Document b5Lk9D35aad426njoxk3gBBq1

Harnischfeger OVERHEAD CRANES BULLETIN C-7-3 INSTRUCTION MANUAL SCF-P&H-1550 Toth 00589 BULLETIN C-7-3 REVISED 11/79 Harniichfeger mM'Ch^ee.wscor.S'n 53246 Toth 00590 TABLE OF CONTENTS SECTION NUMBER I II IH IV SECTION TITLE DESCRIPTION . , General .......................... Description of Operation Purchased Components . Safety ............................ Warranty............. .. Terminology ....... PAGE 1-1 INSTALLATION General . ............... Match-Marking . . . Rumvay . .................. Mainline Conductors Erection ........ Initial Lubrication . , Installation Testing............................... Reeving ................................................ .. 2-1 2-5 2-7 SAFE PRACTICES .................................................................. General ................................. Safety Instructions Hand Signals ........................................................ 3-1 3-1 3-1 3-3 LUBRICATION ............................... .. ....................................... General............... ................................................................. Lubricant Specifications .................................................. Wire Rope Lubrication....................... ............................. .. Electric Motors ........................................................ .. Centralized Lubrication Systems . ................................... Collector Lubrication ........................................... .. 4-1 4-1 4-2 4-5 4-7 4-12 4-12 SECTION NUMBER V VI VII VIII SECTION TITLE PAGE CONTROL SYSTEMS............................................................... General ................................................................................. Protective Panels ............................................................... General......................................... .................................. Magnetic Overload Relays .................. .. AC Magnetic Control.................. .............. .. Description.......... .......................................... ............. Adjustment ............ ............ ....................................... .. DC Magnetic Control ............................... .. Description .................. .. Adjustment vj ........ ............................................ MAGNETORQUETControl................................... Description ............... Adjustment ...................... Control Components ......................... Contactors .................................... Interlocks............... Resistors ............................................................... Controllers ......................... Joy Stick Control Unit................................................... 5-1 5-1 5-1 5-1 5-2 5-4 5-4 5-7 5-8 5-8 5-9 5-10 5-10 5-11 5-13 5-13 5-17 5-18 5-19 5-22 BRIDGE DRIVE SYSTEM............................................................ 6-1 Introduction .................................................. Electric Motors..................................................................... Motor Brakes .................................................... Couplings ............................ ........................................*. MAGNETORQUE............................................. Gear Case .......................................................... Bridge Drive Wheels .............................................................. Collectors and Conductors , ........................................... 6_1 6-7 6-8 6-9 6-1 6,,7 6-8 6-8 TROLLEY DRIVE SYSTEM......................................................... 7_1 Description ................................................................. Electric Motor............................................................. .. , Motor Brakes . .............................................. Couplings . ............. , . . MAGNETORQUE..................................................... .. , , , Gear Case.......... ............................................................. Collectors and Conductors......................................... Trolley Drive Wheels .................................................... 7-1 ?-2 7-2 7,,g 7-2 7_2 7-3 7-2 HOIST SYSTEM ........................................................................... 8-1 General ............................................................... Electric Motor ........................................................................ 8-2 Motor Brakes Couplings ................................................... MAGNETORQUE.................................................. Gear Case and Load Brake ............................ Gear Case...................................................... Load Brake ........................................................................ 8-2 Hoist Limit Switches ................................................................. 8-4 Maintenance of Wire Rope ........................................ Cable Replacement ............................................ Inspection and Maintenance of Bottom Block Assemblies. 8-14 Magnet Cable Reels , .............................................................. 8,,14 8-1 8-2 8-2 8-2 8-2 8-2 8-7 8-9 f SECTION NUMBER SECTION TITLE PAGE IX MOTOR BRAKES....................... ............................................... 9-1 Introduction.................................................. 9-1 Electric Brakes..................................................... 9-1 Shoe Brake ......................................... *........................... 9-1 Disc Brake .................................................. 9-3 Hydraulic Brakes. . ............................................... 9-4 Shoe Brake .................................................................... 9-4 Disc Brake.................................................... 9-4 Electric-Hydraulic Brakes ................................................... 9-0 Shoe Brake ................................................................. 9-6 Disc Brake............................................. 9-6 Hydraulic System..................... .. . ............... . 9-7 General Maintenance .................................................... 9-7 Bleeding .............................................................. 9-8 Draining and Flushing ......................................... 9-9 Refilling.......... ......................................................... 9-9 Hydraulic System Components................................................ 9-10 General ............................................................... 9-10 Master Cylinders .............................................. 9-10 Wheel Cylinders................................................................ 9-12 Crossover Valve .......................... ................... *............ 9-13 Brake Rectifiers.................................................... 9-13 Introduction ............... . ........... . 9-13 Brake Rectifier Maintenance.......... .. 9-13 X GENERAL MAINTENANCE....................... .. 10-1 General Disassembly Instructions .......... .. 10-1 General Inspection and Repair Instructions, . .................. 10-1 General Reassembly Instructions .............................. .. 10-2 Preventive Maintenance . ................................................ 10-4 ia lit Toth 00593 I Toth 00594 DESCRIPTION SECTION I SECTION I DESCRIPTION GENERAL This manual describes the operation, adjustment, lubrication, and general maintenance necessary for the safe and efficient operation of electric overhead cranes. Because this manual will describe a large number of different crane components, it will in some cases be written in general terms. When explicit information not contained in this manual is required, consult the Harnischfeger Service Department. The maintenance of the various components will be described in five sections of this manual. They are: 1. Control Systems 3, Bridge Drive System 3. Trolley Drive System 4. Hoist System 0. Motor Brakes crane consists of three basic units, the bridge, trolley, and hoist, BRIDGE, The bridge is the main structural member used to span the width of the runway area. It travels the length of the runway on rails fastened to the run way. The trolley travels on rails fastened on the top of the bridge girders. TROLLEY. The trolley is a motor driven vehicle, which travels along the rails fastened to the bridge girders, and supports the hoist and trolley mech anism. HOIST, The hoist unit is an apparatus which exerts a force for lifting or lowering. It is power driven through a gear reducer and hoist drum. The bottom block is suspended from the hoist cable reeved be tween tiie upper block sheaves on the trolley struc ture, the bottom block sheaves, and dead ended at the hoist drum. A crane inspection report form has been included in the rear of this manual to aid in establishing a pre PURCHASED COMPONENTS ventive maintenance program. Written, dated and Signed inspection reports and records should be made Components which are not manufactured by P&H are On critical items such as crane hooks, chains, ropes not necessarily covered in this manual. Refer to the and slings. Reports should be kept where readily literature provided by the manufacturer of such available to appointed personnel. The inspector must equipment. be thoroughly familiar with the information contained in the latest edition of USAS B30.2.0, Safety Code for SAFETY Cranes, Derricks, and Hoist, published by the Ameri can Society of Mechanical Engineers. A separate section of this manual has been devoted DESCRIPTION OF OPERATION entirely to safe operating practices. It is most important that the operator read that section and be familiar with this manual before operating the crane, t GENERAL, The basic components of any overhead both for hts own protection and the protection Of crane are illustrated in Figure 1-1, Any overhead others. 1-1 Toth 00595 seen oh DESCRIPTION Figure 1-1. Overhead Crane WARRANTY The terms under which these cranes are guaranteed are clearly defined under the warranty which ac companies every P&H product. This warranty, while generous, will be voided if the crane is operated with loads in excess of the nameplate rating, under unsafe operating practices or conditions, or with accesso ries or attachments not designed or furnished and approved by the Harnischfeger Corporation. Modi fications made on the machine which affect safe op eration or capacity will void the warranty. TERMINOLOGY Certain terms are frequently used in this manual. For better understanding, several are defined below. See Figure 1-1. 1. BRIDGE, That part of a crane consisting of girders, end trucks, end ties, footwalks, and drive mechanism on Which the trolley or trolleys operate. 2. TROLLEY. The unit which travels on the bridge girder rails and carries the hoisting and trolley travel mechanism. 3. HOIST, An apparatus which is part of the crane, exerting a force for lifting or lowering a load. 4. RUNWAY, An assembly of rails, beams, girders, brackets, and framework on which the crane or trolley travels. 1-2 5. SPAN, The horizontal distance, center to center, of the runway rails. 6. END TRUCK. The unit consisting of a frame, wheels, bearings, and axles which support the bridge girders or trolleys. 7. LOAD. The total superimposed weight on the bottom block, 8. BOTTOM BLOCK. The assembly of hook, bear ing, sheaves, pins, swivel, and frame suspended by the hoisting ropes. 9. COUNTERTORQUE. A method of control by which the power to the motor is reversed to develop torque in the opposite direction, 10. DYNAMIC. A method of controlling crane motor speed when in the overhauling condition to provide a retarding force. 11. REGENERATIVE. A form of dynamic braking in which the electrical energy is fed back into the power system. The definitions in this section have been taken, in part, from the Safety Code for Cranes, Derricks, and Hoists (USAS B3O.2.0 - 1967). c I Toth 00596 installation SECTION II SECTION II INSTALLATION GENERAL Prior to erecting the crane, the building dimensions must be verified. The measurements must corre spond with those shown on the certified Clearance drawing and the crane must be erected with the same relationship to the building as shown on the drawing. It is recommended that the crane be inspected by a qualified P&H Service Department Representative prior to the initial operation of the crane. MATCH-MARKING Upon completion of shop testing, the crane is matchmarked and disassembled for shipment. Figure 2-1 illustrates an example of match-marking. The right front corner is designated as corner No. 1 and the numbers continue around the crane clockwise In se quence to the right rear corner, which is designated as corner No. 4. A match-mark number is stenciled on the crane and/or every part removed from the crane at the 2-1 Toth 00597 SECTION II point of disassembly. When two Or more cranes of the same type are shipped to the same job site, each crane is color coded in addition to match marking. All electrical terminals and wires are tagged to in sure proper reconnection. When match-marking is completed, the crane is dis assembled to the extent required for shipment, FigI'rcr ?. *! through 2-4 illustrate the extent to which typical cranes are disassembled for shipment. INSTALLATION RUNWAY GENERAL. For proper operation of a F&H crane, an adequate and properly aligned supporting struc ture must be provided. The runway dimensions must he verified with the certified clearance drawing. RAIL INSTALLATION, The runway rail adjacent to the mainline power conductors must be installed END TRUCK Figure 2-2. Disassembly - Typieal Small Industrial Type Crane 2-2 Toth 00598 installation first. The following procedure should be used when installing runway rails, 1, Align the rail sections on the center of the runway beam with a transit. On very short runways a chalk line can be used to align the rails. 2, Bolt or weld the rail section together. The rail joints must be tight and at the same elevation to pro vide a smooth running surface. For recommended welding procedures, consult the HarniscMeger Serv ice Department, 3. Fasten the rail to the runway beam, SECTION tl 4. Install the opposite runway rail in the same man ner as described in steps 1, 2, and 3, The distance between the runway rails must be within il/8 inch, center to center, in a straight line along the entire length of the runway. The runway elevation must be , equal and level within 1/4 inch in a straight line, along the entire length of the runway, as determined by transit measurements. REAR 1 Figure 2-3, Disassembly - Typical Large Industrial Type Craae 2-3 Toth 00599 INSTALLATION MAINLINE conductors The mainline conductors are current carrying con ductors used to provide electrical power to the crane as it moves along the runway. The horizontal and vertical alignment of the con ductors must he straight and true. The alignment must be made with respect to the runway rail and NOT the runway beam. ERECTION GENERAL, The crane must be assembled and in stalled in accordance with the erection drawings furnished and the match-marks on the crane. The crane must be erected with the same relationship to the building as shown in the drawings. BRIDGE. The bridge girders are fastened to the end truck or end ties with body bound bolts to maintain the "buiit-in" squareness of the crane. These bolts have machined shanks, which are closely fitted into precision reamed holes. If it is necessary to align the holes in the girder with the holes in the end truck or end tie, use a size-on-size barrel pin, CAUTION : DO NOT USE tapered drift pins, since these will offset the advantage gained by using body bound bolts. SECTION II tion. The tubing must rise slightly from the cab to the brake to prevent air from being trapped in the hydraulic line. Before operating the brake, it is necessary to: 1, Fill the master cylinder or reservoir, with hy draulic brake fluid of the required type. 2, Bleed the system, 3, Adjust the brake as required. Refer to SECTION EX, MOTOR BRAKES for proper bleeding and adjustment procedures. INITIAL LUBRICATION The crane is lubricated at the factory prior to ship ping, However, all grease fittings must be relubri cated before operating the crane, and all gear case oil levels must be checked. INSTALLATION TESTING GENERAL. The following tests must be done under three different conditions. They are: 1. Preliminary test 2. No-load test 3. Load test TROLLEY, Position the trolley on the bridge as shown on the erection drawings. COUPLINGS. When the crane is disassembled for shipment, some of the compression couplings may have been slid back from the end of the shaft for temporary storage during shipment. Refer to the erection drawings for the correct placement of the couplings and refer to SECTION VI, BRIDGE DRIVE SYSTEMS for the correct installation procedure. OPERATOR'S CAB. Attach the operator's cab to the crane structure, ELECTRICAL CONNECTIONS. The operator's cab is completely wired at the factory. All external conduits from the cab are fitted and removed for shipping. Electrical equipment that has been removed for shipping is marked with identification tags to assist in reconnection. Complete wiring diagrams are furnished with the crane and must be used to assure proper connection of the electrical equipment, HYDRAULIC CONNECTIONS, If hydraulic brakes are used, a line is installed from the master cylinder to the top of the operator's cab. A sufficient amount of tubing is furnished to make the connections from the cab to the wheel cylinder and reservoir. After the cab has been installed, complete the hydraulic connec- Prior to reeving the bottom block and applying power to the crane, check the following: 1. The material in tilts manual must be read and thoroughly understood, especially those portions con cerning proper assembly, alignment and adjustments. 2. Main line disconnect switch is in the OPEN posi tion. 3. Runway rail alignment for parallelism in span and vertical and horizontal line-up, 4. All lockwashers are in place and bolts are in proper location (especially bridge end ties) and se curely fastened. 5. Electrical connections for good contact and con formance with wiring diagram, 6. Overload relays are properly adjusted and where required dash pots filled to proper oil level. 1, Bridge conductor system for line-up with top and centerline of bridge rail. 8. Bridge collector staff for secureness, collector line-up and contact with conductor system. 9. Runway conductor system for line-up with top and /fenterline of rumvay rail. Toth 00601 SECTION II INSTALLATION 10. Runway collector staff for secureness, collector line-up and contact with conductor system. 11. All brakes (electric and hydraulic) for adjust ment, tight hydraulic line connections and bleeding Of system. 12. Limit switch manually for free operation, 13. All lubrication and oil levels for sufficient lubri cant. Id, All guards are in place and securely fastened, coupling, bridge and trolley rail guards, etc. 15. Power supply in conformance with crane speci fication as ordered. - PRE-TEST PRECAUTIONS. The main line discon nect switch on the crane shall remain open. Before starting the tests remove all loose objects which could fall and cause injury to personnel or damage to equipment. Open all power and control circuit mas ter' switches on each motion control panel. Place all controllers in the neutral or OFF position. PRELIMINARY TEST. The preliminary test is done without the bottom block reeved. Test the hoist mo tion as follows: 1. Close main line disconnect switch on the crane. 2. Close Control circuit switch on hoist control panel, NOTE The plugging and accelerating relays on an AC powered crane must be blocked so that the normally open contacts are closed in or der to check contactor sequence, 3. Operate heist controller in both directions and observe that control panel components function in agreement with wiring diagram sequence. 4. Return controller to neutral position and close main power switch on hoist control panel. 5. Operate hoist controller in both directions for a period of time just sufficient to observe and verify that motion occurs, that direction of rotation is cor rect and speed control is available, rf direction of rotation is reversed, reverse in accordance with the instructions in SECTION VI, BRIDGE DRIVE SYS TEMS. Test the trolley motion as follows: 1 : CAUTION - When propelling the trolley or bridge, watch for interference along the travel distance in cluding overhead obstructions. 2-6 1. Close control circuit switch on trolley control panel, 2. Operate trolley controller in both directions and observe that control panel components function ill agreement with wiring diagram sequence. 3. Return controller to neutral position and close the power switch on trolley control panel. 4, Operate trolley controller in botli directions for a period of time just sufficient to observe and verify that motion occurs, that direction of travel is correct and speed control is available. If direction of travel is reversed, reverse motor rotation in accordance with the Instructions in SECTION VI, BRIDGE DRIVE SYSTEMS. 5. Open control circuit switch on trolley control panel. The procedure for testing the bridge motion is the same as described above for the trolley motion. NO-LOAD TEST. Before proceeding with the no load test, reeve the bottom block in accordance with the reeving diagram furnished with the crane erec tion drawings. Figures 2-6 through 2-18 illustrate typical reeving arrangements used on P&H overhead cranes. Test the hoist motion as follows: 1. Close the main power and control circuit switches on the hoist control panel. 2. Raise the bottom block to a point approximately two feet from the limit switch reset counterweight and stop the bottom block. 3. Test the hoist limit switch for proper operation as follows: A, Check to see that the hoist limit switch reset counterweight is at the bottom of its travel and is free to move. B, Using extreme care, slowly "inch" the bottom block into contact with the limit switch reset counterweight. C, Again using extreme care, inch the bottom block upward a distance not to exceed 4 inches for the Type DB limit switch, or 8 inches for the Type HB limit switch. The limit switch must open somewhere within these tolerances. D, If the limit switch fails to stop the bottom block within these tolerances after making contact with the limit switch reset counterweight, check the wiring diagram for the possible cause. Find and correct the defect. Toth 00602 INSTALLATION WARNING^ Open the main power supply knife switch and lock it in the open position before examining the components of the limit switch circuit. 4, Repeat operations 1 through 3 until the malfunc tioning is corrected and positive limit switch opera tion is obtained. 5. Check the upper and lower limits of travel when a geared limit switch is used. The lower limit should be set so that the LOWER circuit is opened when two wraps of wire rope remain on the drum. The upper limit should be set so that the RAISE circuit is opened when the bottom block reaches the upper limit of the lift dimension shown on the certified clearance drawing. The procedure for adjusting the geared limit switch is described in SECTION VIII. WARNING Sufficient clearance must be allowed to pro vide for a few inches of drift after the RAISE circuit is opened by the limit switch. 6. Operate the hoist several times, raising and low ering the bottom block, and observe speed control, motor brake, and limit switch operation. 7. Check all other hoist safety devices for proper and safe operation. Test the trolley motion as follows: } CAUTION When propelling the trolley or bridge, watch for obstructions, including overhead obstruc tions, and be prepared to stop short of them. 1. Operate the trolley across the full length of the bridge in both directions several times, observing speed control and motor brake operation. 2, Check all other trolley safety devices for proper and safe operation. The procedure for testing the bridge motion is the same as described above for the trolley motion. LOAD TEST. Prior to Initial use, all new cranes must be tested by or under the direction of an ap pointed or authorized person and a written report must be furnished by such person(s), confirming that the crane is capable of handling rated load. The rated load should not be more than 80 per cent of the maximum load sustained during the test. The test loads shall not be more than 125 per cent of the crane rating. All load movements during the test shall be Initiated, supervised by, and the responsi bility of the appointed person. The test load shall be a weighted or known load, as near as possible to 125 per cent of crane rating, but not exceeding 125 per cent of rating, SECTION H The procedure for the load test is as follows: 1, Have an experienced, competent crane operator at the control when conducting the load test. 2, See that the master switches and/or controllers for all motions are in the neutral position, 3, Close the main power and control circuit switches on the crane for all motions. 4. Hitch the test load to the bottom block. 5. Before lifting the load, the hook must be brought over the load for a straight vertical lift so the load will not swing when lifted. 6. The appointed person directing the lift shall see that the load is well secured and properly balanced in the sling or lifting device, and that the crane is operating in a clear, unobstructed area. 7. Raise the load a few inches and stop the motion to check the stopping and holding ability of the hoist brakes. 8. Cheek the operation of all motions, and observe the operation of the limit switch(es), control sys tem, brakes, etc. REEVING Figures 2-6 through 2-18 Illustrate typical, doublereeving arrangements used on overhead cranes. Other reeving arrangements can also be achieved, by following the general patterns shown in Figures 2-6 through 2-18. For special applications, reeving in formation should be obtained from the Harnischfeger Sales or Service Office in your area. NOTE Single-reeving may be used on some lightduty cranes. If 2 or 4 part single-reeving is specified, it may be necessary to put 2 to 4 reverse twists in the wire rope to keep the bottom block straight. Figure 2-5 Illustrates the correct method of attach ing the wire rope end to the hoist drum. Figure 2-5, Attaching Wire Rope to Drum 2-7 Toth 00603 SECTION II IHSrALLATlOH Toth 00604 SCT'ON Toth 00605 SECTION II INSTALLATION Figure 2-14, 4 Part Cross Reeving Figure 2-17. 12 Part Cross Reeving Figure 2-15, 8 Part Cross Reeving Figure 2-18. 16 Part Cross Reeving Figure 2-16. 8 Part Conventional Reeving 2-10 NOTE For 8 part reeving when all sheaves In the bottom block are the same diameter, refer to Figure 2-16, For 8 part reeving when two in side sheaves in the bottom block are larger diameter than two outside sheaves in the bot tom block, refer to Figure 2-9, Toth 00606 SECTION III SECTION III SATE PRACTICES t- GENERAL The use of cranes is subject to hazards that can only be met by the exercise of intelligence, care, and common sense. It is therefore essential to have competent and careful operators, physically and mentally fit, thoroughly trained for safe operation of the equipment, and the handling of loads. All of the situations described in this section have at one time or another, contributed to unnecessary ac cidents. The operator of the crane is urged to care fully read this section and to avoid the hazardous operating conditions described herein. It is impos sible to foresee alt such conditions, and it must re main the responsibility of the operator to anticipate and avoid 'any unsafe conditions not covered in detail in this manual. No machine is entirely safe unless it is properly maintained. Therefore, it becomes important to practice a program of periodic inspection and pre ventive maintenance. The information in this manual outlines such a program. WARNING Never depend on the brakes to suspend the load aloft, unless the operator is at the con trols, alert, and in a position of readiness to handle the load. SAFETY INSTRUCTIONS i. It is assumed that personnel assigned to operate overhead and gantry cranes of the size, complexity, and cost represented by these cranes are competent and experienced in their work, it is recommended that all operators and their supervisors be familiar with the safety, inspection, and maintenance provi sions of USAS B30.2.0, latest edition, published by the American Society of Mechanical Engineers at 345 East 47i Street, New York, N.Y., 10017. 2. All controls and safety devices shall be tested by the operator at the start of a shift. Any discrepan cies shall be reported to the supervisor. Controls or devices not operating properly shall be adjusted, repaired, or replaced before the crane is operated. Check for the proper operation of all limit switches at the start of a shift. WARNING^ The upper limit switch is a safety device rather than an operating control and shall not be unnecessarily actuated during normal op eration of the crane. 3. Check the bell or warning device at the start of a shift. 4. Load shall be well secured and properly balanced before being raised or lowered, 5. Chains, ropes, and slings used for lifting must be continually inspected for damage or wear that could make them unsafe for use. 6. The hoist lines must be vertical before starting a lift. 7. Avoid sudden starts and stops of all crane motion, 3-1 Toth 00607 SECTION IH SAFE PRACTICES HOJ5T. With forearm vertical, forefinger pointing up( move hand in j/rall horizontal circle* LOWER. With orrr extendi downward, Forefinger pointing down, move hand in small horizontal circle &&fDG TRAVEL. Arm extended forward, hand open and slightly raised, make pushing motion in direction of travel. TROLLEY TRAVEL. Palm op, fingers dosed, thumb pointing in direction of motion, jerk hand horizontally. STOP. Aim extended, palm down, hold posi tion rigidly. EMERGENCY STOP. Arm extended, pairs dawn, move hand rapidly right and left. MULTIPLE TROLLEYS. Hold up one finger for block modted w1n and two fingers for block morked "Zl`. Regular signals follow. 3-2 MOVE SLOWLY. Use one hand to give any motion signal and place other hand motionless in front of bond giving the motion signal. ( Hoist Slowly shown os example) MAGNET fS DISCONNECTED. Crone eperoter spreodi both hands apod TM palm up. K33 Figure 3-1. Standard Hand Signals Toth 00608 safe practices section 111 8, Start a lilt only upon receipt of a proper signal from the person Who is directing the lift, or an ap pointed signalman. However, the operator must obey a stop signal at all times no matter who gives it. v g. Loads shall never pass over the heads of workmen or other personnel, or any way endanger their safety. 10. A warning device shall be sounded' each time be fore traveling, and intermittently during travel, es pecially when approaching floor personnel. 11. Caution shall be exercised to insure that the load does not contact or catch on any obstructions when traveling or lifting, 12. No one shall ride the load, hook, or other lifting devices, or be on the crane while it is in operation, 13. The load shall not be lowered beyond a point where less than two wraps of wire rope remain on the drum, and never below floor level. 14. Know the rated capacity of the crane and do not exceed this capacity, except for test purposes under properly supervised conditions. 15. Whenever a load which approaches the rated ca pacity of the crane is lifted, raise the load a few inches, return master switch and/or controller to OFF position and cheek to insure the ability of the brake to hold the load suspended. 16. Before leaving the control station of a crane, the operator shall lower the load to the floor. ^arningJ The operator shall not leave his position at the controls while a load is suspended. If. An operator's attention to the load and work area shall not be diverted while operating the crane. 18, Wire rope should be visually inspected, daily, for broken wires, excessive wear, stretch, kinking, or twisting. Details of such an inspection are given in SECTION VIII, HOIST SYSTEM. 19. When two or more cranes are used simultane ously to handle a load, an appointed signalman shall direct the operation. 20. If it is necessary to use one crane to push an other, carefully inch the crane to engage the second crane, and proceed to push at a slow rate of travel. 21. If the power supply is interrupted during opera tion of a crane, the operator shall immediately place all controllers in the OFF position. 22. If the crane is used for outdoor operation, it Shall be locked in a secure "home" position, prior to leaving the crane, to prevent it from being moved by wind force. 23. Before mechanical or electrical adjustments or repairs are started, all controllers shall be in the OFF position. Main and emergency switches shall be opened with one of them being locked open. Warning signs shall be placed on these switches and later removed only by the person who placed them there. Operators of other cranes on the same run way shall be alerted to prevent danger to the men working on the crane. 24. When a lifting magnet is being connected, dis connected, or repaired, the workman on the ground who is actually performing the work shall signal the crane operator to open the magnet safety switch until work is completed. 25. Iteplace all protective guards before operating the crane, 26. At least annually, the crane hook should be in spected for cracks by the magnetic particle or other suitable crack testing inspection method, to deter mine that no cracks are discernible. A hook that is cracked shall be replaced immediately. A hook that is bent so that the throat opening is increased by more than 15% in excess of normal, or is twisted more than ten degrees shall be replaced. 27. Operators shall be familiar with the operation of fire extinguishers, when provided, HAND SIGNALS If signals are given from toe floor to the crane op erator by hand, they must be in accordance with those shown in Figure 3-1. 3-3 Toth 00609 Toth 00610 lubrication H SECTION IV LUBRICATION SECTION IV GENERAL To insure proper operation of tills machine, all points requiring lubrication must be serviced with the correct lubricant, at the proper time interval. Nor mal wear points which require lubrication are shown in Figures 4-2 through 4-5. The intervals between lubrication and the type of lubricant to be used are also shown in the illustrations. All of the various arrangements of gear cases, truck assemblies and so forth are not shown, but the general outline for the proper lubrication will apply to any crane regardless of the type or arrangement of components. facturer's instructions take precedence over lubri cation recommendations in this manual, if a conflict exists. The following points must be kept in mind when lu bricating the machine. 1. Do not allow oil or grease to come in contact with brake shoes or wheel. Points not considered to be normal wear points (levers, linkages, pins, and so forth) should be lubri cated with an oil can once a week. Apply a few drops of motor oil to each exposed pin or lever not equipped with grease fittings to prevent rusting and to provide the limited lubrication required. The lubrication intervals recommended in this manual are based on one eight hour shift operation of the ma chine, five days per week. Where more than one shift operates the machine, lubrication schedules should be adjusted accordingly. Refer to the manufacturer's manual furnished with each machine for information concerning lubrication instructions for purchased equipment. The manu 2. Wipe up any spilled or overflowed lubricants. 3. Do not overfill gear cases. They are not intended to retain lubricants when filled beyond the maximum indicated oil levels. Use the dipstick, visual oil level indicator or oil level pipe to maintain the pro per oil level in the gear case. 4. Before and after applying grease to the grease fittings, wipe the fitting clean to prevent an accumu lation of dirt which could be forced in the part being lubricated. 5. Be sure the lubricants are not contaminated before using them. 4-1 Toth 00611 SECTION IV LUBRICATION LUBRICANT SPECIFICATIONS The following list identifies lubricants suitable for use on the machine by tliree methods. These methods are as follows: r wwwyiwi I CAUTION The multipurpose grease (MPG) used for ini tial lubrication at the factory Is a soap base, 12-Hydroxy Lithium Stearate type. Other soap base greases are not always compatible with this type of grease. Barium base grease is definitely not compatible. Another soap base grease may be used if experience has proven that the substitute grease is acceptable for the particular application. Before switching to any other type of grease, however, the grease systems must be thoroughly purged of the original type of grease and the affected parts must be removed and cleaned. 1, By P&H Specification Number. This specification number identifies the initial fill lubricantas classified by internal Harnlschfeger Corporation Standards, 2, By Military Specification Number. If a Military Specification Number exists for a lubricant that cor responds to the P&H Number in the same line, the Military Specification Number is entered. NOTE The absence Of a Military Specification Number does not necessarily mean that the lubricant does not meet a Military Specification, It may mean, for instance, that the lubricant has not been tested and qualified by the military be cause it is relatively new. For that reason, it is not certified as meeting the standards of a particular Military Specification, even though it may be capable of doing so. 3, By Equivalent Lubricant. Equivalent lubricants presently confirmed as meeting the requirements of the P&H specification are listed by manufacturer and trade names. It should be noted that omission of a h ade name from the list does not signify disapproval of that particular lubricant. It merely means that, as of the date of this writing, the lubricant has not been tested by P&H, Also, no superiority of a brand of lubricant is to be inferred from the order of appear ance on a list. Each list is alphabetical and all prod ucts listed are equally acceptable, HEAVY DUTY MOTOR OIL INTENDED USE: Lubricating hand-oiled items such as pins, levers and linkages. Also used as gear lube hi magnetic cable reel drive gearcase, on cranes so equipped. P&H SYMBOL SPEC. NO. AMBIENT RANGE military SPEC, NO. EQUIVALENT LUBRICANTS SAE GRADE MANUFACTURER MO 451A -40F to `i50F M1L-L-2104B Conoco Tracon SAE 10W Continental Oil (or latest Company issue in effect) Encolube HDX II Exxon MO 4-2 45IC Delvac 1200 Series Rotella T Oils TBD Mil B Motor Oil Ursa Oils Extra Duty Super Tenol It Mobil Oil Corporation 11 Shell Oil Company tr Sun Oil Co. - DX Division ii Texaco, Inc, tr Sinclair Refining Company Amoco 200 Motor Oils It Amoco +10F to +100F MIL-L-2104B (or latest issue in effect) NOTE: Equivalent lubricants and manufacturers are the same as for P&H Spec, 451A Motor Oil as described above. The only difference, insofar as this description is concerned, is that P&H Specification 451C ip an SAE 30 grade oil. Toth 00612 [RtCATION SEMI-FLUID GREASE 'INTENDED USE: Vertical trolley gear eases not equipped with lube pumps. P&H SYMBOL SPEC, NO. AMBIENT RANGE MILITARY EQUIVALENT SPEC. NO. LUBRICANTS SFG 460 . 0F to 20CF Mobiles EP-023 SECTION IV SAE GRADE --- MANUFACTURER Mobil Oil Corporation OPEN GEAR AND WIRE ROPE LUBRICANT INTENDED USE: Brushed or sprayed onto open gears and racks. Wire rope lubrication, in heated condition. P&H SYMBOL SPEC, NO. OL < 464 AMBIENT RANGE All MILITARY SPEC, NO. W-L-7S1 equivalent LUBRICANTS Amovis Lubri cant and Amoco Open Gear Comp'd. SAE GRADE MANUFACTURER Amoco L________ .... Type 1 - Richcote Lu- Atlantic Richfield Regular bricant, Jet Company Lubricants Grade 1 *- ''Sinclair'', Light and Atlantic- Lubricants 36 Grade 1 - thru 40 Medium Coglube * Continental Oil Grade 3 - Company Heavy Surett * Exxon MIL-L-43914 Grade 1 Mobiltac * Mobil Oil Corporation Cardium EP Comp'ds & Fluids * Shell Oil Company Crater 2X Union Gearsliield Liquid Gear Composition * Texaco, Inc. Union Oil Company of Calif, - Union 76 Division * Whitmore Mfg. Co, ^Consult lubricant manufacturer for proper viscosity grade, which will depend on application and climate. 4-3 Toth 00613 SECTION IV LUBRICATION MULTIPURPOSE GR.EASE INTENDED USE: Shaft couplings and bearings, wheel bearings, some motor bearings, and other points equipped with grease fittings, P&H SYMBOL SPEC* NO, AMBIENT RANGE MILITARY SPEC. NO. EQUIVALENT LUBRICANTS MANUFACTURER MPG 472A Below -10F (NLGI *0 EP) MIL-G-10924 MIL-G-23827 MIL-G-81827 Litholine Industrial 0 EP "Sinclair" Atlantic Richfield Oil Co. Conolith EP #0 Continental Oil Company Rolubricant 0 Humble Oil and Refining Company Mobilux EP #0 Mobil Oil Corporation Alvania EPRO Shell Oil Company Prestige EP SO Sun Oil Co. - DX Division Multifak EP i0 Texaco, Incorporated MPG 472B *-20 to +40F See above (NLGI P. EP) Amolith No. 1 EP American Oil Company Litholine Industrial 1 EP "Sinclair'' Atlantic Richfield Company Conolith EP #1 Continental Oil Company Rolubricant 1 Humble Oil and Refining Company Mobilux EP #1 Mobil Oil Company Alvania E P #1 Shell Oil Company Prestige EP W1 Multifak EP HI Sun Oil Co. * DX Division Texaco, Incorporated MPG 472 C *+20 to 125F See above (NLGI HZ E P) Amolith No. 2 EP American Oil Company Litholine EP Moly "Sinclair" Atlantic Richfield Oil Co. Conolith EP #2 Continental Oil Company Rolubricant 2 Humble Oil and Refining Company Mobilux EP #2 Mobil Oil Corporation' Alvania EP #2 Shell Oil Company All Purpose ep n Sun Oil Company Multifak EP #2 Texaco, Incorporated *PumpabiIity tests also required when used in centralized lubrication systems. Consult manufacturer of system. 4-4 Toth 00614 BRI CATION SECTION IV HIGH TEMPERATURE GREASE NDED USE: This is a special grease which shows high thermal stability and resistance to shock loading and adverse chemical environmental conditions. It is used as a replacement Jtor P&H 472 MPG when reversing service, long life, or high temperature operation demands this premium lubricant. P&H SYMBOL SPEC, NO, AMBIENT RANGE MILITARY EQUIVALENT SPEC,<NO. ,, LUBRICANTS MANUFACTURER HTG 476 (working temperature range) 0F to +450 Not available Shell Darina No, 2 E.P. Shell Oil Company ; Note: The above lubricant is the only one currently approved as meeting P&H Specification No. 476. It is ; Shell Oil Code Number 71622. PETROLEUM GEAR OIL * INTENDED USE: All trolley gearcases equipped with lube pumps and all bridge and hoist gearcases, within v temperature range indicated. Note: Conforms to AGMA J?5, P&H |: SYMBOL SPEC. NO. AMBIENT RANGE MILITARY SPEC. NO. EQUIVALENT LUBRICANTS MANUFACTURER ' GO 486 +40F to +125P American Industrial Oil 96 American Oil Company Duro Oil S-1000 Atlantic Richfield Company Si" Dectol R&O Lubricating Oil, Grade 92 Nato 220 Vactra Oil BB Hydraulic Oil, 3220 Sunvis 999 Regal R & O 220 Union UNA x 1000 Continental Oil Company Exxon USA Mobil Oil Corporation Shell Oil Company Sun Oil Company > DX Division Texaco, Incorporated Union Oil Company of CaliforniaUnion 76 Division 4-5 Toth 00615 SECTION IV t-UBRICATlOH hydraulic brake fluid INTENDED USE: Intended for use in manual hydraulic brake systems. DO NOT USE IN POWER ASSIST SYSTEMS.__________________________________________________ P&H SYMBOL SPEC. NO. AMBIENT RANGE MILITARY SPEC, NO. EQUIVALENT LUBRICANTS manufacturer HBF 492 All VV-B-680 2 IB Brake Wagner Electric Corporation (latest Fluid Formula issue) H-68 UCON Brake Fluid 4823 Union Carbide Corporation, SYNTHETIC GEAR OIL - ARCTIC SERVICE INTENDED USE: Substitute for Petroleum Gear Oil (GO-P&tl Spec.' 486) in ambient temperatures lower tnan +20F. SYMBOL P&H SPEC. NO. MILITARY SPEC. NO. EQUIVALENT LUBRICANTS MANUFACTURER GOA 474 MIL-L-2105B Polar Start DN-600 Continental Oil Company Mobilube SNC Gear Oil Mobil Oil Corporation WIRE ROPE LUBRICATION Each time a rope bends over a sheave or straightens from a slack position, many strands move or slide against each other. Lubrication is a necessity to prevent wear as a re sult of movement. An equally important reason for correct lubrication is to prevent corrosion of wires and deterioration of the fibre core. 4-6 No set rule can be given concerning the frequency of lubrication. This will depend on the conditions to which the rope is subjected. The severity Of the duty and the amount of corrosive elements to which the rope is subjected will have to serve as an index in determining the need for relubrication. An open gear and wire rope lubricant (GL)conforming to P&H specification 464 is recommended for use as wire rope lubricant. All wire rope lubricants must have tiie following general qualities: 1. They should contain no acids or alkalies. Toth 00616 |t|pThey should have sufficient adhesive strength to jpjgl|iay on the rope. .IpfiLThey should be able to penetrate between the Y/ii'es and strands. They should be insoluble under the conditions of ^^^pplicatlon, , . .. ^-'5, 'They should have high film strength. ^tiKThey should resist oxidation, fHs& Correct methods should be used in applying the lu- ^Bbicant. Wire ropes that have been in service should Rlytays be cleaned thoroughly before they are relub,.||r|feated. Use wire brashes, scrapers, or compressed Jllpr to clean the rope. All possible foreign material ggjaind old lubricant should be removed from the valleys ^Bbetween the strands and the spaces between the outer IggjjiSijihe lubricant should be thin enough to penetrate the ,,Jgg|srands to the core, but not so thin that it will run off :T-V;; the rope, It must not he so thick that it merely coats SECTION IV the outside of the rope. The best lubricant is a fairly thick, semi-plastic type, which is applied hot, in a thinned condition. This type of lubricant will penetrate while hot and cool off to form a plastic fil ler and coating, which will then resist the penetration of water. Three methods of applying lubricant to wire rope are illustrated in Figure 4-1, Each has its advantages, and no single method is recommended in preference to the other. The most convenient method should be used, whenever necessary. ELECTRIC MOTORS Complete lubrication instructions are provided in the ED Bulletins covering the electric motors. Refer to Bulletin ED-6 for AC wound-rotor motors, to Bulletin ED-7 for DC motors, and to Bulletin ED-11 for AC squirrel-cage motors. ills- p-' - teV hi IBlP ills iH Iii8 LUBRICANT SPLIT BOX METHOD SPLIT BOX METHOD-funne! shaped box lifted with burlap or wiper at outlet end. BURLAP WRAPPER POUR-OH METHOD THE POUR-ON METHOD-oil should be hoi, yet adhesive. Always hold the wiping swab behind the sheave. BATH METHOD BATH METHDD-for applying heavierbodied lubricant at hi$i temperature. Gas burners or steam heat may be used to maintain temperature of lubricant. Rope should run through slowly. Figure 4-1. Lubricating Wire Rope 4-7 Toth 00617 Toth 00618 [' BRIDGE DRIVE WHEEL USE OIL CAN TO APPLY SEVERAL DROPS OF OIL WEEKLY TO ALLPINS AND LEVERS NOT EQUIPPED WITH GREASE FITTINGS. Figure 4-2. Lubrication Chart (Typical Bridge) CRAIN OIL LEVEL BRIDGE DRIVE END GEAR CASE . .' ' - -' 1^-1 . . . ............. , >, .1 ,.. . >. ....... . ........ ,,.I. ............ ...................................... , .. ........................... ',. ............... --................<............ Uc........ v ..?, *. Figure 4-3. Lubrication Chart (Typical Bridge) Toth 00619 GO OR GOA main and refill EVERY 5 MONTHS DRAIN AND REFILL EVERY 6 MONTHS GO OR GOA BREATHER OIL LEVEL MO EVERY THREE MONTHS (EXCEPT TYPE "SB" BRAKES) MikAL. SECTION IV REMOVE ROTH PLUGS. AOD UNTIL CLEAN LUBRICANT APPEARS AT OPPOSITE HOLE. FLEXIBLE COUPLING SHEAVES eveny 3 months MPG MPG EVERY 3 MONTHS REMOVE BOTH PLUGS. ADD UNTIL CLEAN LUBRICANT APPEARS AT OPPOSITE HOLE. SEMI-FLEXIBLE COUPLING SHIELDED BEARING REPACK EVERT 6 MONTHS MPG IMPORTANT: TO INSURE THAT THE FACES OF THE SHEAVE HUBS SET LUBRICATED, PHY THE SHEAVES APART, IN PAIRS, AND OBSERVE FOR GREASE COMING UP BETWEEN THE SHEAVE HUBS AS IT IS PUMPED INTO THE FITTING. UNLESS THIS IS DONE, THE HUBSIDE SURFACES i BOTTOM BLOCK WILL WEAR RAPIDLY AND THE RESULTING METAL FILINGS CAN CAUSE BEARING FAILURE. --------------- \ mmm MPG EVERT 3 MONTHS REMOVE BOTH PLUGS! ADD UNTIL CLEAN LUBRICANT APPEARS AT OPPOSITE HOLE, FLEXIBLE COUPLING PEDESTAL BEARING USE OIL CAN TO APPLY- SEVERAL DROPS OF OIL WEEKLY TO ALLPINS AND LEVERS NOT EQUIPPED WITH GREASE FITTINGS. Figure 4-5. Lubrication Chart 4-11 Toth 00621 SECTION IV CENTRALIZED LUBRICATION SYSTEMS Cranes equipped with Centralized Lubrication Sys tems should use Multipurpose Grease (MPG), NLGI #1, For outdoor operation in low ambient tempera tures, NLGI #0 should be used instead of NLGI #1, Refer to the manufacturer's instructions furnished for the operation and maintenance of the system. lubrication COLLECTOR LUBRICATION All hinge points of collectors should be lubricated as required, with a few drops of oil (MO) to insure free movement. NOTE ' Do not lubricate hinge points of collectors if atmospheric conditions are such that dirt will build-up on the oil and affect the move ment of the collectors. 4-12 Toth 00622 SECTION V SECTION V CONTROL SYSTEMS iji!fcENERAL jA .This section covers the theory of operation, main'^"stenance, and adjustment of a number of different giwvisj-.ir- itypes of control systems. Because of the many dif'tav- . 'ferent combinations of a basic type of control, the ' doacriptions will be general without references to /.,any particular applications,............ jjv^^~'The power supply must be in accordance with the :|S|^o^rane specifications as ordered. If the crane is op* p&psAfdfated on a power supply other than that specified, serious damage could result to the electrical equipT >hient. motor circuit. Figure 5-1 illustrates a typical AC protective panel and Figure 5-2 illustrates a typical DC protective panel. All the equipment is mounted in a heavy gage sheet steel enclosure. The enclosure has hinged doors that are interlocked with the main disconnect knife switch so that the door cannot be open unless the switch is in the OFF or OPEN position....This same.. interlock prevents the switch from being closed Until the doors are closed. OVERLOAD RELAYS MAIN DISCONNECT KNIFE SWITCH PROTECTIVE PANELS The crane protective panels, when used, include all .^disconnect and overload devices, which include the v main disconnect knife switch (with provisions for ex ternal operation), main contactor, overload relays for each motor circuit, and control circuit fuses. /When a manual' type control with a control circuit ,. limit switch is used, the reversing and limit switch /contactors are included on the panel. l On direct current protective panels an inverse time overload relay is supplied for each motor circuit, /.and an Instantaneous trip overload relay in the com* simon line. /./On alternating current crane protective panels, two . inverse time overload relays are supplied for each MAIN CONTACTOR CONTROL FUSES Figure 5-1. AC Protective Panel 5-1 Toth 00623 SECTIOH V MAIN CONTACTORS control systems ; MSN DISCONNECT KNIFE SWITCH CONTROL FUSES OVERLOAD RELAYS i'ig {Sit Figure 5-2. DC Protective Panel 'mm The main contactor is reset and opened by the START-STOP pushbutton mounted in the front of the cab so that it -is easily accessible to the operator. MAGNETIC OVERLOAD RELAYS GENERAL, The magnetic overload relays used for motor overcurrent protection are of the automatic reset type, The plunger {Figures 5-3 and 5-4) of each relay is stamped L, M, and H (low, medium, and high). The nameplate lists the amperage values which corre sponds to the plunger markings. Magnetic overload relays are of two types: time limit and instantaneous trip, The time limit over load relay has a time delay before tripping on over load, 'The instantaneous trip overload relay trips immediately on overload. ADJUSTMENT (TIME LIMIT HELAY). The correct position of the adjusting indicator on the plunger rod in relation to the solenoid plunger must be deter mined before the relay can be properly adjusted. To determine the correct position, proceed as fol lows: 1. Obtain the full load ampere rating from the motor nameplate, 2. For AC or series reversing DC motors add 25 per cent to full load rating. Select proper location of the adjusting indicator on plunger rod by comparing the ampere requirements of the motor with the amperage ratings listed under L, M, and H on the relay nameplate, and set the adjusting indicator to correspond with the location on the solenoid plunger, 3. For DC dynamic brake circuits the procedure is the same as described above, except that 60 per cent is added to the full load ampere rating of the motor. 5-2 ;.GC mm - PLUNGERS LOCK NUf| rod' PISTONj -M^DAShFOT^ Figure 5-3, Magnetic Overload Relay (Time Limit Type) Toth 00624 SVSTEMS ^time limit relay has two adjustments that must *|||jgj6nsidered. Jffcproper amperage rating i!i^jProper timing {he correct adjusting indicator location has determined, the procedure for adjusting the Itfngerage setting of the time limit relay is as folfffioli's:.- ^JilJjnscrew the dash pot and remove the plunger and ^HftHton assembly. See Figure 5-3. WtK&t- 1 CAUTION i CWtAMWSpSAM1 ' - ---Care should be taken that the exposed dash *fg|<|pot oil does not become contaminated. ... lB23jLoosen the knurled locknut at the base of the tflpluhger. pgfcv. yjffi'Rntate the plunger until the adjusting indicator on HURie plunger rod is at the correct setting, as deter- ffmined above. Tighten the locknut. Tlace the piston assembly "jMv'.the dash pot. Fill the dash pot to the proper oil Jgpeyel, Slide the dash pot and piston onto the relay, irtpighten the dash pot, IJsgSr wSflir NOTE The dash pot must be 2/3 full with the piston JSPft- assembly in place in the dash pot. USE fgggsiONLY DASH POT OIL FOR FILLING. |g|g|The length of time the time limit relay is delayed is * i|g&ntrolleci by a valye disc at the bottom of the piston ^l&sembiy. By covering the different siae holes in Jgg||.the piston, the time delay can be increased or derap^greased, The following table shows the relatively |||^||$nft delay that can be obtained by covering the varPjpibus holes. WARNING Do not cover all the holes or the unit will not ItlllP-' operate. DELAY Shortest Intermediate Short Intermediate Long Longest LARGE HOLE Open Closed Open Closed LARGE HOLE Open Open Closed Closed SMALL HOLE Closed Open Closed Open Figure 5-4. Magnetic Overload Relay (Instantaneous Trip} *540 Minor variations from the exact amperage setting may be expected; therefore, in some cases it may be necessary to set the relay amperage setting slightly above the amperage setting determined from motor nameplate rating. However, with the time limit re lay this should not be done until the time delay ad justment has been completed, ADJUSTMENT (INSTANTANEOUS TRIP RELAY). The procedure for adjusting the instantaneous trip relay is as follows: 1. The instantaneous trip relay should be adjusted to trip when overloaded to approximately 250-300 per 5-3 Toth 00625 SECTION V CONTROL SYSTEMS cent of motor full load ampere rating. The motor full load ampere rating is obtained from the motor nameplate. After the overload rating has been de termined, compare the overload rating with the L, M, and H ratings on the relay nameplate to determine the correct location of the adjusting indicator in re lation to the plunger. 2. Remove the dash pot, and remove the plunger as sembly. Hold the nut and turn the adjusting screw until the adjusting indicator is at the correct location as determined above. See Figure 5-4, 3. Replace the plunger in the dash pot and reassem ble the relay. WARNING Do not put oil in the dash pot. AC MAGNETIC CONTROL DESCRIPTION THEORY OF OPERATION, The voltage on the slip rings of an AC wound rotor motor varies directly in proportion to the slip frequency of the rotor. The frequency and voltage are at twice the line frequency and double the motor secondary voltage when plugging at synchronous speed, Therefore, if the slip ring voltage is applied to a rectifier the resulting DC voltage output will vary proportionally to the slip frequency of the rotor and inversely proportional to the motor speed. As there are innumerable combinations of motor horsepower and secondary voltage rating possibles, the operating voltage of the control is chosen to be constant. By using a potentiometer, the control voltage is matched to the particular motor open secondary voltage. For practical purposes the surge voltage when starting will equal the nameplate open secondary voltage and the surge voltage when plug ging will be 100-200 per cent of the open secondary voltage. On countertorque hoist applications, one of the re lays is connected and adjusted to act as an overspeed relay to prevent excessive lowering speed in the minimum countertorque control step. REVERSING-P LUGGING CONTROL. The magnetic reversing-plugging control provides five speed steps for both directions of travel, A motor circuit and lUScd control circuit knife switch are provided on the control panel. By opening the motor circuit knife switch the control circuit and contactor sequence can be checked without energizing the motor circuit. Place a jumper across the normally open contacts of relay 4R to check the contactor sequence. See Fig ure 5-5, CAUTION The jumper across the normally open con tacts of relay 4R must be removed after the contactor sequence has been checked. Fail ure to remove the jumper may result in faulty operation or possible damage to the control system. Motor circuit overcurrent protection is provided with inverse time overload relays in two phases of the motor circuit. Low voltage protection prevents re starting of the motion alter the low voltage relay TO COMMON OR UNITIZED DC CONTROL SUPPLY PANEL TO MOTOR SLIP RINGS The DC full wave rectifier output is filtered by a condenser to prevent faulty operation or relay chat ter. The relays are connected in parallel across the rectifier and each relay has a normally closed con tact In series with an accelerating contactor coil. The surge voltage due to starting or plugging will operate all the relays to open the accelerating con tactor coil circuits. As the voltage decreases due to an increase in speed, the relays drop-out in turn allowing the accelerating contactor to close. Relay drop-out is governed by coil voltage and relay ad justment, The relay coil is designed to have a drop out voltage low enough for the highest speed step. 5-4 ACCELERATING RELAY ACCELERATING COILS RELAY CONTACTS Figure 5- 5. Typical Reversing Plugging Control I- Toth 00626 CONTROL SYSTEMS SECTION V . opens. When the power is interrupted by opening relays are controlled by a simple automatic scheme the main power supply switch, due to low voltage or which is dependent on the motor secondary voltage. an overload relay tripping, the master switch must This prevents high current surges when plugging or be returned to the neutral position before the low accelerating, and also protects the mechanical parts voltage relay will close and the control panel be from excessive shock. comes operative. The reversing contactors are mechanically and. elec trically interlocked. All accelerating contactors are controlled by accelerating relays. The first accel erating relay serves as a plugging relay. This per mits the operator to manually control the accelera tion or hold any speed step. Acceleration Is controlled automatically when the master switch is rapidly advanced. The plugging and accelerating relays are controlled by a simple automatic scheme which is dependent on the motor secondary voltage. This prevents high current surges when plugging or accelerating, and also protects the mechanical parts from excessive shock. MAGNETORQUE CONTROL. The MAGNETORQUE control is used in conjunction with a conventional slip ring motor and eddy current load brake. The control provides five speed steps in both the hoisting and lowering directions, A motor circuit and fused control circuit knife switch are provided on the control panel. By opening the motor circuit knife switch, the control circuit and contactor se quence can be checked without energizing the motor circuit. The plugging and accelerating relay con tacts must be maintained in the closed position, and a jumper placed across the normally open contacts of relay 4R to check the contactor sequence. See Figure 5-6, REVERSING-G OUNTERTOHQU E LOWERING CON TROL, The magnetic' ebuntertorque control is de signed for service where an initial load is suspended from the hoist at all times. Such applications as grab bucket cranes and constant service magnet cranes are typical. The control differs from the conventional type of control by the use of reverse torque to offer subsyncronous speed control. The control provides five speed steps in both hoisting and lowering. The first three lowering control steps are countertorque points, A motor circuit and fused control circuit knife switch are provided on the con trol panel. By opening the motor circuit knife switch, the control circuit and eontactor sequence can be checked without energizing the motor circuit. Ac celerating relay contacts must be maintained in the closed position to check contactor sequence. To check the overspeed circuit, manually operate the overspeed relay to close the normally open contacts. Motor circuit overcurrent protection is provided with inverse time overload relays in two phases of the motor circuit. Low voltage protection prevents re starting of the motion after the low voltage relay opens. When the power is interrupted by opening the main power supply switch, due to low voltage Or an overload relay tripping, the master switch must be returned to the neutral position before the low volt age relay will close and the panel becomes operative. I CAUTION tm*m*m*m*w*m*>***+ > The jumper across the normally open contacts of relay 4R must be removed after the con tactor sequence has been cheeked. Failure to remove the jumper may result in faulty operation or damage to the control system, pfA -'-'W Motor circuit overcurrent protection is provided with inverse time overload relays in two phases of the motor circuit. Low voltage protection prevents re starting of the motion after the low voltage relay opens. When the power is interrupted by opening the main power supply switch, due to low voltage or an overload relay tripping, the master switch must be returned to the neutral position before the low voltage relay will close and the control panel be comes operative. The reversing contactors are mechanically and elec trically interlocked, The last three accelerating eontactors are controlled by accelerating relays. This permits the operator to manually control the acceleration or hold any speed step. Acceleration is controlled automatically when the master switch is rapidly advanced. The accelerating The reversing contactors are mechanically and elec trically interlocked. The last three accelerating con tactors are controlled by accelerating relays. This permits the operator to manually control the accel eration and hold any speed step. Acceleration is controlled automatically when the master switch is rapidly advanced. An overspeed relay is also in cluded to prevent excessive lowering speed in the minimum torque steps two and three. The acceler ating relays and overspeed relay are controlled by a simple automatic scheme which is dependent on the motor secondary voltage. This prevents high cur rent surges when plugging or accelerating, and also protects the mechanical parts from excessive shock. OFF POSITION COUNTERTORQUE CONTROL. Re fer to Figure 5-6 when reading the following des cription. The off position countertorque lowering control operates exactly the same as the reversing countertorque lowering control. The off position countertorque lowering control has an additional circuit which automatically retards the lowering motion and sets the motor brake when the master switch is returned to the OFF position. This en sures that the motion slows down before the motor brake sets, thereby reducing motor brake lining wear and shock loading of the mechanical compo nents. 5-5 Toth 00627 SECTION V 4- Ml$ CONTROL SYSTEMS M23 5-6 CONTACTOR SEQUENCE COMT L 8 t-A 2A 3A 4A 5A uv TR HOfST b. LOWER 54 3 2 t OL 2315 XX XX X XX XX X X XXX X X X X XX XXXX XX X XX XX XX XX X XX XX XX X XX X XX XX X XX "X11- INDICATES CONTACTOR CLOSED Figure 5-6, Typical Oif-Position Countertorque Control JG5D Toth 00628 CONTROL SYSTEMS SECTION V , js* When the master switch is placed in the third, fourth, or fifth steps lowering, relay TR will be actuated, thus setting up the circuit to make the off position countertorque circuit effective when the master switch is returned to tire OFF position. Re lay contacts CT3, TR, and Nil will close maintaining a circuit for relay OPC, Relays H and 1A will be closed, offering the same maximum countertorque as if the operator had held the master switch in the first lowering step. Contactor OPC then closes relay R, which transfers the maintaining circuit to relays TR and NH. Normally the load will be decelerated by motor retarding torque and relay NH will drop out. If relay OPC does not operate, timing relay TR will open the R relay, stopping the lowering motion and setting the motor brake. ADJUSTMENT To adjust the AC magnetic voltage control system, proceed as follows: 1. Remove potentiometer connection (T, Figure 5-7) and connect a source of 60 cycle variable voltage to the AC input terminals of the rectifier. Connect an AC voltmeter (VI) across the AC input terminals. The supply voltage must be variable between 130 volts and aero volts. 2. Adjust the relay air gap (A, Figure 5-8) and spring length (B) to obtain pickup and drop-out voltages at VI to within 1 or 2 volts of the voltages shown in ( ) Table 5-1, 3. Reconnect potentiometer tap (T), connect a sec ond voltmeter (v2) and a source of 60 cycle voltage to Si and S2. This power source must be capable of delivering a voltage equal to the motor secondary voltage, and the meter (V2) must have a range that extends through this value. ft Figure 5-7. Wiring Diagram 1*31 4, Adjust potentiometer tap (T) until VI reads 75 volts when V2 reads the motor secondary voltage. 1 CAUTION Do not maintain the voltages at these values for any length of time. The resistors and relay coils are designed for part time duty only at these values, therefore, are in danger of becoming overheated. 5, The potentiometer must also be adjusted after the motor, resistors and control are installed and wired. Connect a voltmeter (VI) across the rectifier AC input terminals. With the motor held in a stationary Table 5-1. Pickup and Drop-Out Voltage Application Relay NH OS 1R COM-1 Rev. Bridge or Trolley Pickup 74 Drop-out 66 COM-161 Magnetorque Bridge Braking Pickup 74 Drop-out 66 COM-1 Load Brake Hoist Pickup 68 Drop-out 54 COM-61 Magnetorque Hoist Pickup 78 Drop-out 71 COM-55 Countertorque Hoist Pickup 82 128 Drop-out 72 82 2R 3R 4R 68 56 32 54 46 25 68 56 32 54 46 25 56 32 46 25 56 32 46 25 66 68 54 47 5R 42 34 B-7 Toth 00629 SECTION V CONTROL SYSTEMS Table 5-2, VI Voltmeter Reading with Motor Secondary Resistor Connected to Slip Rings Application Master Controller Position VI Volts COM-1 Rev, Bridge or Trolley First Step - Either Direction 68-72 COM-161 Magnetorque Bridge First Step - Either Direction 68-72 COM-1 Load Brake Hoist First Step - Hot it or Lower 68-72 COM-61 Magnetorque Hoist First Step - Lower 72-76 COM-55 Countertorque Hoist Third Step - Lower 68-72 position, move the master switch to the position in dicated in Table 5-2, Be sure the motor does not rotate. Read Vl and return the master switch to the OFF position. Open the control circuit knife switch and move the potentiometer tap (T) in the required direction to obtain the voltage shown in Table S-2 at VI. On any particular crane installation the motor will most likely be loaded to a greater or lesser degree than average. Therefore, improved performance may often be obtained by moderately changing these ad justments on the job. Relay 1R should be adjusted to close just before the motor reverses during a plugging operation. The relays may be made to close earlier by reducing the air gap (A, Figure 5-8) or to close later by increas ing the air gap, The relay may also be made to close earlier by in creasing the spring length (B) or later by decreasing it. Generally, more positive relay operation will result with a stiff (short) spring and a long air gap. AIR GAP ADJUSTING SCREW SPRING ADJUSTING NUT It is best not to change the factory adjustment of the spring, except in extreme cases. The air gap should be maintained to within 0.010 to 0.015 inch. CAUTION NEVER turn the air gap adjusting screw down to the point where ttie adjusting screw can touch the relay coil retainer screw. Be sure the jam nut locks the adjusting screw. When field adjustments are desirable, they should be made to obtain approximately equal motor current surges not exceeding 200 per cent on each control step. This results in the smoothest acceleration. DC MAGNETIC CONTROL DESCRIPTION THEORY OF OPERATION. Voltage acceleration is a simple automatic control scheme which is depend ent on armature voltage, After the initial adjustment, the rate of acceleration will remain fixed. This control prevents high current surges when plugging or accelerating, and also protects the mechanical parts from excessive shock. The armature voltage of a DC motor depends on the field strength and armature speed. It varies from nearly line voltage when the motor is running, through zero at zero speed to nearly line voltage (of reverse polarity) when the motor is plugged at 100 per cent speed. Thus, the armature voltage can be con sidered as varying directly with motor speed. Figure 5-8. Type CV-3 Relay 5-8 The DC voltage acceleration control consists of a group of normally open acceleration relays whose coils are connected so as to measure this armature voltage. Each of these relays are adjusted to oper ate at a different preset voltage. As the armature voltage rises during the acceleration of the motor, these relays close in sequence; their contacts dose circuits to the accelerating contactors which in turn close to bring the motor up to normal speed. Toth 00630 CONTROL SYSTEMS SECTION V The plugging control portion of this system consists of another normally open relay PR with a double coil; PR1 and PR2. PRl is connected to the motor armature circuit the same as the accelerating relay coils above. PR2 is connected across the control circuit power supply. When the motor starts from rest PR2 closes the PR contacts immediately. This completes the acceleration contactor coil circuit so that the motor accelerates normally untier control of the accelerating relays. However, if the operator plugs the motor (suddenly reverses the control while the motor is still running in the original direction) the polarity of coil PRl reverses, causing it to "buck" coil PR2. This pre vents the PR contacts from closing and locks out all the accelerating contactors. The motor is smoothly decelerated with all the motor accelerating resist ance in the circuit. As the motor slows down the ai'mature voltage diminishes, which weakens the "bucking" effect of coil PEI. Near zero speed PR2 closes the PR contacts and the motor is accelerated the same as when starting from rest. REVERSING-PLUGGING CONTROL. The magnetic reversing-plugging control provides five speed steps for both directions of travel. A motor circuit and fused control circuit knife switch are provided on the control panel. By opening the motor circuit knife switch, the control circuit and contactor sequence can be checked without energizing the motor circuit. The plugging and accelerating relays must be blocked closed to check contactor sequence. Motor circuit overcur rent protection is provided by one inverse time and one instantaneous overload relay. Low voltage protection prevents restarting of the motion after the low voltage relay opens. When the power is interrupted by opening the main power supply switch, due to low voltage or an overload relay tripping, the master switch must be returned to the neutral posi tion before the low voltage relay will close and the panel becomes operative. The reversing contactors are mechanically and elec trically interlocked. The first accelerating contactor is controlled by a plugging relay; all the other accelerating contactors are controlled by accelerat ing relays. These permit the operator to manually control the acceleration or hold any speed step. Acceleration is controlled automatically when the master switch is rapidly advanced. The plugging and accelerating relays are controlled by a simple auto matic scheme which is dependent on the motor armature voltage. This prevents high current surges when plugging and accelerating, and also protects the mechanical parts from excessive shock. REVEHS1NG-DYNAM1C LOWERING CONTROL. The hoist control provides power hoisting and power or dynamic lowering. The change from power to dynamic lowering or vice versa when lowering is an inherent characteristic of the circuit. An emergency dynamic braking circuit is established when the master switch is brought to the neutral position. Five steps of control are provided for both hoisting and lowering. A motor circuit and fused control circuit knife switch are provided on tire control paneL By opening the motor circuit knife switch, the control circuit and contactor sequence can be checked without energizing the motor circuit. The plugging and accelerating relays must be blocked closed to check the contactor sequence, . Motor cir cuit overeurrent protection is provided by one in verse time and one instantaneous overload relay. Low voltage protection prevents restarting of the motion after the low voltage relay is opened. When the power is interrupted by opening the main power supply switch, due to low voltage or an overload relay tripping, the master switch must be returned to .the neutral position before the low voltage relay will close and the control panel becomes operative. The reversing contactors are mechanically and elec trically interlocked. When hoisting, the first three steps are controlled manually, directly from the master switch. The last two steps are controlled manually as well as auto matically by the accelerating relays. The accelerat ing relays are controlled by a simple automatic scheme which is dependent on the motor armature voltage. This prevents high current surges when accelerating and also protects the mechanical parts from excessive shock. The first step hoisting is provided with an armature shunt to give good speed control under light loads. ADJUSTMENT 230 VOLT REVERSING-PLUGGING CONTROL. The accelerating relays are adjusted at the factory to approximately the following values: a Relay 1AR 2AR 3AR Volts to Close 89 146 192 Volts to Open 40-50 100-130 120-170 The PR relay coils PRl and PR2 are connected so that they act cumulatively while the motor is accel erating and running, PRl (the coil nearest the control panel) is the only coil used during the ad justing procedure of the PR relay. It is factory adjusted to close at about 200 volts and to open at about 100 volts. 230 VOLT HOIST DYNAMIC-LOWERING CONTROL. The accelerating relays are adjusted to approxi mately the following values: Relay AR2 AR1 Volts to close 40 115 Volts to Open 10-25 65-95 5-9 SECTION V CONTROL SYSTEMS DC VOLTAGE ACCELERATION AND PLUGGING CONTROL, On any particular crane installation the motors will most likely be loaded to a greater or lesser degree than the average. Therefore, im proved performance may often be obtained by mod erately changing these adjustments on the job site. STATIONARY FIELD The DR relay should be adjusted to close just before the motor reverses during a plugging Operation. For hoist control, relays AR1 and AR2, and for re versing-plugging control, relays 1AR, 2AR, and 3AR may be made to close earlier by reducing the air gap (A, Figure 5-8) or to close later by increasing the air gap. The relay may also be made to close earlier by in creasing the spring length {B) or later by decreasing the spring length. Generally, more positive relay operation will result with a stiff (short) spring and a wide air gap. It is best not to change the factory adjustment of the spring except in extreme cases. [cMmST; NEVER turn the air gap adjusting screw down to the point where the adjusting screw can touch the relay coil retainer screw. Be sure the jam nut locks the adjusting screw. When field adjustments are desirable, they should be made to obtain approximately equal motor current surges not exceeding 200 per cent on each control step. This results in the smoothest acceleration. 1 MAGNETORQUE CONTROL DESCRIPTION The MAGNETORQUE control is exactly what the word MAGNETORQUE implies, an electromagnet exerting torque on the motor to preload the motor, thereby utilizing the better part of the slip ring motor characteristics. The wound rotor induction motor, due to its inherent characteristics is the most desirable type for crane service. Since slip ring motors have poor speed regulation under no-load or light-load conditions, the motor tends to run at synchronous speed. Therefore, the MAGNETORQUE control incorporates a MAGNETORQUE unit (eddy current load brake) to preload the motor and to pro vide the speed control of a normally loaded motor without the use of a jnechanieal load brake. The MAGNETORQUE unit is a device for transmitting torque by means of electromagnetic fields, therefore, there are no mechanical connections between the stationary and rotating members of the MAGNETORQUE unit. Figure 5-9 illustrates the MAGNETORQUE unit assembly. The stationary field member comprises a doughnut shaped coil, excited by low voltage direct current, encased in a circular 5-i.Q magnet spider. The spider is arranged to provide a large number of alternate north and south magnetic poles. The rotating member, or rotor, is very light in weight for the horsepower. The MAGNETORQUE unit should require very little attention, as the construction of the unit does not re quire any wearing parts. The MAGNETORQUE unit is coupled to the hoist unit to rotate at motor speed. Since the field member is stationary and the rotor has no electrical connec tion, there are no moving electrical parts requiring maintenance. The braking torque is accomplished through magnetic lines of force between the station ary field member and rotor. Therefore, only mag netic lines are broken - the result - no wearing parts, no replacement of friction surfaces. Direct current excitation to the stationary field is obtained through a step-down transformer and a rectifier. MAGNETORQUE control results are achieved with the MAGNETORQUE unit exerting a torque resisting the driving torque of the motor. By properly match ing the motor torque through secondary resistance, and the braking torque through resistance which controls the MAGNETORQUE unit excitation, the desired characteristics are obtained. MAGNETORQUE control provides superior speed regulation over any other AC crane control and actually excels the control available with DC dynamic lowering control. In hoisting, all loads can be controlled at slow, medium, and high speeds. An outstanding feature of MAGNETORQUE control is the fact that it is impossible for the load to lower with the controller on any hoist position. Even on the first hoist control step, the load will always raise Toth 00632 CONTROL SYSTEMS SECTION V through the entire load range from no-load to 126 per cent of rated crane capacity. As there is only a 15 per cent change in speed from no-load to full-load on the first step of control, the hoist unit will grad ually take the slack out of the sling and then smoothly raise the load. This is a very desirable feature and eliminates the necessity for inching or jogging, When heavy iogds, are only partially raised and then stopped, the load will not lower when hoisting motion is resumed, which is the cage on all other electrical schemes including DC dynamic lowering. In lowering, all loads can be lowered at slow, me dium, and high speeds; this is true for overhauling as well as non-overhauling loads. Capacity loads can be lowered at 12 per cent of full load hoisting speed, which means accurate spotting of all loads, without the necessity of inching or jogging. MAGNE TORQUE control insures positive hook action, no in advertent lowering when hoisting is expected, and flat speed load characteristics on all lowering speed stops. Off-position braking is a safety feature with MAGNE TORQUE control. With the controller in the off-po sition, the MAGNETORQUE unit is excited at a re duced voltage. In case of electric motor brake failure, the load mil overhaul the hoisting unit, but the MAGNETORQUE brake will exert a braking torque to slowly lower the overhauling load to the floor, thus, preventing a free falling load. An additional safety feature can be ineoi'porated with MAGNETORQUE control and is known as ALL PO SITION BRAKING. This feature consists of an aux iliary permanent magnet alternator and rectifier, with an automatic switching means for excitation of the MAGNETORQUE unit. In ease of simultaneous power and electric motor brake failure, the sus pended load will overhaul the hoisting unit. In this case the alternator will automatically generate cur rent and excite the MAGNETORQUE unit, thereby, retarding the overhauling load speed to approxi mately 40 per cent of full load speed. This safety feature is accomplished regardless of position of controller handle. The alternator is open circuited under normal operation and is only inserted when the mainline disconnect switch is open, or in case of power failure. The ALL POSITION BRAKING feature is similar to the off-position dynamic braking as obtained with DC dynamic lowering Control. A series relay is connected in series with the MAG NETORQUE field circuit. This relay insures ex citation on the MAGNETORQUE unit before the motor directional contactors H and L can close, except the last three hoisting and last lowering control steps, because in these steps the MAGNETORQUE brake is not excited. This insures positive safe control in case of an open circuit in the MAGNETORQUE unit. Failure of current in the MAGNETORQUE unit cir cuit will result In opening of series relay, auto matically opening the directional contactor coil cir cuits, thereby, interrupting the motor and electric motor brake circuits. ADJUSTMENT GENERAL. The adjustment of MAGNETORQUE con trol is similar for both FULL MAGNETIC and MAN UAL DRUM CONTROL, The only difference in these controls is the method of control and number of speed steps: full magnetie control having five (5) hoisting and five (5) lowering control speed steps, manual drum control having seven (7) hoisting and eight (8) lowering control speed steps. On full mag netic control, speed steps 2 and 4 hoisting and 2, 4 and 6 lowering are omitted from manual drum con trol. All adjustment should be accomplished by varying the excitation current in the MAGNETORQUE unit. It should not be necessary to change the motor char acteristics by changing the motor secondary re sistance, Changing the motor secondary resistance may result in excessive motor current. Changing the motor characteristics or Increasing the motor torque by changing the motoi' secondary resistance also necessitates increasing the excitation on the MAGNETORQUE unit and will also result in exces sive heating of MAGNETORQUE unit, The motor secondary resistance should not be changed without first obtaining approval from the Harnischfeger En gineering Department, For tire best result the adjustments of the control should be made with loads ranging from 50 per cent to 100 percent of rated hoist capacity, preferably 100 percent load. Before proceeding with adjustment be sure that motor brake is properly adjusted and brake shoes are not dragging on wheel. Also check MAGNETORQUE unit series relay to be sure that relay armature pulls in at minimum brake excitation. Proceed with adjustment by checking the lowering speed on all lowering control steps. After establish ing maximum MAGNETORQUE unit excitation the intermediate and low current should be approxi mately 6S per cent and 45 per cent of the maximum excitation current. Check the results with speeds for the corresponding load on the speed-load graph, Figure 5-10. The speed in the various steps should be within 3 per cent to 8 per cent of the speeds on the graph for a given load and speed. The speed on the various control steps should be within 3 per cent plus or minus at no load, and within 8 per cent plus or minus at full load. For example step 3 lowering manual drum control the no load graph speed is 12 per cent of synchronous motor speed, a deviation of 9 per cent to 15 per cent speed is allowed at this point. At 100 per cent load the graph speed is 34 per cent of synchronous motor speed, a deviation of 26 per cent to 42 per cent speed is allowed at this point. The variations from the graph should all be In the same direction, in other words if the speed is high in a certain step the speed in all steps must either fall on the graph or to the high side. If the speeds obtained are in excess of the graph speeds, increase the torque on the MAGNETORQUE unit by 5-11 Toth 00633 SECTION V CONTROL SYSTEftllftl shorting out resistance in the circuit. If the speed obtained is slower than graph speeds, reduce the torque on the MAGNETORQUE unit by increasing the resistance in the circuit, A supply voltage variation will affect the adjustment and change the speed load characteristics. An in crease in supply voltage after adjustments are made will increase the speed and a decrease will reduce the speed on ail MAGNETORQUE control steps, in fact on all control steps. The MAGNETORQUE unit should be set with normal operating voltage. MAGNETIC CONTROL, For full magnetic control step 1 hoisting has maximum MAGNETORQUE unit excitation, step 2 has a reduced excitation and on Steps 3, 4 and 5 the MAGNETORQUE unit circuit is open. In lowering steps 1, 3 and 3 have maximum excitation on the MAGNETORQUE unit, step 4 has a reduced excitation and on step & the MAGNETORQUE unit circuit is open. The MAGNETORQUE unit excitation in step 1 HOIST and steps 1, 3, and 3 LOWER are identical and the excitation is governed by the resistance between Ml3 for tire main hoist, M14 for the auxiliary hoist and R60. The excitation in step 2 HOIST and step 4 LOWER are identical, and is governed by the re sistance between R60 and R61. Decreasing the re sistance between M13 or M14 and R60 will increase the MAGNETORQUE unit excitation and decrease the hoisting and lowering speeds in step 1 HOIST and steps 1, 2, and 3 LOWER. Decreasing the resistance between R60 and R61 will increase the MAGNE TORQUE unit excitation and decrease the hoisting and lowering speeds in step 2 HOIST and step 4 LOWER. Increasing the resistance will have the op posite results, increasing the speed in the same cor responding Steps. The speeds in steps 3, 4, and 5 HOIST and step 5 LOWER should be checked, but should not require any adjustment. MANUAL DRUM CONTROL. For manual control steps 1 and 2 hoisting have maximum MAGNE TORQUE unit excitation, step 3 has an intermediate reduced excitation, step 4 has low excitation, and on steps 5, 6 and 7 the MAGNETORQUE unit circuit is' open. There are actually 8 hoist control steps, steps 7 and 8 being identical, In lowering steps 1, 2, 3, 4, 6 and 6, maximum excitation is on the MAGNE TORQUE unit, step 7 has an intermediate reduced excitation and in step 8 the MAGNETORQUE unit circuit is open. The MAGNETORQUE unit excitation in steps 1 and 2 hoisting and steps 1, 2, 3, 4, 5 and 6 lowering are identical and excitation is governed by resistanceM13 for main hoist, M14 for auxiliary hoist and R60. The excitation in step 3 hoisting and step 7 lowering are identical and governed by the resistance between R60 and R61. The excitation in step 4 hoist- ing is governed by the resistance between R61 arfS'C R62. Decreasing the resistance between M13 maitp. j hoist or M14 auxiliary hoist and R60 will increastPfPB the MAGNETORQUE unit excitation and deereas|if||j|p the hoist and lowering speeds in steps 1 and 2 hoistfllt and steps 1, 2, 3, 4, 5 and 6 lower. Decreasing RillT resistance between R60 and R61 will increase UiMiS MAGNETORQUE unit excitation and decrease hoisting and lowering speeds in step 3 hoist atfdil?^" step 7 lower. Decreasing the resistance betweenlj|L R61 and R62 will only affect step 4 hoist reducing^ the speed in this step. Increasing the resistanceffllj. will have the opposite results, increasing the spe^lljjj in the same corresponding steps. The speeds inllp steps 5, 6 and 7 hoist and step 8 lower should belRlL checked, but should not require any adjustment. i|SlP m Before making adjustments cheek the MAGNEp.-_,,.H TORQUE unit air-gap and be absolutely sure thafgfjP same is fairly uniform, d-iSlil JP CHECKING AND ADJUSTMENT PROCEDURE, Makefigg the adjustments with load of 50 per cent to 100 perj-^fc cent of rated capacity. The weight of load should bej|jjj checked so that actual 'weight is known and no false| adjustments are made. It is only necessary to ad-Wfi just the speed with one load, the speed-load char-;;ftt acteristics for all other loads should follow die graph'^^jj fairly close. The adjustments should be made for* the lowering operation. Adjust the MAGNETOSQUE-jl unit excitation so that the speeds, lowering, eonformi|;4j with speeds on speed-load curves. Figures 5-10 orJ||l|j 6-11, Increase or decrease the resistance between;^ M13 or M14 depending on main or auxiliary hoist and^p R60 to obtain the speeds in steps 1, 2, and 3, full'|^g magnetic, or 1, 2, 3, 4, 5 and 6, manual drum control*|||i to correspond with the speeds on the coiwesponding|gSf step and load on the speed-load curves. Increase p> or decrease the resistance between RBO and R61 obtain the speed in step 4 full magnetic or 7 manual.^ drum control to correspond with the corresponding:^^ speed, and load on the speed-toad curves, Figures ||p-! 5-10 or 5-11. ij 0M After completing adjustment for lowering operation cheek hoisting speeds with the same load, The only step hoisting which can be varied without changing adjustment for lowering is step four (4) manual drum iial control only. The speed in this step can be in creased or decreased by increasing or decreasing the resistance between R61 and R62. After com pleting adjustment for lowering it should not be necessary to make any adjustments for hoisting steps as the speeds for these steps should be fairly^ close to tiie corresponding steps on the speed-load curves, A slight variation of 3 per cent to 8 per cent speed in the actual speed as previously explained, with the corresponding speed-load curve, due to variation in MAGNETORQUE unit characteristics can be expected. The speeds on steps 3, 4 and 5 hoist and 5 lower full magnetic, or 5, 6, and 7 hoist 5-12 Toth 00634 SECTION V Figure 5-10, Manual Drum Control Speed - Load Curves Figure 5-11. Full Magnetic Control Speed - Load Curves ' and 8 lower manual drum control should be checked Milit should not require any adjustment as there is no :? MAGNETORQUE unit excitation on these steps. SgreSSiggS-; sgigs^gjge r=5^Sv After completing the adjustment with a load, remove -The load and check the speeds under no-load condi tions In all control steps. These speeds should be -^m fairly close to those on the characteristic curve. A reuoid should be kept of the weight of the load used, is motor speed, and MAGNETQRQUE unit current, in dll Ml control steps hoisting and lowering both with load and no load. KsSn aV^v- li&AGNETORQUE SERIES RELAY ADJUSTMENT. ^ SmaGNETORQUE series relay is f^^nROTiF unit |tiiat insures excitation on the MAGNET Q g^2'Alpefore the motor or motor brake circuit can -sorgl2ed, / Adjust the magnetic air gap (A, Figure S-8) by turn |ing the adjusting screw so the Miloses the contacts at the lowest MAGNET ^ ^excitation, Always maintain a slight SaP the relay will drop out quickly when the MA ^TORQUE circuit is de-energized, |&djust spring length (B) to allow sufficient com ->-->sipreggjt0ll |or opening of the contacts who wsfiMMAGNETOUQUE circuit is de-energised. Thisspimg ^adjustment must also be balanced with the air gap adjustment so that it will not interfere with the relay closing at the lowest MAGNETORQUE excitation. Be sure the jam nut locks the adjusting screw se curely. CONTROL COMPONENTS CONTACTORS GENERAL, All contactors are equipped with large forged copper silver plated contacts and powerful blowout coils. The operating magnet structure and coils are de signed for direct current operation, thereby eliminat ing the troubles with laminated cores. For alternat ing current applications a rectifier is used to supply direct current. The stationary contacts are rigidly mounted on heavy copper posts with milled seats. The movable contacts are rigidly mounted on the low inertia movable contact holder, precision molded of aluminum alloy with a milled seat. 5-13 Toth 00635 SECTION V The contacts are arranged for a rolling, self-clean ing action, striking first at the top then rolling to a stop at tiie bottom of the contact where no arcing occurs. The operating magnet armature of the Type A and B contactors are precision casted of aluminum alloy with a soft steel insert, The Type AA operating magnet armature is made of low carbon steel, which is formed and machined. The armatures, movable contact holders, and contact arms are balanced to virtually eliminate contact bounce. The type A contactors are single pole with normally open contacts. The type B contactors are single pole CONTROL SYSTEMS with normally closed contacts. The type AA con-' tactors are available in two, three, or four pole ar rangements with normally open contacts. The last digit in the type number designates the number of' contacts, ' I Both normally open and normally closed electrical interlocks are available. Reversing contactors are mechanically interlocked, TYPE A CONTACTOR MAINTENANCE. Oil im pregnated bearings are used at the pivot points of the. contactor. These do not require lubrication, The are gap "B" and magnetic gaps "C" and "D" are" factory adjusted and no provisions are made for ad-'t justment. See Figures 5-13 through 5-15. Variation ? from Table 5-3 indicate wear in the operating parts. -S3 ARC SHIELDS SA sail 5-14 Figure 5-12, Checking Initial Contact Pressure Toth 00636 SECTION V pT m llj %Type islgli ?V r ftt*- pi^ -> ' jjj| Ifeo Table 5-3. Contactor Tolerances Contact Pressure (Pounds) At Center Of Contact Tips Initial Pressure Final Pressure Contacts Contacts Open Sealed 3.0 5 oz 4,5 6.5 oz Arc Gap "B" (Inches) With New Contact Tips Magnetic Gap "C" (Inches) At Center Of Magnet Core Magnetic Gap "D,T (Inches) Contacts Contacts Sealed Open , MIM. THICKNESS Per Contact Tip 5/8 1/32 15/32 1/64 1/32 3/8" NCD CO ll gif'300 |jj /A/BOO 6.2 9.5 oz 9,0 14,5 Oz 10.0 i 1 lb 16,0 1 lb 9 oz 13/16 1/32 15/16 3/64 23/32 1/32 1/32 1/32 7/16" 1/2" ||lf: IK00 fIiPgg* 'B-300 \t/y iBI A-102 S&A-103 Ip PA-104 fey SSBill ||S&-302 i ;XA-303 LAA-304 3.0 5 oz 6.2 9.5 oz 3.0 * 5 oz 6.2 9.5 oz 4,5 6,5 oz 10,0 1 lb 4.5 3,5 oz 10.0 i 1 lb 7/16 1/32 33/64 1/64 17/32 1/32 5/8 1/64 1/2 t 1/32 1/2 t 1/64 1/32 11/16 1/32 21/32 1/64 1/16 1/32 1/32 3/8" 7/16" 3/8" 7/16" BLOWOUT ASSEMBLY '1 CONTACT BLOWOUT ASSEMBLY CONTACT CAPSCREW ARMATURE ELECTRICAL INTERLOCK TRIP Figure 5-13. Type "A" Contactor ARMATURE MAGNET CORE C.r~ ELECTRICAL INTERLOCK TRIP ' Figure 5-14, Type "B" Contactor 5-15 Toth 00637 SECTION V CONTROL SYSTEMS BLOIfOUT ASSEMBLY > CAUTION : Always be sure the arc shields on the blowout assembly are down and in proper position after checking contactors. TYPE B CONTACTOR MAINTENANCE. OH im pregnated bearings are used at the pivot points for the armature and movable contact holder. These do not require lubrication. The arc gap "B" and magnetic gaps "C" and "D" are factory assembled and no provision is made for ad justment. Variations from Table 5-3 indicates wear in the operating parts. For proper operation worn parts should be replaced, The contacts should be replaced when worn to one half the original thickness at contact surface. Check initial contact pressure by looping a piece of wire or string around the movable contact at center of contact face as shown in Figure 5-12. Manually open the contacts and fasten a spring scale to the wire or string and pull scale, taking scale reading just as contact holder moves. The final contact pressure must be checked with new contacts. Use same general procedure as above for initial pres sure except that the contact must be kept closed manually to prevent armature movement. Take scale reading just as contacts open. Initial and final contact pressures should be main tained within tolerances specified in Table 5-3, Figure 5-15. Type "AA" Contactor For proper operation the worn parts should be re placed. . The contacts should be replaced when they are worn to one-half the original thickness at the contact sur face. Check the Initial contact pressure by looping a piece Of wire or string around the movable contact at the center of the contact face as shown in Figure 5-12, With the contacts open as shown, fasten a spring scale to the wire or string, pull on the scale and take a scale reading just as the contact holder moves. The final contact pressure must be cheeked when new contacts are Installed. Use the same general pro cedure as described above for initial contact pres sure, except that the contactor must be closed manu ally, Take scale reading just as the contact opens. Initial and final contact pressures should be main tained within the tolerances specified in Table 5-3, 5-16 CAUTION Always be sure the arc shields on the blow out assembly are down and in proper position after checking contactors. TYPE AA CONTACTOR MAINTENANCE. Oil im pregnated bearings arc used at the pivot points for the main hinge bearings and movable contact holders. The main hinge bearings are rubber cushioned to provide resiliency for self alignment and to absorb shock. These bearings do not require lubrication. The arc gap "B" and magnetic gaps "C" and "D" are factory assembled, These should not require ad justment for the life of the contactor. Variations from Table 5-3 usually indicate wear in the operating parts. For proper operation worn parts should be replaced. The arc gap "B" and magnetic gap "C" can be changed by changing the position of the con tact arms and armature on the shaft. This can be done by loosening and tightening of the bolts in the clamps. This adjustment must only be made with new contacts to insure proper gaps. The contacts should be replaced when worn to one half the original thickness at contact surface. Toth 00638 CONTROL SYSTEMS SECTION V 2 NORMALLY OPEN CONTACTS 2 NORMALLY CLOSED CONTACTS Figure 5-16. Sleeh-ical Interlock 1 NORMALLY CLOSED A 1 NORMALLY OPEN CONTACTS Check initial contact pressure by looping a piece of wire or string around the movable contact at center of contact face as shown in Figure 5-12. With con tacts open as shown in Figure 5-15, fasten a spring scale to the wire or string and pull scale taking scale reading just as contact holder moves or is just free from contact arm seat. ) The final contact pressure must be checked with new contacts. Use same general procedure as above for initial pressure except manually close the contactor. Take scale reading just as contacts open. Initial and final contact pressures should be main tained within tolerances specified In Table 5-3. INTERLOCKS ELECTRICAL INTERLOCKS. The electrical inter locks used with the type A, B and AA contactors are self-contained units. They are mounted on the con tactor panel by a mounting bracket and actuated by a trip arm mounted on the contactor armature. The electrical interlock assembly consists of two sepa rate sets of contacts. See Figure 5-16. The electrical interlock housing is a bakeltte mold ing. The stationary and movable contacts have sil ver alloy tips. The stationary contacts are mounted in the housing. The movable contacts are mounted on a nylon molded push rod. By rearranging the contacts and springs the assembly can offer two normally open, or two normally closed, or one nor mally open and one normally closed contact arrange ments. The contacts are actuated by the contactor trip arm contacting the interlock push rod. MECHANICAL INTERLOCK. The mechanical inter lock used with the type A and AA reversing contactor is a self-contained unit. They are mounted directly on the contactor panel. Clearance in the panel holes for mounting provide adjustment for proper opera tion. The interlock is actuated by the armature tail piece on the type A contactors and the inside movable contact arm tail piece on the type AA contactors. See Figure 5-IT. The mechanical interlock has two bakelite molded cam levers mounted and hinged on a common bolt, A cam follower is mounted on a separate bolt. Two nylon rollers on the cam follower contact the cam levers to provide the interlocking. A torsion spring returns and holds the cam follower in the neutral position. The two bolts supporting the cam levers and cam follower provide a pivot for these members and also a means of securing the interlock to the panel. Figure 5-17. Mechanical Interlock 5-17 Toth 00639 section v When one of the contactors on a reversing contactor panel is energized the tail piece contacts the inter lock cam lever. The lever is rotated about its pivot point. This in turn rotates the cam follower bracket. When the contactor is completely sealed and the tail piece is at maximum travel, the opposite side cam lever interlocks the other reversing contactor. RESISTORS GENERAL. The type of resistors generally used on AC and DC cranes are either cast grid, wire wound or stamped steel. The crane service and motor horsepower determine which of the three resistors to use. Resistor classifications are selected on the basis of the crape service requirements and duty cycle. The cast grid, wire wound and stamped steel resis tors have these characteristics in common: 1, Relatively constant resistance value regardless of temperature changes. 2, Good air circulation providing fast heat dissipa tion, 3, Fast and simple replacement of individual grids, 4, Can withstand severe vibrations. 5, Positive grip connecting lugs for external wires. The resistors may be installed in a resistance rack making it possible to remove one individual resistor bank or box without disturbing the remaining resis tor banks. CONTROL SVSTEHStil. iS8SL INSPECTION. The following items should be checked^ periodically: ,"' ' 1. Check all resistorconnections for tightness. : WSf 2. Cheek the rod bolts on the resistor end plates foFilHft tightness. fsMTtM 3. Check the contact surfaces of the resistor for breaks, burns or pitting, .a^jfe8g| 'ItfpjB! 4. Check the jumpers used on wire wound reslstors-llpf and the outgoing connection for tightness, .SlJSSta If any of the above conditions exist, take correctivdJsfpj action to eliminate all of the deficiencies. Be carefui-Ss^B not to deform the resistance units. CAST GRID RESISTORS. The cast grid resistors^ are made of an alloy cast iron. The grids (Figure's 5-18) are mounted on mica insulated rods and stackedf between heavy pressed steel end plates. Clamp typer terminals are used on the cast grid resistors. Mica-'I tubes and washers provide insulation for the grids! and high temperature insulation bushings insulate the rods from the end plates, The smaller grid size (sizes A, B, C, and 2101 to 2106 Inclusive) can be removed by loosening the:, mounting rod holts and slipping the grids out. To| remove the larger grid sizes (2107 to 2111 inclusive) the grid box must be disassembled and then remove the mounting rod bolts with the mica tube, m MS WIRE WOUND RESISTOB. The wire wound resistors ; (Figure 6-19) are used with smaller horsepower,motors where a high resistance and low current is ; required. The wire wound resistors use a special: resistance wire wound around porcelain cores. The;;; Table 5-4, Glassification of Resistors Approx. Per Cent of Full Load Current on First Point Class Numbers Applying to Duty Cycles 15 Sec. On Out of Each 90 Sec. 15 Sec. On Out of Each 60 Sec. 15 Sec. On Out of Each 45 Sec, 15 Sec. On Out of Each 30 See. Continuous Duty 26 141 151 161 171 91 SO 142 152 162 172 92 70 143 153 163 173 93 100 144 154 164 174 94 150 146 155 165 175 96 200 or Over 146 156 166 176 96 NOTE: For crane application select resistors at 50 per cent of full load current on first point. wa 5-18 Toth 00640 HgitOL SYSTEMS . .... ROD WITH #1 INSULATING TUBE GRIDS ROD WITH INSULATING INSULATING BUSHING TUBE SECTION V GRIDS TERMINALS MNSULAT1NG BUSHING MICA WASHER 'END PLATE Figure 5-18, Cast Grid Resistor WmSW ROD WITH END PLATE RESISTOR UNIT TERMINAL SUPPORT ROD END PLATE Figure 5-20, Stamped Steel Plate Besistor fesae TERMINALS MICA WASHER Figure 5-19, Wire Wound Besistor Scores are spiral grooved to prevent adjacent turns 18Tgpgjcfrooimis touching and shorting arc then assembled out. The cores with the on aluminum frames to Inform a resistor unit, bus|ftThe resistor units are mounted on mica insulated . rod3 and stacked between pressed steel end plates. Solderless terminals are used for the external con .. neetions. |j,The resistor units can be replaced by removing the .mounting rods and Insulating tubes. Mica tubes and &v!lerS Pr0v^e insulation for the resistor units and . , ,;8- temperature insulating bushings insulate the 2gg!^K>ds from the end plates. I* STEEL PLATE RESISTORS. The Stamped P`ate resistors (Figure 5-20) use grids made of iRgW?,, sPeo^ stainless steel which is non-bre'akable and IggjHiighly resistant to corrosion. Figure 5-21, Edge Wound Resistor Assembly EDGEWOUND RESISTORS. The edgewound resistor unit (Figure 5-21) is a ribbon edge wound on a cera mic tube and fired over with a vitreous enamel. The units are supported in a frame by shoulder washers and through bolts. CONTROLLERS MANUAL DRUM CONTROLLER. The manual drum controller controls the motor for the various crane motions directly. It starts, stops, ana reverses the motion, and also provide speed regulation, A modi fied version of the control is the Semi-Magnetic Control which includes reversing contactors. The operating head can be either a straight line lever, an under lever or a radial (crank) lever. For floor control the head is provided with a spring re turn rope operated sheave wheel, See Figure 5-22. 5-19 Toth 00641 SECTION V is$$ Figure 5-22. Manual Drum Controller The drum cylinders are mounted on a square shaft, insulated with impregnated fibre angles. The fibre angles are placed on the shaft so as to provide ample insulation. Formed copper segments are mounted on the drum cylinder. The longer copper segments have leader segments. The leader segments are used for maintenance purposes, so it is only necessary to re place a short segment when the contact end is burned from malting and breaking the motor circuit. A po sition indicating starwheel is also mounted on the drum shaft. The complete drum cylinder and shaft, assembly can be removed through the bearing plate at the lever end. The contact fingers consist of forged copper tips riveted to steel fingers. These tips are removable and replaceable. A flexible copper shunt is provided between the contact finger and outgoing connection. The fingers are adjustable for wear. Keep the fin gers adjusted to allow for 1/16 of an inch of move ment between the finger tip and drum segment. The adjustment is maintained by a set screw, A flat spring resting against the sides of the set screw head prevents the set screw from turning during controller Operation. 5-20 CONTROL SYSTEMS;: For alternating current the controller is provided i with arc shields between part or all of the controller; f fingers. /v For direct current the controller is provided with'- arc shields and magnetic blowout coils to quickly:/:: extinguish and confine the arc. ' W For small ho* iepu*n*i* AC and DC motors, arfrl-l shields and blowout coils are nut used, NOTE :ft| Always advance the controller slowly, Never throw thecontroller to the full ON position .v/ without giving the motor time to accelerate. i-iM The following parts of the controller should be in speeded and the maintenance indicated should be;; performed: 1. Lubricate the pivot points. /v 2. Inspect the finger tips and contact segments. If, pitted, smooth with a fine file or sandpaper. If dirty, j clean with electrical cleaning solvent. 3. Lubricate the fingers and contact segments with/ clean petroleum jelly. Never use oil or grease, / 4. Operate the controller. Adjust the spring tension/ at the starwheel latch for proper feel of controllerY: steps. C;,T 5. Replace all the damaged are shields. :;Y 6. When it is necessary to replace the blowout coll; on a direct current controller be sure that the blow-/ nut coil replacement is connected to give the proper ;; polarity. =/ 7. When ordering separate contact segments, list the; piece number stamped on the contact segment. If no: piece number is stamped on the contact segment, list; the following information: Bfc A, The distance from tip to tip of the inside arc (A, Figure 5-23). ;; 3 yM Figure 5-23. Controller Segment Diagram Toth 00642 igQHTROL SYSTEMS \ tfv? D. ri ho distance from tip to tip, around arc (B), .C. The width of the segment (C). Hie fingers are adjusted by turning the set screw _untU the finger tip is lifted by the contact segment i/16 of an inch. See Figure 5-24. FINGER TIP iIontact SEGMENT SET SCREW SECTION V In a simiiiar manner, that is, they are actuated by molded cams mounted on a single shaft. The shaft is rotated by the controller lever. The difference between the two controllers Is the manner in which the shaft is rotated, the type of contacts and the size of the units. The controller illustrated in Figure 5-25 is the larger of the two controllers and is actuated by molded cams mounted on a horizontal shaft coupled directly to the controller lever. The cams are ar ranged so that the contacts are closed in a prede termined sequence. The movable contacts are mounted on contact levers, which are hinged to the stationary contact moldings. A roller type cam fol lower is held against the cam by a spring between the contact lever and stationary contact molding. The Figure 5-24. Finger Adjustment CAM OPERATED CONTROLLERS. Two types of iiCam operated controllers are used for crane control. ,-The cam operated controllers are illustrated in Figdirer* 5-25 and 5-26, Both of the controllers operate ;;CO.`ITRO..LER LEVER ^stationary contacts MOVABLE CONTACTS Mmim mmmM' S STAR WHEEL STEEL BALL SPRING Figure 5-25, Cam Operated Controller Figure 5-26, Cam Operated Controller 1679 5-21 Toth 00643 SECTION V CONTROL SYSTEMS movable contacts have tips on each side of the con tact bridge and can be turned over for increased contact life. Control position indication is given by a hardened steel star-wheel in contact with a spring pressurized steel ball. The controller illustrated in Figure 5-26 is a minia turized version of the controller illustrated in Figure 5-25. The operation of this controller is basically the same as the operation of the larger controller, with the following exceptions: 1. The shaft that the cams are mounted on is verti cal. 2, The shaft is rotated by bevel gears in the control head. 3. Both the movable and stationary contacts are in a single molded housing. 4, The contacts are normally open and are closed by the cams in a predetermined sequence. The following parts of the controller should be in spected and the maintenance performed as indicated; 1. Inspect the contacts. If the contacts are exces sively pitted they should be replaced. 2. Inspect the cams for excessive wear, 3. Operate the controller. If the steps of- the con troller cannot be felt, inspect the starwheel, ball, and spring. 4. Inspect the contact support or housing for cracks or defects, and replace if necessary. 5. The ball bearings in the large controller should be lubricated periodically with a high grade of multi purpose grease. 6. The bevel gears in the control head of the small controller should be lubricated with a high grade of multipurpose grease periodically. For two speed control, a three contact pushbutton is used. Partially depressing the pushbutton closes the direction and low speed circuits. Fully depressing the button opens the low speed circuit and closes the high speed circuit. For the five step variable speed control, a five step pushbutton is used. Initial depression of the push button closes the direction circuit. Progressively depressing the button in increments of approximately one-eighth inch actuates additional accelerating con tactors. The accelerating contactors short resist ance out of the motor circuit and motor speed in creases. All the pushbuttons are of the "Dead Man" type, that is they have a spring in the button to return the but ton to the OFF position when it is released. JOY STICK CONTROL UNIT GENERAL, The joy stick is a means of operating two controllers with one control lever. Two ver sions of the joy stick are used with the different types of controllers. The operation and maintenance of both joy sticks is described in the following para graphs. TYPE I JOY STICK. As illustrated in Figure 5-27, the operating mechanism consists of two yokes mounted at right angles to each other. A gear seg ment is fastened to each yoke and is meshed with the pinion on the coupling shaft, which transmits the motion to the controller. The operator's lever passes through a slot in the center of each yoke. As the operator moves the lever in one direction, the lever causes one of the yokes to swing in an arc, while the lever moves along the slot in the other yoke, Diagonal movement of the lever causes both yokes to move simultaneously. Adjusting screws and locknuts are provided on the top of the unit. These provide stops to prevent an over travel of the controller in the full ON position. The gear segments in the unit should be lubricated periodically with a high grade of multipurpose grease. PUSHBUTTON CONTROL STATION, The pushbutton control station is used for floor controlled operation of the crane. The pushbuttons are housed in a weather-proof -case which is suspended from the crane. The number of pushbuttons in the station is determined by the number of motion to be controlled from the pushbutton station. Three types of push buttons are used, depending on the type of control. The single speed pushbutton is a simple make-break switch. When this type of button is used, only one speed can be obtained from the motion. The speed of the motion is unaffected by the amount of pressure used to depress the button. 5-22 TYPE II JOY STICK. The operation of the Type II joy stick is as follows: See Figure 5-28. 1. Movement o the joy stick handle from left to right, as viewed from the operator's seat, causes the bevel gear to rotate. The movement of the bevel gear rotates another bevel gear attached to the con troller. The speed of the motion is determined by the amount of handle movement from the centered OFF position. 2. Movement of the joy stick handle from front to ,, 0 back, as viewed from the operator's seat, causes the f handle gear to move the round rack gear back and V. ... forth. The back and forth movement of the round Toth 00644 c') CONTROL SYSTEMS rack gear causes the rack gear to move back and forth, and rotates the gear attached to the controller. The speed of the motion is determined by the amount of handle movement from the centered OFF position. 3. Diagonal movement of the joy stick handle will cause the bevel gear and rack gear to actuate their SECTION V individual controllers, winch In turn actuate their respective motions. The speed of the two motions will depend on the amount of handle movement in a diagonal direction from the centered OFF position. Should the handle be moved more to the left or right, in relation to the front and back movement, the con troller actuated by the, bevel, gear, will be more OK than the controller actuated by the rack gear. Toth 00645 Toth 00646 (brIDOE DRIVE SYSTEM SECTtOH 1 mm mmi *$gjg; y-gfp'i SECTION VI BRIDGE DRIVE SYSTEM !<? m . ISSINTRODUCTION ri#S: fttlour basic types of bridge drives are used on elocoverhead cranes. Each is illustrated in Figure mt' Center Gear Case Drive Center Motor Drive ">jig#s;:V--..- mSSi Dual Gear Case Drive |s4j Individual Wlieel Drive i|g|he function of tire bridge drive is to propel the "sjoridge along the bridge runway. All the drives are gs||si.milar, in that power from an electric motor is Jglffipansttutted through a gear case and suitable shafts ^ggsfe the drive wheels at the ends of the bridge girder. Sf.V/rT jtHiThe center gear case drive is illustrated in Figure a^^A3. The drive consists of a single electric motor ll|fsupplying power to a single reduction gear Case. The s^SCar1 case is connected by shafts to the drive wheels Tpfl&t the ends of the bridge girder. As illustrated in ^ifeFigure 6-3 the drive wheels can be directly congiyfocted to the gear case, or connected to tiie gear 4|ggba8e through a gear and pinion at the drive wheels. figure 6-3 illustrates the typical center motor drive, tjiS^Thls drive uses a single electric motor, with the out- shaft extending from both ends of the motor, "^^^Shafts connect the motor to two gear cases, one lo- j|C|:\?.ated near each end of the bridge girder. The drive ^^^irheels are connected directly to the gear cases. Figure 6-4 illustrates the typical dual gear case drive. This drive is a combination of the center gear case and center motor drives. It incorporates a single motor and gear case at the center of the bridge girder with hvo gear cases near each end of the bridge girder. The drive wheels are connected directly to the gear cases near the ends of the bridge girder. Figure 6-5 illustrates the typical individual wheel drive. It consists of a single motor, gear case, Shaft, and wheal, driving One end. of the bridge. Two individual wheel drives are used to propel the bridge along the runway. Each electric motor supplies power to a gear case, which is directly connected to a drive wheel on the bridge, A variation of this drive is shown in Figure 6-1. The cross shafting which connects the two motors together allows the bridge to continue' to run at a reduced speed in the event that one electric motor falls. The maintenance and adjustment of the above com ponents are described in the order they appear in Figure 6-1, starting with the electric motor, ELECTRIC MOTORS NOTE The description and maintenance procedures in the following paragraphs are general in. nature. For more specific Information, refer to B&H Bulletins ED-6 (AC wound rotor mo tors), ED-7 (DC motors) and ED-11 (AC squirrel cage motors). 6-1 Toth 00647 aWM^ WWW IWB IM^ SECTION Vt MOTOR BRAKE DRIVE WHEEL DRIVE WHEEL CENTER GEAR CASE DRIVE CENTER MOTOR DRIVE BRIDGE DRIVE SYSTEM DRIVE WHEEL DRIVE WHEEL END GEAR CASE DRIVE WHEEL OPTIONAL CROSS SHAFTING 7~ MOTOR KOTOR BRAKE INDIVIDUAL WHEEL DRIVE MOTOR Figure 6-1, Typical Bridge Drive Arrangements GENERAL, All crane motors are built specifically for rugged crane service. They are designed for rapid acceleration and frequent reversals. Both Al ternating Current (AC) and Direct Current (DC) motors are used for crane applications, depending on the type of power supply. The DC motors are normally series wound, totally enclosed, with a split or solid frame. The AC motors are normally of the three phase wound rotor or' squirrel cage induction type, with an enclosed Or enclosed fan-cooled housing. WARNING Disconnect and lock open the power supply on the crane before starting any work on the motors, MAINTENANCE. The maintenance procedures for the electric motors, both AG and DC are similar. It is recommended that a periodic inspection schedule 6-2 be set up to inspect and clean the motors, Various forms are provided at the rear of tills manual for the purpose of recording test results and various motor information. These forms should be copied and included as part of the periodic inspection sched ule. The following points should be kept in mind when in specting the motors: 1. The motor should be blown out or vacuumed at least every 6 months, more often if conditions war rant, to - keep the motor free of dust or other con taminants. Wipe any dirt from the exposed con ductors, so a short circuit cannot be established between the conductors. 2. The stator and rotor should be subjected to an insulation resistance test by means of a 600 volt megger. The insulation resistance between the rotor, stator, and ground should not be less than 1 Megohm, Toth 00648 Figure 6-2, Typical Center Gear Case Drive (i The frequency at which the test should be performed will depend on the operating conditions, 3. Inspect the banding for tightness, 4. The flexible copper brush shunt must be securely fastened to the brush holder. 5. When replacing or renewing the brushes, they must be carefully fitted to the contour of the com mutator or slip rings with fine sandpaper (#00). After seating the brushes, remove them from the holders and clean the brushes and holder to insure free movement of the brushes in the holders. Re move the carbon dust from the motor after sanding the brushes. 6. The slip rings must be Kept clean, smooth, and concentric. They can be cleaned with any commer cial electrical cleaning solvent or fine sandpaper (400). 6-3 M i-l: I iij VA Toth 00649 SECTION VI -MOTOR MOTOR BRAKE ONLY HALF OF THE drive is Shown. THE REMAINING PORTION IS AS SHOWN FIGURE 6-1 BRIDGE DRIVE SYSTEM GEAR CASE Figure 0-3. Typical Center Motor Drive CENTER GEAR CASE END GEAR CASE DRIVE WHEEL' Figure 6-4, Typical Dual Gear Case Drive 6-4 Toth 00650 BRIDGE DRIVE SYSTEM SECTION VI Figure 6-5, Typical Individual Wheel Drive 7. If the slip rings are rough or pitted, smooth out with fine sandpaper, turn down with a light cut on a lathe, or grind with a fine stone, followed by a pol ishing with #00 or #000 sandpaper, In addition to the points discussed above, the DC motor requires the following inspection and main tenance, The commutator surface must be smooth, concentric, and properly undercut. The normal ap pearance of the commutator is chocolate brown in color. If any of these conditions do not exist, one of the following procedures is recommended; 1, Sand the commutator with fine sandpaper to smooth out any pitting or roughness. 2. If the commutator is eccentric or deeply pitted, remove the armature and take a slight cut oil the commutator in-a lathe, followed by undercutting and a final polishing. The undercut grooves must be kept free of carbon dust. 3, Be sure the mica between the commutator bars is undercut to a depth of approximately 1/32 to 1/16 inch after turning. It is advisable to make periodic inspections to make sure that the mica is not flush with the commutator bars, 4. The commutator must be kept free of Oil, grease, wax, Or other contaminants, AC MOTORS, If brush adjustment is required, the following procedure should bo used; 1, Check all brushes to insure that they make good contact with the slip rings and they move freely in the brush holders. See Figure 6-6, for AC Motors G-5 Toth 00651 SECTION VI 2, Adjust brush pressure by moving the adjusting pin. The brush pressure must be maintained be tween 3-1/2 and 4-1/2 pounds per square inch of brush contact surface. Dual voltage AC motors have a connection plate at tached to the side of the motor. Should it be neces sary to reconnect the motor from low voltage to high voltage (or high voltage to low voltage), discon nect the power supply leads to the motor, and re connect the stator terminals to the Leads in accord ance with the connection plate diagram. All crane motors are connected according to NEMA connection standards. Figures 6-7, 6-8, and 6-9 illustrate the NEMA connection standards. If the direction of rotation is incorrect, reverse any two of the three line leads to the stator at the motor or reversing contactor. For two phase motors, re verse two leads which are common to one winding. BRIDGE DRIVE SYSTEM DC MOTORS. If brush adjustment is required, the following procedure should be used: 1, Raise the pressure bar from the top of the brash and remove the brush from the brush holder. See Figure 6-10, 2. Loosen the brush holder nuts. 3. Slide a strip of wood 1/16 to 3/32 inch thick be tween the brush holder and commutator. Lower the brush holder until it makes contact with the wooden spacer. PRESSURE BAR 13T9 Figure 6-7. Stax Connection, NEMA Standard 1$8D Figure 6-8. Delta Connection, NEMA Standard u LI i TERMINAL CONNECTIONS FOR TWO PHASE STATOR -0-L2 WITH EIGHT TERUSHAL LEA&S L3-Wv-L2 4 FOR 220 VOLTS FOR 440 V0LT9 L4 LI y-- LI - L2 ------------ 1---------- LZ - L3---*----- f1 ---------------L3 L4-f_ |_ 1---- 1-- L4- . T $T4 4T3, T2. Ti lT4 JiT3 i T2 , TJ T* T5 TO T7 -+T8' -*T7 T6 TO 32H04 reel Figure 6-9. Two Phase, NEMA Standard 6-6 Figure 6-10, Brush Holder Assembly for DC Motors 4. Tighten the brash holder nuts and remove the spacer. 5. Check the space between all the brush holders and the commutator with the spacer. The space should be the same for all. Make sure that the brush hold ers are perpendicular to the commutator and prop erly positioned around the commutator, 6. Check to see that the brushes make good contact with the commutator and move freely in the brush holders. To insure good contact, draw a strip of fine #00 sandpaper between the commutator and the brushes. f CAUTION Do not use emery cloth to seat the brashes on the commutator, 7. Adjust the brash pressure by moving the adjusting pin. The brash pressure must be maintained be- Toth 00652 lyTvFsj&.j-' BRIDGE DRIVE SYSTEM tween 4 and 6 pounds per square inch of brush con tact surface, Figures 6-11 and 6-12 illustrate the wiring diagrams for the DC motors most commonly used on overhead cranes. MOTOR BRAKES SECTION VI The operation and maintenance of the motor brakes is described in SECTION IX, DIAGRAM SHOWING TERMINAL LEADS ON L.H. SIDE VIEWED FROM COMM. END ROTATION INTERCHANGE CONNECTIONS TO A1 8 A2 Figure 6-11, 4 Pole Reversible Series DC Motor without Interpoles COUPLINGS INTRODUCTION, Overhead cranes use various sizes and types of couplings to connect the motor output shaft to the gear case(s) and the gear case(s) to the drive wheels or hoist drum. The actual size and type of couplings on a particular crane will depend on the size and application of the crane. The cou plings do not normally require any maintenance, other than lubrication and checking the bolts for tightness at regular intervals. REPLACEMENT, If coupling must be replaced, the following points should be kept in mind: 1, When a straight shaft is used with a flexible or semi-flexible coupling, the shaft end must be flush with the face of the coupling to insure proper shaft float. 2, Tapered shaft ends will extend beyond the face of the coupling and must be fully seated. 3, Before tightening the compression or split type coupling, check the spacing between the shaft ends. The spacing must be approximately 1/8 to 1/4 inch between the shaft ends. To maintain proper balance of the coupling, the nuts and bolts on one side of the coupling must be installed in the opposite direction of the others. See Figure 6-13, DIAGRAM SHOWING TERMINAL LEADS OH L.H. SIDE VIEWED FROM COMM. END, CODPLING HALVES TO REVERSE DIRECTION OF ROTATION INTERCHANGE CONNECTIONS TO A1 & A2 Figure 6-12. 4 Pole Reversible Series DC Motor with Interpoles LQCKWASHER Figure 6-13. Correct Method of Bolting Split Coupling 6-7 :T;i Toth 00653 SECTION Vi BRIDGE DRIVE SYSTEM 4, The compression ox' split couplings are matchmarked to insure that they are properly balanced when assembled. DO NOT INTERCHANGE COU PLING HALVES. Be sure to align the match marks. 5, The shaft ends must be flush with the inner face of the flange type rigid coupling, to insure proper shaft spacing. If the coupling utilizes face keys, the ends of the shaft must be flush with the bottom of the face keyway. The matehmarks must be aligned to maintain proper balance of the coupling, NOTE It may be necessary to jack up the end truck to rotate the truck wheel while aligning tire shaft and face keyways. MAGNETORQUE A MAGNETORQUE electric load brake normally is not used on bridge applications. If the MAGNETORQUE is used, the location will differ, depending on the type of drive. The operation and maintenance of the MAGNETORQUE is described in SECTION vin, GEAR CASE INTRODUCTION. The function of a gear case is to transmit motor torque. As illustrated in Figure 6-14 the gear case consists of a number of different size pinions and gears, helical or spur, housed in a gear case and mesh with each other to provide a contin uous transmission of power from the input shaft to the output shaft. The size of the gears and the num ber of reductions determines the output speed and the amount of torque. The gears are press fitted to a keyed shaft and are supported in the gear case by anti-friction bearings which are enclosed in a bear ing capsule. Some bearing capsules are shimmed for the proper amount of end play during assembly. The gear cases are designed so that the top of the gear case can be removed without distrubing the gears or gear shafts. MAINTENANCE. The following points and the points in SECTION X should be kept in mind when perform ing any work on the gear case. 1. Inspect the gear case for backlash and end play. The proper backlash is manufactured into the gears and the total backlash is checked during assembly. The end play is controlled by shims used with some bearing capsules. If the shims and bearings are re moved, the same shims must be replaced at reas sembly. If shims must be replaced, replace them with shims of the same thickness as the originals, 2. Inspect the gear case lubricant for foreign parti cles or other contaminants. 3. If the gear case is equipped with a pressurized lubricating system, check for positive output of lu bricating oil from the pump. If there is not suffi cient flow of gear oil, check the gear ease for suf ficient lubricant and possible damage to the piping. 4, Coat all mating surfaces of the gear case halves with a non-hardening liquid sealer prior to reas sembling the gear case. 5. Wire all capscrews which were wired prior to disassembly. BRIDGE DRIVE WHEELS INTRODUCTION. The bridge drive wheels are matched, since wheels of unequal diameter will cause one end of the bridge to run ahead of the other. This is called "skewing". (BOTTOM) Figure 8-14. Typical Gear Case 6-8 ites INSPECTION. The drive wheels must be inspected at regular intervals as follows: 1. Measure the circumference of all the drive wheels with a steel tape measure. The variations in the circumferences must not exceed 1/32 inch. 2. inspect the wheel flanges for wear and signs of the flange rubbing against the runway rail. 3. Inspect the wheels for flat spots and any unusual wear patterns or markings. 4. Inspect the wheel bearings for lubrication, 5. Inspect the wheels for excessive float. Wheel float is the amount the wheel can move across the ( Toth 00654 bridge drive system rail from flange to flange. The wheel float is ap proximately 1 Inch for wheels with straight treads and 1-1/2 inch for wheels with tapered treads. NOTE The wheel float of the flangeless wheel is controlled by the side roller. Side float should be 1/2 Inch per aide. If any of the above conditions exist the wheel must be repaired or replaced. NOTE When replacing either a bridge wheel or a Wheel bearing, care must be taken to insure that bearing retainers, if reused, are returned to their original locations. Bearing retainers are individually fitted to the end trucks. A new bearing retainer must be firmly seated against the vertical and horizontal locating faces on the end truck, clamped, and then the mounting holes must be reamed size-on-slze. COLLECTORS AND CONDUCTORS DESCRIPTION. The function of the collectors and conductors is to provide a continuous electrical con nection between the power source and the crane, as the crane moves along the runway or as the trolley moves along the bridge. See Figure 6-1B, The col lectors are metal shoes or wheels which contact a bare metal conductor. The conductors are made from various materials and in various cross-sec tional configurations, such as figure-8, round, angle, bar, or tee. Figure-8 and round conductors are hard drawn copper wire. The angle, bar, and tee con ductors can be made of copper, aluminum or steel depending on the environment. MAINTENANCE. All the collectors and conductors must be inspected at regular intervals. Check the following items: Lock open the mainline power supply switch before performing any work on the collectors and conductors. 1. The contact surface of the collectors and con ductors must be kept clean so that good electrical connections are maintained. 2, The vertical and horizontal alignment of the entire system must be straight and true. NOTE The alignment is made with respect to the runway rail and NOT the runway beam. 3. The collectors must be adjusted to maintain proper contact pressure for the entire length of the conductor system. 4, The collector shunts must be in place and se curely fastened. Evidence of broken strands should be considered cause to consider replacement of col lector shunts, 5, The hinge points of the collector shall be lubri cated periodically with a light lubricating oil. See SECTION XV. 6. Inspect the collector shoes or wheels, and heal ings for excessive wear. Replace all worn parts. 7. Copper wire conductors must be free of kinks or bends. 8. The insulation must be kept clean to prevent a short circuit between the conductor and its support ing member. Figure 8-15. Typical Collector-Conductor System ADJUSTMENT. Whenever a collector or conductor is replaced all the collectors on the support bar must be checked to insure that they are properly aligned. Figures 6-16 through 6-19 illustrate the alignment tolerances which shall be held between the collectors and conductors. 6-9 Toth 00655 SECTION VI *1-4" TOLERANCE BRIDGE DRIVE SYSTEM 5-1/2" * 1/4" TOLERANCE 1G*8 Size Angle Conductor 2-1/2" x 2-1/2" x Thickness 2" x 2" x Thickness "X" 5-1/8" Min. 4-3/4" Min, Figure 6-16. Mainline Collectors Type "C-l" Collectors 5" *1/8" TOLERANCE Figure 6-18, Mainline Collectors Type "F" Collectors Min. Dimension of Vertical Contact Surface 2-1/2" 2" "X" 5-1/8" Min, 4-3/4" Min. Figure 6-17, Mainline Collectors Type "D-l" Collectors 6-10 Type "E-l" Collectors Toth 00656 TROLLEY DRIVE SYSTEM SECTION VI SECTION VII TROLLEY DRIVE SYSTEM WM | m I fat DESCRIPTION The function of the trolley drive is to propel the trolley along the bridge. All the drives are similar in that power from an electric motor is transmitted through a gear reduction and drive shafts to the drive wheels at the ends of the trolley. The size and number of reductions in the gear case, and the actual physical location of the various components will vary depending on the Hive and operational requirements of the trolley, The operation and maintenance of the components used in the trolley drive will be described in the order they appear, Figure 7-1, starting with the electric motor. !; in i; II ! -W kil. ;]f :f 7-1 Tu \*i Toth 00657 SECTION VI ELECTRIC MOTORS The maintenance and adjustment procedures for the electric motors are described in SECTION VI, BRIDGE DRIVE SYSTEMS. MOTOR BRAKES The maintenance rand adjustment procedures for the motor brakes will be described in SECTION IX, MOTOR BRAKES. COUPLINGS The maintenance of the couplings is described in SECTION VI, MAGNETORQUE The maintenance and adjustment of the MAGNE TORQUE electric load brake is described in SEC TION VIII. GEAR CASE TROLLEY DRIVE SYSTEM The maintenance of the gear case is described in SECTION VI. COLLECTORS AND CC^UCTORS GENERAL. The function of the collectors and con ductors is to provide a continuous electrical connec tion between the power source and the trolley as it moves along the bridge. The maintenance of the collectors and conductors is described in SECTION VI, ADJUSTMENT, Whenever a collector or conductor is replaced, all the collectors on the support bar must be inspected to insure that they are properly aligned. Figures7-2through 7-5 illustrate theproper alignment which must be maintained between the col lectors and conductors. FESTOON CONDUCTOR SYSTEM, The function of the Festoon Conductor System is to supply power to the trolley. As illustrated in Figure 7-6 the system 5-1/2" SUPPORT BAR COLLECTORS CONDUCTORS BOX GIRDER 1" MAX. TRAVEL Figure 7-2, Trolley Collectors Type "C" 7-2 --X BOX GIRDER Figure 7-3. Trolley Collectors Type "D-l" Toth 00658 TROLLEY DRIVE SYSTEM consists of a number of small trolleys, running1 on an I-beam, which supports the electrical conductor cables. The trolleys are connected together bymetal chain. The lead trolley is pulled along by the tow bar which is attached to the main trolley. SECTION VII TROLLEY DRIVE WHEELS The maintenance of the trolley drive wheels is the same as described in SECTION VI for the bridge drive wheels. SUPPORT BAR Figure 7-4. Trolley Collectors Type "D-2" Figure 7-5. Trolley Collectors Type "V" 7-3 Toth 00659 Toth 00660 HOIST SYSTEM SECTION VIII SECTION VIII HOIST SYSTEM m GENERAL The function of the hoist system is to raise and lower a load. Figure 8-1 illustrates a typical hoist system. Basically, the system is a hoist drum MOTOR BRAKE ELECTRIC MOTOR driven hy an electric motor through a gear case. The hoist drum is used to take-up and pay-out the wire rope used to raise and lower the load. The MAGNETORQUE load brake (if applied) can be lo cated between the motor and gear case as shown or at other locations depending on the design of the MACHETCRQUE HOIST DRUM Figure 8-1. Typical Hoist System jV-j 8-1 Toth 00661 SECTION VIII hoist system. An elective motor brake is used to stop and hold the load after it has stopped. The size and number of reductions in the gear case and the actual physical location of the various components will vary, depending on the size and operational re quirements of the hoisting mechanism. The operation and maintenance of the above com ponents are described in the order they appear in Figure 8-1, starting with the electric motor. stationary FIELD assembly HOIST SYSTEM (' ELECTRIC MOTOR The maintenance and adjustment of the electric motor are described in SECTION VI. MOTOR BRAKES The maintenance and adjustment of the motor brake are described in SECTION IX. Figure 8-2. MAGNETORQUE Unit COUPLINGS The maintenance of the couplings is described in SECTION VI. MAGNETORQUE MAINTENANCE. The following items should be in spected and maintenance performed as indicated: See Figure 8-2, C. Leave the drain plugs out for 1 hour after greas ing, to allow the lubricant pressure to stabilize and to prevent damage to the seals. ADJUSTMENT. The MAGNETORQUE unit does not require any adjustment. However, the procedure for adjusting the control systems which include the MAG NETORQUE unit is described in SECTION V. GEAR CASE AND LOAD BRAKE 1, The MAGNETORQUE unit should be blown out or vacuumed periodically, depending on the atmospheric conditions. 2. If the MAGNETORQUE unit is equipped with sealed bearings, they must be removed, cleaned, and repacked with Shell Darina #2 EP (P&H Specification #476) after every 10,000 hours of operation. 3. If the MAGNETORQUE unit is equipped with lubri cation fittings, proceed as follows: A, Remove the drain plugs and place a container Under the drain holes to catch the old lubricant that is pumped out. B. Pump Shell Darina #2 EP into the grease fitting until clean lubricant is expelled from the drain hole. 8-2 GEAR CASE The maintenance of the gear case is described in SECTION VI. LOAD BRAKE DESCRIPTION. The function of the mechanical load brake is to hold the load after hoisting, and to control the speed of the load when lowering. The mechani cal load brake consists of a threaded shaft with a fixed flange, a motor gear with a threaded bore, a ratchet with friction linings riveted to each side, and spring controlled pawls mounted in the gear case. See Figure 8-3, During the raising cycle, the motor gear is driven clockwise causing the motor gear to compress the Toth 00662 MOTOR GEAR MOTOR PINION INTER GEAR 6&da Figure 8-3. Principle of Mechanical Load Brake Toth 00663 SECTION VIII HOIST SYSTEM ratchet between itself and the fixed flange. The spring controlled pawls are thrown away from the ratchet, therefore, no braking action occurs. During the lowering cycle, the motor gear is driven counterclockwise attempting to release the ratchet. Simultaneously, the load on the hook drives the fixed fU.iigo counterclockwise attempting to close the brake. The pawls engage the ratchet and forces the ratchet to slip between the motor gear and flange, thereby, creating braking torque. PAWL ADJUSTMENT. The pawls must be keptproperly adjusted to clear the ratchet teeth when raising and to engage the ratchet teeth when lowering. If a rapid clicking sound occurs in the gear case during the raising cycle, the pawls are touching the tips of the ratchet teeth. To adjust the pawls, proceed as follows: 1. Loosen an adjusting screw locknut. See Figure 8-4. 2. Operate the hoist in the raising direction and slowly turn the adjusting screw counterclockwise until the clicking sound stops. Then stop the hoist and turn the adjusting screw an additional one-half turn. 3. Tighten the adjusting screw locknut, 4. Repeat steps 1 through 3 to adjust the other pawl. 5. Check the lowering motions to be sure the pawls engage the ratchet firmly at the start of the lowering motion. If the pawls noisily hammer into the ratchet teeth, the clearance is excessive and must be ad justed accordingly. INSPECTION. It is recommended that a periodic inspection schedule be set up to inspect the mechanical load brake. The frequency of inspection will depend on the operating conditions. This in spection should include the following: 1, The friction surfaces of the motor gear and fixed flange, and the pawl plugs must not be excessively worn or polished. 2, The brake must not be chattering. 3, The oil in the brake gear case must be at the proper Level. 4, The friction linings must not be excessively worn. HOIST LIMIT SWITCHES GENERAL. The hoist limit switch is a safety device which prevents the bottom block from coming in con tact with any part of the trolley. All limit switches are similar, in that they open circuits to stop the hoisting motion when the bottom block is raised above ( a preset upper limit. Figure 8-4. Load Brake Pawl Adjustment (100A2546) 8-4 Toth 00664 * SHEAVE CORD SHEAVE A POSITION 1 CLOSED CIRCUIT POSITION 2 OPEN CIRCUIT POSITION 3 PLUGGING (REVERSE) CIRCUIT A - HOISTING CIRCUIT CONTACTS B-PLUGGING CIRCUIT CONTACTS HOIST ROPES NOTE TRIP LEVER SHOWN IN THE LOWEST POSITION WITH LIMIT SWITCH CONTACTS AS SHOWN IN POSITION 1. Figure 8-5. Type R Limit Switch " '' ' i ini..<iniii.L-i.i -.... inL-xrai.v i r- n i Toth 00665 ipr- SECTION VIII The hoist limit switches automatically reset when the bottom block is lowered below the preset upper limit. Two types of limit switches are used on crane appli cations. They are the weight operated limit switch and the geared limit switch. The operation, and maintenance of both is described in the following paragraphs. WEIGHT OPERATED IT MIT SWITCHES. The most common types of weight operated limit switches are illustrated in Figures 8-5 through 8-7. The following general description applies to all weight operated limit switches, regardless of type designation. The basic operation of any weight operated limit switch is as follows; 1, When the bottom block is below the preset upper limit, the reset counterweight or bar maintains the limit switch in its normal operating position. See Position 1, Figure 8-5. 2. When the bottom block approaches its preset upper limit it contacts the reset counterweight or bar. Further upper movement of the bottom block NORMALLY OPEN CONTACTS HOIST SYSTEM ( \ Figure 8-6. Type DB Limit Switch 173 8-6 lifts the reset counterweight or bar, allowing the operating lever or sheave to rotate. As the operat ing lever or sheave rotates, it turns a shaft on which tiie actuating cams are mounted. Therefore, as the shaft rotates, the earns rotate until they open the normally closed contacts of the limit switch. This stops the hoist motor and applies the motor brake. See Position 2, 3. If the bottom block drift beyond the preset upper limit, the reset counterweight or bar continues to rise, and the actuating cams rotate still further. Eventually, the plugging cams close the plugging circuit contacts. This reverses the hoist motor and lowers the bottom block below the preset upper limit. See Position 3. Not all of the limit switches have plugging circuit contacts, and some of the limit switches that do have plugging circuit contacts use these contacts for pur poses other than plugging. The function of the plug ging circuit contacts, as applied to a particular ap plication, can be determined by referring to the wiring diagrams furnished with the crane, Normal limit switch maintenance consists of re placing the contact tips when they are burnt. The procedure for replacing the burnt contact tips is as follows: 1. Remove the limit switch cover. Toth 00666 HOIST SYSTEM SECTION VIII ( 2, Remove and replace all the contact tips. 3. Loosen the two cam clamping screws 1/4 turn each. 3. Replace the caver and test the limit switch to be sure that it is operating properly. 4. Depress the upper limit switch adjusting pinion with a screwdriver until it meshes with the adjust able upper limit cam. GEARED LIMIT SWITCH. The adjustable geared limit switch opens the HOIST circuit when the bottom 5. Rotate the cam in the direction to open the nor block reaches a preset upper limit and opens the mally closed contacts. The white marker on the LOWER circuit when the bottom block reaches a pre gear teeth is directly over the nylon roller which set lower limit, The limit switch is driven by the actuates the switch. Continue to rotate the cam until hoist drum, and is actuated after a predetermined the contacts just open. number of drum revolutions. 6. Tighten the two clamping screws. Both the HOIST and LOWER circuits are connected through sets Of normally closed contacts in the limit 7. Operate the hoist to lower the bottom block to the switch. Both the upper and lower limits of bottom desired lower limit of travel. block travel are preset at the factory. If the limit switch requires adjustment, proceed as follows: See 8. Adjust the lower limit switch cam in a sequence Figure 6-8, similar to that used in steps 3, 4, 5, and 8. 9. Operate the hoist to check the upper and lower limit settings and readjust if necessary. 10. Replace the limit switch cover. MAINTENANCE OF WIRE ROPE Figure 8-8. Geared Limit Switch Adjustment NOTE The lower limit of bottom block travel must be set so that the LOWER circuit opens when at least two wraps of cable remain on the drum. The upper limit must be set so that the bottom block stops a minimum of 6 inches before contacting the hoist drum or any part of the trolley. Sufficient clearance must be allowed to provide for a few inches of drift after the HOIST circuit is opened. 1. Remove the limit switch cover. 2, Operate the hoist to raise the bottom block to the desired upper limit of travel. GENERAL, All wire rope will eventually deteriorate to a point where it is no longer servicable. There are three basic causes of wire rope deterioration. They ax'e; 1. Abrasion or wear. 2. Corrosion. 3. Fatigue, caused by the pulling, bending, crushing or kinking forces applied to the rope during normal service. None of the above causes of deterioration can be eliminated entirely. However, all three can be mini mised, thus insuring the longest possible safe serv ice life from the rope. INSPECTION. The first step toward the proper care of wire rope is an inspection schedule. All wire rope used in critical service {lifting of loads, etc.) should be inspected on a regular periodic basis, preferably at least weekly. This inspection should be aimed at determining the degree of deterioration at the worst rope lay, since this will determine the suitability for continued service. By definition, a rope lay is the axial distance along the rope in which one strand makes one complete turn around the rope. The in spector should pay particular attention to the follow ing: 1. Internal wear caused by grit penetrating between the strand and wires. 2. Kinking. 8-7 B Toth 00667 SECTION VIII HOIST SYSTEM 3. Lubrication. 4. Corrosion, 5. Number of broken strand per lay. 6. The manner in winch the fittings are attached. 7. The condition of the sheaves over which the rope must pass, including sheave alignment. 8. The amount of wear on the outer wires. Any evidence of serious rope deterioration from cor rosion should cause consideration to be given to re placing the rope. More than one broken wire in any one strand should be cause for caution, Breaks oc curring in the valley between adjacent strands are generally a warning of an abnormal condition, justi fying caution. WRONG WAY RIGHT WAY Any of the following conditions should cause the in spector to question the remaining strength of a rope, and to give consideration to the possibility of dis carding the rope. 1. If the core shows through more than one pair of strands. 2. Kinking damage is severe. 3. Evidence of improper lubrication, combined with other defects. 4. Wire that has come in contact with an electrical circuit or that has been subjected to overheating, 5. Serious reduction in rope diameter, 6. Evidence of "bird-caging". This increased diam eter is usually caused by the sudden releasing of a heavy load while the rope is twisted. 7. Any broken wires at the dead end of a cable should be cause for cutting off a section, preferably at least three feet beyond the broken wires. Refasten or re socket the rope. 8. Numerous broken wires or as many as three ad jacent broken wires in one rope lay. WHEN UNREELING OR UNCOILING WIRE ROPE-DO NOT ALLOW ROPE TO FORM A LOOP. IF LOOPS ARE FORMED, KINKING WILL RESULT. Figure 8-9. Unreeling Wire Rope ( Kinking is caused by the rope taking a spiral shape as the result of an unnatural twist in the rope. One of the most common eauses for this twist is improper unreeling and uncoiling as illustrated. Figure 8-10 shows the progressive stages of a kink, and the end result. i UNREELING WIRE ROPE, When unreeling wire rope, it is imperative that the coil or reel rotates as the rope unwinds, If the coil or reel does not rotate, the wire will be twisted as it is uncoiled, and kinking will result. A kinked rope is severly damaged, and unsafe for maximum service. Figure 8-9 shows the correct method for unreeling rope from coils or reels. Another acceptable method of reeling rope off is to place a shaft through the center of the reel and support the shaft so the reel can revolve as the rope is pulled off. If this method is used, the reel should not be allowed to revolve so rapidly that is "throws" rope off. Reel rope off slowly. 8-8 Figure 8-10. Kinking of Wire Rope Toth 00668 hoist system SECTION vm Part 1 of the illustration shows the beginning of a kink. At this stage, no harm will be done if the loop is immediately thrown out to prevent further kinking. Part 2 of the illustration shows the effect of the ap plication of a load to a kinked rope. The rope has been seriously strained and is no longer safe for maximum service, Part 3 shows the condition of the rope in part 2 after the kink has been straightened out. Strands and wires are out of position. This creates unequal ten sion and strain and will cause excessive additional wear On the damaged areas. CUTTING WIRE ROPE, When wire rope is to be cut, seizings must be plaeed on each side of the place where the rope is to be cut, to prevent unlaying of the strands. On preformed wire rope, one seizing on each side of the cut is usually considered to be suffi cient, On non-preformed wire ropes less than 7/8 inch in diameter, two seizings are recommended. On non-preformed wire rope over 7/8 inch in diameter, three seizings are recommended. Three basic methods are recommended for cutting wire rope. They are; 1. Abrasive cutting tools. A suitable abrasive cut ting machine will do the job quickly and easily. 2. Shearing tools. Wire cutters can be used to cut through smaller ropes, while special blade-action tools and a hammer are used for larger sizes. 3. Flame. Welding equipment can be used to burn cuts through wire rope. NOTE Additional information on the care and in spection of wire rope can be obtained free of charge from most wire rope manufacturers. This is a complex subject, since it deals with a question to which there is no definite an swer; namely, when will a rope break. For the sake of safety, a rope should be discarded when, in the opinion of a qualified inspector, it Is no longer safe for the service to which it is assigned. It is suggested that the person assigned to inspect wire rope used in critical applications contact a rope manufacturer for further information on the subject. Table 8*1 illustrates the cross-sections of .various types of wire rope recommended for use on P&II overhead cranes, and Table 8-2 shows the breaking strength and weight per foot on the various types Of wire rope. CABLE REPLACEMENT Figures 8-11 through 8-17 illustrate the method P&H has developed for replacement of crane cable. Al though Figures 8-11 through 8-17 show an auxiliary bottom block with 4 part reeving, large blocks with as many as 12 part reeving are handled as easily. 1, Lower the bottom block onto horses or other sup port to hold it in an upright position. Figure 8-11 2, Slip the coil of new cable over the hub of a cable changing reel which has a removable top flange or ring. With one man operating the crane, rotate the drum until all the old cable is unwound. The second man then disconnects the cable from one end of the drum and lowers the end by a handline to the third man on the floor. Figure 8-12 ?? SECTION via HOIST SYSTEM 3, The man on the floor connects the ends of the old and new cables by means of a braided wire splicer which locks in, pulling like the old familiar Japanese finger traps. Figure 8-13 ( 4. The crane operator winds up the old. cable slowly, pulling the new cable through all the sheaves, equal izers, etc. 8-10 Figure 8-14 Toth 00670 HOIST SYSTEM SECTION VIII Figure 8-15 6. Now lower the end of the old cable. The floor man attaches it to the reel which he turns manually to take up the old cable as the drum unwinds. 7. When all the old cable is on the reel, tie it and remove the coil. Attach both ends of the new cable to complete the job. Figure 8-16 Figure 8-17 8-11 'i .:i?rtTi \\.\ Toth 00671 SECTION VIII Table 8-1, Wire Rope Types TYPE - 12 6 x 42 Preformed Iron Tiller Rope 6x25 With F. W. Preformed Improved Plow Steel Wire Rope 7x7 I.W. R. C. Same as Type 4 Except to be Right Lay - Lang Lay TYPE - 14 TYPE 14 A HOIST SYSTEM ( 6 x 37 With F,W. Preformed Improved Plow Steel Wire Rope Fibre Core 6 x 37 With F,W, Preformed Improved Plow Steel Wire Rope Right Lay - Lang Lay 7 x 7 I, W, R, C. Same as Type 14 Except to be Right Lay - Regular Lay 6 x 25 With F, W, Preformed Improved Plow Steel Wire Rope Fibre Core 18 x 7 Non-Rotating Preformed Improved Plow Steel Wire Rope Fibre Core TYPE - 18 TYPE 25 6 x 37 Type With F, W. Extra High Strength Preformed Steel Wire Rope 7 x 7I.W.R.C. 6 x 25F I.W.R.C. Preformed Extra Improved Plow Steel Wire Rope (Filler Wire) F. W. - Filler Wire I. W. R. C. - Independent Wire Rope Core RIGHT LAY - REGULAR LAY RIGHT LAY - LANG LAY ALL TYPES OF WIRE ROPE LISTED IN RIGHT LAY - REGULAR LAY EXCEPT TYPES 4A & 14 - PREFORMED RIGHT LAY - LANG LAY 8-12 Toth 00672 Toth 00673 ChCIO*i aowamwvwiwmttmivaJpi^&fwx^ftffflti&rM&Xfffltf SECTION VIII INSPECTION AND MAINTENANCE OF BOTTOM BLOCK ASSEMBLIES The following points should be kept in mind when in specting and maintaining the bottom block assem blies: 1. All sheave grooves must be smooth to prevent possible damage to the wire rope. Clean up any rough areas and any sharp or burred edges. 2. Make sure that all sheaves rotate freely. If a sheave binds Oil a sheave pin, the wire rope will be dragged th rough the sheave groove and damage to the wire rope and/or sheave may result, 3. Make sure all sheave pins are securely retained in position. 4. Make sure the hook nut retaining bolt is in place and securely tightened. 5. Replace the hook nut immediately if it shows any signs Of wear or damage. 6. Check the hook safety latch for proper operation. 7. Clean up any rough areas and any sharp edges on the sheave frame, 3. At least annually, the crane hook should be in spected for cracks by the Magnetic Particle, or other HOIST SYSTEM suitable crack testing inspection methods, to deter mine that no cracks are discernible, A IS per cent increase in the throat measurement of the hook or a 10 per cent bend in the hook shall also be considered reason for replacement. 9. Refer to SECTION GENERAL MAINTENANCE when removing, cleaning, inspecting, and reassem bling a bottom block assembly. MAGNET CABLE REELS Magnet cable reels are used on cranes using lifting magnets or electrically operated buckets to take-up and pay-out the electrical conductor cable. Magnet cable reels are power driven or of the spring take-up type. Refer to the manufacturer's literature in the master parts books for information on the maintenance, lu brication, and inspection of the spring take-up type of magnet cable reel, Power driven magnet cable reels are connected to th hoist drive mechanism, and are designed to takeup and pay-out at about 95 per cent of magnet hoist speed. 4 6-14 Toth 00674 MOTOR BRAKES aiaaiMaato. SECTION IX a SECTION IX MOTOR BRAKES INTRODUCTION Motor brakes are grouped under three basic types: electric, hydraulic, and electric-hydraulic, NOTE This section does not cover the P&H types ABE, SBEM and SSM brakes. Refer to P&H ED Bulletins ED-12, ED-13 and ED-14, re spectively, for information on these brakes. i Brakes are an important factor in the safe operation of a crane. Therefore, it is recommended that a periodic preventive maintenance and inspection schedule be set up for the motor brakes. All brakes must be inspected weekly and adjusted, if necessary, to ensure that they operate properly. This interval assumes a normal 8 hour work day. The proper maintenance and adjustment procedures are described in this section. CAUTION load to the floor, and lock open the crane power supply disconnect switch. ELECTRIC BRAKES SHOE BRAKE DESCRIPTION. The shoe type electric brake is spring set - electrically released. Operating the motion control device associated with a crane motion closes the circuit which applies power to both the motor and brake coil. See Figure 9-1. Returning the motion control device to the OFF posi tion opens the circuit to both the motor and brake coil, arid the spring sets the brake. ADJUSTMENT. The shoe brake has three adjust ments: torque spring, magnetic air gap, and shoe equalization. To adjust the brake, proceed as fol lows: Before adjusting any pox'tion of any electric hoist brake, lower the bottom block and/or MAGNETIC AIR GAP ADJUSTING HUTS LOCKNUT (1) 1, The torque spring adjustment is accomplished by loosening locknut (2, Figure 9-1), and turning the ad- TORQUE SPRING ADJUSTING NUT .LOCKNUT (2) BRAKE POT BRAKE COIL BRAKE WHEEL MAGNETIC AIR GAP "S" ARMATURE f III ADJUSTING SCREW 4 LOCKNUT(3) SHOE EQUALIZATION Figure 9-1. Shoe Brake - Adjustment 9-1 Toth 00675 SECTION IX MOTOR BRAKES Table 9-1, "L" Dimensions for CD and CDH Shoe Brakes BRAKE NUMBER ORIGINAL LINING THICKNESS LINING PRESSURE AT RATED TORQUE LBS/IN. "L" DIMENSION 8-CD (CDH)-100 1/4 18.6 4-9/16 10-CD (CDh)-200 3/8 20.3 5-31/32 13-CD (CDH)-550 3/8 21.5 8-5/32 16-CD (CDH)-1000 1/3 21,6 7-27/32 19-CD (CDH)-2000 23-CD (CDH)-4000 1/2 1/2 23.7 25.0 li-3/32 12-11/16 Note: The "Brake Number" consists of three parts: the prefix which indicates the brake wheel diameter; the type brake (either type CD or CDH); and the suffix which indicates the torque rating: for 1/2 hour foot pounds. justing: nut until spring length "L" is obtained. See Table 9-1, Tighten the locknut. The brake torque can be reduced by increasing the spring length. The spring length must not he shorter than the length shown in Table 9-1. 2, The air gap adjustment is accomplished by loosen ing locknut (1), and turning the two adjusting nuts until air gap "S" is 3/64 of an inch. Tighten locknut (1) against the adjusting nuts. Check the air gap at point "S", Figure 9-1, The air gap shall not exceed 3/32 of an inch at any time. 3. The shoe equalization adjustment is accomplished by backing off air gap locknut (1) and tightening it against the yoke until the air gap "S" is closed. Loosen shoe equalization locknut (3) and turn the ad justing screw until equal clearance is obtained be tween both shoes and the brake wheel. Tighten lock nut (3) and check the clearance to be sure that the adjustment did not change when tightening the locknut. Tighten locknut (1) against the adjusting nut. Figure 9-2. Shoe Brake - Friction Lining Replacement MAINTENANCE, The brake friction linings must be replaced when they are worn to approximately one half of the original thickness shown in Table 9-1. The determining factor as regards replacement, is to prevent brake wheel damage due to contact between the brake wheel and rivet heads. To replace the brake linings, proceed as follows: 1, Loosen locknut (1, Figure 9-2) and tighten the locknut against yoke (2) until air gap "S" is closed, 2, Remove nut (3) and swing brake jaw (4) outward to disengage torque rod (5). Swing the torque rod over brake pot (6). 3, Then remove Hie brake shoe assembly through the top of the brake jaw. Care must be taken not to loosen friction plugs (7) and the spring in the brake Shoe assembly. Replace the brake linings. 9-2 4. Replace the brake shoes and reassemble the brake in the reverse order of disassembly. Adjust the brake as described under the topic ADJUSTMENT. The shoe type brakes are equipped with pins and bushings at the various pivot points, The pins and bushings must be replaced as soon as they show signs of wear. Block up the brake pot before starting to dis- assemble the brake, so that it wilt not drop and cause injury or damage. 1 Toth 00676 MOTOR BRAKES DISC BRAKE DESCRIPTION. The disc type electric brake is spring set - magnetically released. Operating the motion control device associated with a crane mo tion closes the circuit which applies power to both the motor and brake coil. See Figure 9-4, Energizing the brake coil pulls armature (9), com pressing spring (7), thus releasing the brake. Returning the motion control device to the OFF po sition opens the circuit to both the motor and brake coil, and the spring sets the brake. ADJUSTMENT, The brake must be properly adjusted to release when power is applied and to stop the mo tion when the power is shut off. At least once every month inspect the brake to determine if adjustment is necessary. Adjust as follows: (See Figure 9-3.) 1, Loosen the locknuts, 2, Turn the adjusting nuts until the air gap "S" is 1/32 of an inch, 3, Tighten the locknuts and check air gap "S". Rej adjust if necessary. LOCKNUT SECTION IX Figure 9-4, Disc Brake Assembly not Figure 9-3. Disc Brake Adjustment DISASSEMBLY, To disassemble the brake, proceed as follows: 1. Remove brake cover (6, Figure 9-4). 2. Disconnect the leads to magnetic brake pot (6), 3. Insert a 1/2-13 UNC bolt through the opening in the end of the brake pot and thread it into spring guide (4), Tighten the bolt a few turns to relieve spring pressure on armature (9) and to ensure that the spring guide is firmly retained by the bolt. 4. Remove the three adjusting nuts and lockwashers from the brake pins and slide the magnetic brake pot off of the pins, 5, Remove armature (9), disc type brake linings (10), disc plate (2) and back plate (1). NOTE If it is necessary to remove spring guide (4), compression spring (7) and spring spacer (8) from the brake pot, set the brake pot on a work bench with the spring guide towards the bench. Hold the brake pot down with one hand while slowly removing the bolt which was in serted in step three. Slowly allow the brake pot to rise as the spring extends. INSPECTION, The following items should be in spected after the brake has been disassembled: 1, The friction discs must be clean and free of oil, and must not be excessively worn, When the discs have worn to approximately 3/16 inch they must be replaced. 9-3 Toth 00677 SECTION IX MOTOR RRAKES 2. Inspect the friction discs, armature, and disc plates for warping, and replace if necessary. REASSEMBLY. Reassemble the brake in the re verse order of disassembly. HYDRAULIC BRAKES SHOE BRAKES DESCRIPTION, The shoe type hydraulic brake is spring released - hydraulically applied. Depressing the pedal on the master cylinder pumps hydraulic fluid to the wheel cylinder on the brake, applying the brake. The shoe type hydraulic brakes have two different configurations which are designated as the type CH and DH. The operation of both is the same and the maintenance and adjustment for both is described below. CH BRAKE ADJUSTMENT. The CH brake has two adjustments, one to compensate for brake lining wear and the other for shoe equalization. 1. The brake lining adjustment is accomplished by loosening locknut (2), and turning nuts (1 and 3) until 0.020 inch is obtained between each brake shoe and the brake wheel at the pivot point of the brake shoes, Tighten locknut (2) and cheek the adjustment to be sure that the adjustment did not change when tighten ing the locknut. 2. The shoe equalization adjustment is accomplished by backing off locknut (4) and turning adjusting screw (5) until equal clearance is obtained between both shoes and the brake wheel. Tighten the lockout and check the clearance to be sure the adjustment did not change when tightening the locknut. DH BRAKE ADJUSTMENT. The DH brake is Self-'pip adjusting and does not require any adjustments dUr-! ing normal operation. However, the brake mu -J be adjusted whenever it has been disassembled. Adjust' the brake as follows: (See Figure 9-6.) ?M 1. Loosen the locknut and turn the adjusting nuts until approximately 0.020 inch is obtained between each brake shoe and the brake wheel at the pivot point of the brake shoe. Tighten the locknut and chock tho clearance to be sure the adjustment did not change when tightening the locknut. MAINTENANCE. The procedure for replacing the brake linings for both the DH and CIf brake is de scribed below. To replace the brake linings of the CH brake, pro ceed as follows: 1, Remove nuts (2 and 3, Figure 9-5), swing the brake jaws outward, and disengage torque rod (6). 2, Remove the brake shoes and replace the linings. 3, Readjust the brake. NOTE It may be necessary to back off the shoe equalization adjusting screw (5) to allow the brake jaws to open, To replace the brake linings of the DH brake, pro ceed as follows: 1. Remove the locknut and adjusting nut. Swing the brake jaws outward and disengage the torque rod, Mil See Figure 9-6. 2. Remove the brake shoes and replace the linings. 3. Readjust the brake. DISC BRAKE DESCRIPTION. The disc type hydraulic brake is spring released - hydraulically applied. Depressing the pedal on the master cylinder pumps hydraulic fluid to the brake cylinder, applying the brake. See Figure &-7, ADJUSTMENT. The brake must be kept properly adjusted at all times. To adjust the brake, proceed as follows: 1. Remove the cover. 9-4 Toth 00678 ADJUSTING NUTS LOCKNUT SECTION IX iWl LOCKNUT WHEEL TORQUE ROD BRAKE CYLINDER RELEASE-STOP SHAFT BASE Figure 9-6, DH Shoe Brake Adjustment BRAKE CYLINDER SUPPORT PLATE 2, Loosen the locknuts. Push the disc plates and friction discs away from the brake cylinder by hand mid turn the adjusting nuts until the air gap "S" is 0.040 inch. 3. Tighten the locknuts and check air gap "S". Re adjust if necessary. SCREW BRAKE CYLINDER DISASSEMBLY, To disassemble the brake, proceed as follows: 1. Remove the brake cover. 2, Disconnect the hydraulie line to the brake cyl inder. yw/wwyil > CAUTION I Cap the hydraulic line to prevent loss of or contamination of the hydraulic fluid. AIR GAP "S" 3, Remove the locknuts. Remove the brake cylinder support plate with the brake cylinder. The brake cylinder can be removed by removing the screws which attach the cylinder to the support plate, 4, Remove the adjusting nuts and slide the disc plates and friction discs from the brake pins. FRICTION DISC 8RAKE ^ COVER Figure 9-T. CH Disc Brake Assembly INSPECTION, The following items should be in spected after the brake has been disassembled: 1, The frictton discs must be clean and free of oil, and must not be excessively worn. When the discs have worn to approximately 3/16 inch they must be replaced. 9-6 Toth SECTION IX MOTOR BRAKES 2. Inspect the friction discs and disc plates for warp ing and replace if neeessary. REASSEMBLY. Reassemble the brake in the re verse order of disassembly. ELECTRIC-HYDRAULIC BRAKES SHOE BRAKE DESCRIPTION. The shoe type electric-hydraulic brake is a combination of the electric and hydraulic brakes. This brake serves two functions, parking brake and service brake. The parking brake portion Of this brake is spring set - electrically released. Energizing the crane applies power to both the crane controls and the brake coil, releasing, the brake. The parking brake will remain in the released position as long as power is applied. The service brake portion of this brake is spring re leased - hydraulically applied. Depressing the pedal on the master cylinder pumps hydraulic fluid to the wheel cylinder, applying the brake. and tightening it against the yoke until air gap "S" is closed. Loosen shoe equalization locknut (3), and turn the adjusting screw until equal clearance is ob- tafned between both shoes and the brake wheel. Tighten locknut (3) and check the clearance to be sure that the adjustment did not change when tighten ing the locknut. Return the adjusting nut from the yoke to its Original position. * MAINTENANCE. The brake friction linings must be replaced when they are worn to approximately one half of the original thickness shown in Table 9-1, The determining factor as regards replacement, is to prevent brake wheel damage due to contact be tween the wheel and rivet heads. To replace the brake linings, proceed as follows: 1. Loosen the adjusting nut closest to the yoke, and tighten it against the yoke until air gap "S" is closed. 2. Remove locknut (1) and the adjusting nut. Re move the wheel cylinder, swing the brake jaws outward, and disengage the torque rod, . ADJUSTMENT. The shoe brake has three adjust ments: torque spring, magnetic air gap, and shoe equalisation. To adjust the brake, proceed as fol lows: (See Figure 9-8.) 3. Then remove the brake shoe assembly through the top of the brake jaw. Care must be taken not to loosen the friction plugs and spring in the brake shoe assembly. Replace the brake linings. 1, The torque spring adjustment is accomplished by loosening locknut (2) and turning the adjusting nut until spring length "L" is obtained. See Table 9-1, Tighten the locknut. The brake torque can be re duced by increasing the spring length. The spring length must not be shorter than the length shown in Table 9-1. 2. The air gap adjustment is accomplished by loosen ing locknut (1), and turning the adjusting nut until air gap "S'1 Is 3/64 inch. Tighten the locknut. Tighten the hydraulic return spring nut sufficiently so that the hydraulic fluid is pumped back to the master cylinder. Check the air gap at point "S," Figure 9-8. The air gap shall not exceed 3/32 inch at any time. 4. Replace the brake shoes and reassemble the brake in the reverse order of disassembly. Adjust the brake as described under the topic ADJUSTMENT, ^ DISC BRAKE < GENERAL, The operation of the disc type electrichydraulic brake is generally the same as described for the shoe type electric-hydraulic brake. See Fig ure 9-9, ADJUSTMENT. To adjust the brake, proceed as follows: 1, Remove the brake cover. 3, The shoe equalization adjustment is accomplished by backing off the adjusting nut closest to the yoke, 2. Back off the locknuts on the brake pins, and turn the adjusting nuts until ah' gap "S" is 1/32 of an inch. MAGNETIC AIR GAP ADJUSTING NUTS YOKE TORQUE SPRING ADJUSTING NUT 9-6 Toth 00680 SECTION IX %. IjSiflB if I f; |: s' ? !; 3, Tighten the locknuts, and check the air gap to be sure the adjustment did not change when tightening the locknuts. 5. To disassemble the brake pot assembly, proceed as follows: DISASSEMBLY. A. Place the brake pot assembly on a work bench with the armature against the bench, To disassemble the brake,proceed as follows; 1. Remove the brake cover. See Figure 9-9. 2, Remove the hydraulic hose to the brake cylinder, B. Hold the assembly down by hand, slowly remove the capscrews, and allow the assembly to raise, C. Remove the spring and spaeer. and disconnect the electrical leads to the brake coil. D. Remove the pin and unscrew the brake cylinder. [ CAUTION 6, Remove the locknuts and slide the disc plates and friction discs from the brake pins. Cap the hydraulic line to prevent loss of or contamination of the hydraulic fluid, 3, Install a 1/2" x 10-24 capscrew in the brackets on each side of the brake pot. Tighten the capscrews to ensure that the armature is firmly retained by the capscrews. 4, Remove the adjusting nuts and lockwashers. Re move the brake pot assembly. INSPECTION. The following items should be in spected after the brake has been disassembled: 1, The friction discs must be clean and free of oil, and must not be excessively worn. When the discs have worn to approximately 3/16 inch they must be replaced, 2. Inspect the friction discs, disc plates and arma ture for warping and replace if warped. REASSEMBLY, The brake is reassembled in the re verse order of disassembly. HYDRAULIC SYSTEM GENERAL MAINTENANCE The following points should be kept in mind when working on the hydraulic system: 1, Tolerances of working parts in hydraulic systems are very close. Even small amounts of dirt or for eign material in hydraulic systems can cause wear or damage to the components and cause generally faulty operation of the system. Every precaution must be taken to assure absolute cleanliness of the hydraulic system and fluid, 2, Whenever the system is drained, itie system should be flushed and new hydraulic fluid of the type originally used, added as required, 3, All containers and funnels used for hydraulic fluid must be clean. Use a funnel with a 200 mesh screen for filling the hydraulic fluid reservoir. 4. Never mix fluids of different types or brands. See SECTION IV for hydraulic fluid specifications. 5, Whenever there is a hydraulic system component failure which gives reason to believe that there are r metal particles or other foreign material in the sys tem, drain and flush the entire system. Refill the Figure 9-9. Disc Brake Assembly system witli clean hydraulic fluid, 9-7 Toth 00681 SHCTIDN IX MOTOR BRAKES 6. Ail hydraulic connections must be kept tight to prevent leakage, 7, When removing any hydraulic component, be sure to cap the hydraulic line and plug the ports of the re moved component. 8, All hydraulic components must be disassembled and assembled in clean surroundings. During dis assembly, pay particular attention to the identifica tion of parts for proper assembly. Clean all metal parts in clean denatured alcohol and rinse in hy draulic fluid before reassembly. Be sure to Clean all internal fluid passages. After the parts have dried thoroughly, lay them on a clean, lint-free sur face for inspection. 9. Always replace all O-rings, and seals when over hauling a hydraulic component. Lubricate all parts with clean hydraulic fluid before assembly. Soak all seals in hydraulic fluid before installation. Use a small amount of petroleum jelly to hold O-rings in place during assembly. 10. Be sure to replace any lost hydraulic fluid alter completing the installation of a repaired component. ; CAUTION \ Hydraulic fluid must never come in contact with the brake linings. 11. It is considered good maintenance practices to check the adjustment of any brake which does not seem to be operating properly, and also to check the master cylinder pedal linkage before removing any item from the brake system for repairs. Poor ad justments are more likely to be the trouble than a malfunction of an assembly. 2. Close the mainline disconnect switch on the crane, 3, Depress the remote bleeder pushbutton, and pump the master cylinder pedal until the soft spongy pedal action disappears. WITHOUT REMOTE BLEEDER. To bleed systems without a remote bleeder, proceed as follows; NOTE Two men are required to bleed systems with out a remote bleeder. 1. Check the brake for proper adjustment. 2. Attach a bleeder hose to the bleeder fitting on the wheel cylinder, and submerge the free end of the hose in a clean jar which has been filled one-third full Of clean brake fluid. See Figure 9-10. 3. Loosen the bleeder fitting three-quarters of a turn, and pump the master cylinder pedal until the fluid expelled into the jar is free Of air bubbles. 4, Tighten the bleeder fitting and remove the bleeder hose. BLEEDING GENERAL. When air is present in the hydraulic system, the master cylinder pedal will feel "spongy" and the brake will not operate properly. Air will enter the system when a master cylinder or any component is removed, or when a hydraulic line is broken or loose. Before bleeding the system, check all fittings, hoses, and lines for loose connections. Also, check the level of the hydraulic fluid in the reservoir. The level must be up to the top of the reservoir, during the entire bleeding operation, Fill as necessary with clean hydraulic brake fluid only. The following procedures are for hydraulic systems with and without a remote controlled bleeder. When ever necessary, bleed the system as follows; REMOTE BLEEDER. To bleed systems with a re mote bleeder, proceed as follows: 1. Check the brake for proper adjustment. 9-8 Figure 9-1C, Bleeding the Hydraulic System (Typical Method) MASTER CYLINDER. The procedure for bleeding the master cylinder is the same as for bleeding the hydraulic system, with the following exceptions: 1. The bleeder hose is attached to the bleeder fitting On the master cylinder. See Figure 9-11. Toth 00682 MOTOR BRAKES f I BLEEDER DRAIN HOSE SECTION Ik The procedure for flushing a system without a re mote controlled bleeder is as follows: 1, Fill the master Cylinder reservoir with clean alcohol, and proceed as described in the instructions for bleeding the system. Continue to pump the foot pedal until the alcohol being discharged from the system is clean. Figure 9-11. Bleeding the Master Cylinder 2. When more than one master cylinder or brake is used, bleed all master cylinders first. Then bleed each wheel cylinder, first from one master cylinder and then from the other master cylinder. Then re bleed each wheel cylinder from each master cylinder in the same sequence. DRAINING AND FLUSHING Whenever foreign material is found in the hydraulic system, the entire system must be drained and flushed, and refilled with the proper fluid, as listed in SECTION IV. Also, see the topic GENERAL MAINTENANCE of the Hydraulic System, SECTION IN. The procedure for draining and flushing sys tems with or without a remote controlled bleeder are as follows; To drain the hydraulic system, open the system at its lowest point and place a container under the opening. See Figure 9-12. Also, loosen the bleeder screw on the wheel cylinder three-quarters of a turn; this allows the fluid to drain from the tubing. Then pump the foot pedal until all fluid is pumped out of the master cylinder, After draining, recon nect the line and close the bleeder screw on the wheel cylinder. ONLY USED WITH REMOTE CONTROL BLEEDER SYSTEM NOTE The master cylinder must be kept full of clean alcohol during the entire flushing oper ation, 2. Drain the system as described previously, and allow the system to dry. Replace all rubber parts In the system, fill the system with clean hydraulic fluid, and adjust the brake as necessary. The procedure for flushing a system with a remote controlled bleeder is as follows: 1. Fill the remote control bleeder reservoir with clean alcohol. Continue to depress the remote con trol bleeder pushbutton, while pumping the foot pedal until clean alcohol is discharged from the system. 2. Drain the system as described previously, and allow the system to dry. Replace all rubber parts in the system, fill the system with clean hydraulic fluid, and adjust the brake as necessary. REFILLING After the hydraulic system has been drained and flushed, or whenever a new system is installed, the following procedure should be used to fill the hy draulic system. To fill a system without a remote control bleeder, proceed as follows: 1. Fill the master cylinder with clean hydraulic fluid, and keep it filled throughout the remainder of the procedure, 2, Bleed the system according to the instructions for bleeding previously given. Figure 9-12. Draining the Hydraulic System To fill a system with a remote control bleeder, proceed as follows: 1. Fill the remote control bleeder reservoir with clean hydraulic fluid. This reservoir must be kept filled throughout (lie balance of this procedure. 2, Depress the remote control pushbutton and con tinuously actuate the master cylinder foot pedal until no more air bubbles are expelled into the reservoir. 3, Replace the reservoir cap. 9-9 itit Toth 00683 SECTION IX HYDRAULIC SYSTEM COMPONENTS GENERAL The operation of the individual components of the hydraulic system are covered in the following para graphs, All the components are covered in the order they appear in Figure 0 13, starting with the master cylinder. NOTE Cap the hydraulic lines when any component of the system is removed, MASTER CYLINDERS GENERAL, Three different master cylinders are used, depending on the size of the brake, and the type of brake. The master cylinders are designated as Types I, II, and in, DESCRIPTION - TYPE I, Tho Type I master cylin der is a two stage master cylinder which incorpo- MOTOR BRAKES rates the advantages of a large piston for large vol ume and a small piston for high pressure. Fluid is initially displaced by tire large piston assembly (which contains the high pressure chamber and floating piston) through the bore in the fixed piston rod. As the large piston assembly continues forward, the floating piston contacts the fixed piston rod, Fluid from the low pressure cylinder chamber is now forced over the floating piston into the high pressure chamber. The outlet port, in the floating piston, allows the fluid to Dow through the fixed piston rod into the brake system. As fluid forced up the relief valve tube develops pressure in the relief valve chamber, the relief valve spring is balanced and the relief vaive lifts off the lower seat, Instantly the pressure is dropped to atmospheric pressure in the low pressure chamber, The fluid, from this chamber, is now displaced to the reservoir chamber via the open relief port. At the same instant the relief valve opens, the high pressure cup flares and seals, due to the drop to atmospheric pressure behind It. Mechanical input, IS .VM 0 5| ;f. g fj || ;| Jj || :|| % '< % D-10 Figure 9-13, Typical Hydraulic Brake System (100E3850) Toth 00684 MOTOR BRAKES SECTION IX Figure 9-14, Type I Master Cylinder j 9-11 SECTION IX at the push rod, is now transferred to fluid energy via the floating piston, DESCRIPTION - TYPE II. The Type H master cyl inder is a single stage type master cylinder, which has one pressure chamber to displace iluid into the hydraulic line and to provide the necessary pressure to apply braking torque. During application of the brake, initial piston move ment seals off the intake port. Then, further piston movement displaces fluid into the hydraulic line. As fluid movement increases, pressure builds up in the system. This pressure actuates the brake cyl inder to apply the brake. A residual check valve is installed at the outlet end of the master cylinder, to maintain hydraulic pres sure in the line while brake is in the released posi tion, thus lessening the possibility of air leaking into the system at the wheel cylinder. It also increases the boiling point of the hydraulic fluid. MOTOR BRAKES DESCRIPTION - TYPE III. The Type m master cylinder is a single stage type master cylinder. The operation of this master cylinder is the same as de scribed for the Type II master cylinder, with the following exceptions: 1, The master cylinder has a larger capacity. 2. The piston assembly Is housed in the fluid reser voir, WHEEL CYLINDERS Different types of wheel cylinders are used on hy draulic and electric-hydraulic brakes, depending on the size and type (shoe or disc) brake. The operation of all wheel cylinders is basically the same, and the following description will apply to all wheel cylinders. Fluid entering the wheel cylinder forces the piston outward, brings the brake shoes or discs in contact with the brake wheel or disc plates. ( \ c 1. Bushing 2. Brake Pedal 3. Felt Retainer 4. Felt Shaft Seal 5. Snap Ring 6. Retainer Plate 7. O-Ring 9-12 8. Shaft 9, Lever 10. Lockwasher 11. Capscrew 12. Supply Tank 13. Filler Plug 14. Filler Plug Gasket 15. Washer 16. Lockwasher 17. Screw 18. Spring Case Gasket 19. Spring and Case Assembly 20. Piston Assembly Gasket 21. Piston Assembly Figure 9-16, Type HI Master Cylinder ma 22. Lockwasher 23. Capscrew 24. Gasket 26. Bleeder Screw Adapter 26. Bleeder Screw 27. Gasket 28. Plug Toth 00686 MOTOR BRAKES BARREL PISTON BRAKE RECTIFIERS SECTION !X CROSSOVER VALVE 'fhe crossover valve is used only -with double station brake systems (two master cylinders and one brake). The crossover valve prevents fluid from one master cylinder from being pumped into the other. The valve consists of a valve body which resembles a tee fitting and a sliding piston inside the valve body, as shown in Figure 3-18. Hydraulic pressure applied to one end of the valve, causes the piston to move to the opposite end of the valve body, sealing off the opening at that end. internal passages allow the fluid to flow to the wheel cylinder. INTRODUCTION Rectifiers are used to convert AC power to DC be cause of the inherent disadvantages of AC powered electric brakes. , The shoe brake rectifier assembly has two circuits, one for releasing the brake quickly, and the other for holding the brake in the released position. When power is initially applied io the assembly, the brake relay (BR, Figure 9-19) closes and applies power to the brake transformer which is connected to the rec tifier. A current sensitive relay (SR) is connected in series with the brake coil. When the current has reached a preset level, relay (SR) is actuated. This opens normally closed contacts (SR) and closes nor mally open contacts (SR), thus changing the trans former output voltage applied to the rectifier. This is desirable because, once the brake has been re leased, less power is required to hold the brake in the released position. The disc brake rectifier assembly operates in a similar manner except that it does not have the hold ing circuit. BRAKE RECTIFIER MAINTENANCE SHOE BRAKE RECTIFIER. The shoe brake recti fier assembly must be inspected periodically to in sure that the current sensitive relay is properly ad justed. If the adjusting screw is about to touch the coil pole piece, the relay must be adjusted. See Figure 9-20. To adjust the relay, proceed as fol lows: 1. Actuate the relay, loosen the locknut, and turn the adjusting screw until the distance between the ad justing screw and the coil pole piece is from 0,003 to 0.005 inch. If a thickness gage is not available, a piece of writing paper can be substituted for the thickness gage. Tighten the locknut. 2. Tighten the Spring adjusting nut until the relay begins to chattel', 3. Then back off the adjusting nut until the relay stops cfiattering. Figure 9-18, Typical Crossover Valve In tiie event that the motor brake fails to release and the rectifier assembly is suspected, the following procedure should be used to check the rectifier as sembly: 1. Actuate the brake relay (BR, Figure 9-19) and measure the transformer secondary voltage between taps (XI and X3) and (X2 and X3), Compare the measured voltages -with the voltages shown in Table 9-2. If no voltage is measured, check the line fuses, brake relay, and transformer primary, and replace the defective component. 9-13 Toth 00687 Table 9-2. Shoe Brake Rectifier Data BRAKE ecDioo 10CD200 A.C, TRANS. VOLTS FORCING HOLDING XI-X3 X2-X3 D.C. RECT. VOLTS FORCING HOLDING BRAKE COIL RES, SERIES RELAY COIL RES. BRAKE COIL HOLDING AMDS. BRAKE COIL AND POT ASSEM. LIST # 60 8 52.7 6.00 1.42 .414 3,28 981E38-1 60 3 52.7 6,00 1.84 .414 2,92 981E39-1 13CD550 90 12 79.7 9.60 2.34 .414 3.48 981E34-1 16CD1000 90 12 79.7 9.60 2.675 ,414 3.10 981E40-1 19CD2000 140 18 125 15.0 1.998 .177 6.90 981E41-1 23CD4000 140 18 125 15,0 2.382 .177 5,86 981E42-3 TWO BRAKES 8CD100 140 18 125 15.0 2,84 .177 4.97 TWO BRAKES 10CD200 140 18 125 15.0 3.28 .177 4,34 TWO BRAKES 13CD550 140 30 125 25.8 4.68 .177 5,32 TWO 981E38-1 TWO 981E39-1 TWO 981E34-1 TWO BRAKES 16CD1OO0 140 30 125 25.8 5.35 .177 4.67 TWO 081E40-1 TWO BRAKES 19CD2000 140 30 125 25.8 4.0 .177 6.18 TWO 981E41-1 TWO BRAKES 23CD4Q00 140 30 125 25.8 4.76 .177 -________J 5.23 TWO 981E42-3 2. If transformer secondary voltages agree with the values shown in Table 9-2, measure and compare the rectifier output voltage. If no voltage is measured, check the transformer secondary fuses, series resistor, and rectifier input voltage. If rectifier input voltage is correct, replace the rectifier. 9-14 DISC BRAKE RECTIFIER. To check the disc brake rectifier assembly. Figure 9-21, proceed as follows: Measure rectifier output voltage and current, and compare these measurements with the voltage and current values shown in Table 9-3, If rectifier volt age is low, measure transformer primary and sec ondary voltages and compare these voltages with the ones shown on the nameplate. If these agree with the nameplate data, replace the rectifier. Toth 00688 MOTOR BRAKES ( ADJUSTING SECTION IX SPRING ADJUSTING TO A.C, POWER (BR SUPPLY TRANSFORMER CONNECTIONS 230 V PRIMARY 460 V PBJMAHY BRAKE COIL "M"1 "t3r XI rr'na ar^i SECONDARY SECONDARY Figure 9-20. SR Relay Adjustment Figure 9-21. Disc Brake Rectifier Assembly Table 9-3, Disc Brake Rectifier Data BRAKE SIZE *CD-0 *CD-1 CD-2 CD-2D CD-3 CD-3D CD-4 CD-4D CD-5 CD-5D CD-6 CD-GD BRAKE POT ASSEMBLY LIST NO. 981F75-1 981E49-1 981E43-2 981E44-2 981E46-2 981E45-2 981E48-2 981E47-2 981A6-2 981A5-2 981A7-2 981A8-2 BRAKE COIL LIST NO. 975F265-1 975F263-1 975E341-2 975E347-2 976E340-2 975S346-2 975E339-2 976E343-2 975E348-2 975E349-2 975E351-2 975E352-2 BRAKE COIL RES. OHMS 18,2 11.67 9.14 9.38 7.26 7.89 5.35 5.29 5.37 4.62 4.87 4.8 BRAKE COIL AND RECT. VOLTS 18 18 18 18 18 18 18 18 18 18 18 18 ACTUAL BRAKE COIL AMPS. ,99 1.5 4 1,97 1.92 2.4 2.28 3.36 3.4 3.35 3.9 3.7 3,75 RECTIFIER RATING AMPS. .74 1.5 2.4 2,4 2.4 2.4 4.0 4.0 4.0 4.0 4.0 4.0 * Intermittent Hoist Service 9-15 Toth 00689 Toth 00690 CEHEftAL MAINTENANCE SECTION X SECTION X GENERAL MAINTENANCE GENERAL DISASSEMBLY INSTRUCTIONS GENERAL INSPECTION AND REPAIR INSTRUCTIONS The following points should be kept in mind during disassembly of any component: 1. Disassembly should be limited to that required for specific repairs, Never disassemble an assembly beyond the point necessary to fix the trouble. 2. Never use heat from a torch to assist in removing parts unless the parts to be heated are already dam aged beyond repair. Excessive heat will damage the parts beyond repair. 3. Never use more force than necessary while dis mantling an assembly. In most cases a great deal of force is not required. When any major component has been removed and disassembled, all parts should be inspected for wear or damage. Particular attention should be given to the following items: 1, Clean all parts thoroughly, using kerosene, diesel oil, or a suitable commercial cleaning solvent. Never use a hot alkaline solution on finished parts or bearings, 2, Inspect all gears for worn, cracked, or broken teeth, 3, Inspect all bushings for wear, scoring, or galling. 4, Before performing any work on the hoisting unit(s), lower the bottom block or other lifting de vices to the floor. If the bottom block can not be lowered to the floor, secure it to some part of the crane structure that will adequately support it. 4. Replace all oil seals and 0-rings. 5, Replace all gaskets, making sure the replacement gaskets are of the same thickness as the old gaskets. Use gasket material of the same composition. 5. Care should be taken to see that the parts that 6, Inspect all anti-friction bearings for excessive have been removed are not nicked or damaged. play, distorted races, and roller wear or damage. Prepack all anti-friction bearings with a good grade 6, Tag electrical wires when disconnecting them to of bearing grease before reassembly. insure proper reconnection. Also, refer to the wir ing diagrams furnished with the crane. 7, Smooth out ridges on shafts. Be particularly careful to inspect all surfaces on which seal lip seacs. 7. Before any adjustments or repairs are started, These surfaces must be very smooth to prevent all controllers must be in the OFF position. Main wearing away the seal lip, which will cause oil or and emergency switches should be opened, with one grease leaks. I Of them being locked open. Warning signs should be placed on these switches and later removed only by 8, Inspect all threaded items and replace those with the person who placed them there. damaged threads. 10-1 Toth 00691 SECTION X WHY HEAT IT. ANYWAY? II Jon ueei an inlerlefcnce lil, il's often ccnvftiienl to stiinlt the inmi taco onto Be shall. To do this, you need to establish a diifetaice in tei'peraluro. And it's usually easier !o he ' !be bearing than to coot the stall. SOME CD'S AND DON'TS. To leal the bearing, iometse it in hot oil. Don't heal the bearing over a flame. And don't heat il atmve.S'tf'F. Plan to use enough oit-either gueitching wl that has a ItiniiTM flash point of 303?. or Iransfomer oil. CLEAN THE CONTAINER FIRST. It yw reuse oil, make sura ifs abso lutely clean by tillering it carefully. Again, use plenty of oil-becasse loo little nay heat and cool too lapldty, causing the beeritg to heat unevenly. GENERAL MAINTENANCE 9. Inspect all other parts for any evidence of dam age, Replace or repair any part which is in ques tionable condition, The cost of the part is often minor in comparison with the cost of redoing the job if the part should fail, GENERAL REASSEMBLY INSTRUCTIONS The following points should be kept in mind when re assembling any component of this machine. 1. When torque valves are specified, be sure to use a torque wrench and tighten as directed, 2. Always prepack anti-friction bearings with suit able bearing grease before final assembly. 3. If a bearing is to be heated for assembly purposes, the entire bearing should be immersed in an oil bath, or heated in an oven, for sufficient time to ensure that is heated throughout, See Figure 10-1. 4. Never force a bearing on a shaft if the fit appears to be so tight that the inner race will be distorted. Either polish the shaft seat or heat the bearing, or do both. 5. Inspect all grease passages to be sure they are open and clean. 6. Smooth out all nicks, burrs, or galled spots on shafts, bores, pins or bushings. 7. Check the fit of keys in keyways. File or grind the key, if necessary, to make sure it fits without interference, 8. Roller bearing spacers must be reassembled in the bearing from which they were removed. They are ground to fit individual bearings, See Figure 10-2. ANOTHER "HOT" TIP. Place a rack at the holloa Df the ccntainer and set the beating on it. This wTi prevest the beating Iron touching the hot bettors. Itv.il! also separate the hearing (rota any conlamination that nay have settled on the boltoa. 1; I TO HEAT BEARING UNIFORMLY. Place it in the balh as soon as heating starts. Or else allow Sutlicient line for entire beerlrtglo reach temperature. Stifoit and Seat at 300F. for 15 elrotes. Check temperature by immersing a thsr.iissselei mar bearing. iis 10-2 Figure 10-1, Heating Bearings 1. Inner Race 2. Spacer 3. Outer Race 4. Inner Race Figure 10- 2. Double Roller Bearing 1 n u Toth 00692 GENERAL MAINTENANCE f I Screw Diameter 1/4-20 5/16-18 3/8-16 7/16-14 1/2-13 5/8-11 3/4-10 7/8-9 1-8 1-1/8-7 1-1/4-7 1-3/8-6 1-1/2-6 Table 10-1. Recommended Torque Values SAE Grade 2 P&H Standard No Head Marking SAE Grade 5 P&H Hi-Tensil 5 ft. lbs. 11 It, lbs. 18 ft. lbs. 28 ft. lbs. 39 ft. lbs. 88 ft. lbs. 105 ft. lbs. 160 ft. lbs. 235 ft, lbs. 300 ft, lbs. 420 ft, lbs. 560 ft. lbs. 740 ft, lbs. 8 ft. lbs. 17 ft. lbs. 31 ft. lbs. 49 ft. lbs. 100 ft. lbs. 200 ft. lbs. 350 ft, lbs. 570 ft. lbs. 850 ft, lbs. 1050 ft, lbs. 1480 ft. lbs. 1950 ft. lbs. 2580 ft. lbs. SECTION X SAE Grade 8 12 ft. lbs. 24 ft. lbs. 44 ft, lbs. 70 ft. lbs. 125 ft. lbs. 250 ft, lbs. 440 ft, lbs. 720 ft. lbs. 1070 ft. lbs. 1500 ft. lbs. 2120 ft. lbs. 2780 ft. lbs. 3710 ft. lbs. Values listed are suggested maximums on parts carrying residual oit of manufacture. These values do not apply to plated or otherwise lubricated parts. 10-3 Toth 00693 SECTION X PREVENTIVE MAINTENANCE CRANE SERIAL NO.CUSTOMERS MACH. NO. CAPACITY_________________________________ SPAN, VOLTAGE VALUE WHILE OPERATING, .INSPECTED BY,, GENERAL MAINTENANCE , . LOCATION ^ VOLTAGE. .DATE GENERAL Preventive maintenance programs reduce overall mainte nance costs and prevent serious shutdowns by forewarning, or pointing out serious problems. Minor adjustment, clean ing and parts replacement not only maintain the high effi ciency of Overhead crane Operation, but also eliminate nui sance complaints from operators and minor shutdowns. To determine a preventive maintenance program to meet the requirements of a particular crane is virtually impos sible due to numerous variable factors such as material handled, application, local atmospheric conditions, mode of operation, load, etc. However, experience has given us the knowledge to establish an average program. This program is based on a 40 hour work week (8 hours per day, 5 days a week). The customer can apply this program in proportion to the hours the crane is worked each week. This program is one of (1) periodic inspections (2) deter mining the corrective measures required by checking the report filled out at the time of inspection. As a matter of being economical and expedient, the maintenance personnel inspecting the crane can take care of minor adjustments, cleaning and repairs where required. Periodic review of old inspection reports will point out the service life of crane components. This will foretell the need for adjustment, repair or replacement of components. The ordering and replacement of parts can be planned in advance thus minimizing time and expense involved, DAILY OPERATIONAL CHICK BY OPERATOR 1, Check the operation of all safety and warning devices such as limit switches, sirens, lights, horns, pushbuttons and other safety devices. 2. Check the operation of all brakes* When lifting maxiinum load, be sure the brakes will hold load. Make this icheck by lifting the load only a few inches from floor. / 3, Check operation of variable speed pushbuttons, when j used, to malee certain full speed control is obtained. ' ' WEEKLY INSPECTION 1. Inspeot all brakes and adjust where required. 2. Check the level of the hydraulic fluid in the master cylinder. 3. Inspect all hoisting cables for wear, kinks and broken wires. 4. Inspect all gearing and hoist cables for proper lubrica tion, (be sure to include bottom blocks, bucket, open gear ing, lumber grapple and other attachments), Lubricate all lube points requiring weakly lubrication as outlined in Section IV, Lubrication, 5. Apply several drops of Oil to all pivot points on pins and levers not equipped with grease fittings. 6. Check for secure locking on brake pins. MONTHLY INSPECTION 1. Perform the steps outlined under "WEEKLY INSPEC TION". 2. Inspect the general condition of all contactor points, auxiliary contact points on all contactors, relays, switches, limit switches and controllers. 10-4 I CAUTION Contact tips on drum controllers, limit switches and PfeH contactors must be cleaned with QOO sandpaper. Do not file contact lips. The following steps 3 and 4 pertain only to cranes with ad justable controls. 3. Take current reading at all motor primary circuits to determine inrush values during motor acceleration. Record these figures, NOTE The maximum inrush values for hoisting motors is 200'S of motor nameplate data and the maximum in rush values for bridge and trolley motors is 200% of motor nameplate data. Record the voltage readings at the crane while lifting a maximum load, at this time tlm crane should he at the furthest point from the taps of main line conductors. Voltage readings should be within + or -10% of the rated line voltage, 4. Adjust the controls as required. 6. Check all gear- cases for proper level of lubrication, 6, Check crane runway rails tor the following: a. True alignment (tolerance 1/8 inch) b. Span (tolerance t l/8 inch) c. Rail splices (gap should be zero with splice plates tight) 7, Check the alignment of conductors and shoes. 8, Check die motor brushes for free movement. Also check the brushes to determine if there is enough stock for wear. QUARTERLY INSPECTION 1. Perform the steps outlined under "MONTHLY JNSPECtion". 2. Conduct a complete crane inspection using this inspection sheet. 3. Lubricate the crane (be sure to include attachments). SEMI ANNUAL INSPECTION 1. Perform the steps outlined under "QUARTERLY IN SPECTION". 2. Check the crane to determine if high resistance ground faults exist. This can be done with a megger. 3. Lubricate all motors. 4. Check the wheels, compare the diameters of drivers, check the flanges for evidence of flange wear due to rail misalignment, 6. Drain and flush ail gear oases. Refill with clean, fresh lubricant of the proper type. ANNUAL INSPECTION 1. Perform the Steps outlined under "SEMI ANNUAL IN SPECTION". 2. Check the fitted bolts by removing and inspecting for evidence of any shearing action. 3. Check the drive shaft alignment at the couplings when motors or gear cases are removed for repair. Toth 00694 Rekebai mmhtehahce MOTORS - BRAKES - CONTROLS CHECKCOLUMN WHICH SHOYfS CONDUION Of UNIT OR WHAT IS NEEDS' TO PLACE UNIT IN OPERATING CONDITION riOTE- ADDITIONAL NOTATIONS ARE lO BE listed ON LAST PAGE USING LtN JlUimER AND COLWUN LETTER FORIPgriTIFKATIQH,______________ Bridge Mator Armoluro or folpr ^ Bridge Motor Commutator or Slip Ring Bridge JAator field or Stator Bridge Motor fro*heJ Bridge Motor Brush Holders Bridge Motor Bearings & Oil Seoli Main Hoist Motor Armotufe Or Rotor Main Hoist Commutator or Slip Ring Main Holst Motor Field or Stotar Main Hoist Motor Brushes Main HoisI Motor Brush Ho Wen Moifi Heist Motor Beorings B OH Seals Aw. Holst Motor Armature or Rotor Aux, Holst Motor Commutator or Slip Ring Aux, Hoist Motor Field or Stator Ajjx. Hoist Molar Brushes Aux, Holst Mrstor Brvsh Holders Aux, HoUt Motor Bearings & Oil Seals Trolley Motor Armature or Rotor Trolley Motor Commutator Slip Ring Trolley Motor Field or Stator Trolley Motor Brushes Tfolloy'Motor Brush Holders CHECK COLUMN WHICH SHOWS CONDITION OF UNIT OR WHAT IS NEEDED TO PlAC UNIT IN OPERATING CONDITION NOTE: ADDITIONAL KOTATIGM5 ARE TD QE LISTED OH LAST PAGE USING LINE NUMBER AND COLUMN LETTER FOR IDENTIFICATION. _____ Bridge Resistor! Main HoW Resistors Aux, Heist Resistor* Trol ley Resistors CM\ OPERATED MASTER CONTROLLERS Bridge Controller Stationary Contacts Bridge CanlrolWr Movable Contacts Main Hofjt Controller Stationery Contacts Main Hoist Controller Movable Contacts Aux. TWst Controller Stationary Contacts Aux. Hoist Controller Movable Contacts Trolley Controller Stationary Contacts __ Trolley Controller Movable Contacts CONTROL CABINET Line Contactor & Knife Switch Bridge Contacted Bridge Contactor Awe, Contacts Main Hoist Contactor* Main Hoist Contactor Aux, Contacts Aux. Hotjl Contactors Aux. Holst Contoctar Aux. Contacts Trolley ContoCtars Trolley Contactors Aux. Contact! CV Relays Main Hoist Brake Linings Moln Holst B*o'xe Wheel at Discs Main Holst Broke Coil Aux. tt?it Broke Liningi Aux, Hoist Broke Wheel or Discs Aux. Hoist Broko Coll Trolley Broke linings Trolley Broke Wheel or Disc* Trolley Brake Coil Hydraulic Broke CylfrWer Hydroulic Brake Linas Hydroulfc Master Cylinder Broke Rectifier & Relay Idoin Holst Limit Snitch Avx. HjJst Limit Switch Trolley Conductors Tcottey Collectors DRUM CONTROLLERS Bridge Controller Finger Tips Bridge Controller Segments Bridge Controller Blowout Colls Main Hofst Controller Segments Msin Hoist Controller BlovrOut Colls Aux. Hols! Controller Finger Tips Aux. Hoist Controller Segments Aux. Holst Controller Blowout Calls Trolley Controller Finger Tip* Trolley Controller Segments Trolley Controller Blowout Coils SECTION X 10-5 Toth 00695 SECTION X MECHANICAL EQUIPMENT GENERAL MAINTENANCE 10-6 Toth 00696 gpf-' /fc-f- ~ CENEBAL MAINTENANCE SECTION X SAFETY PRECAUTIONS TO BE OBSERVED BEFORE INSPECTING ANY CRANE 1. Before working on or from a crane get permission from your foreman. 2. Never go on a crone without first informing the operator. Be sure the operator understands what you are to do and what he is to do, : -- - 3. When repairs to a crane are necessary, move the crane to a location where it will not interfere with the operations on the floor or operation of other cranes. 4. Before starting repairs, check the following; a. Main switch is looked open, h. That a sign is on the main switch warns against closing it, c. That all controllers are in the OFF position. 6, Where more than one crane uses the same runway, place stops at a safe distance to protect the crane wider repairs from collision. 6. When working near the main line runway conductors,dis connect the power or cover the conductors in accordance with the recommendations from the plant electrical depart ment. 7. When repairing a crane place a sign "DANGER: MEN WORKING OVERHEAD" on the floor beneath the crane. S, When repairing runways place stops or warning signs at ends of the section Under repairs. 3, Wien boarding a crane always use the platforms, steps or ladders provided. 10. Raise or lower ail tools or material with the use of a hand line or block and tackle. Do not fasten the hand line to yourself. 11. Take cars that loose parts and tools do not fall to the floor. 12. Beware of loose or torn clotliing which may be caught in the moving parts of the crane. 13. Replace all guards and ether safety devices which were removed to facilitate repairs. Remove all tools, loose parts and other material from the crane. Remove any rail stops that were placed on the rails during the repair period. 14. Inform the operator of the crane that the repairs are completed. c- J3 E J0 fi c Lj <5 NOTES 10-7 Toth 00697 ATE INSTALLED drives machine A C, O-C, TYPE MANUFACTURER'S NO, DATE JN STOKACE date installed TOOL NUMBER DRIVES MACHINE CYCLES VOLTS SERIAL NO. date IN STORAGE LOCATIO N-SECTION date installed DATE IN STORAGE TOOL NUMBER DRIVES MACHINE TOOL NUMBER <n DATE BLOWNOUT BEAftTNGS END PLAY BRUSHES & HOLDER COMMU. MEGGER GENERAL CONDITION INSPECTED BY MOTOR MAINTENANCE RECORD DATE TAKEN OUT OF SERVICE- DATE -SCRAPPED- MOTOR MAINTENANCE RECORD Toth 00698 ^pm^g SERIES SHUNT COMPOUND TYPE FRAME PHASE CYCLES TEM P. RISE MODEL NO. FORM NO. MFGRS, ORDER NO, CONNECTION DIAGRAM - ROTOR OR ARMATURE SYNCHRONOUS INDUCTION SPEED VOLTS amperes EXCITATION AMPS- ROTOR OR armature OR SERVICE NO. MANUFACTURER'S NO, serial NO. OUR ORDER NO, DATE STATOR SPECIFICATION OPEN EXP, PROOF [] DRIP PROOF Q TOTALLY ENCL, q VERTICAL - BEARINGS SLEEVE n BALL p ROLLER p SHAFT EXTENSION PULLEY GEAR pitph NO. CRCOVM PITCH Dt A. BELT DRIVE BELT SECTION A--1/2 X 11/32 Q B"21/32X7/16 C--7/8 X t7/32 Q D--f - 1JA X 3/4 DATS JNCTALLC MOTOR SERVICE RECORD LOCATION APPLICATION DATC REPAtftttO REPAIRS OR PARTS REPLACED CAUSE REPAIRED SY TOTAL COST MOTOR SERVICE RECORD Toth 00699 "1 <rt mo o Toth 00700 r! ORDER BLANK TO; Manager of Technical Publications Harnisehfeger Corporation 4400 West National Avenue ., Milwaukee, Wisconsin 53246 SUBJECT; Owner & Operators Manual Model_____________________ Bulletin No._________ .__ Attached is a check or purchase order in the amount of $_ covering copies of the above Owner & Operators Manual, Please forward manuals to the following ad dress: Name________________ __ Street_________________________________ _________ City & State_________ ________________ _ Date P.O. No. QUANTITY REQUIRED UNIT COST -- to 25 26 to 49 50 to -- $7.50 $6.50 $5.00 If more than one type of manual is required, list type and number required below, or on the reverse side of this form. MODEL No. No. REQUIRED Please use this form when ordering additional manuals. Additional forms are available upon re quest. All orders must be accompanied by a purchase order or check for the full amount of the order. ORDER BLANK TO: Manager of Technical Publications Harnisehfeger Corporation 4400 West National Avenue Milwaukee, Wisconsin 63246 SUBJECT: Owner & Operators Manual ModelTM____ ,- ___ _ Bulletin No__ Attached is a check or purchase order in the amount of $___________________ covering copies of tha above Owner 6 Operators Manual, Please forward manuals to the following ad dress: Name _ Street________ City & State Date------P.O, No.,,____ QUANTITY REQUIRED UNIT COST -- to 25 26 to 49 50 to -- $7,50 $6.50 $5.00 If more than one type of manual is required, list type and number required below, or on the reverse side of this form. MODEL No. No. REQUIRED Please use this form when ordering additional manuals, Additional forms are available upon re quest. All orders must be accompanied by a purchase order or check for the full amount of the order. Revision 1 l Toth 00701 H QUALITY a SERVICE SINCE 1684 WAREHOUSES AND SERVICE STATIONS MILWAUKEE 46, W1S................... 4400 W. NATIONAL AVE, ATLANTA, GA................... 359-361 E. PACES FERRY ROAD NORWALK, CALfF.................. 14420 S. BLOOMFIELD AVE. PHOENIX, ARIZ.................................... 130 S. 29TH STREET SEATTLE, WASH....................... 135 S. BRANDON STREET TETERBORO, N.J...................................100 NORTH STREET ATLANTA, <3A . BOSTON* MASS * BUFFALO, N + Y. BIRMINGHAM, ALA * CHICAGO, ILL. CINCINNATI, OHIO CLEVELAND, OHIO DALLAS* TEXAS BRANCH OFFIC ES DENVER* COLO. DETROIT* MICH, NORWALK, CALIF. MIAMI, FLAt MILWAUKEE, WIS. NEW YORK* N.Y, PHILADELPHIA, PA, PHOENIX, ARIZ, PITTSBURGH, PA, SAN FRANCISCO, CALIF, SEATTLE, WASH, ST. LOUIS. MO, TETERBORO, N.J, WASHINGTON, D.C, AGENTS AND SERVICE STATIONS IN ALL PRINCI PAL COUNTRIES OF THE WORLD ( LITHO in U.5*A. Toth 00702