Document b1LMNZYJd60znn7ZbVvNneky
PROGRESS REPORT
*
' .technical services dept. -w. q. krummrich plant
j job no. [ 1716:246
(report no.
I 95 (Final)
(date
I
2 ( 21 f 6a
w.o. krummrich plant
.
Q t. L. BOEHM )
0. A. Meyer l.E V. Brawley
RESEARCH
------------ S'.' '2nd.
ig R. H. Munch
GENERAL OFFICE *0 N. E. BILGER Ed. danna (4 )
OTHERS
E J.R."Savage
'0*. R. KELLOGG
0 J. M. CONNAUGHTON
D. Fitzgerald 12 V. Wh jaeger 0i. P. DUNLAP
'i J. Landwehr
*0 T. W. DALTON 0r. e. HEISLER
45) G. L. Bratsch c. e. amaSS oST&poulos 0 P. W EDWARDS Queeny
G.O.
T. M. Morrow <2 p.onjiirffrmo 0R. E. Howard B P.B.Benlgnus
QQ J- R. McClain
43 W. L. Rice
43 J. F. Quinn
0S. A. HEININGER
G.R.Buchanan
P M. B..PATRICK
0 T.M. Patrick *B D. B- HOSMER
E J.O.Bright
Q^W. J. WILSON
EH. C. Carder pej J.C .Bryant -Ar
qqD.C.Armstrong
|0 W.A.Kuhn-G.O. *51 N. l. sample
EcJ R.S .Yates
*5L)H.F. Ray
'
B R.J.Stratmeye rE W.R.R3 chard
TO RECEIVE DETAIL SECTION
Tint: AROCLOR AND AROCLOR BLENDS: PROCESS IMPROVEMENT PLAN
personnel: R. m. MoCutchan (T. E. Greenman)
problem;
The objective of this report is to present the Dept. 246 (Aroclors, Pyranols and Pydrauls) Process Improvement Plan.
SUMMARY
( ti
.
Savings of $14,000 and new earnings of $45,000 (B.T.) wdll be realized during 1968 as a result of increased capacity.
Ready for 1969 production will be a new continuous chlorination
plant with accompanying stills, earth treatment columns, storage
tanks, and increased blend capacity at a cost of $1.5M. Benefits
of the expansion will be:
_
1. Provide a total WGK Aroclor capacity of 70.OM lbs/yr which
will be sufficient to meet sales needs through 1972 with a
25$ excess domestically. Maximum capacity will be needed
by 1976-77.
'
2. Protect market by achieving corporate quality goals.
5. Ability to supply all customers with Aroclor from either
Anniston or WGK.
4. Lower maintenance costs.
5. Increased profits will begin in 1970 with payout occurring in 1971*. (See "Appendix H" for manufacturing cost details.)
An estimated 5/4 man-years of TSD process time and 5-1/2 man-years
of PR & D time will be needed during 1968.
ACKNOWLEDGMENTS: Thanks to D. C. Armstrong, V. Brawley, D.
Fitzgerald, J. A. Gloeckner, and H. F. Ray for their assistance
and cooperation in the gathering of data and wilting of this
PM
report.
PRM.
^ h{
O O*4'
R. M. MeCutchan
o
o Technical Services Dept.
/J<J
COMPANY CONFIDENTIAL INFORMATION
This document Is the property of Monsanto Company and the recipient Is responsible for its safekeeping snd disposition. It contains confiden
tial Information of Monsanto Company which must not be reproduced, revealed to unauthorized persons or sent outside the company without
proper authorization. Either retain in secure files or destroy.
f O WGK 800 RE V- 2/66
TOWOLDMONOQ45326
' 91370-.246(1)
Page 2
2/21/68
DETAILS _
I. Synopsis of Process
.
The Arocldr process consists of the following steps:
Chlorination - Batch chlorination of biphenyl (B10) with snift gas (approximately 86 mole % CI2 ) at 150JC produces
. Aroclor. The by-product Is hydrogen chloride (HCl) gas.
Blowing - Crude Aroclor from the chlorlnators is blown with air to remove excess HCl before distillation.
Distillation - Crude Aroclor which has been air blown is continuously fed to the stills. These stills are straight-
take-over type with no fractionation.
Earth Treatment and Filtration - The distilled Aroclor' is . earth (attapulgus) treated, filtered, and transferred to
storage.
Blending and Loading - The finished product from the storage
tanks is loaded into cans, drums, tank trailers, and tank
cars, or used for making blends (electrical and non
electrical).
'
The principal Aroclors produced at WGK are 1242, 1248, 3294, and 1260. The last two digits indicate the % chlorine (weight) contained in the chlorinated biphenyl mixture (Aroclor).
II. Scope of Report
This report pertains to both the existing batch chlorination plant and the proposed continuous chlorination plant which is expected to be on-stream by January, 1969.
0190723
TOWOLDMONOQ45327
91570:246(1)
Page 3
2/21/68
I
1X1. TSD Process- Job List
Priority
Job
Capital Savings/Benefits
EDC
1
Install heat exchanger $8,000
Meet 1968 sales needs, 4/1/68
on Project 5334 (app
insure $25,000 rate
roved). Follow startup.
savings in 1968.
2
Coordinate quality tests
0
Protect $5 M market
3/1/68
in conjunction with PR&D
effort.
3
Make nitrogen blanket
$1,000
Quality
system operable.
4/1/63
4 Determine biphenyl loss-' 0 Quality, minimize
es under various chlori-
losses
.
nator conditions. Recom
mend conditions for 1968.
6/1/68
6
Design and install fume $7,000
Safety
removal system.
6/1/68
6 Investigate possible blend specification changes.
0 Increase blend'capaclty 6/1/68 $l,000/yr in lab costs Raw material savings
7 Check still operation
0 Quality
at pressure lower than
4 0 mm.
' 4/1/68
8 Evaluate level recorder $1,500 for still #2, install
i if Justified.
Process control
6/1/68
9
Evaluate liquid nitro
TBD
Lower nitrogen costs
4/1/68
gen supply system for
Dept. 246/254.
.<
10
Evaluate automatic drum $200
$20,000/yr labor sav
flushing and drumming
300 M
ings and quality
installation with new .
. improvement.
building.
11
Evaluate equipping 1
$15,000 Increase distillation 1/1/70
still with horizontal
capacity by 5 M lbs/
pump and boildown
year 1
facilities
TOWOLDMONOQ45328
'91570:21*6(1)
Page 4
2/21/68
IV. Capacity . A. Aroclor
1 Current Capacity
.
. Department 246 Is rated at 2.5 M lbs Aroclors/month, or 29.9 M lbs Aroclors/year. The department averaged 2.5 Mlbs/month during 1967- Presently the bottle neck Is chlorine availability and distillation rate.
2* Sales Forecast - WGK (H. J. Day, 9/7/67)
' TABU: I (M Lbs)
Made In
'
Aroclor
1967 1968 1969 1970
1971
1972
1252 .1242
1248 1254 1260 1262
22 '
12576 6595 6615 4815 154
16107 5049
4851 6638
125
19037 4596
5039 6953
135
21484
4571 5462
7345 145
23772 4447
5957 8l4o
155
25572 4861
6257 84 85 _ 166
TOTAL
29775 52750 35760 39007 42471 45340
Dept.Cap. 57200* -----New 40 M lbs/yr Plant -----
Based on installation of still preheater and increased CI2 rate.
5. Capacity to Meet 1968 Sales
. Current department capacity is not sufficient to meet 1968 sales needs. Capacity increases are planned in both the chlorination and_dlstillation steps to an overall capacity of 57-2 M lbs Aroclors/year, or 5-1 M lbs/month.
a) Chlorination
1. Project 5824 installs a 6" chlorine feed line to Dept. 246 (EDC 5/1/68).
2. Project 4864 increases chlorine revaporization capacity (EDC 5/1/68).
3. The Brink's mist eliminator elements will be replaced to reduce yield losses in the off gas.
. 4. In-line specific gravity instruments are needed, and will be installed in the continuous chlorina-
' tion plant.
019072^
TOWOLDMONOQ45329
... 91370:246(1)'
Page 5
2/21/68
IV. Capacity (Continued)
'
A. Aroclor (Cont'd)
..
' b. Distillation
:
Project 5334 installs a spiral heat exchanger to preheat the still feed (EDC 3/1/68). This gives a 10$ surge capability and.Insures needed production until the expansion is complete.
4. Storage Capacity, M Gal.
Product
TABLE II
Present Capacity,
1968
After Blending . Add 5 Tanks
Project Complete & Remove Un'gd
1971 Add Three
Tanks
Minimum 1971 Storage Recom By H. J. Day,
6/67
1242 1248 1254 1260
TOTAL
55 20 20
^0
80 40 40 20 '
140 132.0 40 25.2 40 34.4 20 20.2
125
180
240
211.8
All new tanks will be 20,000 gallon aluminum tanks ' with nitrogen blanket facilities.
B. Aroclor Blends
1. Current Capacity
Dept. A-246 is rated at 1.2 * lbs/month Pyranols (14.4 M lbs/year) and B-246 at 0.575 M lbs/montii Pydrauls (6-9 M lbs/year). However, the Pyranol capacity can not be achieved because of lack of mix tank capacity. During 1967 these blends were produced while operating at near capacity:
Pyranols:
1260 PPO 1254 PPO
A13BJB
Pydrauls: A-2 00 280
TOTAL BLENDS .
1261
4,958,639 3,099,362 1,199,190 9,237,191
' 2,454,315 191,772
11,'883) 27 8
019072b
TOWOLDMONOQ45330
91570:246(1)
Page 6
2/21/68
IV. Capacity (Continued)
8* Aroclor Blends (Cont'd)
2. Future Capacity and Sales Forecast .
Project 2844 (EDC 7/1/68) provides for changes and additions to loading and transfer lines, metering facilities, and the conversion of No. 8 storage tank to No. 3 mix tank. This will increase mix tank capacity from 27.5 M gal. to 47.5 M gallons, . and should make possible capacities of 24.0 M lbs/ year Pyranols and 6.9 M lbs/year Pydrauls.
Aroclor Blend Sales Forecast, M Lbs. ' (H. J. Day, 9/26/67)
.
TABLE III
Pyranols:
Expanded Capacity
't, 1968 1269
1970
1971
1972
Inerteen PPO (1260) Inerteen 54201 KA Pyranol A13B3B
7200 2000 1736
7500 1800 1800
8000 8700 9200
I960 2100 2100 _2200 _2200
. TOTAL PYRANOLS 24000 10936 11100 11850 13000 13500
Pydrauls:
b->
rc0oo0aos
Pydraul A-200 Pydraul 280
2340
1700 24o
1100 320
1100 350
TOTAL PYDRAULS TOTAL BLENDS
6900 30900
2537 13475
1940 1304o
1880 13750
1420 14420
1450 14950
C. Drumming
1. Current Capacity
.
Drumming is done on two shifts, one standard operator per shift, 5 days per week. The standard operator also helps load trailers and tank cars (25^ of time).
. During the 12 month period, June '1, i960 - May 31, 1967, the following drums and cans were filled: (see Appendix A for detailed drumming report.) _
Size
;
TABLE IV 55 Gal. 30 Gal.
0190727 5 Gal . Total
Aroclors Blends
7221 8249
0 2*0
569 2148
7790 1023J
TdWOLDM6N0045331
91370:21)6(1)
Page 7
2/21/68
IV. Capacity (Continued)
C. Drumming (Cont'd)
1'. Current Capacity (dont'd)
Grand Total: 18,727 drums and cans Average Output: 36 drums and cans/man/shlft
2 Future Drumming Needs
' TABLE V
Total Production, M Lbs
1972 (Sales Forecast)
5 Year $ Increase
Aroclor Blends
29.8 11.9
45.3 14.9
52/ 2 5$
On the assumption that drumming requirements Increase proportionally in 1972 with total production, 26,600 drums and cans will be needed. By adding tone man on
third shift drumming, these needs can be met with an average output of 3? drums and cans/man/shift. After
1972, a seven-day operation may be needed.
If drumming requirements Increase sharply, a more auto mated drumming facility might be considered. (A rough estimate of such an installation Including building is $200-300 M) Another source of justification for an automated system is the possible need of a drum flushing Bystem for improved "as packaged" quality. Anniston ,TSD has the assignment of determining total company needs for maintaining Aroclor quality while packaged. Results of their studies will dictate drumming needs for future quality requirements.
D. Tank Car and Trailer Loading
The following table shows the number of tank cars and trailers loaded during June 1, 1966 - May 31, 1967, and the projected loadings for 1972:
TABLE VI Number of Trailers or Carsi
0190728
Tank Cars: Aroclors Pyranols Total
Trailers: 95$ Aroclors 5$ Pydrauls
6/66-5/67 72
197
1212 111 236 300
TOWOLDMONOQ45332
91370:246(1).
Page 8
2/21/68
1
IV. Capacity (Continued)
''
D. Tank Car and Trailer Loading (Cont'd)
The existing loading facilities plus the two unloading . docks included in the proposed plant expansion (CKA 1800)
will be adequate through 1972.
E. Haw Materials
The following raw materials 'will be needed based on sales forecast.
TABLE VIX
' (M lbs)
1968
197?
Biphenyl Chlorine
TCB TTCB
18.0 M lbs 34.1
5-5 0.9
25.2
46.6
4.3 1.2
F. Expansion - Continuous Chlorination__(CEA - l800)
1. Scope
,
a) Five new 22.000 gallon aluminum storage tanks
(EDC 7-1-68).
b) Railroad spur and two unloading docks
c) One 100,000 gallon biphenyl storage tank
d) Three existing 15,000 gallon underground tanks
will be dismantled .
e) Separate transfer lines for each product from
day tanks to tank farm, and from tank farm to
loading or drumming areas.
f) Chain of four chlorinators with external cooling
and continuous feed tank (EDC 12-1-68)
g) Continuous blow tank and intermediate storage tank
hj Two semi-continuous distillation systems .
I) Four continuous porocel column treatment systems
J) A complete therminol heating system
k) Additions to the existing control room including
instrumentation
l) Electrical substation changes to supply power
m) Motor control center
'
n) Foreman's office
0190779
TOWOLDMONOQ45333
t}1370:246(1)
Page 9
2/21/68
IV. Capacity (Continued)
'
F. Expansion - Continuous Chlorination (Cont'd)
2 'Justification for Expansion
. a) Provide a total WGK Aroclor capacity of 65-0 M
lbs/year which will be sufficient to meet
sales needs through 1972 with a 40$ excess at
WGK.
b) ' Protect market by achieving corporate quality
goals as follows:
1242
1294
Resistivity, x 10^ ohm-cm 10,000
13,000
Power Factor, %
0.6%
0.3$
Thermal Chemical Chlorides, <0.1
<0.1
ppm c) Ability to supply all customers with Aroclor1
. from either Anniston or WGK.
d) Lower maintenance costs.
e) Increased profits will begin In 1970 with payout
occurring during 1974. At maximum capacity in
the new plant, profits (R.T.) will be.approximately
$2.0 M/year over profits at maximum capacity in
the old plant. If the Aroclor sales growth
pattern continues, and with only a small increase
in Anniston Aroclor capacity, maximum WGK capacity
of 70 M lbs/year will be needed by 1976-77- If
' a 25$ surge capacity is required, further expansion
. should be anticipated in 1972-75*
3. Capacity
After the continuous chlorination plant is on stream, all biphenyl will be chlorinated to the 1142 level in the new plant. It will then be chlorinated to the 1148, 1154, and 1160 levels in the batch plant. In 1972, based on H. J. Day's forecast of 9/7/67, the capacities and requirements of each plant will be:
a) Chlorlnator Capacity, M lbs/year
TABLE VIII
Maximum Capacity
1972 Sales Based on 1972 Forecast Product Split
For Internal Use:
Continuous System (1142)
For Sales:
;
Continuous System (1142)
15-9 25*6
0190730
TOWOLDMONOQ45334
91370:246(1)
Page 10
2/21/68
IV. Capacity (Continued)
3 . Capacity (Cont'd)
Maximum Capacity 1972 Sales Based on 1972
Forecast Product Split
For Sales (Cont'd) Batch System using lll)2 as feed for l-l1*8, 1154, and 1160
19.8
9.
Batch System using Biphenyl as feed for 1148, 1154, 1160
0
24.5
Total Aroclors For Sales
45.4
70.0
b) Still Capacity, M lbs/year
Still No.
Product
TABLE IX
1972 Sales Forecast
Maximupi Capacity Based on 1972 Product _Sp li t__
2
3 1(new) 4 new)
1260-62 Boil-down 1242 1242 1248 1254
only. .
8.6 all aroclors
25.0 0.6
4.9 6.3
Boi 1 - downs 20.0 25.0 10.0
6.5 8.5
Total Aroclors
. 45.4
70.0
A. Goals
The following Aroclor quality goals were set at the corporate Aroclor meeting held on May 9-10, 1967:
121)2
Resistivity x 109 ohm-cm
Power Factor, % TCC, ppm
10,000 0.6 <0.1
1251)
Resistivity x 109 ohm-cm
Power Factor, % TCC, ppm
15,000
0.3 <0.1 '
TOWOLDMONOQ45335
91370:246(1)
Page 11
2/21/68
V. Quality (Continued)
B. 1967 Aroclor Quality
In December 1966 the removal of the catalyst baskets from the chlorinators was completed at W.G.K. No other normal operating conditions have been changed. During 1967 the only quality shift has been an improvement in the electrical properties of both 1242 and 1254 during the third quarter. This is unexplained. Normal quality ranges have been as follows:
TABLE X
1242: 1254:
W.G. K. - 1967 - In Plant Analysis
1967
8/07-11/67
Normal Range Average
Spec.
Resistivity x ioy ohm-cm
Power Factor, * TCC, ppm
1,000-10,000 0.5-3.0 0.45-0.6
6,000
0.7 0.49
500 5-0 0.65
Resistivity x 109 ohm-cm
Power Factor, % TCC, ppm
5,000-40,000 0.2-1.0 0.6-1.0
40,000 0.2 0.8 '
None None None
For a complete storage tank analysis record of Aroclor 1242 and 1254, see Appendix B.
C. Batch Quality Studies and Recommendations
Since early in 1967 there has been a concerted effort to improve Aroclor stability and electrical properties. This is a corporate effort headed by D. C. Armstrong of W. G. K., PR & D. It was initiated by the realization that Monsanto's Aroclor was surpassed in quality by foreign competitor's products.
The following quality factors have been considered and/ or investigated: (For a complete report of PR & D batch work, see J. A. Gloeckner's progress report 91370:3794(1).)
1. Chlorination
*.
a) Higher temperature chlorination will improve Aroclor quality. Four storage tanks of 1242 have been made at 195C with'an average 0.30 ppm TCC. The normal material' made Just prior
to the tests averaged 0.45 ppm TCC. Optimum temperature has not been determined. ,
0190732
TOWOLDMONOQ45336
91570:246(1)
Page 12
2/21/68
)
V. Quality (Continued)
C. Batch Quality Studies and Recommendations (Cont'd)
1. Chlorination (Cont'd)
.
b) Higher ferric chloride concentrations (0.2/)
are" beneficial at 150"C. At 26UDC, the benefit
Is doubtful.
.
c) Catalyst particle size was checked and found to
vary considerably! 7[See Appendix C).Pennsalt
Is the only supplier of anhydrous ferric chloride
and they do not attempt to control particle size.
d) Biphenyl quality Is an Important variable under
normal conditions. At higher temperature or
catalyst level the effect of biphenyl quality is
greatly reduced. ' '
e) Initial reaction temperature does not affect
quality as long as'it is at least 120C.
f) Bromine was added to the chlorine to a 700-800
ppm level and used to make a storage tank of
' 1242. At reaction conditions of 195C and 8 lbs.
FeCls/batch, a TCC of .047 was obtained. This
material was life-tested by Electric Utilities
and approved.
g) Sparger design has been changed to give better
chlorine distribution and to prevent catalyst
. settling. Resulting quality data has not been
. obtained.
h) Off-gas condensate is not suitable as a raw material
for electrical grade Aroclor, but could be used
for non-electrical grade. Off-gas losses increase
,, by five times when increasing the reaction
< temperature from 150C to 195C. Cost of yield
loss will increase by $50,000 for production of
50 M lbs.
Conclusion: Only one change can be recommended to improve Aroclor quality in the chlorination step. A temperature of 195C should be used.
2. Filtration of Crude Aroclor
If catalyst concentrations higher than 0.05/ arc used,
the undissolved ferric chloride should be removed
before distillation. A centrifuge installation would
cost $25-40,000.
'
0190711
TOWOLDMONOQ45337
91370:246(1)
Page 13
2/21/68
V. Quality (Continued)
C. Batch Quality Studies and Recommendations (Cont*1d)
3 Distillation
.
a) A lime charge equivalent to 0.8$ o.f the chlorination mass should be used (present practice).
b) Bor good process control, a level recorder is
recommended for No. 2 Still. Especially during 'boil-downs, guess work risks line pluggage and
considerable downtime.
' 11 Earth Treatment vs Porocel
In the present plant, 20 lbs. of attapulgus earth is mixed into a blend tank of distilled Aroclor for 30 minutes and then filtered to a finished product . ' tank. Varying amounts of earth and porocel were
tried, but no significant quality difference was noted. Power factor was measured on a temporary in line instrument.
3. Storage and Transfers
,
'
a) All Aroclor storage tanks should be 21-23,000 gallon aluminum tanks with a nitrogen blanket. The existing nitrogen system does not work and is being checked for modifications. It will be
' operable by 4/1/68. b) Separate aluminum transfer lines should be
available for each aroclor product.
D. Continuous Chlorination Recommendations
WOK PR & D recommends the following process conditions
be used in the continuous chlorination Aroclor plant
expansion:
-
1. Chlorination
a) Biphenyl
Biphenyl will be monitored for water content. If high levels (80 ppm and above) are encountered . frequently, the biphenyl should be dried with a molecular sieve prior to chlorination.
o'
TOWOLDMONOQ45338
91270:2*16(1)
Page 1*4
2/21/C
V. Quality (Continued)
. D. Continuous Chlorination Recommendations (Cont'd)
TABLE XI
.
Temperature
Min. Temp.
Max. Temp
Biphenyl Feed Tank
Chlorinator 1
..
2
3 4
100C 140 150 170 190
120C 160 170 190 210
c) Catalyst
'
Use 0.1/ FeCl3 having a mesh size specification . of 50/ less than 15 microns and 100/ less than
50 microns. Direct addition of the catalyst to the chlorinators is being explored. No baskets are to be used.
d) Yield Losses - Based on laboratory continuous chlorinatlons, vapor losses are expected to be 2-5
' times that experienced at the Anniston Plant. This material should be used for non-electrical grade Aroclor production.
e) Circulation rate should be as high as possible compatible with good maintenance (narrows isomer distribution).
2. Crude Aroclor (11*12) Storage
a) Temperature should be as high as possible, 150-190UC minimum.
b) Residence times should be as long as possible with a 12 hour minimum. The new intermediate storage tanks are sized for a 48 hour residence time.
c) The catalyst present improves stability. d) Agitation is recommended for optimum contact of
catalyst and 1142. It will also minimize catalyst build-up in the tank. e) HC1 removal will be accomplished by maintaining a mild vacuum (650 mm absolute) on the 1142 storage tank. Further work will determine if this is necessary. Air blowlhg is not recommended.
OH1**
TOWOLDMONOQ45339
91370:246(1)
Page 15
2/21/68
V. Quality (Continued)
D. Continuous Chlorination Recommendations (Coat'd)
5. Distillation
..
a) Lime charge of 0.8% adequately handles up to 0.2% catalyst concentration.
b) Pressure Is not very critical, but the lower the better. Starting with the same crude and distilling to the same yield, pressure and TCC are related as follows:
TABLE XII
Pressure
Temperature
TCC
5 mm 40
60
190C
240 280
0.22 ppm
0.27 0.J2
e) A forecut of 1% will result in an improvement of 0.01-0.03 ppm TCC, independent of earth treatment method, chlorination conditions, or ageing. The forecut could be added to the condensate
from the chlorinators and used for non-electrical Aroclors. Present plant expansion does not
. anticipate making this forecut. Further PK & 1) . Investigation is scheduled.
4. Earth Treatment
Use porocel columns as demonstrated at Anniston.
5. Future Work
'
_ EIM1
a) Assist in plant demonstration at Anniston using 5/1/
chlorination conditions of 190-195C in the third
chlorlnator and FeCl3 added to each mix tank.
Evaluate results. (Test scheduled for 3/11/68).
b) Define where FeCl3 should be added (pending
4/1/
Anniston demonstration).
c) Determine necessity arid means of HC1 removal
3/1/
from crude.
'
d) Investigate effect of water and trace Impurities 9/1/
in! biphenyl on Aroclor stability. Monitor IIE0
level in department biphenyl 'Storage.
e) Monitor bromine content of department chlorine. 3/1/
f) Evaluate additional routes for improving
9/1/
' Aroclor stability.
.
.
0190736
TOWOLDMONOQ45340
91}70:246(1)
Page 16
2/21/68
V. Quality (Continued)
.
. E. Aroclor Blends
-
Specifications are normally met on all Aroclor blends, but sometimes with great difficulty. The following
conditions hinder the production of high quality blends:
1. General
a) .
b) .
. c) . d)
e)
The blend tanks are inadequate in size and TTCB storage non-existent. Project 288h will provide a third blend tank (20,000 gallons). It is recommended that one of the underground storage tanks (15,000 gallons) be retained for TTCB
storage. There is only one supplier (Hooker) of TCB and TTCB. These raw materials have poor electrical qualities and are difficult to clean up. To aid in the mixing process, the blends are blown with plant air. This is not a good practice and an alternate method should be used. Earth treatment of the blends does little good, sometimes degrading the electrical properties. During 1967 earth treatment of 1260 PP0 and 1254 PP0 has been stopped. Less difficulty in meeting specifications has resulted. The chloride scavenger harms electrical properties.
2. Specifications
a) Pydrauls - No problems
b) 1254 PPO - No problems c) 1260 PPO - Two causes make the specific gravity
and refractive index specification difficult to meet: (1) The specifications for the blend are
narrower than for the components. (2) The specific gravity and refractive index
specifications do not correlate well with
each other. The per batch average is three blend adjustments and eight control sample analyses. This means increased lab costs, but more importantly, delay in shipments, below minimum .drummed Inventory, and poor TCB and TTCB yields..
-I
A program to correct this problem was set up in 1966 by Don Harris and Bill Caraway, but was dropped after preliminary work because'the dollar . value was low ($10-12M/year). Completion of . this w6rk is still needed as the time factor becomes more important and blend sales Increase.
0190717
TOWOLDMONOQ45341
91370:246(1)
Page 17
2/21/68
V. Quality (Continued)
E. Aroclor Blends (Cont'd)
' d) A 13 B 3 B - Tills blend suffers from the same specific gravity and refractive index problems as does 1260 PPO. In addition, blends must be adjusted with 1260 since there Is no TTCB storage. Finally, because of the poor quality TTCB, the electrical property specifications are difficult, and occasionally Impossible to meet. Five electrical property checks and seven specific gravity and index analyses arc made on an average batch.
VI. Yields
A. Biphenyl
TABLE XIII
Year
Actual Yield
Standard
1964
1963 1966 1967
96.37^
98.39 98.66
98.30
97.0/
The yield loss is in the off-gas condensate and is worth $7,000 in 1968 when chlorinating at 150C and $37,000 when chlorinating at 195C. In the continuous chlor ination plant this material will be used in the feed stream when producing non-electrical grade Aroclor.
B. Chlorine
Chlorine usages are calculated by the chlorine department and therefore are not a meaningful gauge to the Aroclor Department operations.
1 TTCB
TABLE XIV
Actual Yield 1967
Standard
TCB TTCB
98.23 94.11
98.0# 98.0
The yield losses are worth $10-12 M in 1968 and are due to lack of TTCB storage and mix tank capacity.
0190738
TOWOLDMONOQ45342
91370:246(1)
18 '/21/68
VII. Manufacturing Costs (Year 1967)
Total cost variance on the Aroclor production and blending
operation was (-) $9,298 for 1967* The following items
represent the larger cost variances:
A. Compressed Air Act $12,132 Sch $6,007 Var (-) $6,123
Compressed air is pro-rated to the using departments.
E. Supplies
Act $17,381 Sch $22,5^3 Var $3,16?
Supply costs appear normal and are itemized in Appendix D.
C. Packing Containers
Act $120,886 '.
Sch $113,293 Var (-) . $7,393
A larger than expected percentage of Aroclor and Ardor blends are being sold in drums.
D. Laboratory
Act $35,993 Sch $31,772 Var (-) $4,223
As noted previously, many control samples are analyzed
in achieving blend specifications.
*
E. TSD, Experimental, and PH & D
Act $107,635 Sch $30,794 Var (-) $76,841
Since early in 1967, an intensive program has been planned and pursured in an effort to improve Aroclor quality.
F. Mechanical Expense
Act $129,008 Sch $192,778 Var $63,770
A plant expansion expected in 1967 which did not materialize causes the large positive variance.
Mechanical expenses and downtime during 1967 were above
1966, but in line with 1964-65- Other downtime results
primarily from low chlorine pressure. This should be
corrected with the completion of projects 3824 and 4864.
For a summary of 1964-1967 mechanical expense and downtime,
see Appendix E.
Appendix F itemizes the mechanical expenses for 1966 1967. Pumps continue to be a source of high maintenance costs. It is recommended that all new pumps installed be equipped with mechanical seals. Replacement or modification ol1 existing pumps to pumps with mechanical seals will be evaluated.
0190739
TOWOLDMONOQ45343
91570:246(1)
Page 19
2/21/68
VII. Manufacturing Costs (Continued)
F. Mechanical Expense (Cont|d)
'
' Appendix G lists all projects currently pending, or . completed during 1967.
VIII. Stream and Air Pollution
The principal stream pollutants from I)cpt. 2*16 are biphenyl and chlorinated biphenyl. These are sewered at a rate of 700-800 Ibs/day and are not considered a pollution problem. The sewering of this material will be eliminated with the Aroclor plant expansion by.January, 1969-
The principal air pollutant is HC1 gas. This is minimized by drowning the blQW tank vapors.
01907*0
TOWOLDMONOQ45344
APPENDIX "A" ' DRUMMING OP AROCLOR & BLENDS, 6/56 - 3/67
Prod.
Type Container,
Gallons
55 50 June 1966
55 30 July
1232
1242 "
1248
!
1254 1260
i
!
1262
i
A 13 B 3 B 1
1254 ppo ;
1620 PPO i '\
PYD A-200
1
PYD A-280
1254 + 10% XYL
i
: I ! j
THERM 1
I
THERM 2 *
THERM 3
88 985
138 249
196
64
*-
40
39 302 158
36 510
66
251 7 95 22 16 91
203 >
, 42 IqIi
55 5 Aug.
55 30 Sent.
j 22 ! 40 ! 192 i 402 1 i 19 > 352 ! 96
: 433
` 76
:1
; 195 20
30 ; 183 132 : 297 -`*148
: i53 377
60 '
190 .
61
-
255
4
TOTALS
1696
64
91 '
1656 29
66
1641
162
1^75
ii-
32c
IV /.06T0
TOWOLDMONOQ45345
APPENDIX "A" fCCNTINYED? DRUMMING OF AHOCLOP. & BLENDS. 6/66 - 5/6?
Prod.
Type Container,
Gallons
55
30
Oct. 1966
5
-
55 30 Nov.
12J2
-
1242
1248
1254
1260
1262
A 13 B 3 B 1254 PPO
1260 PPO
150 345 2?
216
PYD A-200
I 366
PYD A-2 80
1254 + 10& XYL
THERM 1 THERM 2 therm 3
i
. J1
! .
!
59 70
231 12 142 178 1 1 91 !
i
1 j 231
;
! 39
: 52
5 ' 55
5
55 30
Dec
. 138 Q4
35 354
1034
^ 170 64
. 161
200 52
-
120
221 24
58 70 134
Jan. .
" IOC 50
174 - 174
116
152 1
39 28
( 75
-
TOTALS
; 1229
142 9311
1069
1319
252 , 1037
150
l 5
10 61
32 103
0190742
TOWOLDMONOQ45346
APPENDIX "A"' ^09r'T,"r\T"ED' DRUMMING OP AROCLOR & SPENDS, 6/66 - 5/67
Prod. .
Type Container
Gallons 55 5 ! 55
30 5
55
30 5 ! 55
30. 5 4 55
30 5
'1232 ' ' 1242 -
1248
1254 1260 1262 A 15 B J B 1254 PPO
1260 PPO .
FES.
41
176 108 154
53 !
37 2
143 74 ;
' MAR.
92 72 250
30 14 255
15
APRIL
MAY
TOTAL
18 104 U!i8
52 1 141
s 36
98 201 456
35 53 ^ 130 151
63 1560
1039 71 4456
24
416
79 99 175 1571 Ti53 1649
244 37 10
1790 50
203
PYD A-200
PYD A-2 80
225 -'
I 60
224
158
9
2766 212
1254 + 10^ XYL
rrnjERM 1 74ERiy! 2 THERX 3
39
16 ' 110
38.
52 112 90 1 15 16
*4 I'd
231 Id yQ 36 1 7,ii 16
TOTALS
1029 127 969 15 16 128 7 35 123 12::; 99 2-5 55 0 7l. 15 - 7 C
G19 0 7 43
,
'
J.) Gal. 5h~'
d, cn ^
p7
TOWOLDMONOQ45347
APi'E;;dk Jj AA1jSIS_Eli'.CTRIC AL CK/O)8 1 S'! 2
Spec. u. 63 max.
G^G min.
5.0 max.
Mo.,__19>V Lo'L Ko.
TC C
Resistivity x 10--'
r F.
Co.,,; 0 ..to
January
Kobruarv
Karc.'i
Apr] 1
May June
Ju] y Auj.US t
September
October1
November
December
January 1968 February
K3 -
'101 0.2
1330
4 02 0.29
3930
4 03 0.30
20Gu
J{ 09 ' 0.37
' 6co
`106 0. i) 1
oGG
^ 0Y 0.49
600
4 08 0.51
. 1030
4n 0.43
3200
412 G.G^
2040
bvj ii -J) -|,
0.39.
. O . "t .y
'
1600
960
421 0.28
700
4?2 0.34
680
423 0.43
900
427 0.47
1600
426 0.52 431 0.48
880 730
436 0.32
2130
437 0.36 i) 4 0 0.62
1300 4240
444 0.61
2300
447 0.53
3230
nil C 0.28
2880
433 0.39
433 0.33 436 0.49 437 0.47
459 0.35 462 0.63
2620
20 4 0
74 69 5000 2560 2610
463 0.46 469 0.47
10400 6900
471 0.38 1172 0.30
22400 13600
473 0.44 476 0.41
13690 7330
'177 0.26 4 80 0.30
13750 4000 -
1)82 0.37
8000
485 '488
489 492
49? 494
KK-
4 02 403 406 408
0.53 0.64
0.35 1.81 0.40 0.35;
0.34 0.37 0.35 0.50
2000 1300 1450 1545 2500 2880
1320 10600
1880 1900
0. C G G. ?
1.63 2.?0 ] .1 c 2.64 4.44
G . VG 0.7 6
I.60
>. -
5. GG
2.37
t J : ; , 6:;;: .! 1, ' u : J : o:
(jn.. 'g, g ... ]-'eC J 3 )
A'] 1 ot:u r 1 0 Ci 'j a 'J i. 0 1 c; . no . '
1 .02
3.06
1.66.
0.2o
3.24
0.(6
0.64
0.83
0.8] - (-11 '01 G ) o
0.63
i1':' C ' 3 )
1 -39
0.3`J 1.36 -- (1>'PC, 6 ilo
0.99 O.o4
FeC'la 76-' 60(1 pi>:.. ii}-s
0.62
0.7 8 0.4o
0.36 - (3 93 "0, 2 ] b;
0.23 0.40
0.24 -
F0CJ3) (] 2 1 ] :
1.26
bcOJ.s,
0.19 - (19'V'C, 2 IU
I2O3)
1.74
2.64
2.96 -- (l95c, 2 lbs
4,4l .
FcC]3)
2.46 --. (I93c, 2 lbs
1.23
Fe C 3 3 )
2.49 0.66
1.33 2.27
o'"1"
TOWOLDMONOQ45348
ArPE.DIX (Continued )
SyvC. -- .. ' pvcU.t SOS C Si,. 'Jc.'C^C US .
*Ot rio. ICC Resistivity ;
a
VO o%
~i i
o
Jc nu&'-"'J ocbruary Marcn
Aprs 1 Kay
.
June
Julv
August September oc tober
November
December
January 1968 February
KI6 01 6^4 601,' 606
607 Cop
613 6io
616 619 62 1
623 625 26 63I 632
633 634 636
637 KK602
605
0. cO 0.65 o.b 0.63 1 .Cv1 1.07 1.00
0.33 1.13 0.36 ^. !>0
0.79 1.06 1.05 G.>0 0.67 0.85 1.34 1.24 0.82
0.85 0.57
ca 0 310
4060 22.'...', 1
1200 10400 22400
663O 5rC6
O Jf V, ^ 36020 24015 4323,. 0\^u4 Dv
4160 13500
6950 8805
2650 16000
P.F.
.r
4.12 1 (>f. 0.50 0.24 2.33 0.4 p 0.29 0.31 a. C'') u.70 0.14 0.15 0.27 0.11 0.20 0.31 0.43 O.76 0.70
1.44 0.31
0190745
TOWOLDMONOQ45349
AP?K3>IX C
Particle size was determined by St. Louis Testing Laboratories, Inc..
Plant Date Sample Tested _
V. G;\ 5/6 -'6?'
Anniston 5/25/'6T
Per Cent less than pee Cent less than
1 micron s micron
per Cent less than 10 micron
Per Cent less than 20 micron
Pe r Cent less than. .. ..iCS'On
Per Cent less. uh&n ib,, micron
' ----. -----
17.4 40.6
. 65.5 95.1
6.6 24.5 42.0
9.3.4 -- --
1 G.i 7/6/6?
An;b ^ 0 (, v cY
5^
C'-- ,c-` yi.'k
-- --
-- --
5. b'
21.fc
.(
0190746
TOWOLDMONOQ45350
APPENDIX D 8 J..- PEj.E^
Items over
bought from the storeroom during 9 months of 1567:
Kilter paper, Spar-tier
Glass bottles, 9 pt.
Oakite cleaner
.
Seals (labels)
Filter cartridges
Soaps and detergents
'
16 oz. bottles and caps
Kerosene
.
Filter cartridges,-Also?
Pressure gauges
Rags
.
Steam hose
9-2' flanged tees, 4 gate valves
S062,g j 6-97.52 502.26 475-00 462.00 551.66
355.93 277.2m 272.-'. u
24g.`;o 244.66 221.61 24 0.00
The above items account for about 50$ of the total supply, cost. T.10
balance is made- up of non-repeating items bought through the storeroom, and through purchase orders.
TOWOLDMONOQ45351
APPENDIX E
SUMMARY OF TRUE- REPAIR, MECHANICAL ' EXPENSE, AND DONETIKE FOR 1964 - 1967
CateRory
True Repair
Mechanical Expense
Repair D. T.
'
Process D. T.
Total D.T.
1264
1965'
1966
1967
$80,404 $82,302 $70,450 $
116,834 100,379 88,592 . 129,008
1.92# 2.93^
056
3.13#
3.29
2.00
0.46
4.48
9.03
9-20
2.76
10.50
0
TOWOLDMONOQ45352
co'oJ -t-v- vjJ c no c.o
Category
Pump furnace Dept, rcpa 1 men Instru: eno Ejector Plautexriant l;'^.rot e.jcoio Work to Assist Tank, Closed Pi pin ^ Electrical I'ij. see llano ous All Others
Total ;:.E.
liLChALi.CAL LXPLLoLA, 1966-1767 YTD (JULY)
1967 Thru July
% oT Total j-i.L .
$10,971 1,384
4,799
3,533 2,030 13.333 6, 0 CA 5,702
575 2,544
636 1,320 4,236
`
17.05 2.2
7.7 5.7 3.3 24 ;y 14.0
9.2 0.Q .6 1.1
2.5 6.6
1966
$10;O66 1,844 P r r '
7,34o 2,5p4 13', 2 _:
3 ? Yd
9,124 2 ; 647 6,722 4,331 3,435 7,623
$62,200
$68,552
I 01907A9
TOWOLDMONOQ45353
APPENDIX G PROJECTS CURRENTLY PENDING
OR COMPLETED DURING 1967
Engr. Auth. No.-
S-842 S-892 S-893 S-670 S-650 S-647 S-7060 M-6049 M-5034
Est. No.
5331* 2844
5639 1138 4263 4467 4448 4871 5018 5411 3446 3528 2698
R3771
3491 Minor
Date h2&L. 8/67 4/66
10/67 12/66 1/67 3/67 4/67 4/67 5/67 8/67 7/66 7/66 12/65
8/66 8/66
Description
Cost
Status
Install heat exchanger Blending & Loading
Facilities
Relocate TCB Dock Install alarms on chlor. Dism. gravity instrument Replace steel & handrails Replace vacuum jet Install Exp. Filter P.M. painting steel P.M. insulation repairs Install safety showers Alter shower tracing Alter three loading docks Dismantle & replace
lean-to
Upgrade control room
Upgrade office Upgrade lighting Relocate 6" fire
protection line Roof over loading dock Install mech. remote
Ram valve Install spare #2 still
pump
$ 8,000 . 60,000
2,100 3,^50
500 18,810
4,620 2,600 23,380 5,375 2,700 1,000 5,700 30,500
4,000
6,000
8,000
EDC 2/1/68 Given to CED for construction; mat'l being ordered. EDC 7/1/68
Comp. 8/67 Complete Complete Complete Complete 6/67 Complete Complete Comp. 5/67 Comp. 5/67 Complete Held up pending study of drumming required. Held up pending department expansion by CED. Est. sub. 8/67
Complete 5/67
Complete 2/67 Scheduled for December 1967 T/A Estimate submitted
01907^
TOWOLDMONOQ45354
APPENDIX H
Using the cost standard prepared by .H. F. Ray for the expanded Aroclor plant operating at a maximum capacity of 70 M lbs/year, the following manufacturing costs and net profits/year were
calculated:
Sales Forecast, M lbs.
Unit Mfg. Cost
Net Profit (B.T.) M $
Increased Profit Compared to .1968, M $
1968 1262 1970 1971 . 1972 1976-77
32.75 35.76 39-01 42.47 45.54 70.00
$6.84 $7.66 $7.47 $7.29 $7.16 $6.48
1.59 1.45 I.65 1.87 2.06
3-65
. -- _ -0.14 0.06 0.28 0.47
2.06
Payout should occur during 1974.
Assumptions:
"
1. Average sales price of 15-OfS/lb.
2, SARE of 22^.
5. Salary and wage increase of 4^ annually over 1968.
4. 1967 prices on biphenyl and ferric chloride, 1968 prices on other raw materials.
5. Depreciation based on addition of 1.5 M $ capital with 12 year life.
6. Addition of four operators, one packer, and one foreman.
7. Biphenyl yield of 97%} chlorine - 93%.
01907^
TOWOLDMONOQ45355