Document b3J5mQ850Nz2wgwBpqmLBKw1

mm CYANAMID To: B.. Coopersmith Location: Wayne From: H. C. Gaffney Location: Chicago Plant Extension: Subject: Reference: MONTHLY REPORT Cate: January 31, 1984 Copy to: r . F. Anderson - NA J. F. Daly - MG J. S . Druzbacky - BB R. L. Johnson - MG F. F. Loffelman - NA S . M. Lustig - NA C. G. Neumann - NA HIGHLIGHTS Continued fluctuation of lead prices. Elastomer inventories moved from Rosemont to Chicago Plant. Blood lead levels show appreciable increase. I. SAFETY & HEALTH A. The plant has operated 4429 days (thru 1/29/84) without a disabling injury. B. There was no recordable injuries during this period. C The latest blood lead levels fcr 23 employees ( all but office personnel are:) 6 raos Jan. Last Average 60 ug Pb/lOff grams blood or above 1 50 - 59 40 - 49 below 40 % below 50 0 5 11 7 78% 0 1 9 9 96% 0 3 9. 11 39% Average . 40 38 39 We are concerned with this reversal of blood lead levels trends and are actively pursuing correction witfe all employees. It say be attributed to a let down over the Dec. - Jan. holiday season. NA 839 REV. 4-82 '`7/ 4-82 CYWI 1-000198 II. PRODUCTION & SHIPMENTS Actual Jan. % of budgeted rate Stabilizers Litharge Plant 110 117 112 Shipment k. pounds Stabilizers Litharge 505 4 Est. Feb. 99 112 10 3 521 20 Est. March 98 112 10 2 517 20 III. INVENTORY End of Dec. End of Jan. 5c$ DOS hi______ d o ? Bad of Feb. End of ] k3 DO? k$ 1 Finished Goods Support Goods Plant totals 217 28 270 32 217 28 200 24 4 34 56 470 56 270 210 49* 34 260 31 27 230 2' 61 490 5! IV. TECHNICAL A. WAXED EXTRDDATES Contact has been made with Nichols - Zenith regarding a gear pump. Extrudate samples have been sent for their evaluation and recommendations, and a trial is being arranged. Estimate date of completion is April 15th. B. PPG Results of our preliminary studies on the correlation of pH with grind, oil absorption and insolubles were pre sented to Pto on January 12th. We see no correlation at this time, work is continuing. C. SLM MSDS, specifications and test methods for Cyastab SLM have been supplied to Goodrich, and an order has been received for 50 lbs. for the Western Electric trial vilt will be shipped week of 1/26. .i. CYWI 1-000199 K.ik FMUEK&n TECHNICAL (continued) D. TENNECO We have been informed verbally of a complaint regard ing electricals on Cyastab 523-0, but have not received the written complaint at this time. As we now understand the complaint, 523-0 / Tribase XLoiled is now being used in compounds where ancthc-r stabil izer has been used previously. In this compound electri cal properties are important, and the last 2 shipments of 523-0 have been found inferior to Tribase XL-oiled. Laboratory tests indicate that current 523-0 production is no different than production in previous years. Product modification will be required (Barium Stearate instead of Calcium StearateO. We are now awaiting a sample of Tribaae XL oiled which will be used as a control. CYWI 1-000200 V. GENERAL A. Effective February 1st. the Chicago Plant will assume responsibility for inventory and shippments of Elastomers which have been handled from the Rosemont D. C. First shipment of material into Chicago on 1/30.. Mr. Brewster and Amato visited the plant to review our inventory capabilities. B. PERSONNEL Hourly 12 (including 5 non- exempt working supervisors). 15 one on sick leave C. LEAD PRICE List price has fluctuated betwssa%23 & 28$ during the month - currently at 24$. Joe Rhodes, Chemical Group purchasing and the writter will meet with the 3 major lead suppliers to discuss the future lead prices for 1984. D. Jim Daly is proceeding very effectively in setting up our initial computer programs. We now have daily inventory control of finished goods and raw materials on the computer. Utility and. labor usage should be programed this week. Jim will attend a 3 day computer course at WI nest week. H. e. Gaffney f QYV\H 1-000201