Document b5gygYD4QwGVRbQq95pL5kxbD

Monsanto FROM (NAME & LOCATION) W. C. Engman, V7. G. Krummrich ATE April.24, 1972 cc SUBJECT fiEFEFJENCE PROGRAM TO REDUCE PCB LOSSES FROM MANUFACTURING FACILITIES TO G. L. Bratsch ` fWptA'IiPL iAi $E'5*j yfc Pi *5 V) ps. r* jj n r ^ xi S E ttj& fca fc \j L /* F. J. Holzapfel - G.O. D. B. Hosmer - G.O. P. B. Hodges - G.O. W. B. Papageorge - G.O. J. R. Savage - G.O. G. A. Hippe - UGK A. E. Leisy - WGK Attached is the program for reducing and/or eliminating sources of PCB sewer losses from manufacturing facilities. Completion of all items, except for HC1 off-gas scrubbing facilities, will reduce losses at the Aroclor Department to less than 0.1 #/day by mid June. External losses (Incinerator and Rip Track) will range from 0.01 to 0.55 #/day. Cost is roughly $15,000 expense and about 5 man-months technical effort is required. The above assumes PCB losses at the c/S Department are negligible. Sewer samples are being taken to confirm. Installation of an HC1 off-gas scrubber will allow operation of Aroclor Dept, when C/S Dept, is shut down. Additional losses assuming drowning 5/o of the time will be 0.1 to 0. 15.if/day on the average. Monitoring will consist of composite samples taken twice per week at: 1. Treatment Plant Influent 2. Treatment Plant Effluent 5. Aroclor Dept. Parshall Flume (oroject to be completed by 5/15/72) ` 4. Incinerator sewer . 5. Rip track washes (10 per month) Cost of the sampling program will be about $2,500 per month. /trn att. : W. C. Engman Technical Services Department : OSNN 3*>289 STLCOPCB4076933 STLCOPCB4076934