Document b5OYdkNp2rBLymwrg8MyyLbO1
4
CHG 00838
e champlin
A Subso<ry of Umon Pacific Corporation
INTER-OFFICE CORRESPONDENCE
TO: FROM: SUBJECT:
CENTRAL SAFETY COMMITTEE Braxton V. Routh Central Safety Committee Meeting
OFFICE:----- Safety
SAFETY & fo<jg-
date: mm iffl.
The Central Safety Committee, met at 2:30 p.m. on Hat/ 8, 1984.
Attendee*: Absentee:
R. E. Schneck J. W. Bryant W. 6. Vuckworth W. G. Miller
T. J.Grgurich
B. V. Rooift R. E. Sio-'tif
J. H. Tansey G. V. Whipple
7. The statistic* on accidents to date, were reviewed, There were no recordable injuries in April resulting in loss of time. This is the first month we
have gone accident free since November 1983. To date there have been six reportable injuries - 4 in the Process Artec, 1 in the Terminal and 1 in the
Laboratory. Ail the employees arte back to wo>ik. Our incident note to date is 2.3 as opposed to 2.5 for the same time last yean.
II. INFORMATION
(a) There one 33 physical examinations scheduled Ion managens and professional staff members. The new procedure we have instituted is working well.
(&} 573 pains of safety shoes/boots have been ordered to date.
(c) 18 employees are attending the fire school at Lamar University, along with one instructor. My report to date is that the school has been very successful.
id) We began using the fire training field on Tuesdays and Thursdays to train our personnel in basic fire fighting procedures in the event of an emergency. To date 102 employees have.participated in this training.
le) To date 233 employees have been screened for potential aromatic expo
sure. Mood tests of the Maintenance personnel (East 6 West Plants) will be completed this month.
{) The Health and Safety Committee agenda was passed out and our first
meeting with this group will be held Thursday afternoon. Hay 10. A report of this meeting is forthcoming.
[gl We have received nothing in writing from OSHA since the closing con ference. Handy's two citations have been withdrawn. D
CH/w-001059 v MAY 141984
-1SWc ' LOSS rnwTP --3T.
Central Sa{ety Cormitt&z Hay 11, 1984
III. SAFETY MAINTENANCE WORK ORDER REPORT
------ --
Hr. Whipple discussed the sa{ety work orders. Lag time seems to be a problem. The work orders {or the Terminal walkway*, submitted In the past, axe not active. Inhumation on the worst areas has been {onwarded to the Terminal department 6or. their, review.
OTHERS
o Bob Loveless is due to report in on Hay 16 and will {ill a void in the Safety department.
__P There was a discussion on where the new {ire trucks should be parked. Sa{ety will review the possibilities o{ where these may be parked out o{ the elements.
0 Our hurricane plan needs to be reviewed since the hurricane season will begin June 1.
There being no' {urther business the meeting adjourned at 3:23 p.m. The next Central Sa{ety Committee meeting will be held June 12, 1984 at 2:00 p.m. in the Coherence
Room.
Braxton V. Routh
Distribution:
R. E. Schneck J. W. Bryant W. B. Duckworth T. J. Grgurich W. G. Hiller R. E. Story J. H. Tansey
G. D. Whipple
CE/VJ-OOIOSO
Central Salety Committee.~ April 12, 79S4
CHG 00839
VI. During the month o May safety meeting* mitt be conducted at the Relinery Terminal Fire Company training lield west o Koch Rejinery, alt attendees should participate, ll unable to do so, employees should not be sent to the lire training grounds as bystanders, A memo will be sent to all cognizant supervisors,
VII.
A Delensive Driving Course taill be held April 17th and 18th in the Salety Training Room Irom 5:30 p.m. - 9:30 p,m., and is open to all employees, spouses and children ol driving age responsibility,
VIII.
Aromatic-blood testing has been implemented during this month, 53 employees at the West Plant have completed this testing program. The program taill be
conducted .at the East Plant in the Salety Training Room and supervisors taill be notilied to this ellect,
OTHERS
0 .The. too lire trucks which arrived Irom Enid will be relurbisked, checked and etc., and will be kept at the West Plant.
0 There was a discussion on possible disciplinary action to be taken when salety rules are violated in regards to accidents. Examples were given on past experience: Cooper, Hill, Friday, Isenberg, Thomas, Grigsby, Campos,
and so lorth.
0 Harry Edwards is visiting the plant this week looking at PNAs and airborne material at the West Plant.
0 Corrective measures have been taken to relieve the odors in the Blueprint room at the Path Lane Building.
0 Harry Edwards discussed.a computer monitor system, lor our chemicals whereby any time there is a release, the TLV is updated every 10 minutes along with the potential problems associated with it. This computerized program is outlined in Houston and it could be very important to our operations especially in a fyS release. He suggested that stall members be selected
to monitor this program in the near \uture.
There being no lurther business the meeting adjourned at 4:16 p.m. The next Central Salety Committee meeting will be held on Tuesday, May 8, 1984 at 2:00 p.m. in the
PCoherence Room.
Braxton V. Routh
Distribution:
R. E. Schneck J. W. Bryant W. B. Duckworth T. J. Grgurich W. G. Miller R. E. Story J. H. Tansey G. D. Whipple
CH/W-001061
c champlin
A SubsuJiaty Ot Union Pacific Corporaion
INTER-OFFICE CORRESPONDENCE
~ / CHILDERS \M. PERRYMAN
LOVELESS.
RETURN TO
TO: FROM:
CENTRAL SAFETY COMTEE Braxton D. Routh
OFRCE: Sa^ETY & LOSS DATE: ItaCaNJRQMPT.
SUBJECT: Central Safety Committee Meeting
The Central Safety Carmittee met at .2:00 p.m. on February 14, 1984.
Attendees: Guest:
R. E. Schneck J. W. Bryant W. B. Duckworth T. J. Grgurich
Harry N. Edwards
R. E. Miller W. G. Miller B. D. Routh R. E. Story J. H. Thnsey
(G. D. Whipple)
The statistics on accidents to date were reviewed. After showing video tapes of the two recent lost time accidents a short discussion ensued. The first one was the
90 Area onployee who slipped over an empty gas cylinder and bruised his right foot. The second accident was the Laboratory employee who was burned when a LPG sample exploded. This accident interrupted the Laboratory's safety record of 13 years 4 months. QSHA has questioned Laboratory personnel regarding possible ignition sources.
Harry Edwards reported on his observations frcm his reports on Industrial Hygiene in 1983. She following are his ccranents:
(a) (b)
(c) (d) (e)
(f)
(g)
I
(i) (J>
OSHA inspector has looked at records
taicon
Qf a few of than so far
Benzene samples will be taken of barge unloading. Our monitoring should be broadened.
Our hearing protection areas should 'be monitored.
Supervision should be more specific as to safety procedures for new trainees in a department.
HpS does not pose a residual health problem. Odors are not necessarily health threatening.
,P_&__A,is only a probable "bad actor" at the West Plant. This should be watched carefully.
Discuss limit variances between inside and outside refinery fence.
We should be cautious of alinurfncr piv>priflTTh females into the plant areas.
(Example: Laboratory tour with the supervisor frcm a high school chemistry
class.)
,
^
The BTK unit is no longer high in concentrations of -vapors. Covering pits help eliminate these vapors.
Platformer area was high. tion is Mpna.
Change in sample procedures to reduce air contaminaReceived
CH/W-001062
-1- ^AR 5 1984
.. .Central Safety Committee , . March 1, 1984
(k) Dust is main problem In East Plant II. Change procedures to reduce amount of dust in air.
(l) Terminal area is all right for lead. Sanitation has been very helpful.
(m) Highest EEB level is at Knock Ehgine work area in the Terminal department.
(n) Coker dust needs to be watched carefully. The coke handling contractors need to be aware of potential problens.
Recommendations for 1984:
1. It is planned to reduce air monitoring in the plant because most primary sources have been shut off. Plans will be formulated for Chrome in 1984.
2. It was pointed out that Mr. Schneck wants to set up a program to train all supervisors to recognize potential drug related problems. It was also pointed out that a definite Corporate policy P*=>pp-Pri1rap_d'mp;a. arvri alrW-v-0 needs to be. fistahlished.
3. In designing the new Laboratory 1 ppm of benzene should be the requirement to anticipate the forthcoming reduced standard. Disposition of samples in the Laboratory continues to be a problem. It was' suggested that smaller samples be taken if this is practical.
HI. It was again pointed out that additional storage for Emergency Response Team equipment is needed at the #4 Platformer, the Old Cat Cracker, the New Plant Control Room and the #1 Crude Ifriit. ERT equipment consists of hip boots, bunket coat, fireman's helmet and gloves which are in a bag for each assigned ERT member.
IV. It was also pointed out that all supervisors should continuously monitor the wearing of proper safety equipment such as hard hats, safety glasses, ear plugs, safety shoes,
Ncmex coveralls, etc.
V. Safety is working with the Training department on special training for supervisors who
have problems and are reluctant to conduct safety meetings. The problem seems to exist
with supervisors in Operations.
~~-------- ---------------------------
VI. He problem of tank dike walkways accessibility has been making slow progress. This activity should pick up within the next 60 days.
Here being no further business the meeting adjourned at 4:02 p.m. He next Central Safety Committee meeting will be held on Tuesday, March 13, 1984 at 2:00 p.m. in the Conference Rocm.
kBraxton D.1 Routh
DISTRIBUTION:
R. E. Schneck
J. W. Bryant W. B. Duckworth
T. J. Grgurich W. G. Miller R. E. Story J. H. Thnsey G. D. Whipple
CH/W-001063
-2-
uenurai sareuy uommimcee January 19 , 1983
CHG 00841
Contractors* Employees Treated at Champlln First Aid, 1982
Cuts &/or Bruises Bums Eyes "Others"
TOTALS
Mundy
15 7
21 7
50
RMC-Goldston
5 2l" ' 15
5
46
Others
5 3 1 3
14
Totals
25 31 37 15
no
Page 6
108 cases $20.00 each 2. cases @ $30.00 each
= $2,160.00 60.00
Total charges to date
$2,220.00
Note: "Basic" fee charge to increase to $25.00 as of I-I-83.
Procedures
There were no procedures presented at this meeting.
Off-the-Job Safety
The book "A Sigh of Relief", which is sent to the home of new employees who have small children, was passed around to each member. As requested, a copy will be given to each manager.
New Business
Safety meetings will be scheduled for Poth Lane employees - Engineering. Purchasing and Administration - on the third Tuesday oir""&koh mentis at 11:00 a.m. in the conference room. Different subjects will be presented at each month's meeting which will keep employees up to date and informed on procedures throughout the plant.
A STOP program for supervisors will be initiated on January 26, 1983. It is hoped that all supervision who have not completed this course will do so this year.
Mr. Keith Barenklau, Consultant, will visit us during the coming week in the hope that he can present a program of motivation for all our supervisors.
Mr. Harry Edwards, our Industrial Hygiene Consultant, will visit the plant in the near future and do more work in the Terminal area around our lead blending area. He wishes to take some hair samples of some of our onployees for further evaluation.
At the next meeting, and each subsequent meeting, the Committee will review the status of safety work orders. Guy Whipple will be responsible for providing a list of these work orders to the Committee. .
CH/W-001064
Central Safety Committee July 26, 1982
CH 00842
^
Page 4
First Aid Cases, Plant Wide , 1-1-82 through 7-21-82 (Cont'd)
,1Hane" Martinez Danny Kucera Martin Garcia Robert Castaneda Martin Garcia Jesse Garcia Carlos Moreno I. M. Thomas Joe D. Alexander McKinley Darden John Mitchell Joyce Krumnow Fidel Cortez Jesse Martinez Gary Keys Howard Anderson , George Rodriguez
n n
n n n n
Process Maint. Maint.
Lab. Maint. Lab. Term. Maint. Process Maint. Maint. Process Process Process Process Maint. Maint.
Minor chem. irritation chest Minor chem. bum upper body Contused & bruised left finger Laceration left palm Minor chem. burn of body Cut rt. middle knuckle Minor chem. bum both feet Deeply embedded F.B. rt. wrist 2nd dg. chem. bum L. eye Minor bruise left leg Severe bruise back of rt. leg Severe bruised knee Minor chem. bum of body Bruise right foot Muscle strain upper shoulder Minor low back strain Minor upper back strain
5-15-82 5-25-82 5-28-82 5-31-82 6-10-82 6-11-82 6-15-82 6-16-82
6-18-82 6-28-82 6-30-82 6-14-82
7-1-82 7-2-82 7-9-82 7-16-82 7-19-82
Contractors1 Employees Treated at Champlin First Aid, 1-1-82 through 7-21-82
Mundy
RMC-Goldston
Others
Totals
Cuts &/or Bruises
15
4
3 22
Bums
5 21
3 29
Eyes
20 15
1 36
"Others"
6 4 3 13
TOTALS
46 44 10 100
98 cases @ $20.00 each = $1,960.00
2 cases @ $30.00 each =
60.00 TOTAL CHARGES TO DATE: $2,020.1
Procedures/Chemical Control Data
The following Procedures and Chemical Control Data were approved by the Committee with minor revisions from Engineering and Maintenance. These procedures will be issued to all safety manual holders in the near future.
Preventing Trips, Slips or Falls on Walking-Working Surfaces Procedure - New Aromatic Sampling Procedure, No. 22 - Revised Chemical Control Data Sheet - Acetic Acid - New Chemical Control Data Sheet - "Nickel Carbonyl - New
New Business
On August 11th and 12th, 1982, Drug and Alcohol Abuse seminars will be held in the Safety office for employees, spouses and youngsters 12 years and older. These seminars will be conducted on an hourly basis from 5-6, 6-7 and 7-8 p.m. There will be no problem in driving into the plant and parking at the Safety office for these sessions
CH/W-001065
CH6 00843
IN THE EVENT OF AN EMERGENCY
1. Reporting party contact Base Four on Special Fire Number. 2. Guard will reach Safety Manager or at least one Safety
Engineer. 3. Shift Foreman will authorize calling Refinery Terminal
Fire Company or AID Ambulance if necessary. 4. Guard will activate proper coded in-plant fire signals. 5. Guard will give "Code 500" i.e. shuttle bus #1 reports to
New Plant.Control Room and shuttle bus #2 to #4 Platformer Control Room, then Old Cat and Alky, and deliver ERT personnel to scene of fire. Terminal ERT due'at their varied locations will contact dispatcher for transportation. Gate Guards upon receiving "Code 500" will follow emergency procedures. 6. Security will contact necessary personnel on emergency call out list. 7. The Shift Supervisor will remain on-scene commander of ERT until relieved by Safety Manager or a Safety Engineer.
CH/W-001066
Central Safety Committee Meeting June 8, 1982
CEG 00844
Page 5
The Industrial Hygiene report is being studied to see what action is required. The B.T.X., Laboratory, Terminal and Maintenance departments are prime areas requiring attention.
There being no further business the meeting adjourned at 2:48 p.m. The next Central Safety Committee meeting will be held on July 13, 1982 at 2:00 p.m. in the Conference Room
Braxton u. Kouth
Distribution:
R. E. Schneck J. W. Bryant W. B. Duckworth
J. F. Gay T. J. Grgurich M. M. Horseman W. G. Miller B. C. Poynter D. L. Scharff J. H. Tansey W. A. Thompson G. D. Whipple
CH/W-001067
Central Satety Committee April 14, 1982
CHG 00845
Pag*
Off-the-Job Safety
Two Defensive Driving Courses will be held - April 19 & 20, April 21 & 22, 1982 for all employees and their spouses. A total of 8 hours is needed to qualify an employee for a 10% reduction on his insurance over 3 years.
New Business
A total of 19 people will attend the Lamar University Fire School which will be held May 3-7, 1982, in Beaumont, Texas.
Ordering of safety shoes will begin by April 15, to be completed by July 2, 1982. Supervisors should notify the Safety department of anyone he wishes not to have on the list...to get- company supplied safety shoes (1 pair per year) .
The Chairman passed out a proposed Corporate Emergency Procedure - "In the Event of an Emergency". A meeting will be scheduled later to go over this plan with all managers. The Chairman requested that comments on this proposed plan be sent promptly to the Safety Manager.
. Mr. Harry Edwards, Industrial Hygienist, will be here April 26 & 27 to make an inplant survey and to assist us in bringing our industrial hygiene program up to its proper level. He will probably work 16 hours and will be taking monitoring samples, sound level surveys, and etc.
The Drug Awareness program will be expanded to include hourly employees. Jim Bryant and Brack Routh will propose a plan for accomplishing this at next month's meeting.. The response to the past Awareness session for supervisors has been very`positive.
The STOP program will be presented in the near future for supervisors who have not attended a previous session.
There being no further-business-the meeting adjourned-at-3:55 p.m. The next Central Safety Committee meeting will be held on May 11, 1982 at 2:00 p.m. in the Conference Room.
Braxton D. Routh
Distribution:
R. E. Schneck J. W. Bryant W. B. Duckworth R. C. Duvall J. F. Gay v M. M. Horseman W. G. Miller B. C. Poynter D. L. Scharff
J. H. Tansey W. A. Thompson G. D. Whipple
CH/W-001068
Central barety committee
October 14, 1981
CHG 00846
First Aid Cases Plant Wide from 1-1-81 through 10-12-81 (Cont'd)
Jose Perez Horace Trickey G. R. Rodriguez Wayne Hill Howard Anderson Gerald McAnear Leo Ramirez Estanfeita Martinez Roberto Garza Larry Bryant Tom Cornelius R. Campbell
L. Harrison Reynaldo Gonzalez Maria Gonzalez Andres Gomez Roy Johnson Juan Olmos Robert Coker' Joe Lopez Rick Barrera McKinley Darden Rosendo Vasquez Randy Anderson Adan Basaldua
C. E. Schoenfeld W. R. Knight E. Martinez Bernard Minor Wm. Waggoner
Maint. Process Maint. Maint. Maint. Process Maint. Process Term. Term. Maint. Maint.
Process Maint. Whse. Process Term. Process Process Maint. Process Maint. Maint. Process Maint. Maint. Term. Process Term. Term.
Foreign body right eye Inc. avulsion, rt. hand Minor chemical bum, upper body Minor low back strain Inhaled irritation fumes Irritating chemical, left eye Arch bum, both eyes Minor bruise left jaw Two abrasions left lower leg Bruised left elbow Two spot acid bums rt. shoulder lst chemical bum, rt. leg Catalyist dust in rt. ear Bruised left leg & buttocks Minor chemical bum, rt. leg 2nd thermal bum, left arm Minor thermal bum, right thumb 1st degree chemical bum, left hip Bruised left testicle Fractured left 1st fingertip Bruised left thumb Minor chemical bum, left ear Minor chemical bum, face Foreign body right eye Laceration left 2nd finger Low back strain lst chemical bum, right hand Bruised back & waist Minor ankle sprain Cut right 5th finger
7-19-81
7-19-81 7-20-81 7-21-81 7-24-81
8-4-81 8-4-81 8-6-81 8-7-81 8-19-81 8-21-81 8-25-81 8-20-81 8-28-81 9-3-81 9-3-81 9-11-81 9-16-81 9-16-81 9-17-81 9-19-81 9-21-81 9-24-81 9-27-81 9-28-81
9-29-81 9-30-81 10-1-81 10-1-81 10-6-81
Contractors* Employees Treated at Champlin First Aid,'1-1-81 through 10-12-81
Mundy
R.M.C.
Plant & Field
Others
Totals
Cuts &/or Bruises Bums Eyes "Others"
TOTALS
5 3 5 1
14
7 1 8 2
18
6 4 5 3
18
3 21 2 10 2 2Q
6
7 57
Procedures
There were no procedures presented at this meeting. Due to an incident recently regarding facial hair, a paragraph will be added to eight (8) procedures stating that the face must be clean shaven in the area of the facepiece seal. As soon as these procedures are updated they will be issued to all safety manual holders.
New Business
Mr. Schneck reviewed the upcoming safety audit and asked for help from previous
participants. We need to stress and update items from last year's audit. House
keeping has improved tremendously and we must maintain the effort to keep the
plant clean.
CH/W-001069
-4-
CHG 00847
<U O AO H <U JW B 4-1 O
OJ3
V-'V"'
<D
O T-I (U 44 B w o 043
as
cu Ua H 0)
44 S 4-1 O 043
A CU O AO
h a>
4-1 B 4-1 O 043
A (U O AS T-I 0) 4-1 S 4-1 O
vS^S
As a) O AS T-I CU 4-1 6 4-1 O 043 N-'Ny
O CM Mb CO tH.CM CO CM ON ON O On
cm r-s co m CM CO Mb CO CM UO r--1 O
OO CO CO r4 COO CO O
Mb CM O
> -3- Mb uo o\ CM ON
Pi
1 i
i 1 ' 1
1
z 44 CM 4J rH 4-1 r-< 44 Mb 4J CM 4-1 i--l
Z Z
Xm
on
nu co <u on
Kon X in a) on <u CO
ON CU ON
X ON
0) ON
M
Pi o
X (U 1 S3 u z sx o CU M H Ho < ze
M bo
IX X M rW 43
H f--l u
O cd cU Z OW
42 44 P O PS
a
pq
cd
X
a)
o Po
b<S bS
43 O *-3 P3
o
T3 CU S3
P CU O* I--l PO
IX PS
CU f>
ri---<I
c<3 H
Q PQ
AS
.a
o m rH
4-1 CM
4-1
O s/
AQs)
* ON
t>0 CM
i--l 1--1 co (3 Mb
fo uo CO cU
UO
r-4 CM X*
uo -u- on a CO
X >s
1
1 i X Mi
(U S3
CM CO CM CU en
bO cU
co co 00 s/
cu a.
CO co CO
a P-i b
uo rH
o
uo CM
44 O
CO PS
PX PQ 2 P
Z
ezx
(U O
oP
ewx
cU t--l
P
H
Z
ZB
<3 <
H
PS P
O T-I
P-i <3
X
VO CO
S3
CU 4J
f1-
cU cu rH H
S3
CM Mb
CX-H
CU
co CO
1 pE4
o
co CO
p
00 (--I 1--t
1--1
cU
oS
T-I O
rl
CU AS
X
O
sCU
CU
~P
t>> CO-H
O rH R iH
03 O
o
S3 =5 ft O
sCU PS
co 43 <U
CU CU CO bO Jh E-t rs
bo
i--l o
CU S3 T-I CU
r-4 X CM cfl ro.
43 rH
fcut
a) i
bO Pocm
B cu ft co
>0 cu cu co
X bO UMb
44
S3
BO X<u
I rH
CU 44
CU iH t-I iH 4 iH 4-1 iH
O B asw
X ON
cU rl CU CU CU
ON CO b OPS o
M1
1
1
1 11
>
IH
>
obs zo
5 CM
M co cfl CU
X
ft AS 44 cfl
zEm
z
QeMx ou
> z<}
o
CO
H
oo >
T3
CO uo
ft
CU
<3rl
T r-4
(X
cm r-. CM
p
44
co uo
CO --
Z o
CO
CO
!-i
43 -- Mi H 44
O vO en
4-1
rl CO CO < H
IX O uo - O 43
rl o O CO
bO
a
03 uo CM r-3
cU co CO
rH
ft UO
Q r-4
cd
44
5 CU 44 < O
W
CO fi ^ X
CO
oo
co uo
cm rs
CO uo
43 O vO
co O uo
H T3 uo
CU CO
ft uo
44
S3 -
cfl co rH
ON CM sfl-
CO Mi
en
rH CM CO
-
Mb
CO CO
*
44
X
CU
o
cU CU
ft <3
ft
cu
bO p
CO
ft CU
b043 S3 44
H O 44
43 U
bO O H
1X44 rH
cu a)
J4 CO
rl SX X 'S- <U P bO
H c
<3 CU 03
CO
o
H E-c
u
p> PS E- CO
Z H
CO CO ex
h4 Pi H
K
CO ex
bo cU s
03 03
44 rl
CU <3
CU
$ 44
CO x
2 rl
IX SX
rH
o rH
o *
CU
a
mi-
X
oo
X
;3 O bs
cu 44
b> o o 43 X Cfl o
CO
S3 H cfl > 43 X
44 CU ex
Xp
CU co
43
44 44
CU
4H4 X
XCU d
s z xPS
cd co CU 9 - CU
i--i PS CO 0)
SX CU CU 33 ft ft
CO
ex P CU
P
o <3
P cu
o
iH O 43 43 Z 43 ft
CU SX P
43 rH rH CU S' ft O
rH i--1 .H > <u >,
44 cU cu CU M 44
CU o o H O 4-1 44
O. 1
I
<O
<3
W J
S
pS
o
< >
ex a) CO
P Cfl
O 43
44 i--1 i--i ft iH iH
o Cfl CU SX u o
cu
PS I
CU CM
P CO
O 43 M IX O CU rH O CU iH
H CM
1
cU Q
CU 44 cU p
a
cfl
> w
44 S3 CO cu
ft rl 44
O
S3 .
bo
iH S3 SX O CXQ
<3 ^
PS
O
>4
PS
33
1-0
w
Pi
44 o 44
o
. 44
H
CO JP
2 CU CO
<j
44
X
B H rH
o 44
o ex
cd
o cu rH o
oo 1 <! 1
<3 CP
pS M C3 Ih <
# PQ o
oz
IH
s <3
PQ
M
t-I
H
H MH
CH/W-001.070
champlin c
INTER-OFFICE CORRESPONDENCE
- CENTRAL SAFETY COMMITTEE
OFFICE:
FROM:
Braxton D. Routh
DATE:
SUBJECT: Central Safety Committee Meeting
Safety August 12, 1981
The Central Safety Committee met at 2:00 p.m., August .11, 1981.
Attendees:
R. E. Schneck W.. . ,,B. _Duc,kwortmh
B. C. Foynter
D. L. Scharff
(Chairman)
J. H. Tansey G. D. Whipple B. D. Routh
Absentees:
R. C. Duvall M. L. Hansen M. M. Horseman
W. G. Miller W. A. Thompson
Guest:
D. G, Perryman - Ft. Worth Corporate'Safety
The statistics on accidents to date were reviewed. The incident rate is 1.7 compared to 3.1 for the same time last year. Since the first of the year we have recorded 6 reportable accidents with 4 resulting in lost time. Our offthe-job accident frequency is much greater with 19 off-the-job injuries, with a frequency rate of 23.55. We still have 2 employees away from work as a result of off-the-job injuries.
We are working approximately 100,000 man hours each month. New people are being instructed as _they,_come aboard ..but the... program-could be expanded with supervisors following up on accident prevention.
One (1) lost time accident was recorded because Procedure No. 9 - First Aid Report - was not followed. Employees and supervisors are encouraged to re-read this procedure and hopefully it will be followed so there will not be a recurrence of our recent lost time accident.
Dr. Charles Craig is now our new company physician replacing Dr. Gray. He will be available in industrial hygiene matters and a meeting will be set up to discuss with management problems in this field.
Statistics do .not..include first-aid for contract employees. We are now, and have been since January 2, 1981, back charging all contractors for first aid service performed.
Following is a total of injuries (First Aid 1-1-81 through 8-10-81) as well as off-the-job injuries that nave caused lost time from work:
CH/W-001071
* Central Safety Committee August 12, 1981
PROCESS
Cuts &/or Bruises
13
Burns
6
Eyes
8.
"Others"
9
TOTALS
36
MAINT.
13 6 6 7
32
TERM.
6 5 1 4
16
LAB. 1 1
2
WHSE. 2
2
OFFICES TOTALS
35 18 15 1 21
1 89
TOTALS @ SAME TIME LAST YEAE
24 16
8 28
76
fReportable and Lost Time Injuries 1-1-81 through 8-10-81
J. H. Odem
1-3-81 1 Process Incomplete avulsion rt. thumb nail, no time lost.
J. E. Escobedo 2-10-81 Maint. Puncture wound left thumb, no time lost.
J. K. Jones
3-21-81 Process 10% fracture thorasic vert., 13 work days lost.
R. G. Lopez
7-16-81 Terminal Sprain right foot, 5 work days lost.
R. E. Hinojosa 7-25-81 Process Bruised rt. forefinger, 5 work days lost.
E. Martinez 8-4-81 Terminal Severe bruising rt. knee, still off.
Off-the-Job Injuries that caused lost time, 1981
Maint. employee (I.M. Thomas) cracked sternum moving furniture
Process employee (Anna Campos) auto accident, broken thumb Process employee (F. Lott) stab wound rt. hand Maint. employee (M. Darden) motorcycle accident Process employee (D. Holland) playing handball, shoulder injury Process employee (K. Trial) scratched eye at home Lab. employee (D. Budjick) scratched eye at home Process employee (V. Jordan) back strain at home Process employee (E. Morris) motorcycle accident Process employee (J. Martinez) fell from house, broke foot Terminal employee (K. Green) fell from horse, broke ankle & leg Office employee (B. Cantu) auto accident Process employee (B. Templeton) jumped fence, injured ankle Maint. employee (L. Lister) injured knee @ Karate practice Maint. employee (J. Coulter) fell @ pool, broke nose Process employee (N. Bridges) strained back at home Maint. employee (L. Lister) contused ribs @ Karate practice Maint. employee (L. Herron) roller skating, broke ankle Process employee (G. Pakebusch) fell on pier,- shoulder injury
20 work days lost 21 work days lost
7 work days lost 57 work days lost 41 work days lost
2 work days lost 1 work day lost 6 work days lost Still off 40 work days lost 90 work days lost 8 work days lost 39 work days lost 2 work days lost 4 work days lost 6 work days lost 3 work days lost Still off 10 work days lost
Off-the-job frequency rate 19 x 200,000 . 517 x 312
23.55
First Aid Cases Plant Wide from 1-1-81 through 8-10-81
Tom Cornelius James Jones
Vincente Morin Jimmy Hull
Robert Castenada Wayne Matlock Sam Longoria William Fleeman Kathy Reaves
Maint. Term. Process Term. Lab. Term. Maint. Process Process
Abdominal muscle strain Left neck strain lst chem. burn left thigh Muscle strain left knee
Muscle strain left arm Abrasion left knee Bruised upper lip Is t'-^~2n3^thermal burns
1-3-81 1-14-81
1-8-81 1-8-81 1-14-81 1-14-81 1-21-81 1-28-81 1-28-81
CH/W-001072 -2-
wd.jucujr OUUUlLLUue^ August 12, 1981
First Aid Cases Plant Wide from 1-1-81 through 8-10-81 (Cont'd)
J. E. Pope Oscar Zepeda Jesse Martinez Jerry Perez Vickie Jones Rick Barrera David Grigsby N. L. Bridges Richard Kientz William Campbell Mike Morgan Allen Green Jerry Perez
Kenneth Cross Alice Hawkins
David Garza Juan Garcia Leroy Georg Kenny Dean Danny Escamilla Joe Lopez Maria Gonzales Carlos Lazo Esteban Gonzalez Bruce Franklin Jack Boeck Tommy Cornelius Arturo Ruiz Susan McCullough Jay Baugh Pete Rodriguez W. P. Arnold Keith Cooper Danny Wilson Dean McFall Carl Williams C. E. Schoenfeld Lloyd Lister Paul Alvarez Gerald McAnear Reese Homeyer James Odera Sam Longoria Lloyd Lister Leo Ramirez Ronald Bruni Dean Fleet Richard Salinas Robert Tamez Richard Salinas James Drew Richard Kientz E. A. Ory
Jim Coulter Andres Gomez
"Hane" Martinez
Maint. Process Process Maint. Office Process Process Process Process Process Term. 'Term. Maint. Maint. Term.
Process Process Maint. Maint. Process Maint. Whse. Process Whse. Process Term.
Maint. Process
Process Maint. Process Maint. Maint. Maint. Lab. Term. Maint. Maint. Term.. Process Maint. Process Maint. Maint. Maint. Term.
Process Process Process Process Process Process Maint.
Maint. Term.
Process
Many FB's left eye
Inhaled dry chemical
Inhaled dry chemical
Bruised left knee
Minor back strain
Minor knee strain
FB's right eye
lst thermal burn
Catalyist dust in eyes
Bruised left elbow
Minor chemical bum
Minor chemical burn Bruised finger_________
djlmh prided FB right eve"
, A\
Minor chemical burn
Minor chemical burn
Bruised left elbow
Laceration left thumb Bruised left great toe
Bruised left buttocks
Bruised left 5th finger
Bruised left wrist
FB left eye
Laceration finger
Muscle strain left shoulder
Bruised left 5th finger
FB left eye
Possibly inhaled caustic
Bruised left elbow
FB right eye" Thermal burns of fingers Muscle strain rt. shoulder Bruised rt.. knee
Inhaled sulfur capors Inhaled sulfur vapors
rw/W-001073 '
Gasoline in both eyes Bruised lymph node & testicle FB left eye
Strained left wrist FB right eye Bruised rt. leg & left buttocks Twisted left ankle Muscle strain mid back
Contusion rt. knee Foreign body left palm
Minor chemical burn of face
1-21-81 1-30-81 1-30-81 2-1-81 2-19-81 2-18-81 2-20-81 2-20-81 2-23-81 2-22-81 2-27-81 2-27-81 3-2-81 3-4-81 3-6-81
3-17-81 3-20-81 3-28-81 3-29-81
4-1-81 4-4-81 4-7-81 4-8-81 4-13-81 4-13-81 4-4-81 4-14-81 4-21-81
4-23-81 4-30-81
5-5-81 5-7-81 5-7-81 5-7-81 5-7-81 5-7-81 5-13-81 5-18-81 5-21-81
5-21-81 5-26-81
5-28-81 5-29-81
6-2-81 6-2-81 6-5-81 6-3-81 6-16-81 6-12-81
6-16-816-17-81 6-21-81 6-24-81 6-26-81 6-26-81 6-29-81
. oencraj. oaiecy oommictee
August 12, 1981
--.
First Aid Cases Plant Wide from 1-2-81 through 8-10-81 (Cont'd)
C. E. Schoenfeld Rogelio Ruiz Jay Baugh Catarino Reyes Alfredo Rodriguez Hulen Ross
R. E. Hinojosa Jose Perez
Horace Trickey G. R. Rodriguez Wayne Hill Howard Anderson Gerald McAnear Leo Ramirez Estanfeita Martinez Roberto Garza
Maint. Process Maint. Maint. Process Term. Process Maint. Process Maint. Maint. 'Maint. Process Maint. Process Term.
Mild back museIp strain
^Embedded FB rt. eve^) Mashed rt. middle finger Cut fingernail left forefinger lst chemical burn, upper body Cut distal joint, right thumb Prob. tendon strain left forearm Foreign bo'dy rt. eye Inc. avulsion rt. hand Minor chemical burn upper body Minor low back strain Inhaled irritation fumes Irritating chemical, left eye Arch burn, both eyes Minor bruise left jaw Two abrasions left lower leg
6Nr'i 6-29-81 7-3-81 7-7-81 7-9-81
7-13-81 7-10-81 7-15-81 7-19-81
7-19-81 7-20-81 7-21-81 7-24-81
8-4-81 8-4-81 8-6-81 8-7-81
Contractors1 Employees Treated at Champlin First Aid, 1-1-81 through 8-10-81
Mundy
R.M.C.
Plant & Field ` Others
Totals
Cuts &/or Bruises
4
7
4
1 16
Burns
1
4 27
Eyes
57
5 2 19
"Others"
12
3
6
TOTALS
11 16
16
5 48
Procedure's
There were no procedures presented at this meeting.
Off-the-Joh Safety
Two (.2) sessions of Defensive Driving Courses will be held August 10. & 11 and August 12 & 13 from 4:00 p.m. to 8:00 p.m. One class for employees and spouses will be finished today1
New Business
_________ ^ 7
The Nomex Coveralls policy is not working well. New employees coming aboard\is J a problem. Most employees now have 2 pairs of coveralls and they will be proviued another 2 pairs which include logo and name on each uniform. Hopefully the policy will be presented to all employees and holders of safety manuals within two weeks.
Emergency Response Training continued with enthusiasm. New employees being intro
duced into the program require extra training to bring them up to par with other employees.
Fire extinguishers in all vehicles and throughout the plant are being checked on an annual inspection.
CH/W-001074
-4-
oentrax aaiecy uommxctee
August 12, 1981
--
The Pipeline Department (Warren Thompson's group) completed four (4) accidentfree years recently. Appropriate safety awards were given to each employee.
There being no further business the meeting adjourned at 2:30 p.m. The next Central Safety Committee meeting will be held on September 8, 1981 at 2:00 p.m in the Conference Room.
Braxtotf D. Routh
Distribution:
R. E. Schneck W. B. Duckworth R. C. Duvalls J. F. Gay S
M. L. Hansen M. M. Horseman
<
W. G. Miller B. C. Poynter D. L. Scharff J. H. Tansey W. A. Thompson G. D. Whipple
CH/W-001075 -5-
CHG 00845
J. F. Kucera L. E. Rolando R. A. Koy D. R. Fuqua
AREA ASSIGNMENTS
*
Old Plant - #4 Platformer, Alky Unit, ... #1, 2 & 3 Crudes, Old Cat. Cracker,
B..T.X., Boilers.,. Emergency-Response Team Training.
Terminal Department, all Tank Farms, all Docks, Harlan Tank Farm, Portilla Station, Main Office, Old Computer Building, Corn Products Building, Southwestern Barge Dock.
Laboratory, all Maintenance Shops, Truck Rack, Pipeline Department (Jeter), Warehouse, Drum Storage Rack, South 40, Signs - East & West gates, all safe'ty meetings.
New Plant area.
Each Safety Engineer is responsible for all fire extinguishers, safety showers, breathing and emergency equipment in these areas.
CH/W-001076
CHG 01368
e champlin
A Sutjsiai3'v of Unn Pacific Corporation
INTER-OFFICE CORRESPONDENCE
TO: CHORAL SAFETY CCMMTITEE
OFFICE:
FROM:
Braxton D. Routh
DATE:
SUBJECT: Central Safety Committee Meeting
Safety March 1, 198*1
The Central Safety Committee met at 2:00 p.m. on February 1*1, 198*1.
Attendees: Guest:
R. E. Schneck J. W. Bryant W. B. Dackworth T. J. Grgurich
Harry N. Edwards
R. E. Miller W. G. Miller B. D. Routh
R. E. Story J. H. Tiansey
(G. D. Whipple)
I. The statistics on accidents to date were reviewed. After showing video tapes of the two recent lost time accidents a short discussion ensued. The first one was the 90 Area employee who slipped over an empty gas cylinder and bruised his right foot. The second accident was the Laboratory employee who was burned when a LPG sample exploded. This accident interrupted the Laboratory's safety record of 13 years *1 months. QSHA has questioned Laboratory personnel regarding possible ignition sources.
H. Harry Edwards reported on his observations from his reports on Industrial Hygiene in 1983. The following are his cements:
(a) QSHA inspector has looked at records and taken copies of a few of them so far.
(b) Benzene samples will be taken of barge unloading. Our monitoring should be broadened.
(c) Our hearing protection areas should be monitored.
(d) Supervision should be more specific as to safety procedures for new trainees in a department.
(e) HpS does not pose a residual health problem. Odors are not necessarily health threatening.
(f) P & A is only a probable "bad actor" at the West Plant. This should be watched carefully.
(g) Discuss limit variances between inside and outside refinery fence.
(h) We should be cautious of allowing pregnant females into the plant areas. (Example: Laboratory tour with the supervisor from a high school chemistry class.)
(i) The BTX unit is no longer high in concentrations of -vapors. Covering pits help eliminate these vapors.
(j) Platformer area was high. Change in sample procedures to reduce air contamina tion is helpful.
E- 000931 -1-
oenut`a_L oa.ie uy vuunuui,ec
March 1, 1984
(k) Dust is main problem in East Plant II. Change procedures to reduce amount of dust in air.
(l) Terminal area is all right for lead. Sanitation has been very helpful.
(m) Highest EEB level is at Knock Engine work area in the Terminal department.
(n) Coker dust needs to be watched carefully. Ihe coke handling contractors need to be aware of potential problems.
Reconmendations for 1984:
1. It is planned to reduce air monitoring in the plant because most primary sources have been shut off. Plans will be formulated for Chrome in 1984.
2. It was pointed out that Mr. Schneck wants to set up a program to train all supervisors to recognize potential drug related problems. It was also pointed out that a definite Corporate policy regarding drugs and alcohol needs to be established.
3. In designing the new Laboratory 1 ppm of benzene should be the requirement to anticipate the forthcoming reduced standard. Disposition of samples in the Laboratory continues to be a problem. It was suggested that smaller samples be taken if this is practical.
III. It was again pointed out that additional storage for Emergency Response Team equipment is needed at the #4 Platformer, the Old Cat Cracker, the New Plant Control Room and the 1 Crude Unit. ERT equipment consists of hip boots, bunket coat, fireman's helmet and gloves which are in a bag for each assigned ERT member.
IV. It was also pointed out that all supervisors should continuously monitor the wearing of proper safety equipment such as hard hats, safety glasses, ear plugs, safety shoes, Nanex coveralls, etc.
V. Safety is working with the Training department on special training for supervisors who have problems and are reluctant to conduct .safety meetings. The problem seems to exist with supervisors in Operations.
VI. The problem of tank dike walkways accessibility has been making slow progress. This activity should pick up within the next 60 days.
There being no further business the meeting adjourned at 4:02 p.m. The next Central Safety Committee meeting will be held on Tuesday, March 13, 1984 at 2:00 p.m. in the
DISTRIBUTION:
R. E. Schneck J. W. Bryant W. B. Duckworth
T. J. Grgurich W. G. Miller R. E. Story J. H. Ihnsey G. D. Whipple
-2-
E- 000932
/ CHG 00826
c champlin
A Subsidiary of Union Pacific Corporation
INTER-OFFICE CORRESPONDENCE
TO: FROM:
CENTRAL SAFETY (XJMMITIEE R* A. Loveless
DATE: .....Novan)er.23.>....1984
SUBJECT: Central Safety Comnittee Meeting
The Central Safety Ccranittee met at 2:00 p.m. on November 26, 1984.
Attendees: Absentees:
R. E. Schneck J. W. Bryant W. B. Duckworth V. D. Elliott (R. E. Story) T. J. Grgurich
B. D. Routh R. E. Story J. H. Tansey
G. B. Jaetzold R. A. Loveless W. G. Miller
G. D. Whipple
I. The statistics on accidents to date were reviewed. Guy Whipple discussed the Lost Time Incident involving Henry Sijansky This incident involved a knee injury when an exchanger bundle was being loaded on to a trailer during the Cumene turnaround. Guy discussed all of the factors surrounding the incident and the corrective action that was taken.
Bob Loveless discussed the recent injury to Allen Green in the Terminal depart ment which involved a back strain when a chair in the Terminal control roan failed. All manbers in attendance were urged to check their respective control rooms and see that damaged chairs were removed.
II. (a) The recent visit by Dr. Parker, our radiation consultant, was reviewed. His visit involved a review of our recordkeeping requirements for the inspection of radiation sources and also a discussion with Fidel Velasquez and Eloy Mesa on the proper inspection techniques. He also had a brief discussion with the complainant in the recent Health Department radiation inspection.
(b) Also during the month, Mr. Chuck Frisbie of M & M Protection Consultants conducted his annual inspection. This included a walk-through of the refinery with a few-minor recommendations. No flow tests were conducted on the firewater
pumps and it was decided that Mr. Frisbie would return in February 1985 to conduct these tests. In addition, several items were deleted as recanmendations
on his previous report and noted as itans of interest.
.(c) A video tape was shown concerning refinery housekeeping and lack of attention. A brief discussion took place concerning this subject and it was agreed that Guy Whipple would add some additional laborers to conduct clean-up operations. Dick Schneck emphasized the fact that it is necessary for depart mental superintendents and area supervisors to inspect their areas on a more routine basis to prevent this type of housekeeping problem. r. -' P fk r i". ' v ~~
-i-
CH/W-000198
DEG 3 T384
LOSS .. --v >r?T
Central Safety Ccmmitcee November 28, 1984
(d) An update was given as to the status of the recent OSKA citation and the letter from Phil Gettig in Ft. Worth was discussed.
(e) The 1985 program to turn safety meetings over to the first line super visors was discussed so that all supervisors involved would be prepared for this change. It was mentioned that the training room at the Safety office and the conference room at the Environmental office would be available for con ducting these meetings, and that information on material would be distributed to supervisors prior to each month's meetings. The scheduling of these meetings will be the responsibility of the departments' superintendents and if it is necessary to utilize the Safety training room prior arrangements should be made. In addition to written material pertaining to safety meeting subject matter, a film will be available at the Safety office for use during that month.
(f) Bob Loveless stressed the importance of flow testing of refinery sprinkler systems. Due to the water shortage this program was discontinued In the early sunnier. A request was made that we continue with this program if water is available. Dick Schneck stated that water was available and the program could continue.
(g) A brief discussion took place concerning the aerator removal operations at the West Plant aerator basin. Dae to problems with the video tape which was made during these operations, this item will be tabled until the Decent)er meeting.
(h) Discussion took place Involving previous safety items brought up at the Central Safety Conmittee meetings concerning Tanks 918 and 6l4. Since the last meeting the Inspection group conducted an analysis of Tank 6l4 at the No. 1 Crude Dhit and it was determined that this tank was In operable condition. Dae to the severe external corrosion Guy Whipple will see that this tank is sand blasted and painted and a new platform and ladder installed. In reference to
Tank 918, Tom Grgurich stated that this still under evaluation'and a decision
as to the status of this tank would be given shortly.
(i) The Return to Work from Injury and Illness Guidelines msnorandum from Brack Routh was discussed in detail and it was decided that with some minor modifications it would be released as stated. Jim Bryant discussed the possi bility of employees clearing through Health Services prior to returning to work. However, this will be discussed with area supervisors before Implementation.
(j) Bob Loveless made a request from all members present to provide the Safety department with recorrmendatIons for the 1985 safety program. Dick Schneck emphasized that all superintendents should develop some suggestions in the near future.
Fire Alarm Status: An update was given as to the status of the new fire alarm system. The program timers for the alarm have caused numerous problems In the past and it was agreed by Federal Signal Corporation that these would be replaced. They will be shipped later this week and installed the following week. There will be an additional three remote units to be located in the No. 1 Cat Cracker, No. 4 Platformer, and between No. 1 and No. 2 dock areas. These should be received early in January 1985 for installation.
CH/W-000199
-2-
oenxi'ax OHiecy ujmiu.out;t; November 28, 1984
Fire at Tank 501: The fire which occurred on November 22, 1984 at Tank 501 i involving molten sulfur was also discussed in light of response and personnel I notification. Bob Loveless stated his concern for the fact that Emergency l Response Team msnbers from East Plant I were not allowed to respond due to the \ fact that the shift supervisor did not think there was a. nppri for thpjr services.
J It was discovered after the fire that it is necessary for the shift supervisor
in East Plant I to verbally notify ERT msnbers In this area prior to their response. Dick Schneck expressed his concern for this situation and stated that possibly the operator in charge of the unit can give permission for the ERT members to respond. Tom Grgurich expressed his feeling concerning this and stated that there should be no problems with the operator releasing the ERT members. A brief discussion concerning notification of key plant personnel took place and it was decided that additional people should have been notified. Bob Loveless and Van Elliott will meet to discuss revisions in the plant emergency procedures and to discuss emergency call out list and notification.
III. Guy Whipple provided the committee with a list of Maintenance Work Orders and their status, a copy of which is attached.
There being no farther business the meeting adjourned at 4:10 p.m. The next meeting of the Central Safety Committee will be held on December 11, 1984 at 2:00 p.m. in the Conference Room.
R. A. Loveless
End
Distribution:
R. E. Schneck J. W. Bryant'
W. B. Duckworth V. D. Elliott T. J. Grgurich G. B. Jaetzold W. C-. Miller B. D. Routh R. E. Story J. H. Tansey G. D. Whipple
Copies to:
C. E. Barker J. 0. Cooper U. G. Prondorf W. H. Harris T. G. McNeill R. D. fforlnar D. W. Peterson D. A. Sadler G. W. Smith C. W. Thompson W. A. Thompson
-3-
CH/W-000200
e champlln
A SubMwy of Umon Pacific Carporaion
INTER-OFFICE CORRESPONDENCE
TO:
Guy D. Whipple
^t
OFFICE: C. C. Refinery
FROM: D* W. Peterson SUBJECT: Active Safety Work Order Status
DATE: 11/09/84 CH/W-000201
EAST PLANT I
w.o. # Issue Date Equipment # Description of Work
Status
79316 08/21/84
007-V-001
Repair Walkways on Demex Solvent Prep. Pending Manpower Tower
79344 08/17/84 018
Repair Common Platform on W. Side of BTX Unit (Bottom)
Pending Manpower
79346 08/17/84 018
Repair Common Platform on E. Side of BTX Unit (Bottom)
Pending Manpower
79317 09/11/84 018
Repair Walkways on Towers on the BTX Unit
Pending Manpower
79345 09/11/84 018
Repair Common Platform on W. Side of BTX Unit (Top)
Pending Manpower
79347 09/11/84 018
Repair Common Platform on E. Side of BTX Unit (Top)
Pending Manpower
79352 09/11/84 018
Repair Walkways that are heavily corroded on 18-V-16 to 18-V-13
Pending Manpower
79354 08/17/84
018-V-001
Repair Walkways that are heavily corroded.
Pending Manpower
79353 09/11/84 018-V-013 Repair Walkways that are corroded
Pending Manpower
79349 79350
09/11/84 09/11/84
018-V-016 018-V-016
Repair Top Platform
Repair Top Two Section of Ladders & Cages - severely corroded
Pending Manpower Pending Manpower
79351 09/11/84
018-V-016
Repair all Plate Platform - severe corrosion on BTX Unit
Pending Manpower
79342 08/17/84 018-V-045 Repair Platforms and Ladders
Pending Manpower
79343 09/11/84 018-V-046 Repair Platform & Ladder
Pending Manpower
99362 10/17/84 106
Move Overhead Elec. Feed Lines from Over Driveway at Truck Shop
On Hold
29080 09/11/84 133
Fab Floor Tester for Degree on Slip
Pending Material
(2)
,9348
Issue Date Eauipment # Description of Work
09/11/84 018
Repair Platform Above Reactors on BTX
Status Pending Manpower
TERMINAL 29087 10/24/84
61847 10/24/84
72676 72678
06/20/84 08/17/84
22646 10/11/84
41169 10/11/84
082 Oil Sump at Tk 608 Needs Railing Extend - Pending Install ed to an Elevation of 42". Guard Rails ido tion. Already Not Meet OSHA Height Spec. Elevate Hand . Fabricated
084 Fab. Ladder & Platform in Piperack W. of Out For Bids Tank 1022. Need to Set up a Permanent Ladder <2 Dbl. Blk. Valves W.'of Tk 1022 (Old 8" Line) in Order for Terminal Dept, to Switch Valves When Needed.
085
Repair Wooden Walk @ Tk.s 11 & 12.
Completed
085
Line Valves to #1 & #2 Docks. Fab.
Drawing Underway
Personnel Walkway @ Dock.
085-TK-211 Build Gravel Caliche Walkway at Bottom of Ladder at 211.
Pallets Temporary
Installed. Water to be emptied be*
fore work can be accomplished.
097
Mount 30# Dry Chemical Fire Ext.
Completed
Inside Control Room on #6 Dock.
WEST PLANT 41170 10/04/84
585
Open Ditch
In Progress
CH/W-000202
e champlin
A Sobsidtary d Unan Pacific Corporation
INTER-OFFICE CORRESPONDENCE
TO: Guy D. Whipple
OFFICE: C. C. Refinery
FROM:
D. W. Peterson
DATE: 11/09/84
SUBJECT: Completed Safety Work Orders
W.0.0 Issue Date Equipment 0 Description of Work
EAST PLANT I
66965 10/01/84 008
Clean up Unit at #1 Crude
29081 09/11/84 029
Leak Test Nuclear Gauges
TERMINAL
57965 10/10/84 082
Install Scott Air Pack at 02 API
WEST PLANT
84931 10/08/84 552
49265 09/04/84 521
41173 10/08/84 521
41168 10/08/84 527
41172 10/08/84 546
84994 10/16/84 546
49530 09/26/84 585
BUILDINGS! & GROUNDS
22611 29083
10/10/84 10/05/84
101 125
29088 10/26/84 125
Repair Blue Lens/Safety Shower 29 Vapors on Water Sewer Replace Air Pak Cabinet on Switch Deck Replace Gauge Repair Deluge Gauges Repair Busted Fire Hose Fill w/Sand at Charge Pump & Circ. Pump
Level Foundation for Cylinders on W. Side of Lab Bldg. Install "No Parking" Signs SE Corner Cumene Control Rm. Hall Emergency Lights out at Safety & First Aid Office. Detect Cause & Correct. Lights needed in case of night emergency.
CH/W-000203
e champlin
TO: FROM: SUBJECT:
A SuDSO'ary o( Unon Pacific Corporation
INTER-OFFICE CORRESPONDENCE
CENTRAL SAFETy COMMITTEE R. A. Loveless
OFFtOfe-^&i. i&ty
DATP#r: TU7*/Fet>nuany 8, 1985
Ctn.tn.al Saiety Committee Meeting
jSAi Ft
ICON i. ,,
Tiit Centnal Saiety Commltttt mzt at 2:00 p.m. on January 24, 19 85.
Attendees: Abs entees:.
R. E. Schneck W. B. Duckwonth T. J. Gngunlch R. A. Loveless B. D. Routh
J. w. Bnyant W. G. Millen
D. A. Sadlen (W. 6. Mlllen) R. E. Stony J. H. Tans ey G. D. Whipple
I. Tht accldznt statistics ion. 19 84 went nevlewed. Conpus Chnlstl Rtilntny completed tht ytan with 18 nttondablt Inj units oi which
16 nesulted In lost time. In addition to thls 135 ilnst aid cases wtnt alio expenlenced dunlng tht ytan. Tht ntilntny com-
plzttd tht ytan with an Incldznt natz oi 2.4.
David Sadltn conducttd a dlicuiilon conctnnlng tht Investigation oi tht Gtnald Rtddlng accident which occunntd on Januany 16. . This accident took place at Tank 1002 and Involved a lacznatlon
to Mn. RtdcUng'i night hand when he txptnltnctd a iall on an Ice-covened plptnack. An Investigation was conducted as to the
cause and connective action will Involve posting oi saie access to all tank sample points. This connective action will be dis
cussed with all Labonatony pensonnel at next month's saiety
meetings.
A bnlei discussion conctnnlng the accident Involving Joe Hennandez took place. This Injuny nesulted In contusion to both knees when Mn. Hennandez slipped and iell on an Ice-covened ladden. A
detailed lost time Investigation will be conducted when Joe
netunns to wonk.
The lost time Injuny Involving Canlos Flones will be Investigated pnlon to the next Centnal Saiety Committee meeting. The Injuny
which occunntd on Januany 2 was the nesult oi a iall on an Icecovened ladden.
Mn. Schneck Inqulned as to the newly assigned openatlons pensonnel Into the Maintenance depantment and theln subsequent tnalnlng. Guy Whipple has conducted two meetings with all newly assigned pensonnel and has had much positive Impact concennlng theln saiety awaneness. Additional meetings will also be condi^t^.lfSJ^SInsune theln saie wonk pnactlces .
CH/W-000195
4 4 A9BS
1 safety & loss
'OMTPfil. HFrl.
Ze.ntA.at Safety Committee
FzbA.uaA.y 8, 19 85
~v
Bob Lovzlzii Kzvlzwzd the newly pA.opoizd Safety PzA.^oA.mancz Summary which will bz publlihzd on thz &lAit day o zvzAy month, and which will AzcoAd att pzAtlnznt safety itatlitla . One Azquzst wai made to Include thz o H-thz- job InjuAy itatlitla on a monthly baili.
II. {a} Thz Emplo yzAi IniuAance InjuAy i zttlzmenti &oa thz HaAAy PzAklni and Sam LongoAla caszi wzaz dlicuiizd. Both oi thziz caizi ozzu.KA.zd In mid 1984 and wzaz izttlzd duAlng thz month o VzzzmbzA.
(6) Thz MS M I nipzctlon R zpoAt wai a. zvlzwed and a dlscuiilon took plazz concerning all Azcommzndatloni. A AZipomz to Bill ChlldzAi o& thz CoApoAatz Sa^zty oi&lcz via* pA.zpaA.zd (tilth thz Input o all GznzAal SupeAlntzndznti and will bz iubmlttzd oa Ha. Schnzck'i ilgnatuAz.
(z) Thz KA.kwA.lght Boston BoIIza HachlnzAy 1 nipzctlon RzpoAt wai alio Azvlzwzd and a ilmllaA AZipome to Ft. WoAth ha bzzn pAzpaAzd by Juan FloAZi . Thli Aziponiz will bz pAovldzd to Ma.. Szhnzzk ioA. hii ilgnatuAz.
(d) A IzttzA. pAzpaAzd by BAack Pouth concerning "PztuA.n To
WoAk FAom JnjuAy oa Illnzan wa dlicuazd In Iti znX.lA.zty. GaAy Jaztzold will makz iomz coAAzctloni to thli letter and a dztzAmlnatlon zonzzAnlng dlitAlbutlon will alio bz madz.
(e) All mzmbzAi o& thz Commlttzz wzaz pAzienied with thz Aevlszd Hit &0A. zall-outi In thz zvznt o{ an zmergzncy. Thli compAzhznilve Hit will bz utilized by thz SecuAlty dzpaAtmznt In thz zvznt o an zmzAgzncy. Thz Hit wai appAoved by all mzrnben.
(i) A lettzA conczAnlng tAalnlng AzcoAdi, lauzd by Bill ChlldzAi In Ft. WoAth, wai alio Azvlzwzd. Thli coAAzipondznzz itA.ziizd thz ImpoA-tanzz o accuAatz AzcoAdkzeplng whzn ia&zty mzztlngi oaz zonduztzd. Bob Lovzlzii zmphailzzd thz iazt that ievzAal ia^zty mzztlng AzpoAti that had bzzn AeXuAnzd have lniu6filzlznt In&OAmatlon AegaAdlng thz dlizuiilon mattZA. It will bz neczaaAy oa. dzpaAtmznt iupzAlntzndenti to ImuAz that thziz AzpoAti aAz falllzd out In thzlA zntlAzty pAloA to dlitAlbutlon.
(g) Thz EmployzAi IniuAance Aaozlatlon'i ThlAd Qu.aA.tzA. SummaAy o{ InjuAy Coiti wai alio bAlz^ly dlizuiizd. Total compzmatlon paymenti thAough OctobzA 31, 1984 equalled $25, 000 In addition to $25, 123 which wai paid to HaAAy PzAklni [ $20,000) and Sam LongoAla [$5,123] baizd on thzlA. disability.
-2- CH/W-000196
Central sa^ezy commzzzee
Fe.bfiua.Jiy &, 1985
'"n
[h) The Fe.de.fiati.on Health S Saiety Committee fiepoat wcu reviewed and It wa& noted that all Item6 have been acted on and afie In the pfioce&6 oi being completed. It l& Important to note that Tank 918 l* to be taken out oi ienvlce and all Inlet llne& mill be blinded. It taai agfieed that the mlnute6 iaom the Health and Safety Committee villi be dlitfilbuted to all Centfial Safety Committee membefu.
111. Guy Whipple reviewed the Maintenance Safety Wofik OfidefU and the itatu6 thefieoi, and pfie&ented a copy oi the ll&t to each membeft.
The meeting adjourned at 3:40 p.m. The next meeting oi the Committee l& scheduled iofi Febfiuafiy 1 2, 1 985 at 2:00 p.m. In the Coniefience Room.
R. A. Lovelea
Vlitfilbutlon: Copies to:
R. E. Schneck 3. W. Bfiyant W. B. Vuckviofcth T. 3. Gfigufilch W. G. Mill ex R. E. Stofiy 3. H. Taniey G. V. Whipple
C. E. 8atike>i U. G. Ffiondofii W. H. HafUtlA T. G. McNeill R. V. Mylnafi V. W. ?etefU>on 0. D. Robl6on
V. A. Sadlefi G. W. Smith C. W. Thompson W. A. Thompson
-3-
CH/W-000197
e champlin
A Subsidiary ol Unon Pacrtc Corporation
HAWKINSOiM..,
TO: FROM:
INTER-OFFICE CORRESPONDENCE
MANAGEMENT SAFETY COMMITTEE R. A. Loveless
RETURN TG
OFFICE: Safety.........................
SAFETY & LC:-
DATE: DecemJ^]|lfo_ jL8,5
SUBJECT: Management Safety Committee Meeting
The Management Safety Committee met at 2:00 p.m. on December 10, 1985.
Attendees: Absentees:
R. E. Schneck J. R. Butts G. B. Jaetzold R. A. Loveless W. G. Miller C. J. Romero
J. E. Bolliger J. W. Bryant W. B. Duckworth
G. W. Smith R. E. Story J. H. Tansey P. E. Taylor W. A. Thompson
A. F. Uehlinger E. H. Winters
U. G. Frondorf T. J. Grgurich D. A. Sadler
I. The injury statistics for the month of November were reviewed with the Committee and a brief discussion ensued concerning the recordable accident involving a Maintenance employee.
Buddy Smith explained the incident which involved a pump mechanic who was injured while retrieving a pneumatic tail-hose from a portable scooter. The employee suffered a broken tooth but no lost time was experienced.
II. (a) The video tape which was recorded during the fire at the #1 Pump Pad on December 1, 1985, was shown to the group and explained in its entirety. A task force has been organized to
investigate this incident and develop recommendations to prevent re-occurrence. It was indicated that a contributory cause to this incident involved the storage of 55 gallon drums of flammable materials in the immediate area of the fire. Bob Loveless indicated that it is imperative that we limit this type of temporary storage throughout the refinery to lessen the
the severity of a fire should one ensue.
(b) The first phase.of the OSHA Hazard Communication Standard was implemented on November 25, 1985. This includes supplying
customers with Material Safety Data Sheets on our products. This function was performed by the Fort Worth Safety office and
data sheets have been provided to our location for distribution
upon request.
RECEIVED
DEC IS 1985
-1-
CH/W-000167
SAFETY A LOSS
CONTROL DEPT-- ^
Management Safety Committee * December 11, 1985 __^
II. (b) (Cont'd)
The Texas House Bill 1112, regarded as the Texas Hazard Communication Act, has been initially complied with by supplying to the State Health Commissioner an inventory list of hazardous materials. In addition, letters have been forwarded to the local fire districts concerning information relative to emergencies.
Employee training concerning the general nature of the OSHA Hazard Communication Standard and the State statute began in December with all hourly employees. This training exercise will continue into the second quarter of 1986. It was stressed that it is imperative that all employees attend these safety meeting presentations.
Correspondence from Fort Worth has indicated that the refinery's written Hazard Communication Program is to be submitted to their office no later than January 31, 1986 for approval. This program is being developed and will be reviewed with the Committee upon completion. Bob Loveless stressed that it is important that all area supervisors cooperate in obtaining information concerning hazardous materials inventories and MSDS's. Further progress will be reported concerning this Standard as items are completed.
(c) A video tape presentation was shown to the group concern ing a hazardous situation which presently exists in the PC Boiler area. The old lime treater which is utilized for the storage of steam condensate is in such a condition that repairs are essential for safe operation. The AFE which was submitted to correct this problem has been forwarded to Ft. Worth and should be approved in the- near future.
(d) A brief update was given concerning Maintenance Circles, Inc. safety performance. Year to date statistics indicate that their recordable incident rate is 9.0 with a total of 23 recordable injuries, 13 of which resulted in lost time.
(e) As most members are aware, the proposed Benzene Standard is presently being re-evaluated by OSHA. It was indicated that should this Standard be implemented as previously proposed, corrective actions would be necessary to insure compliance.
Bob Loveless mentioned that in order to insure proper orientation of contractors for the upcoming February and March turnarounds, that a representative from the Safety -department be invited to all turnaround meetings.
The meeting adjourned at 3:15 p.m.
Distribution: Attached
-2-
CH/W-000168
December 11, 1985
Distribution:
R. E. Schneck J. E. Bolliger j. W. Bryant j. R. Butts W. B. Duckworth U. G. Frondorf
T. J. Grgurich G. B. Jaetzold
T. G. McNeill W. G. Miller 0. D. Robison
C. J. Romero D. A. Sadler G. W. Smith R. E. Story J. H. Tansey P. E. Taylor W. A. Thompson A. F. Uehlinger G. D. Whipple
S. R. Wilson E. H. Winters
cH/W-000169 3-
INTER-OFFICE CORRESPONDENCE
TO: MANAGEMENT SAFETY COMMITTEE
FROM:
R- A. Loveless
SUBJECT: Management Safety Committee Meeting
DATEr"--November 14, 1985
SAFETY .
The Management Safety Committee met at 2:00 p.m. on November 12, 1985.
Attendees:
R. E. Schneck J. E. Bolliger J. W. Bryant W. B. Duckworth U. G. Frondorf T. J. Grgurich
G. B. Jaetzold R. A. Loveless W. G. Miller J. H. Tansey S. R. Wilson E. H. Winters
Absentees:
C. J. Romero D. A. Sadler <
R. E. Story P. E. Taylor
I. The accident statistics to date were reviewed with the Committee. The refinery experienced no OSHA recordable injuries during the month of October however experienced 13 first aid cases. This brings the year to date recordable injury total to 10, five of which resulted in lost time with an incident rate of 1.8. This rate compares to a national average of 2.85 for the petroleum refining industry.
II. (a) A brief critique was provided to the Committee concerning the recently completed turnarounds of the #2 FCC and Alkylation units. It was emphasized that the major problem which resulted was the lack of prior notification of work to be performed by subcontractors. Tftis resulted in an incomplete safety orienta tion being provided to these companies which in turn affected adherence to refinery safety regulations. Other items of interest concerning scaffolding, first aid coverage, training of fire and manway attendants, respiratory protection and coordination of vessel entry and hot work were also emphasized. It will be necessary on upcoming turnarounds that additional personnel be employed,through our primary service contractor,
to treat-minor injuries sustained by contract personn^.Q j y q
(b) The first phase of the newly adopted Hazard Communic^ion
Standard will become effective November 25, 1985, and KaljLo 1985
include container labeling and MSDS disbursement to customers. The Fort Worth office will coordinate the MSDS formula^4Bf &rf&SS provide copies to all customers. In addition, it has 8RPt DEPT, recommended by the Corporate Safety department that we imple
ment the NFPA 704 Container Labeling Guidelines for all refinery vessels and storage tanks. It will be necessary that Operations
personnel provide information to the Safety department relative
-1-
CH/W-000170
Management Safety Committee November 14, 1985 '~v
II. (b) (Cont'd)
to vessel contents so that accurate hazard determinations can be made. Subsequent to this evaluation it will be necessary to install proper labels on all vessels. Further information as to the progress of the refinery's Hazard Communication pro gram will be provided periodically to Committee members.
(c) Bob Loveless discussed the recent correspondence which he initiated concerning status of the Radioactive Material License. It was emphasized that it is imperative that all correspondence, inquiries, disposition of radioactive material and sources be reviewed by him prior to transmittal.
(d) The proposed safety incentive program for 1986 was presented to the Committee for their consideration. Several comments were suggested relative to the present program and further discussions will be conducted with superintendents to determine program direction for next year.
0? On November 18, 1985, the Terminal *department will achieve one (1) year without a lost time injury. This is a significant achievement and all department employees are to be congratulated. Award pre sentations will be conducted beginning on Tuesday, November 19th and conclude on Thursday, November 21st. All Management Safety Committee representatives were encouraged to attend each presentation.
Mr. Chuck Frisbie,with Marsh & McClennan Protection Consultants, has been in the refinery since Monday, November 11th, to conduct his annual insurance underwriters' inspection relative to fire protection facilities. Further discussions will ensue upon receipt of his report.
It was stressed that each department should resume safety meeting presentations considering the fact that the turnarounds have been com pleted .
A video tape was presented to the Committee re-enacting a "near miss" incident which occurred north of the 50 Block. The incident involved a 3* x 4* section of lightweight corrugated material which fell from the 50 Block incinerator stack narrowly missing an employee. Further discussions will take place with Maintenance and Operations personnel to determine proper repair procedures to stack insulating material.
The meeting adjourned at 4:15 p.m.
R. A. Loveless
CH/W-000171
Distribution:
R. E. Schneck J. E. Bolliger
J. W. Bryant W. B. Duckworth U. G. Frondorf T. J. Grgurich
G. B.Jaetzold T. G. McNeill W. G. Miller 0. D. Robison C. J. Romero D. A. Sadler
-2-
R. E. Story J. H. Tansey P. E. Taylor W. A. Thompson G. D. Whipple S. R. Wilson E. H. Winters
e champlin
A Subsidiary of Unon Pacific Corporation
INTER-OFFICE CORRESPONDENCE
TO: MANAGEMENT SAFETY COMMITTEE
OFFICE:
FROM:
R. A. Loveless
ATE:
}gr 1985
SUBJECT: Management Safety Committee Meeting
SAFETY & LOSS COMt.iOL DEPT.
The Management Safety Committee met at 2:00 p.m. on September 17, 1985.
Attendees:
R. E. Schneck W. B. Duckworth
0. G. Frondorf. T. J. Grgurich G. B. Jaetzold R. A. Loveless
W. G. Miller C. J. Romero D. A. Sadler R. E. Story P. E. Taylor E. H. Winters
Absentees:
J. E. Bolliger J. W. Bryant
I. The accident statistics for the month of August were reviewed which included a discussion of the recordable injury which occurred at the West Plant. This incident involved an operations employee who was riding a bicycle through a unit when he con tacted a valve stem which overturned the bicycle. The injury involved abrasions to the face and a fractured front tooth. All West Plant personnel were instructed in the proper use of bicycles during the monthly safety meetings.
Another significant incident occurred on August 28, 1985, in the Alky unit when an Inspection department employee received minor HF Acid burns while inspecting an exchanger. Several factors contributed to the incident, one of which being the lack of communication between operations personnel and maintenance employees when changes in the operation are necessary and another- being the lack of proper personal protective equipment in use. As a result of this incident, modifications were made . to the Class B protective suit which will in future include attached glove assemblies for the jacket.
Another incident which involved a contractor injury at the West Plant coker operation was also discussed briefly. This injury occurred during the coker deheading operation which takes place prior to the cutting cycle. The injury involved 1st and'2nd degree burns to the employee's foot which appeared to be minor at the time of the incident, however, required hospitalization shortly thereafter. Lack of personal protective equipment was the primary cause of the injury and as a result all contractors working in this area will be instructed in the pro protective clothing
-i- CH/W-000172 UP 131985
& LOS* DEfr.
wcuiayemeu u
September 19, 1985
IIJ (a)
Paul Taylor gave a status report concerning the West
Plant aeration basin. After further investigation it was
determined that it will be necessary to remove the existing
temporary platform and install a permanent one. This, coupled
with the proper sizing of the aerators, should alleviate the
problems of maintenance which are presently experienced.
George Prondorf will write a Work Order to make these modifica
tions .
(b) The Safety department completed HF Acid training for 50% of the operations employees in the Alkylation unit. Additional meetings will be conducted with Maintenance and other employees who would be affected by the recently adopted procedure changes. It was emphasized that it would be necessary to enforce these rules with all employees to reduce the possibility of injury.
(c) An Incident Report which was filed August 30, 1985, relative to an occurrence on August 29, 1985, was reviewed with the Committee. The incident took place when an unattended electric scooter, with a faulty solenoid, proceeded across the Machine Shop and contacted a workbench. There were no employees injured in the mishap, however it was stressed that it is necessary to turn off the ignition key and place the transmission in the "off" position to reduce the likelihood of unattended travel. Further, it has been noticed in recent weeks that employees are leaving refinery trucks with engines running while the vehicle is unattended. This practice has the potential of causing serious injury should the vehicle transmission fall into the reverse mode and proceed across an occupied area. Incidents similar to this have been experienced at other locations in recent years which made it necessary to establish a procedure
whereby forbidding unattended vehicles being left operating. A letter will be forthcoming from the Safety department emphasizing this policy.
(d) A brief discussion concerning the case status of present litigation took place so as to update all members as to the legal responsibilities of refinery employees.
(e) During the upcoming turnarounds safety coverage will be provided for the Alkylation unit, #2 FCC, Unibon Reactors, Scott Reactor and Tanks 140 & 141. Contract safety personnel will be employed to permit all hot work and vessel entry tasks in addition- to present Champlin staff overseeing these operations. It was emphasized that during the Alky unit turnaround it will be necessary that all employees in this area be required to wear Class B Alky suits during initial disconnecting operations. The Safety department will make the determination as to what point the transition to Class A suits can take place.
(f) The recent incidents in Bhopal and Institute, West Virginia, have made it necessary for industry to develop community awareness and emergency response plans. Champlin (Ft. Worth) is presently evaluating their position relative to this issue and will develop recommendations which the refineries
CH/W-000173
lUcL^iciy emeu u oai.eujr V'm'UUU* W WV
September 19, 1985
XI. (f)(cont'd) will implement. The present avenues of communication which exist with local civil authorities will be utilized to whatever extent possible - to accomplish prompt evacuation of surrounding communities should it be required. Additional response plans will be developed where necessary.
It was suggested that the Management Safety Committee meeting scheduled for October be cancelled,and the next meeting will take place on November 12, 1985, at 2:00 p.m.
The meeting adjourned at 3:00 p.m.
R. A. Loveless
Distribution:
R. E. Schneck J. E. Bolliger J. W. Bryant W. B. Duckworth U. G. Frondorf T. J. Grgurich G. B. Jaetzold T. G. McNeill W. G. Miller
O. D. Robison C. J. Romero D. A. Sadler R. E. Story J. H. Tansey P. E. Taylor W. A. Thompson G. D. Whipple E. H. Winters
CH/W-000174