Document b582yXbqe11292pYveDrKBn90
Company: DOW CHEMICAL CO T"*ocess: HDPE - POLY B
Worksheet
HAZOP-PC 1.00
Node: 19 Page: 1
+------------------------------------------------------------------------- ------------------------------------------------------------------------------------- +
Node: 19 DR-2007 SEAL (PACKING AREA)
Parameter: Flow
Intention: ISOPENTANE SEAL PURGE .4GPM |
+------------------+------------------+-----------------------------------+----------------------------+-------------------------- ----- +
|GUIDEWORD|DEVIATION! POSSIBLE CAUSES I CONSEQUENCES | RECOMMENDATIONS |BY |
No
No Flow ADV-44912 FAILS FUSED POLY IN
PERMISSIVE ON
*
CLOSE
PACKING AREA
PACKING FLUSH FOR
REGULATOR FAILS DESTROY PACKING
STARTUP
MISOPERATION
HEAT UP SHAFT
MORE ISOPENTANE
FLOW INDICATION h
LOSS TO FLARE
INTO PACKING/OUT
SHUTDOWN TRAIN
OF POT
SCORE SHAFT SLEEVE
TRAINING
RF
CHECK SEAL
GC
HOUSING BOLTING
FOR FAILURE POINT
' re
EVALUATE FLANGED INLET CONNECTION TO PACKING PURGE
GC
More Flow REGULATOR FAILURE WET POLYMER DR2007 HIGH FLOW SWITCH OUTLET/LOW POWDER
TEMP SHUTS DOWN
TRAIN
*
_ *. 'UO^76 DO * LvtTPA-
Worksheet
HAZOP-PC 1.00
Company: DOW CHEMICAL CO. T'vocess: HDPE - POLY B
Node: 19 Page: 2
-t---------- ----------------------- --------------------- --------------------- ---------------------- ---.--------,,-------. ------------- --------------+
I Node: 19 DR-2007 SEAL (PACKING AREA)
Parameter: Temperature
Intention: 95 DEG C
+--------------------
|GUIDEWORD DEVIATION POSSIBLE CAUSES
CONSEQUENCES
RECOMMENDATIONS BY |
Less
Lower Temp
LOSS OF TRACING ON FEED LINE LOW AMBIENT TEMP
WET POLY/LOW DR2007 DISCHARGE TEMP/SHUT DOWN TRAIN SEE LOW FLOW FROZEN SYSTEM
EVALUATE
GH
TEMPERATURE ALARM
EVALUATE CONDENSATE TO TRACING IOW FLOW SWITCH
GH
TRACE/INSULATE
GH
D2007/2017
(EVALUATE)
+------------------+------------------ +---------------------------------- +------------------------------------ +---------------------------------- +----- +
Worksheet
HAZOP-PC 1.00
Node: 19 Page: 3
KING AREA)
Intention: CONTAIN PROCESS MATERIALS "TM--+~------------------------------+
ES | CONSEQUENCES | RECOMMENDATIONS | BY | ----- +------------------------------------ +------------------ ----------------+----- +
LEAKAGE OF
CHECK PACKING
GH
HYDROCARBONS TO
AREA SEAL DESIGN
ATMOS
PRESSURE
+----------- ------- --------- +-----------------------------+---- +
3 00 3 0 3 3 1 ) O > O 3 3 3 3 1 )) m 33 3O0 3 1 J >3 D'D 3 3 3 3 ) 3
> do O a 3 3 3 3 D
oooeeeeooi
>0000060001 003000000J >0900000001 10^30000003
>Ot30OOOOO<
6500000003 >00060Q009<
DO A 120980 CONFIDENTIAL
Worksheet
HAZOP-PC 1.00
Company: DOW CHEMICAL CO. "-ocess: HDPE - POLY B
Node: 19 Page: 4
------------------------------------------------------------------------------------------------------------------------------------------------------------------
Node: 19 DR-2007 SEAL (PACKING AREA)
Parameter: Level
Intention: DO NOT OVERFILL D2007
+------------------ H | GUIDEWORD DEVIATION POSSIBLE CAUSES
CONSEQUENCES
RECOMMENDATIONS BY |
More
More
INSTRUMENT
GOES TO SV HEADER LEVEL SWITCH ON *
Level
FAILURE
FILLS PACKING AREA D2007
MISOPERATION
WITH LIQUID
+------------- +---------------- -+---------------------------------- +------------------------------------ +---------------------------------+----- +
DO A 120981 CONFIDENTIAL