Document b5KYJbeNX3mzyGYKndmzOkr70

William R. Bradky and Associates UVIftOMMCftTAl HCAtTH CONSUITANTS 1 OftCfcN STKfcT * NfcWAKK. N. j 10l 6 2 2* 4 2 4 6 October 23, I960 Mr. S. H. Thomas Director of Environmental Control Oven* Corning Piberglas Corporation P. O. BOX 901 Toledo, Ohio 43601 Mi .environmental Health Investigation Owens Corning nberclas Corporation ______ Berlin. N. J. Plant Studies on employee work environment were conducted at the Berlin, New Jersey Plant of Owens corning fiberc.las Corporation September 23 through ^o^tember 27, 1968. This pxant processes imtallation for flat surfaces and for pipes in various sizes and thicknesses, using asbestos, silica, diatomite and cement as main inoreaients. The operation is Known a3 the Kaylo process. Samples of work room air were collected to determine the concentration of asbestos dusts and measurements were made of noise intensity at various octave band frequencies. ( \ dust exposure exists for euvi-o^ees unload me oo. cars of diatomite shipped in paper bag's. The supplier should be urged to use a multi-wall paper bac of heavier strength and one with a dust proof seal. More care should be taken in the loading of bo:; cars to prevent broken bags. tfiere is a potential dust exposure at the second floor batch mix area during bag dumping. It is recommended that the hopper where bags are dumped be enclosed on three sides and mechanically exhausted to the bag collectors. The handling of empty bags is a source of dust. It is suggested that empty bags be placed in a mocnanieally e:.haustcd bin. Oust counts in the area of the flatware line where tho product is boxed or stacked on pallets are higher than ojsjrable. It is suggested that cartons to be loaded, travel on a roller conveyor that passes through a mechanically exhausted booth enclosure. The design of dust collection hoods on the integrated line sawing stations should be improved in order to provide more complete enclosure. Oust counts are excessive at these stations, and it is recommended that employees wear -2- expiratory protection until environnental control has been installed. Oust control at the two band sawing stations for pipe needs improvement, operators are exposed to high dust concentrations. The two band saw stations should have a separate dust collecting system rather than being "tied inM to one of the existing systems. Hood design for dust con trol should be improved. work environment around the entrance to the Sid Cylinder is bound to be quite warm and to have high humidity due to escaping steam. 'Engineering studies should be made to en close an exhaust steam to the outdoors. 'n air sample in the Dowtherm boiler room shows that t'nre is no exposure to Dowtherm. measurements for noise throughout tne plant show a nuisance level of noise being created by the release of conpressed air without the benefit of muffles, a high noise level exists in front of tne Sid Cylinder due to escaping steam. This noise source adds to the background noise level of nearby areas of the plant. Noise on the flatware sanding line is borderline and employees here should be monitored periodically with audiometric testing* Undesirable noise levels e<ist on the integrated line sawing equipment. Enclosure of the sound source with accoustlcal paneling is desirable. The Rotoblast equipment in the Mold Shop is noisy, but the main shop sound pressures e;:ist in the lower octave band'frequencies* The problem is mainly one of nuisance sound intensity. < frr >/*: m villiam R. Bradley ( -4- OUST S'HVL-.IS iamole No Location iilliona of rirticlcc Per Cubic Foot of ;ii 1 Breathing zone level of workmen in 18.0 box car while unloading paper bags of diatom!te (Eagle Pitcher "Celatam"), ** 2 Batch mix floor while charging asbestos 7B, K3, S33. scrap, lime, iron chromite into west asbestos tank. 6.0 ^ ** 3 4 Batch mix floox while charging into south hydropulper. Charging lime and diatom!te by hand, cement and silica being charged by screw conveyor No. 2 line stripping area. 5.0 U" 3.1 \s 5 NO. 2 line pouring end. 6 NO. 1 line pouring end. 2.2 2.3 *7 *8 No. 1 line stripping end. Discharge area of pre-h.irdener during fork lift truck unloading. 3.5 3.6 9 Zn front of No. 9 Sio Condenser. 10 Operator's desk at rear of No. 9 Sid Condenser. 11 Flatware sanding at feed operator's station. (K-17) 12 Flatware line at top sander station (K-17) 2.6 1.9 4.2 5.2 -5- DUST o.^MPms (continued) Sample Wo. Location Million of Particles Per Cubic Foot of ,*ir ^ 13 Boxing flatware and packing on skids. (K-17) 6.0 u 814 Feeder's station on billet line. 3,3 t J 15 Packer's station on billet line. 3.1 **16 Integrated line sawing station on pipe halves. ^ 12.9 ** 17 Flatware finishing line, packing station. K-10 product sizes 2 x 6 x 36 and 2 x 12 x 36. 7.7 ^ 88 18 Flatware finishing line, packing 6.8 station. K-10 product size ( 3 x 6 x 36. 19 Shipping area at end of flatware line. K-10 product si2e 3 x 6 x 36. Carton closing and bluing. 1.4 ^ 8*8 20 8 ?1 Integrated line, 3awing K-10 product size 12 x 3 x 36 and 10 x 1.5 x 36. ** 1*8 Integrated line wrapping and packing station. 13.8 . 3.9 22 Integrated line carton sealing area. 2.2 23 Special assembly laminating jigs. Pipe area. 2.3 8^24 Band sawing, pipe area 3/8 x 2 1/2. 8.7 8 ( -6- DUST samples (continued) ;aDl Mo. Location 25 Center of warehouse. Millions of Particles Per Cubic Foot of >ir 1.3 26 Outdoors 20 feet west of No. 3 and Mo. 4 bag collectors. 3.0 27 28 Mold shop at discharge end of Rotoblast, Mold shop entrance to Rotoblast unit. 3.5 L2.9 i- 29 Mold shop repair area, disc sanding and arc welding. 2.4 U' 30 Maintenance Shop, center of area. 1.6 31 Dowtherm boiler room. 0.9 32 Box car loading 2 x 6 x 36 pipe covering. 2.3 33 antrance to No. 2-B drier. Fork lift truck unloading in drier, flatware and pipe. 3.0 34 outdoor sample collected in salary staff 1.1 parking lot. Z c* NOISK X&^SURiMfcfrTS mpie Overall A NO. Level Scale 31 62 125 250 500 1000 2000 4000 8000 1 90 86 81 80 80 81 78 77 78 86 72 2 91 89 80 82 82 82 80 80 80 86 70 3 95 89 85 84 86 90 91 82 79 73 73 4 92 83 83 84 82 87 81 78 74 72 76 5 93 90v 85 81 83 81 89 77 75 74 76. 6 90 85 82 82 86 82 80 78 75 74 76 7 100 99 82 82 82 84 84 90 88 88 97 8 96 92 84 84 84 82 81 82 86 85 92 5 101 100*'' 83 82 83 83 82 86 92 96 96 10 93 91 J 80 80 79 77 78 60 84 84 89 11 97 94^ 80 81 80 93 84 84 88 88 87 12 95 93V 80 86 82 86 85 85 91 87 92 13 91 86 81 60 77 87 77 78 80 76 78 14 89 87 80 86 79 78 78 76 76 74 82 15 88 as 78 81 77 77 74 73 73 72 85 1-3 99 95v 86 86 85 85 87 87 89 96 85 17 91 89 80 82 78 82 80 87 84 77 75 13 91 89 80 82 78 82 60 87 84 77 75 -8- NOISg MiTSUi: (continued) Sample Overall A No. Level Scale n 63 125 250 500 1000 2000 4000 8000 19 93 s2 i 81 83 80 62 82 85 90 82 82 20 86 94 81 64 84 87 86 87 87 69 93 21 84 75 76 76 74 81 78 84 72 70 70 22 82 78 74 73 70 79 74 70 70 68 68 23 82 76 73 71 69 66 66 76 68 66 68 24 90 88 75 74 70 66 71 82 76 74 87 25 98 90 * 84 95 69 85 50 66 86 87 79 26 98 91 ^ 79 94 92 90 68 87 88 84 80 27 95 85 79 92 84 83 83 80 76 76 70 28 84 75 72 81 76 70 72 70 66 68 70 29 94 89 86 90 84 86 83 81 81 61 82 30 92 64 88 80 82 83 74 74 74 75 77 9 LOCy TION OK NOISS M^SUUJMSNTS Sample No. Z 2 3 4 5 6 7 8 9 10 11 12 13 Location Batch mix floor while charging asbestos 7B, K3, S33, scrap, line, iron chromite into west asbestos tank. Batch mix floor while charging into south hydropulper. Charging lime and diatomite by hand, cement and silica being charged by screw conveyor. No. 2 line stripping area* No. 2 line pouring end. No. 1 line pouring end. No. 1 line stripping end. No. 1 line stripping end, use of compressed air. Discharge area of pre-hardener during fork lift truck unloading. In front of No. 9 Sid Condenser. operator's desk at rear of N0. 9 Sid Condenser. Flatware sanding at feed operator's station. (K-17) Flatware line at top sander station. (K-17) Boxing flatware and packing on skids. (K-17) 10 LOCATION or NOISc! 'SORJM^NVS (continueo) Sample Wo. Location 14 Feeder's station on billet line. 15 Packer's station on billet line. 16 Integrated line sawing station on pipe halves. 17 Flatware finishing line, packing station. K-10 product sizes 2 x 6 x 36 and 2 x 12 x 36* 18 Flatware finishing line, packing station. K-10 product size 3 x 6 ;< 36. f 19 Shipping area at end of flatware line. K-10 product size 3 > 6 x 36. Carton closing and gluing. 20 Integrated line, sawing K-10 product size 12 x 3 x 3o and 10 x 1.5 x 36. 21 Integrated line wrapping and packing station. 22 Integrated line carton sealing area. 23 Special assembly laminating jigs. Pipe area. 24 Band sawing, pipe area 3/8 x 2 1/2. 25 Mold shop at discharge end of Rotoblast. 26 Mold shop entrance to Rotoblast unit. C 11 I LOC* Tio:: OF NOIS-* MS? "UKiMKNrS (continued) Samole No* 27 28 29 30 Location Mold shop repair area, disc sanding and arc welding. Maintenance Shop, center of area. Oowtherm boiler room. Box car loading 2 x 6 x 36 pipe covering. ( ( 12 >( TtiMPgR^flJftc: *.nd u.^.rivd i{um.tdity rest No. Location Temperature Degrees Fahrenheit 1 No. 2 line stripping area. 79 2 No. 2 line pouring end. 80 3 No. 1 line pouring end. 81 4 No. 1 line stripping end. 85 5 Batch mix floor while charging 85 into south hydropulper. Charging line and diatomite by hand, cement and silica being charged by screw conveyor. 6 Discharge area of pre-hardener 90 during fork lift truck unloading. 7 In front of No. 9 Sid Condenser. 97 a Operator's desk at rear of No. 9 Sid Condenser. 86 % Relative Humidity 60 60 59 58 42 52 50 44 c -13- MAIN BATCHES A3 ASBESTOS K-10 Batch K-3 or Vi-3 S-33 7-D 6% 6.2% 3% 15% K-10 Batch w-3 or K-3 S-33 7-D 9*4 3% 3% 15% Core Batch S-33 4-T T.1% 3.9% 13% K-20 Batch V-3 S-33 4-T 2% 10% 8.3% 20% Silica minus 325 mesh - 99% Si02 Diatomaceous uarth Nevada minus 325 mesh 85% S102 -14 Willwm R. ii/vjli '* "J 1 nutate.' IHVJRONMtNUL HtU'ti vf lb l* R I t N ' I H I | I \ i V\ v K i f > / i ,i i !. * i i . i i i. JUne 27, 1H9 Mr. I. H. fbaMs Director of fttvlronmental Control Owen* Coming Plberglas Corporation P.O. Box D01 Toledo, Ohio 43401 Be Hnvlronnental Health Study lnrlln. Hew Jersey fUM| tovironmental Health Studies on work environment were conducted June 17 and It, I960 at the Herlin, Hew Jersey plant of Owene-Coming Plberglas Corporation. The current study wee a follow up investigation of a study node in Septenber 1968 to determine Hwthir improvements have been nade in lessening employee exposure to the inhalation of dusts including asbestos fibers. The plant processes insula tion for flat surfaces and for pipes in various sines and thicknesses using asbestos, silica, dlatomite and a cement as naln ingredients* Measurements vers made of In-plant noise intensity at several locations, which include overall noise pressure energy measurements as well as octave band frequencies, noise measurements were made at those locations where previous measurements indicated noise exposures of employees exceeded "A" scale intensities above 90 decibels* -a - Th# dust tupUt collected by the laplngoaent tdAi<M oilag triple distilled Mtr wirt counted undor X00 x light field alcroieopy. lha whrini fiXur iiapXai war* evaluated la accordance with tha aethod for tha attUMratlOB of ubHtos dust on sasbrana flXtors ss proved by tbardf a t^ach of tha 0.0. PubXlc laalth Ssrvloa. St Is recognised that u--brine flltox technique is only on ladieotlon of tbs prosoaeo of ssbostos fiber* in sir dovoXopod for tbs ssbostos fabric industry. St is further rocognlsod 1U ths inplager technique that an ostlnatioa of tha prosoaeo or absence of Asbestos fibers of respirable also gives answers that sro reXstable to the toxicology sad to tbs Instances of asbostosis in Industry. boot of the batches prepared for production of iasultation products in the Berlin Pleat oontaiaod botesan 13 sad SO* asbestos or dletooscoous earth end represent an even snsXXer percentage of raw product by "eight involving respirable sloe asbestos in the fern of fibers. Oenerally speaking airborne dust la the work eaviroanant has lessened in conoeatraticn. 9m exhaust hood at the flatware finishing line loading station should be extended in acoordanoo with prior design. -3 - Hood enclosures about tbo batch nix dumping station* that are mechanically axhausted also should ba installed. laprov--nts la exhaust vaatllatloa hood enclosure should ba aada at tha finishing lino station, tha "1* saw and tha "C" saw should ba provided with mechanically axhausted hood aaclosuras on tha intagratad lino similar to those installad am tha "1" saw. Where dost axposuras exceed fiva million particles par cubic foot of air, control of tha work environment la racoanandad. In caaas whara tha duat count la laaa than fiva million partlelaa tha quantity of aebastoe fibers in tha breathing tone la of such a limited quantity that occupational illness from asbestos!* la unlikely. Where duat control by hood enclosure of tha process with mechanically exhausted ventilation daaa not reduce operator axpoaure te duat eonoantratlona laaa than five million partlelaa par cubic foot of air, than reaplratory protection in the form of approved typo oaaka ahould bo worn, these maehe are elaaalfiad aa toxic duat respirators, approved by the U.S. Bureau of Xinea in Oehedula 21* thoaa roaplratora are eimllar to MCA Ouatfoa typo auobor 25. or aimilar roaplratora leeood by willaon Onouny or American optical Coapany. 4 thars ara a faw locations in tha plant ahara noisa aaaaursMats axcaad 90 decibels on tha aAa aeala. Consideration should ba given to aolsa raductlon by control af tha noisa source. If this is not feasible than tha wearing of aar nuffs on tha part of enployees is recooaeaded. A now noisa eouroe vas evaluated in tha plant, this involvas disc grinding on natal fores in tha Mold hop. / WUlu *. radUy ( Sample lo. 1 2 3 4 5 4 7 10 11 u 13 fttPiHOX* DOS* location Bunber 2 Una stripping flatware line, fnd Operator's Station X-10# 2 x 14 x 34 flatvere lias* Top Sander station X-20, 1H x 14 X 36 Batch nix floor while charging Asbestos tanks Batch nix floor, south hydropulper flatware finishing line Packing station X-10 1*| x 14 x 34 flatware finishing line packing station 1*10 product! l*s x 14 x 36 integrated line - "B* saw X-10 product# 2 x 1 x 36 "A* saw 16 x 1H x 36 Trisect# product X-10 BWnber 3 line pouring Xunber 3 line stripping BWnber 2 line pouring BttBber 1 line pouring Millions of Particles Hr Cable Foot of_Mt 1.4 3.4 2.4 4.2 4.0 9.1 9.0 12.4 2.7 1.6 1.7 1.4 1.7 f lapl H9t. 14 IS 14 17 14 14 20 21 22 22 24 25 24 27 -4 - HtflKOM WST SAMPLBS <COnt*d) ttsaUaa latch mix floor, loadla? lut4tut tanka Batch nix floor. South bydropulper NlUlom of Particles * eubig .got of Mr l.t 2.7 Band saw, no. 1204 bo. 1S47 2.0 *ft* sm - food and 14 x 2 x 14 Trl out X-10 product 2.2 "B" ssv operator* station E-10 product 10 x 2 x 24 12.4 riatvara finishing product stacking 1^ x IB x 24 Oora product 4.a Plsfevaro finishing stacking station 4.4 Billot lino foador station 2.2 Billot lino packing station 2.1 PlBtwaro lino top sanding oaroa 2.7 Plstoaro lino food operator aroa 4.1 Xntrgrated lino and wrap Book 1.7 Hold Shop, natal shot blast aroa 2.4 Outdoors 20* oast of no. 2 and no. 4 bag collectors 1.4 Sample -- 0 MIKBEAJH ptyraa Location latch mix floor while charging Asbestos tank Batch six floor while Charging hydropulper Flatware Una faod operator's station Flatware lino top sanding Boxing flatware and packing on skids Flatware lino packing station Flatware lino packing station Integrated lias "B" saw Band saw operation a* Asbestos Flbers/cc. Total Fibers greater UfeSfil Wi lO mlcrona OS 04 04 02 .02 .01 .01 .000 02 01S 02 015 .02 01S U .05 .01 .006 02 016 a r HOlfif MKASURJMBHTS aapla overall 'A* , -IfrYtl Seal* 2k ftl 121 390 900 1S2& 2000 4000 4000 160< XOO 99 44 44 90 93 93 4$ 93 97 43 40 104 X03 44 ax 85 8S 4$ 87 9X 94 xox 93 97 94 93 43 44 as 43 89 47 48 94 93 94 89 42 43 90 44 43 40 74 40 9X 70 97 94 40 83 44 40 93 93 96 94 90 43 4494 93 76 40 79 44 43 43 93 43 77 4693 90 44 40 43 93 79 40 90 7X 64 93 9X 4X 44 44 43 43 3 90 43 46 76 f 49 47 79 40 77 76 74 77 43 46 76 64 xo 94 93 90 ax ax 47 96 46 46 90 76 66 XX XX3 xxo 74 40 79 43 93 46 93 94 X04 90 ( X ( sample . . &- 1 a 3 4 5 (6 7 t 10 U -* LQC/.TIOti OF rAZJ-SUUMSN*fS Operator' desk at roar of Ho. 9 814 Condenser In front of Vo. 9 Old Condenser discharge ores of pro* hardener during fork lift truck unloading Line 1, stripping end Integrated line, 0 saw Xntagrated line, A oav flatware finishing lino operator's food station flatware finishing line top sender area Shipping area and of flatware lino Mold Shop natal shot blast area Mold Shop disc grinding on natal ferns