Document b5YbrmMNz0bDEg873NvVwMyb0
Page 1190
1 Q And was Hampshire working in the boiler room 2 while you were working in there? 3 A They could have been patching the ceiling. 4 Q Could have been, you are not sure? 5 A They usually were patching the ceilings. 90 6 percent of the jobs they actually had holes to fill 7 after the plumbers or sheet metal men or the 8 ironworkers. 9 There was always patching of holes that the 10 other people would make. 11 Q All right, so the bulk of the plastering had 12 already been done -13 A In the boiler room. 14 Q In the boiler room, thebulk'of the 15 plastering had already been done by the time Wallace & 16 Gale, including you, got there? 17 A Yes, the bulk. 18 Q As I remember, the church -- the main body 19 of the church has got the stone block on the inside, 20 too. 21 I don't remember seeing any plaster in