions_____________________________________________________________________ decisions/appro ]
9(3-11
Oct. '77
10/1 Key Customer Commitment.
1G/7 Volume forecast for Ex-U.S.A.
a sales. *
(A
Kov. 'll
ACTIONS
DECISIONS/APPROVALS
Eec. '77
HONS 0 7 1 7 9 3
1st Qtr. '73
1/1
ACTIONS
European inventory (3 o sales) in place.
DECISIONS/APPROVALS
1/1 AR approval for European blending plant
2nd Qtr. '78
a V
D
*
3rd Qtr. '73
ACTIONS
7/1 Issue shutdown and decontamination plan fox Newport PC3.
DECISIONS/APPROVALS
8/1
Approval of shutdown and decontamination plan.
11-29
4th Qtr.
'?8
x e 2
in
KJ sC Ul 12/31 Newport UK Aroclor production
ceased.
1st Qtr. 'T9
ACTIONS
PECISIONS/APPROVALS
11-30
2nd Qtr. '79
n *
</i
a
O
I
TIMIN0
3rd Ztr.
'79
ACTIONS
DECISIONS/APPROVALS
11-31
'
4th Qtr. :7 9
1C/1
Demonstrate blending plant at rated capacity.
o
Tt/v
OJJ
mj
- '
i.
1st Qtr. '30
ACTIONS
1/1 As scene exclusive supply from European blending facility.
DECISIONS/APPROVALS
11-32
2nd Qtr. 'SO
o 2 1st o NJ
TE'ING
3rd Qtr. 80
ACTIONS
UHI ) UJ
4th Qtr. 80
n is> o o
DECISIONS/APPROVALS
IIL TRANSFORMER ACTION PLAN
III. Transformer Action Plan
A. Tactical Approach
1. The actions on the following pages are necessarily leas detailed than those related to capacitors, since we are not certain that we have a viable product. We do have a candidate in a blend of MCS 1839, a highly alkylated biphenyl, with trichlorobenzene. The actions described are intended to bring us to go/no-go decisions at various steps toward commercialization; if the product survives them, it will be necessary to re-examine the plan and detail the further steps involved in justify ing dedicated facilities.
2. One step in the plan is firm -- U.S. production of the present PCB-based transformer blends will cease essen tially concurrently with PCBs for capacitors, whether a replacement has been qualified or not.
B. Trichlorobenzene issue
1. The most serious obstacle to success of 1839 is that it has only exhibited the needed low-temperature viscosity when blended with trichlorobenzene (TCB) . TCB has been used for the same purpose in blends with PCB for many years and also is widely used as an intermediate and a solvent. While TCB has not yet acquired any environ mental notoriety, there is a good probability that it will do so in future years -- being a chlorinated aromatic, it may well exhibit biomagnification, persis tence or other unfavorable characteristics.
2. The only u.S. source of electrical grade TCB is Hooker, who make it as a by-product of Lindane. They may not be ready to spend the effort and money needed to assess and defend its environmental acceptability.
3. We conclude that the current program should continue for the time being on the basis of blends with TCB, but before significant investment is made, a full resolution of the TCB issue is mandatory -- preferably by finding a non-chlorinated diluent.
C. Europe
No separate European Events Chart has been prepared. For now, the only appropriate plan is for periodic communication as to status, with more detailed plans firmed up when we conclude that we do have a viable product. Final shutdown of Newport askarel production will be determined by 8/1/77.
III-l
HONS 071801
III. D. Transformer Action Plan (Events Chart - Worldwide)
TIMING
ACTIONS
1st Qtr '76 2/76 Solicit customer information on materials compatibility
2/76 Obtain GEAfestinghouse agreement to model testing program
3/76 Identify site and rough economics of interim manufacture
3/76 Define fire test program
DECIS IONS/APPROVALS
2nd Qtr '76
4/76
Analyze research program for find ing a replacement for TCB as a diluent
5/76 Conclusion on patentability
6/76 Begin 90 day feeding studies
4/76
Management decision to accept TCB or alternate diluent program or drop
Ill
X o X t/i o a> oK>
III, D. Transformer Action Flan (Events Chart - Worldwide)
T IKING 3rd Qtr '76
7/76 7/76
ACTIONS
AR grade estimate prepared for interim manufacture.
Obtain GE/Westinghouse results on transformer model test pro gram.
DECISIONS/APPRO VAIS
071803
h i -:
4th Qtr '76 2 O z (/>
9/76
9/76 9/76 9/76
Check 1839 blends against emergent fire safety stan dard.
9/76 Interim approval of EC 202 including resolution of TCB issue.
Results for 90-day feeding studies.
9/76 Customer commitment to interim manufacture.
AR grade forecast to R.E. Beal 9/76 Decide G0/N0 GO on transformer pro
Complete MCS 1866 Review Report^
gram.
10/76 AR for interim manufacture in existing facilities.
10/76 Begin 2-year feeding studies.
10/76 Initiate European planning process.
10/76 AR approval for interim manufacture.
12/76 Alternate diluent found or search abandoned.
III--D Transformer fiction Plan (Events Chart - Worldwide)
TIMING___________________________________ACTIONS________________________________
DECISIONS/APPROVALS
1st Qtr '77 1/77 Complete site study for economic evaluation for long-term manufacture
1/77 Site selected
2nd Qtr '77
3rd Qtr 'll
4th Qtr 'll 10/77 Begin interim manufacture
11/77 1-year results of 2-year feeding stud ies
12/77 PIR submission for permanent * facilities
1st Qtr '78 2nd Qtr `78
AR submission for permanent facility
071804
January 22, ]'J76
III. C. Transformer Action Plan Ketrofit Opportunity
u. O. Potter
As part of the PvT. Tarh Fou't planning exorcise, v:e considered the possible opportunety of undertaking a program to retrofit Of.karcl containing trons f: o; mer s . This was a, natural item to consider as part of cur planning. After due consideration, the Tacit Force has decided and will recommend that Monsanto not enter into such a program.
Tito reasons for this are that such a program would greatly increase Monsanto's liability and exposure to l'CB contamina tion in the environment. Also, part of the transformer retro fit would be the re-rating of the transformer and the issuing of a now warranty. This obviously hao to be the responsibility of the transformer manufucturer.
The only area wo have decided Monsanto should enter would be to supply the fluids used for retrofitting. We also have decided and recommended that we not be involved in the incineration of askarcl fluids. This was decided because it would require large quantities of PCii containing materials being handled within a Monsanto site, which would make it difficult for Monsanto to meet any forthcoming PCB discharge standards.
Obviously this does not preclude some other technology for de struction of PCB's, only that technology that we now possess for incineration. Also, in the case of incineration it may require building a unit much larger than the one we now have at Krummrich and on the surface this does not look like a business Monsanto should be involved in.
In the area of developing fluids for transformer retrofitting, we should be very careful not to dilute our R&D manpower and detract from our replacement programs or our own internal de contamination requirements. Such a development effort should evolve from our own program for internal decontamination.
Unices you advise otherwise, we arc proceeding with our planning accordingly. Attached for your information is a document wo used for analyzing the retrofitting matter.
AOWS 0 7 1 8 0 5
/rd Attach ment
III-!?
pen planning task forci:
TWHSF03tt??n FLUID RETROFIT OPPORTUNITY
There are r.oiiu: one- hundred thousand BhureX transformers in plan.' in iLc Un-And Fir ter. containing ; total of about three hundred ml].ton pound;;; of PC:-'. bare fluid, There viamiiofi, ore ore valued rot tin orlbrefed on; billion dollars. Seventy percent of then arc let;; term (.on year:; old. Top up for these transformer;-, noreiients about one million pounds per year of fluid, Kcplnc.cr.cnt over ten yearn would represent a demand of thirty Million pounds per year of dielectric fluid plus whatever Hushing medium is needed.
If there in some broad notional program to drain the PCD base fluids out of these transformers, and if Monsanto has a Pen replacement fluid program for new transformers, what should Monsanto's role be regarding the retrofit opportunity?
1. No participation; 2. Sell fluid to transformer manufacturers; 3. sell fluid to transformer users; . 4. Dispose of the Pen's if they arc drained; 5. Involve in a service ot retrofit?
These and other postures are. possible. The following out lines the issues to be resolved to answer this question.
Product
1. Do we have a proved, environmentally qualified transformer fluid? Accepted as fire resistant by FM?
2. Is it compatible with askarel transformer (design insulation, sealants, etc.)? Some or all transformer models?
3. Is it suitable for top up in askarel transformers?
4. If not, is it suitable after a reasonable drain and flush procedure?
5. What would the flush fluid be?
6. How docs our fluid compare to potential competition?
HONS 071806
f'nV.C'l. Vol iv.if: and Vin.iivj
1. Where. arc thos;u (domestic) trnusfoxmorn? Type, size, user, location, age, fluid fill;
2. that. is the total quantity of a shard in them?
3. that volume of fluid would he needed for top up or flush and replace? When?
4. '..1mt. premiums or lcyi station arc stats and federal agencies XiheXy to impose?
Procedure
1. will transformer use.;:;; have to dispose of their a shard
because of a law or because of unavailability of a coin pat iblc top up fluid?
2. Will replacement fluids allovi top up; or drain, flush and fill?
3. If top up, who supplies the fluid and instructions for retrofit to the transformer user;
- transformer manufacturers (including Allis Chalmers and others who once made them),
- fluid manufacturer or
- service companies.
4. If drain, flush and replace, who performs the service?
5. What roles do the transformer manufacturers want to play?
Incincra tion
1. What incineration load will result? Volume, timing, storage.
2. What incineration capacity is needed in what locations? What is available (Monsanto, G.E., others)? How will capacity bo increased sufficiently?
Kanu factoring
1. How will we manufacture/purchase the needed volumes of flushing and replacement fluids?
HONS 071807
III-7
1. Who is responsible for performance of each transformer retrofitted ?
?. Who will be responsible for PCB entering the ecology during draining, flushing, transportation, storage and incineration of askarels?
Public Relations 1. What would be the risks to Monsanto's image if we were to
handle and transport PCB's and concentrate volumes at incineration sites? Economics 1. Sales of fluids for retrofit programs? Profit opportunity. New capital required.
HONS G71808
IV. IMPACT DM RELATED BUSINESS
RONS 071809
IV. Impact on Related Business
A.l Economic Dependence - U.S.
While various other products have been developed using polyphenyls, Aroclor remains the dominant outlet in both pounds and dollars -- 5<y% of budgeted Anniston polyphenyl production for 1976 is biphenyl for Aroclor. Because we have dropped non-electrical uses of Aroclors, including all solid Aroclors (chlorinated terphenyl) in recent years, we already have twice the capacity needed. Total loss of dielectrics would reduce requirements to less than 25% of capacity. A "domino effect" would then begin, because the next largest volume, Santosol 3^0 (hyirogenated terphenyl), would no longer be cost competi tive, and the remaining products including the nowprofitable Therminol 66 could not support the investment.
Since MIPB is a biphenyl derivative and is functionally at least as good as other candidate hydrocarbons. It was chosen for the MCS 1338 blend. MCS 1?38 relates only to the capacitor business, and our transformer candidate uses relatively little biphenyl, so the other derivatives will suffer somewhat even if the replacement program is completely successful.
Table I shows the impact of dielectrics on the flow sheet (based on volumes in the 10/31 Production Plan).
Use of biphenyl in dielectrics is not the only way to maintain a viable flow sheet, of course. Any profitable large volume use of either biphenyl or quaterphenyl would have the same therapeutic effect. Terphenyl volume would be less advantageous, due to flow sheet balance considera tions. A quaterphenyl outlet must be profitable on a fully-costed basis, rather than the by-product accounting currently practiced.
rv-i
HONS on#10
TABLE I
Aroclor/Pyranol Sales, M Lbs.
Santosol 3^0/Therniinol 66, etc,. Sales M Lbs.
MCS 1238 Sales, M Lbs.
Misc. Derivatives & Sales per se, M Lbs.
Total Polyphenyl Requirements, M Lbs.
Present Business 33,800 1^,450 200 5,300 37,200
No Dielectrics -014,450 -05,300 18,600
No Aroclor, 817 lbs., MCS 1238
No Aroclor 2CM# KGS
1238
-0-
-0-
111,450
14,450
8,000
20,000
5,300
5,300
23,200
. ?:x
Unit Cost, f/Lb. Biphenyl
Santosol 340, Therminol 66
1?.2 23.6
27.3 33.1
?4,C 29.5
20.3 25.7
1976 BUDGET
2lvphenvl IV-3
tree
MOWS 071012
IV. Impact on Related Business
A.2 Economic Dependence - Europe
PCB's represent only 26$ of our European polypheny! output, but 54$ of sales revenue. Immediate loss of PCB's would put the complex at a negative perfor mance income, but there are more options available to correct the problem than in the U.S. In addition to the therapeutic effect of a succ'ess'ful MCS 1238 program, the following actions can be taken:
Increase merchant biphenyl volupe.
Increase capacity for hydrogenation of terphenyl for Santosol 340 and/or Santotherm 66, either by debottlenecking from 1500 to 2000 tons/year or by a major expansion to 5000 tons/year, depending on the degree of customer commitment to the prod ucts. While these actions would have a negative effect on U.S. economics (by replacing U.S. exports) the worldwide effect would be positive because of the more favorable flowsheet balance in Europe, and reductions of freight and tariff.
Europe can also follow any U.S. lead on new poly phenyl derivatives.
Impact of MCS 1238 on our European business is illus trated in Table II (using a 2000 ton/year volume of hydrogenated terphenyl in 1978 as an example).
Except for the "1976 Budget" column, these figures arc very rough and are only intended to indicate direc tion. More detailed analysis is to be completed during 1077. This study must answer the question of Interdependence of the MCS 1238 program and a major HB-40 expansion.
IV-4
MONS 071813
<- (
TABLE II
Sa T f/ 3ross Profit -Si'
Performance Income % or. Gross Ir.v.
1976 Budget with PfBs
4 5920
1510 25$
916 18$
1976
1973
Without Dielectrics Without Dielectrics
2705
9320
A59 17$
1070 25$
(97) ( 3$)
519 15$
1973 K
2600T mcs : 87-0 2552 90
15c = 29^
< UI 1
MONS 0 7 1 8 1 4
APfENDIX
HONS 071815
V. Appendix
A. Potential Problem Analysis - Capacitors
The Task Force applied the Kepner-Tregoe type of analysis to our capacitor program to identify poten tial problems and determine preventive and contingency actions for those problems with a significant proba bility. The more significant of the preventive actions have been inserted in the Events Chart. The following is a Summary of the exercise.
Potential Problem:
Adverse medical information is received:
1. Legitimate adverse data from our own or outside studies.
2. Ill-founded accusations from environmentalists or competitors.
3. Inconclusive data after 2-year program.
Preventive Actions:
1. Publish our testing procedures and interim results (with appropriate disclaimer). Review progress with government agencies periodically.
2. Ensure that our own program is complete and timely;
be ready with facts to refute accusations.
.
Contingency Actions:
1. PCB equipment should not be dismantled prematurely.
2, If competent adverse data is received:
a. Recycle through KC 202 procedure and withdraw 12.38 if "no go".
b. Re-assess the dielectrics business. c. Consider extended timing if no viable competitor
has emerged.
V-l
MQhS 071816
Potential Problem: Viable competition emerges to reduce our market share to an unacceptable level. 1. Dow fluid succeeds in power capacitors, perhaps
with a sulfone boost. 2. Small capacitors switch to phthalates and/or
"dry" technology.
Preventive Actions: 1. Consider further patent activities to block use
of sulfones by others. 2. Tout the absence of halogen in 1238, look for weak
nesses in competitive fluids. 3. Meet competitive prices on a cost/performance
basis. 4. Begin aggressive promotion of 1238 as the PCB replace
ment during 2nd Quarter 1976 to preempt emergence of other competitors after 9/1/76 issuance of testing protocol. 5. Seek contractual commitments from major customers.
Contingency Actions; 1. If market share is clearly lost and competition has
no serious weakness, re-assess continuing in the dielectrics business.
HONS 07181? V-2
Potential Problem:
Loss of G.K. support.
1. Due to pricing or timing of our capital commitment.
2. Due to more attractive alternatives.
3. Due to failure of 1238 in performance or environmental acceptability.
Preventive Actions:
1, Price 1?38 at its proper level considering per formance vs. potential competition.
2, Maintain Management contact with G.E. at all relevant levels.
3, Continue the Monsanto/G.E. Research Agreement.
4, Find an approach that would permit G.E. to con tinue to enjoy Magvar license revenue,
5, Move aggressively to permit G.E. to exploit their Inherent technical leadership.
Contingency Actions:
1. Remain flexible on market needs for pricing and timing.
2. Possibly consider G.E. share in 1238 investment.
V-3
MGNS 071B18
Potential Problem: Continuing unacceptable PCB contamination from WOK interim blending. Preventive Actions: 1. Seek acceptance of a definition of "acceptable"
that is not zero. 2. Seek acceptance of expected contamination level
of first batches. 3. Consider sites other than WGK. 4. Do the best possible cleanout Job.
a. Test procedure beforehand. Contingency Actions: 1. Suspend production and re-assess situation. 2. Consider crash project at another site.
0718V9 HONS
V-4
Potential Problem: Toll manufacture proves unreliable. 1. Meeting volume requirements on time. ?. Quality control. 3. Yield/cost control. 4. Force majeure event. 5. Security - confidential information, sales to
competitors.
Preventive Actions: 1. Execute well-drawn secrecy agreements and contracts. 2. Inspect facilities re safety, OSHA and environmental
control, and overall competence before signing con tracts. Provide continuing technical support and surveillance. 3. Consider earlier manufacture "inside". 4. Carry engineering forward on "inside" manufacture to be ready for a potential crash project.
Contingency Actions: 1. Purchase MIPB from e.g. Tanatex. 2. Accelerate program for self-manufacture.
v-5
MOKS 07180
POTENTIAL PROBLEM ANALYSIS WORK SHEETS TRANSCRIPT Indicates most significant problems
(1) (Irreversible) Choice of IP38
- Adverse Med. Data (outside/inoide) - MIPB - TXS ( Degrees
- Appearance of Superior (sooner) Comp. - Too many sources (M/I Problem)
Someone avoids patent
- R.M. Supply Deficiency
- R.M. Quality Deficiency
+ Best anyone knows of.
+ No Chlorine
- Dry capacitors prove more cost/eff.
- Timing -- wc let it slide --^ 1016 accepted
- Loss of G.E. support (for 1?38)
- Pricing
- Alternatives
- Function
- Timing
- Demand for fire resistance
(P) Research Supply -- until interim S/U - Violating Rule -- get dictate
- Demand ' Supply
- Possible rapid escalation - R.M. Quality/Availability - MIPB
TXS
MONS 071821 v-6
(3) Interim Blending/Toll MIPB & TXS
* - Unacceptable PCB Contamination
* - Dependence on toll manufacture .
- limited support resources ^ Force majeure items
- accident - strike
J
- loss of tech/security - create MIPB capacity Ex 'M'
- Soon enough - contract signing delayed - WGK Construction - Emergency need (ban)
- Supply to meet specs
- D.K. - Moisture - Biphenyl
- Can't get customer commitment - support contracts + Better site
- No contamination -Sooner/Cheaper*
V-7
*ONs
(ij) Pricing (Economics) - Adverse G.E, reaction - other - Ultimate economics don't support pricing (Repl. cap.) + Better price/perf. than competitive - Price too high vs. competitive - Dichlor Biphenyl in Europe
(5) Cense PCB by 1/1/78 1 Gov't safety decree - Image/publicity - Customer suit - Customers not ready to change - Transformer PGM drags
(6) Activities leading to self manufacture of TXS Sc MIPB timed to delay capital commitment until after 2-year medical data available. PIR 6/77; A.R. 12/77 i Don't need (already in business). - Mgmt rejects PIR (Risk). - Delay in medical program - Inconclusive result - Outside accusation re IP38. - Synergistic environmental effect
OVERALL TLAN - Dielectrics Business - Veto by Management
v-8
MGNS 071823
A. Adverse Medical Data - MIPB or TXS or Blend
- Inside
------ clearly bad inconclusive 6/77
- Outside ------ competent hysterical
. Preventive Actions
- Publish procedures & results (with disclaimer).
- Heview with government as we progress.
- Influence committee (R. Train/Industry Committee) protocol 9/76.
- Be sure our program is complete.
- Content & timing.
- Ask NCR for MIPB data (if any) (after announcing 1238 compositions).
- Contingency Actions - Don't prematurely dismantle PCB equipment. - If competent adverse data - re-assess dielectrics business; - ask for time if no competitor has achieved credibility; - if one component only is implicated, consider replacing.
MONS 071824 v-9
B. M/I not adequate -- competitor(o) prove viable. - Dow fluid gets power capacitors (with TXS?). - Small ones go to DOP/DINP or Dry-type.
Preventive Actions - Further patent action (?). - Tout "non-halogenated" property of 1238, - Looking for weakness In Dow fluid. - Price consistent with performance. - Begin aggressive promotion of 1238 as a PCB replacement
during 2nd Quarter 1976. - Alliance with G.E. (see item C). - Contracts
Contingency Actions - Re-assess dielectrics business.
C. Loss of G.E. Support - Pricing - Alternatives - Functionality - Timing of interim vs. long-term pricing
Preventive Actions - Price consistent with performance. - Maintain contacts at all relevant levels. - Continue research agreements. - Kind support for continued Magvar licensing. - Emphasise retention of lead time. Contingency Actions - Flexibility -- in pricing, timing, shared venture.
V-10
MOWS 0 7 1 8 2 5
D. Continuing unacceptable PCB contamination of product from "Interim" blending. Preventive Actions - Define acceptable level } 0 - Go elsewhere than WGK (Everett) - Do good job on cleanup - Testing of Procedure - Acceptance of expected level.
Contingency Actions - Suspend production & re-assess.
E. Toll manufacture proves unreliable - Meeting volume requirements on time - Quality - Yield/cost - Force Majeure event - Secrecy/technology/capability
Preventive Actions - Good contracts/secrecy agreements - Manufacture inside - Provide tcchnlcal/.-.upervlnor support
- Monitor operation - Develop engineering Cor Inhouse manufacture (be ready).
Contingency Actions - Accelerate self-manufacture - Buy MIPB
HONS 071826
V-U
7.2 - Appendix
WORLD AREA U.S.A. West Europe ^ East Europe r Hrv> ROW TOTAL
CHART 1 CAPACITOR DIELECTRIC FLUID POTENTIAL
CURRENT M/I %
(AS M LBS. AROCLOR) 74 '75 '76
1 77
100 25
40-50 50
22 13 16 17 15 12 15 15
6555 7777
58 50 37 43 46
1 78 121
18 19 15 15
66 B9
47 * 49
180
20 15
6 9
50
'-1 2
Note 1: Japan uses approx. 8-10 M lbs. per year of non- PCB capacitor dielectrics having banned PCB in 1972
Note 2: Monsanto non-PCB candidate MCS-1238 will have usaje of .75 lbs. for each 1 lb. of Arcelor replaced because of difference in specific gravity.
*GAi$ 07162?
V.3 - Appendix
CHART 2 MONSANTO CAPACITOR FLUIDS SALES FORECAST
a) KCS-123c Sales Fror U.S.A. (M Lbs.)
1976 1977 1976 1979 1960 1985
MCS--1238 Sales Fror U.K.
1976 1977 1978 1979 1980 1985
Domest ic
1.3 9.3 13.5 14.0 14.5 16.0
e) ArocXor Sales
o 1976 l/l 1977
1978 O 1979
1980 QO 1985 a
Domestic
14.6 5.2 -
U.S. Export (excl. Europe)
-
1.5 2.0 2.5 3.0 3.5
Ejrope
_ 0.2 1.0 3.0
-
Total
1.3 11.0 16.5 19.5 17.5 19.5
" -
U.S, Export
2.0 1.0
-
-
-
3.0 4.0
_
3.0 4.0
U.K. Produced
5.9 6.0 4.0
Total
23.2 12.2
4.0
V.4 - Appendix
CHART 3
WORLD AREA
U.S.A. West Europe Canada Miscellaneous
TOTAL
TRANSFORMER FLUID MARKET (M LBS. EXPRESSED AS AROCLOR/TCB BLEND)
M/I %
' 74 *75 76 i 77 78 1 79
100 7-10
100 25
14 14.5
10
5 12 14
30 31.5 33 35 37 38
33 44
3333 4444
42
51 53
50 47 56 59
*80
15 40
3 4
62
X o z
V.5~ Appendix
CAPACITOR FIUID SALES (U.S. Produced)
CHART 4a
1970 1971 1972 1973 197!*
1975
DOMESTIC
SALES
M Lbs
JM_
GROSS Profit
27583
3872
1725 44
17369
2748
978 35
22654
4271
2108 49
37742
7756
2259 29
22098
6731
2753 40
13468
5092
1957 38
EXPORT
SALES
M Lbs
$M
GROSS Profit
4717 3288
699 485
255 36 118 24
3069 4333 2483
517 837 720
139 276 264
27 33 37
2270
968 332 34
TOTAL D & E
SALES M Lbs
$M
32300 4571
GROSS Profit
1980
20657 3233 25723 4788 42075 8593 24581 7451
1096 2247 2535 3017
15738 6060
2289
X
o X u> o a> it* e>
HONS 0 7 1 8 3 1
V.52 - Appendix CAPACITOR FLUID SALES (U.K. Produced)
. Year 1972 1973 1974 1975
Sales M Ebs
714? 7233 7861
5471
<(
19763
5361
H
0\
CHART 4b
Sales
1172 1437
?44o
2168
2383
G.P. $M
336 403 5^6 362
636
G.P % 29 28 22 17
27
V.61 - Appendix TRANSFORMER FLUID SALES (U.S. PRODUCED)
1970 1971 1972 1973 1974 1975
DOMESTIC
SALES
GROSS
M Lbs
$M
PROFIT . %
M Lbs
EXPORT
SALES
GROSS
$M PROFIT
%
TOTAL D & E SAT.RS
M Lbs'
15902
2494
956 38 5454
853
259 30
21356
3347
1215
14007
2571
879 34 5383
926
262 28
19390
3497
1141
11384
2378
825 34 3673
686
172 25
15057
3064
997
13415
2751
864 31 4014
802
202 25
17429
3553
1066
13870
4522
1516 34 4093
1290
333 26
17963
5812
1849
14202
5884
2326 40 4454
1791
532 30
18656
7675
2858
V.62 - Appendix TRfe:Tc?ORLXZP. FLUID SALES (U.K. Produced)
Tear 197? 1973 197^ 1975
1976b
Sales M Lbs,
3193 ?5l8 3^22 26h6
2205
CHART 5b
Sales $M
6^3 546 1007 986
832
G.P. $M 166 139 204 171
215
G.P %'
26 25 20 17
26
x o * to u <JJ
V. 7. Appendix - Toxicological Program
Study
Project #
Material Projected Com(MCS #) pletlon Date
Chick edema factor bioassay 3-day LC 50 Bob-white quail
8-dI*ay LCI' 50 MIIallard'! duckI| s t tl It -I )
MiMcrobiaII l muIItagenvtic pl||ate at| ssay
H
't It
II It
||
Mouse lymphoma mutagenicity Rat teratogenicity* HumTl an sII kin * pTlatch te'I st
li-wTl k. IfnhalaMtion sItIudvy Metabolism Rat
it "
BTL-76-b
TF-76-1 TF-76-2 TF-76-3
TF-76-1 TF-76-2 TF-76-3
BIO-76-5 BIO-76-6 BIO-76-7
BIO-76-8
BTL-76-9
SH-75-21 SH-75-22
BTL-75-54 BTL-75-52
90-day Rat feeding
tl
ii n
TT
n n ti
l^C Fish Residue T, r* "
Human skin Datch test *
6-mM onthII inhall|ation
2-^r. rat feeding
II if il
no BTL-76-10 z
o at ^'t
BTL-75-87 BTL-75-85
96-hr. LC 50 Trout & Bluegill
Bir-76-11 BH-76-12
BN-75-13
1238
10li5 1302 1238
10115 1302 1238
1045 1302 1238
1238
1238
1045 1302
1045 1302 1045 1302
1045 1302 1238
1045 1302
1233
1045 1302 1045 1302 1238
1045 1302 1238
2/76
3/76 3/76 3/76
3/76 3/76 3/76
3/76 3/76 3/76
3/76
3/76
3/76 3/76
4/76 4/76
6/76* 6/76*
Completed 7/76 7/76
7/76* 7/76*
3/77
1/78 1/78
4/78 4/78 7/78
Require; lu,--labeled materials availabl'* 3/1/76. Approximate cost ;-'lV,000 tor MCS 1 38 onlv.
Estimated Cost
1/76
I/77
Initiation
Initiation
1000
750 750 750
750 750 750
300 250 250
2200
4000
900 900
5100 (pd.) 5100 (pd.) 7500 7500
7500
10000 10000
Part of 2-vr -
1000
70000 70000
24000 (12,000 pd.) 24000 (12,000 pd.)
75000
680 680 680
HEALTH & ENVIRONMENTAL ASSESSMENT MCS1238
<I KP
Available data on
O Isopropyl Biphenyl
Tolyl Xylyl Sulfone
MCS 1238
Outline of the test underway Bioaccumulation data Metabolism data Biodegradation data
o *
071835
<NI )
* o
tXfi
RAT ACUTE ORAL TOXICITY*
Signal Word
Danger
*
Warning
LDjo g/kg <.05
.05-. 5
Caution .5-5
-- >5
Category Highly Toxic
Moderately Toxic
Slightly Toxic
Practically Non-Toxic
IPB --
-- 5.0 -
TXS -
-
7.6
MCS 1238
3.8
RABBIT ACUTE DERMAL TOXICITY
; Signal LDso
MCS
1 Word mg/kg Category IPB TXS 1238
Danger <2
Highly
*** --
< * Toxic
to to
Warning .2-1
Moderately Toxic
--
--
Caution 1-5
Slightly
--
--
"
Toxic
"" >5 Practically >10.2 >7.9 >5.0 Non-Toxic
*ONS 0 7 1 8 3 7
IPB
<I Dietary
tIao7
'ftSsnsK:
Body weight
. Organ weights
Hematology
. Sro,ss Pathology
.. Histopathology
Alo 4du'erse Effect Level: 1000 ppm
HONS 0 7 1 8 3 8
SUBACUTE MAMMALIAN TOXICITY 90-DAY RAT FEEDING STUDIES
TXS
Dietary Concentrations: 0,1000, 3000 and 10,000 ppm
Completion 7176
MCS 1238
Dietary Concentrations: 0,100, 300 and 1000 ppm
Completion 7176
MCS 1238 ACUTE MAMMALIAN TOXICITY
<I
to
Acute Oral LDS<, Rats
3.8 g/kg Slightly toxic
vi
Acute Dermal LDso >5.0 g/kg
Rabbits
Practically non-toxic
Skin Irritation Rabbits
3.6/8.0 Moderate irritant
Eye Irritation Rabbits
12/110 Slight irritant
MOfcS 0 7 1 8 4 0
SKIN SENSITIZATION
Human Skin Patch Test, Repeated Application
Number
IPB TXS
< i
ro
Of Subjects.......... . With Irritation....... .
50 50
00
O'
With Skin Fatigue..
00
Sensitized
Completion 3/76
HONS 0 7 1 8 4 1
I
SUBACUTE MAMMALIAN TOXICITY 4-WEEK INHALATION STUDIES
Vapor Concentration 6 hours/day- 5 days/week
(mg/cubic meter)
< ,PB..................................................................... 0,10 and 100 Txs.................................................................... 0,10 and 100
Parameters Evaluated
Behavioral activity Respiratory response Gross pathology Histopathology
Completion 4176
.
HONS 0 7 1 8 4 2
CHRONIC MAMMALIAN TOXICITY TWO-YEAR RAT FEEDING STUDIES
Dietary Concentrations (PPM]
PB.....................................................0, 500 and 1000 TXS..................................................o, 1000 and 3000 MCS 1238................................ 0,100, 300 and 1000 Parameters Evaluated: Chronic Toxicology Oncology
Completion 7178
MGNS 0 7 1 8 4 3
ACUTE AVIAN TOXICITY 8-day LC50 PPM
IPB TXS MCS 1238 Bobwhite Quail.. >10,000 >10,000 >10,000 Mallard Ducks... >10,000 > 10,000 > 10,000
Practically Non-Toxic = >5000 ppm Slightly Toxic = 500 to 5000 ppm
ACUTE FISH TOXICITY 96-Hour LCso PPM
IPB TXS MCS 1238
Bluegills............................. 5 8
11
Rainbow Trout................... 10-100 8
8
Slightly Toxic = 10 to 100 ppm Moderately Toxic = 1 to 10 ppm Highly Toxic = < 7 ppm
AONS 0 7 1 8 4 5
BIOACCUMULATION IN MAMMALS (RATS)
- 25 PPM DIELECTRIC FLUID IN DIET - 30 DAY EXPOSURE, 75 DAY RECOVERY - FAT SAMPLES COMPOSITED PERIODICALLY - EXTRACTED, ISOLATED AND ANALYZED
V-32
HONS 071846
FAT TISSUE RESIDUE LEVEL VS. TIME
25 PPM FEED LEVEL FOR RATS
, -------------------------------------------------------------- ------------------- --
V-33
DIELECTRIC FLUID ACCUMULATION FACTORS
FLUID MCS 1238
AROCLOR 1016 AROCLOR 1242
ACCUMULATION FACTOR* 0.04
0.9 1.4
ACCUMULATION FACTOR - (TISSUE CONCENTRATION/ FEED CONCENTRATION) AFTER 30 DAYS
V-34
RONS 031848
BIOCONCENTRATION POTENTIAL
EQUILIBRATE FLUID BETWEEN WATER AND 1-OCTANOL DETERMINE CONCENTRATION IN EACH PHASE CALCULATE PARTITION COEFFICIENT (Co/Cwl ESTIMATE BIOCONCENTRATION FACTOR
V-35
RONS 071049
PARTITION COEFFICIENTS (LOGARITHMS)
PROOUCT BIPHENYL
LITERATURE 4.1
DIPHENYL SULFONE
2.4
ISOPROPYL BIPHENYL
TOLYLXYLYL SULFONE
MCS 1238
CALCULATED
5.6 4.1 4.7
EXPERIMENTAL
41
2.5 5.5
3.9
4.5
V-36
HONS 071850
BIOCONCENTRATION FACTORS (BF)
LOG (BF) - 0.54 LOG (P) + 0.12
PRODUCT BIPHENYL ISOPROPYL BIPHENYL TOLYLXYLYL SULFONE MCS 1238 TRICHLOROBIPHENYL TETRACHLOROBIPHENYL
CALCULATED
LOG P 4.1 5.5 3.9 4.5 6.2* 6.9*
BF 200 1200 160 400 3200 6300
HONS 071851
FUTURE BIOACCUMULATION STUDIES
- C14 METABOLISM IN RATS - C14 BIOCONCENTRATION IN FISH
V-38
HONS C71852
BIODEGRADATION
MICROBIAL ORGANISMS - NATURALLY OCCURRING ULTIMATE - C02,H20, INORGANIC SALTS PRIMARY - DISAPPEARANCE OF TEST MATERIAL
V-39
HONS 071653
ULTIMATE BIODEGRADATION
C O , EVOLVED % OF THEORY-
V-40
MONS 071854
ULTIMATE BIODEGRADABILITY C02 EVOLVED IN 35 DAYS
PRODUCT MCS 1238
PER CENT OF THEORY 52
AROCLOR 1016
11
DEXTROSE
80-90
C12 LINEAR ALKYLBENZENE 60-80
SULFONATE
V-41
MONS 071855
1AFJY BE0D2G^ADAT!0rJ OF WICS 1238
4
Time (Minutes) V-42
8 HQNS 0V1856
PRIMARY BIODEGRADABILITY
PER CENT BIODEGRADATION
MCS 1238
1-DAY 62
7-DAY 87
ISOPROPYL BIPHENYL
78
96
TOLYLXYLYL SULFONE
32
69
V-43
HONS 071857
FUTURE BIODEGRADATION STUDIES
C14 BIODEGRADATION IN SOIL C14 BIODEGRADATION IN RIVER WATER
V-44
HONS 071858
MCS1839 HEALTH AND ENVIRONMENTAL PROGRAM
8-day LCso Bobwhlte Quail
6-month Inhalation study
8-day LCso Mallard Ducks
90-day Rat feeding
Microbial mutagenic plate assay 2-year Rat feeding (screen)
Mouse lymphoma mutagenicity Chronic fish toxicity/reproduction
Rat teratogenicity
Tissue residue accumulation
Human skin patch test
14c Metabolism--Rats
4-week Inhalation study
14c Rsh residue
MCNS 0 7 1 8 5 9
09 r to
<I
O'
* O
<*S>
MCS 1839 ACUTE MAMMALIAN TOXICITY
Acute Oral LDSo
>15.8 g/kg
Rats
Practically Non-toxic
Acute Dermal LDso
> 7.9 g/kg
Rabbits
Practically Non-toxic
Skin Irritation Rabbits
0/8 Non-Irritating
Eye Irritation Rabbits
0/110 Non-Irritating
j. j, Zonum - B2SK
January 22, 1976
V-10. Retrofit Opportunity
H. c. potter
As part of the PCB Task Force planning exercise, we considered the possible opportunity of undertaking a program to retrofit ar.karol containing transformers. This was a natural item to consider as part of our planning. After due consideration, the Task Force has decided and will recommend that Monsanto not enter into such a program.
The reasons for this are that such a program would greatly increase Monsanto's liability and exposure to PCB contamina tion in the environment. Also, part of the transformer retro fit would be the rc-rating of the transformer and the issuing of a new warranty. This obviously has to be the responsibility of the transformer manufacturer.
The only area we have decided Monsanto should enter would be to supply the fluids used for retrofitting. We also have decided and recommended that we not be involved in the incineration of askarel fluids. This was decided because it would require large quantities of PCB containing materials being handled within a Monsanto site, which would make it difficult for Monsanto to meet any forthcoming PCB discharge standards.
Obviously this does not preclude some other technology for de struction of PCB's, only that technology that we now possess for incineration. Also, in the case of incineration it may require building a unit much larger than the one we now have at Krummrich and on the surface this does not look like a business Monsanto should be involved in.
in the area of developing fluids for transformer retrofitting, we should be very careful not to dilute our R&D manpower and detract from our replacement programs or our own internal de contamination requirements. Such a development effort should evolve from our own program for internal decontamination.
Unless you advise otherwise, we are proceeding with our planning accordingly. Attached for your information is a document we used for analyzing the retrofitting matter.
/rd Attachment
V-47
HONS 071861
V-10. Retrofit Opportunity
PCD PLANNING TASK FORCE
TRANSFORMER FLUID RETROFIT OPPORTUNITY
There arc soma one hundred thousand askarel transformers in place in the United States containing a total of about three hundred million pounds of PCB base fluid. These transformers arc valued at.an estimated one billion dollars. Seventy percent of them arc less than ten years old. Top up for those transformers represents about one million pounds per year of fluid. Replacement over ten years would represent a demand of thirty million pounds per year of dielectric fluid plus whatever flushing medium is needed.
If there is some broad national program to drain the PCB base fluids out of these transformers, and if Monsanto has a PCB replacement fluid program for new transformers, what should Monsanto's role be regarding the retrofit opportunity?
1. No participation; 2. Sell fluid to transformer manufacturers; 3. Sell fluid to transformer users; , 4. Dispose of the PCB's if they are drained; 5. Involve in a service of retrofit?
These and other postures are possible. The following out lines the issues to be resolved to answer this question.
Product
1. Do we have a proved, environmentally qualified transformer fluid? Accepted as fire resistant by FM?
2. Is it compatible with askarel transformer (design insulation, sealants, etc.)? Some or all transformer models?
3. Is it suitable for top up in askarel transformers?
4. If not, is it suitable after a reasonable drain and flush procedure?
5. What would the flush fluid be?
6. How does our fluid compare to potential competition?
V-48
HONS 071362
V-1G. Retrofit opportunity
Mirkct Volume and Timing
1. Where are these (domestic) transformers? Type, site, user, location, age, fluid fill.
2. What is the total quantity of askarel in them?
3. that volume of fluid would ho needed for top up or flush
and replace? When?
.
4. What pressures or legislation are state and federal agencies likely to impose?
procedure
1. Will transformer users have to dispose of their askarel because of a law or because of unavailability of a com patible top up fluid?
2. Will replacement fluids allow top up; or drain, flush and fill?
3. If top up, who supplies the fluid and instructions for retrofit to the transformer user:
- transformer manufacturers (including Allis Chalmers and others who once made them) ,
- fluid manufacturer or
- service companies.
4. If drain, flush and replace, who performs the service?
5. What roles do the transformer manufacturers want to play?
Incineration
1. What incineration load will result? Volume, timing, storage.
2. What incineration capacity is needed in what locations? What is available (Monsanto, G.E., others)? How will capacity be increased sufficiently?
Manufacturing
1. How will we manufacture/purchase the needed volumes of flushing and replacement fluids?
V-49
oil*43
V-10. Retrofit Opportunity
Law
X. Who Is responsible for performance of each transformer retrofitted?
2. Who will be responsible for PCB entering the ecology during draining, flushing, transportation, storage and incineration of askarels?
Public Relations 1. What would be the risks to Monsanto's image if we were to
handle and transport PCB's and concentrate volumes at Incineration sites?
Economics 1, Sales of fluids for retrofit programs?
Profit opportunity. New capital required.
v-50
MONS 071864
Moiisanto
*0* . */!
.
! i ! *< TO :
V-li. patent poaition
PATENT DKPARTW: NT - OKNKRAh OKKICKS E2NI>
November 20, 1975
PATENT POSITION ON PCD REPLACEMENTS V.10 Appendix
M. E. Gibbs - MIA
Davis
_ B2SP
w. C. Hammann - B3SA
R. II. Munch
- TIB
C. P a ton
- B2SC
H. B. Roberts - E2Nn
--J , R. Savage - B2SI,
Q. K. Thompson - T3E
D. Wood
- B2SB
J. J. Zeman
- B2SK
With reference to Jim Savage's memo of November 18, 1975, the current Monsanto patent position on candidate PCD re placements for electrical apparatus is as loiiows:
I, Hydrocarbon + Sulfone Candidates (e.g., MCS-1238, 1468, 1588)
(a) U.S.P. 3,796,934 issued 3/12/74 claims capacitors containing these fluids.
(b) Pending U.S. Application Serial Ho. 424,491 (a divisional application of the capacitor case in (a) above) claims the composition of these candi date fluids. Composition claims in this divi sional application were allowed on 10/21/75 and Business Group's approval has boen received to issue the patent. By coincidence, this applica tion vias selected for optional participation in a trial Voluntary Protest Program undertaken by the Patent Office. This experimental program is similar to opposition proceedings employed for years in Germany, Japan, etc. Because of the importance.of the composition claims to the Busi ness Group, X have recommended that the U.S. patent be allowed to issue and that Monsanto decline to participate in the trial program.
(c) Foreign counterparts of (a) and (b) were filed as a single application in;
Argentina Australia Belgium Brasil Canada Franco Great Britain West Germany
Holland
Italy Japan Mexico Sweden Spain Switzerland USSR
Foreign patents have already issued in Argentina, Belgium, Great Britain, Italy and Spain.
V-51
HONS on*5
V-ll. Patent Position
M. E. Gibb.';
-2-
11/20/75
11. Ester + Sul Tone Ca ndidatos (e. g. , MCM-1475)
(a) U.S.P. 3,811,077 issued 5/14/74 claims capacitors impregnated with composition such as MCS-1475.
(b) Pending U.S. Application Serial Mo. 424,037 (a divisional case originating from capacitor case II(a) above) claims the composition of ester + sulfonc candidates. The composition claims wore allowed on 10/21/75 and were included in the trial Voluntary Protest Program referred to in Section I above. The Business Group has again approved is suance of this patent and cur recommendation is to forego the experimental protest program.
(c) Foreign counterparts were filed in the following countries:
Argentina
Australia Belgium Brazil Canada Finland France Great Britain West Germany
Holland India Italy Japan Mexico Sweden Spain Switzerland USSR
Only the Belgian counterpart has yet issued as a patent.
III. Chlorinated Diphenylmethanes (eg., HCS-1558)
(a) Pending U.S. Application Serial No. 502,486 filed 5/30/75 claims electrical devices (a broad term defined as including capacitors, transformers, etc.) employing a dielectric fluid comprising at least one hnlogenntcd diphenylmethane compound wherein one of the phenyl rings is unsubstituted. These compounds wore found to have good electrical and fire resistant properties coupled with excellent primary biodegrada tion as measured in the SCAS test procedure. Mo action has been received from the Patent Examiner and the foreign filing decision is yet to be reached.
(b) Claims cannot be made to the chemicals per se because they are all old compounds.
Please advi.se if you need further information regarding the
current patent position on PCn replacements for electrical
apparatus.
WllDirk
V-52
LUQjP-
William 11. Duffey
0NS 0?ia6
V-12. G. E. Timetable and Regulatory Situation
D. X. Hi shop - 111 Nil Jan. 30, 1976
Mr. W. B. Papagoonio - I13NU
Dr. Mr. Mr. Mr. Mr.
C. Paton - B2SK R. G. Potter - B2SB D. L. Sidney - D2SB David Wood - B2SD J. C. Weber - B2SK
F.Y.I., the attached appeared in this morning's New York Times.
The heat's off G.E. in New York...and that probably doesn't help us much with MCS 1238.
/mks attachment
D. R. Bishop
The Task Force feels that the reduced pressure helps us and the Industry attain an orderly timetable.
V-53
mgns O^867
V-12. G. E. Timetable and Regulatory Situation
V^:
TUS A'/'H' YORZ. r.'MI'S, FRIDAY. JAhVARY JO, UK
GOVERNOR EASES.1 ' '`""'IK FOB'S'
Overrules' R;!d and Gives : G.Ei Ui>!il'l977 to Meet,' - -'Federal Standard
By LBsTM fiRSHrUOUSIt
Governor Carey, overruling M*> Cwnmiitfoner of Environ*
i men 1*1 CoaiMVMicR,' h** da-i |ded not to fs.t* the Gtn*ral
;sictrfc Comptty <o *tor com-
jpJetoJy.lt* tftieforte ol to* us*lie `OlttfnlCAJs Clliod PCB** If,16
ItoaHudion River.' *' ` [
" lottod,. Mr, .Carey Y.tj 6*06*
d to require' the cotr.pftA/ to
hdbat* only/to tn* KwUnlj
eUntUrti for PCB' dJeitift/fcat, , whloh caJle for no more tfca/j;
S.6 ounce* a <Uy by June!, for?.'
Th* company now d*cb*f*ti
M>oUf two pound* of to* chemL
c*J every dty (pan twp Hud.
on Hirer pleat* otmpartd with!
40 oouft4*>';Uy .from' )97l
to l?d./
J' ;
Tha Z6r)i7)fl)*flM OomftlK [sltmtr,- Ojttay R.' Raid, w
ifttXtd Grnr*l Electric to flop to* OW'hujita oampletety by!
30, and be It eon* iJfcwUn* hMAftp on wfittot* ,toa oompeny be* vrcliUd tUU ! wmr^Uftlfty laniard*.
Mr. Reid'* pory ha botn opptaod by to* Ri*i com*
mere* Cftamtaitnar, John 5. Dy*n; on th* ground that u ifandard thtt ww itrlotrr In Nrw Yorfc to*n In Mbc* tUU* would vi'fAkan N*s* Yor>`4 CumyeMiivr jwUUon end dm* bUt lAdu/Uy. . .
: .CwipM/rf&Hdoa
' hi a j.tj Cut! tt h,,* It *!d meet t/?a r&dcr&l lU..`:dAftf for 3,5 (iup.'a* . Cv, .vro ditvh*rg< w*./ rrn'fr*. ;-oac and might h.-.d tv * dd ton to do** toephin!*. .
Governor CsreyV. f.cc<ltno* ol Mr.-DyjtonV jutuntmt f.j
the lun concre** aiim of tb*j
polity the Qevanor Ar.rtoumwd
thU month In hj* Sut* ef the
&Uib
At that time, Mr.
Cutty *td that h* would weigh
eeonorruc cbneidemUons In tov
rormutUoft. *of, Rvtn>mnenU)
policy,* `
\ \\`
Mr. Reid wu informed ye*-
terday afumoon by Robert J.
Mcr/^do,: Director of SUie
Ooration/of the Governor**,
ldiciaton.,','n>b. Commiwloner
,waa' ndf tuobfcbla (or, com-
menl. ,
v.' <
For (ha sUl* to rw{uin dficharpa of PCB'*, one of. the Governor'* top nidi* atid yeatorday, vroutd "pyl ua on the
*<ne old atf^Muct cocrat"
of enwfing in unfcvoroblo tb niafa for Iftdualry hero.
** j ls<u*'clMd *Phony* '
Furtharmori. tbt* xl'do void, "after all tow year*, of di> obarfdn{40 pound/ a day, no m tan tall m ibare'a one Mt ot dlff^ne*,>tw*!rv.aro and 3j5 ounc**.".-,*' '"j ` ,*.
"U'a a tUUy pho/iy, jjnitoth lit taiu*/' ht addad. ; *
Mr, Raid and Mr.'Dyion have ,tlao daabtd pubtloiy on to* (ftptaWitaUofl of a new law Inquiring davaiopor* to fit* am yironmeoUblspacv atatafoaBta.
I PCb'a-- potycWortnatod bi.fi
phenyiwMvavt eauawd Hvrr ean-f
oer.^reproduetlva (itiura and
[tkJh Mnlactoxu 4n: laboratory
animal*,.' Hud**n F'vrr feah1
u-Hcd ' by uta 'aud radtra);
m/aarther* hava' ahown PC*|
lavri* far in *xct/ of \b
lowahla limit of riv* part* pari
million /it by to* Kvt>dand
Drug Admlnktrttton..
;`
Kartjfr'thij wrrk'lb* Mo' anto Company, 1b* only.makefi of (ha nhrmtul, a*Jd H'wouldi ph*w out produltia.T aj a^orn ai anreptoMa aJUflvlta* wara avli*b)r. PCB* ai> u*d pri-1 marny ln\ Uia prfedurUon of. rauukltor|l%nd airctfi'. ganaras
' >< <
MChS 07X968
V-54
1233 REFINING & ..g-AT
c Star: Cliar. Ip If Filet -".af ir.trg Facility
'
c Certlate F.eirrar.rarer.t 6 Clean Up. Introduce Liquids.
Start F-efir.itg Trial:
t Ctrplata Initial Satining
a C~r.ij.zz Trait Jtr Fever. Refine Return,
o Initiate ?il:t Treats
'
w-'-ttt.it"
1 tank x 1 Treat/'.-'eak * 2200 Units/Week (75 Gal/Vk) 1 It:.*: >: 2 Treats/'/aal-: * 4400 Units/Week (150 Gal/Uk.) ^ 2 larks :: 2 Traata/'. e~k = 6600 Units/Vfeek (300 Gal/Wk) vt tn
PRCCTCTTI'J FACILITIES ICR FULL CONVERSION
.
a Dstcreite Refining Racvirenents And Define Process
9 Sptti:y F.afir.in: 1 Handling Equipment, Obtain Quotes, Prepare Layout. Prepare Ar.i Subnit A?. (1st. 5100,030 Investment - Refining & Related Equipment)
e AR Approval
.
j Etuipr.ant deliver:' (5-5 Months)
Installation Ccmcletad
o Start Up
RC Marrill/RC Pacovicz -1/16/76-
MOMS
071049
5V 2 - Jan. FW 3 - Jon. FV 4 - Jan. FV 5 - Jan. Fit' 6 - Feb.
FW 7 - Feb. PH 1C - Mar. FV 14 - .Apr.
FW 13 - Jlar. FW 17 - Apr.
FW 19 - May October December January 1977
V-12. G. E. T im etable and R egulatory S itu a tio n