Document b1LMNZYJd60znn7ZbVvNneky

PROGRESS REPORT * ' .technical services dept. -w. q. krummrich plant j job no. [ 1716:246 (report no. I 95 (Final) (date I 2 ( 21 f 6a w.o. krummrich plant . Q t. L. BOEHM ) 0. A. Meyer l.E V. Brawley RESEARCH ------------ S'.' '2nd. ig R. H. Munch GENERAL OFFICE *0 N. E. BILGER Ed. danna (4 ) OTHERS E J.R."Savage '0*. R. KELLOGG 0 J. M. CONNAUGHTON D. Fitzgerald 12 V. Wh jaeger 0i. P. DUNLAP 'i J. Landwehr *0 T. W. DALTON 0r. e. HEISLER 45) G. L. Bratsch c. e. amaSS oST&poulos 0 P. W EDWARDS Queeny G.O. T. M. Morrow <2 p.onjiirffrmo 0R. E. Howard B P.B.Benlgnus QQ J- R. McClain 43 W. L. Rice 43 J. F. Quinn 0S. A. HEININGER G.R.Buchanan P M. B..PATRICK 0 T.M. Patrick *B D. B- HOSMER E J.O.Bright Q^W. J. WILSON EH. C. Carder pej J.C .Bryant -Ar qqD.C.Armstrong |0 W.A.Kuhn-G.O. *51 N. l. sample EcJ R.S .Yates *5L)H.F. Ray ' B R.J.Stratmeye rE W.R.R3 chard TO RECEIVE DETAIL SECTION Tint: AROCLOR AND AROCLOR BLENDS: PROCESS IMPROVEMENT PLAN personnel: R. m. MoCutchan (T. E. Greenman) problem; The objective of this report is to present the Dept. 246 (Aroclors, Pyranols and Pydrauls) Process Improvement Plan. SUMMARY ( ti . Savings of $14,000 and new earnings of $45,000 (B.T.) wdll be realized during 1968 as a result of increased capacity. Ready for 1969 production will be a new continuous chlorination plant with accompanying stills, earth treatment columns, storage tanks, and increased blend capacity at a cost of $1.5M. Benefits of the expansion will be: _ 1. Provide a total WGK Aroclor capacity of 70.OM lbs/yr which will be sufficient to meet sales needs through 1972 with a 25$ excess domestically. Maximum capacity will be needed by 1976-77. ' 2. Protect market by achieving corporate quality goals. 5. Ability to supply all customers with Aroclor from either Anniston or WGK. 4. Lower maintenance costs. 5. Increased profits will begin in 1970 with payout occurring in 1971*. (See "Appendix H" for manufacturing cost details.) An estimated 5/4 man-years of TSD process time and 5-1/2 man-years of PR & D time will be needed during 1968. ACKNOWLEDGMENTS: Thanks to D. C. Armstrong, V. Brawley, D. Fitzgerald, J. A. Gloeckner, and H. F. Ray for their assistance and cooperation in the gathering of data and wilting of this PM report. PRM. ^ h{ O O*4' R. M. MeCutchan o o Technical Services Dept. /J<J COMPANY CONFIDENTIAL INFORMATION This document Is the property of Monsanto Company and the recipient Is responsible for its safekeeping snd disposition. It contains confiden tial Information of Monsanto Company which must not be reproduced, revealed to unauthorized persons or sent outside the company without proper authorization. Either retain in secure files or destroy. f O WGK 800 RE V- 2/66 TOWOLDMONOQ45326 ' 91370-.246(1) Page 2 2/21/68 DETAILS _ I. Synopsis of Process . The Arocldr process consists of the following steps: Chlorination - Batch chlorination of biphenyl (B10) with snift gas (approximately 86 mole % CI2 ) at 150JC produces . Aroclor. The by-product Is hydrogen chloride (HCl) gas. Blowing - Crude Aroclor from the chlorlnators is blown with air to remove excess HCl before distillation. Distillation - Crude Aroclor which has been air blown is continuously fed to the stills. These stills are straight- take-over type with no fractionation. Earth Treatment and Filtration - The distilled Aroclor' is . earth (attapulgus) treated, filtered, and transferred to storage. Blending and Loading - The finished product from the storage tanks is loaded into cans, drums, tank trailers, and tank cars, or used for making blends (electrical and non electrical). ' The principal Aroclors produced at WGK are 1242, 1248, 3294, and 1260. The last two digits indicate the % chlorine (weight) contained in the chlorinated biphenyl mixture (Aroclor). II. Scope of Report This report pertains to both the existing batch chlorination plant and the proposed continuous chlorination plant which is expected to be on-stream by January, 1969. 0190723 TOWOLDMONOQ45327 91570:246(1) Page 3 2/21/68 I 1X1. TSD Process- Job List Priority Job Capital Savings/Benefits EDC 1 Install heat exchanger $8,000 Meet 1968 sales needs, 4/1/68 on Project 5334 (app insure $25,000 rate roved). Follow startup. savings in 1968. 2 Coordinate quality tests 0 Protect $5 M market 3/1/68 in conjunction with PR&D effort. 3 Make nitrogen blanket $1,000 Quality system operable. 4/1/63 4 Determine biphenyl loss-' 0 Quality, minimize es under various chlori- losses . nator conditions. Recom mend conditions for 1968. 6/1/68 6 Design and install fume $7,000 Safety removal system. 6/1/68 6 Investigate possible blend specification changes. 0 Increase blend'capaclty 6/1/68 $l,000/yr in lab costs Raw material savings 7 Check still operation 0 Quality at pressure lower than 4 0 mm. ' 4/1/68 8 Evaluate level recorder $1,500 for still #2, install i if Justified. Process control 6/1/68 9 Evaluate liquid nitro TBD Lower nitrogen costs 4/1/68 gen supply system for Dept. 246/254. .< 10 Evaluate automatic drum $200 $20,000/yr labor sav flushing and drumming 300 M ings and quality installation with new . . improvement. building. 11 Evaluate equipping 1 $15,000 Increase distillation 1/1/70 still with horizontal capacity by 5 M lbs/ pump and boildown year 1 facilities TOWOLDMONOQ45328 '91570:21*6(1) Page 4 2/21/68 IV. Capacity . A. Aroclor 1 Current Capacity . . Department 246 Is rated at 2.5 M lbs Aroclors/month, or 29.9 M lbs Aroclors/year. The department averaged 2.5 Mlbs/month during 1967- Presently the bottle neck Is chlorine availability and distillation rate. 2* Sales Forecast - WGK (H. J. Day, 9/7/67) ' TABU: I (M Lbs) Made In ' Aroclor 1967 1968 1969 1970 1971 1972 1252 .1242 1248 1254 1260 1262 22 ' 12576 6595 6615 4815 154 16107 5049 4851 6638 125 19037 4596 5039 6953 135 21484 4571 5462 7345 145 23772 4447 5957 8l4o 155 25572 4861 6257 84 85 _ 166 TOTAL 29775 52750 35760 39007 42471 45340 Dept.Cap. 57200* -----New 40 M lbs/yr Plant ----- Based on installation of still preheater and increased CI2 rate. 5. Capacity to Meet 1968 Sales . Current department capacity is not sufficient to meet 1968 sales needs. Capacity increases are planned in both the chlorination and_dlstillation steps to an overall capacity of 57-2 M lbs Aroclors/year, or 5-1 M lbs/month. a) Chlorination 1. Project 5824 installs a 6" chlorine feed line to Dept. 246 (EDC 5/1/68). 2. Project 4864 increases chlorine revaporization capacity (EDC 5/1/68). 3. The Brink's mist eliminator elements will be replaced to reduce yield losses in the off gas. . 4. In-line specific gravity instruments are needed, and will be installed in the continuous chlorina- ' tion plant. 019072^ TOWOLDMONOQ45329 ... 91370:246(1)' Page 5 2/21/68 IV. Capacity (Continued) ' A. Aroclor (Cont'd) .. ' b. Distillation : Project 5334 installs a spiral heat exchanger to preheat the still feed (EDC 3/1/68). This gives a 10$ surge capability and.Insures needed production until the expansion is complete. 4. Storage Capacity, M Gal. Product TABLE II Present Capacity, 1968 After Blending . Add 5 Tanks Project Complete & Remove Un'gd 1971 Add Three Tanks Minimum 1971 Storage Recom By H. J. Day, 6/67 1242 1248 1254 1260 TOTAL 55 20 20 ^0 80 40 40 20 ' 140 132.0 40 25.2 40 34.4 20 20.2 125 180 240 211.8 All new tanks will be 20,000 gallon aluminum tanks ' with nitrogen blanket facilities. B. Aroclor Blends 1. Current Capacity Dept. A-246 is rated at 1.2 * lbs/month Pyranols (14.4 M lbs/year) and B-246 at 0.575 M lbs/montii Pydrauls (6-9 M lbs/year). However, the Pyranol capacity can not be achieved because of lack of mix tank capacity. During 1967 these blends were produced while operating at near capacity: Pyranols: 1260 PPO 1254 PPO A13BJB Pydrauls: A-2 00 280 TOTAL BLENDS . 1261 4,958,639 3,099,362 1,199,190 9,237,191 ' 2,454,315 191,772 11,'883) 27 8 019072b TOWOLDMONOQ45330 91570:246(1) Page 6 2/21/68 IV. Capacity (Continued) 8* Aroclor Blends (Cont'd) 2. Future Capacity and Sales Forecast . Project 2844 (EDC 7/1/68) provides for changes and additions to loading and transfer lines, metering facilities, and the conversion of No. 8 storage tank to No. 3 mix tank. This will increase mix tank capacity from 27.5 M gal. to 47.5 M gallons, . and should make possible capacities of 24.0 M lbs/ year Pyranols and 6.9 M lbs/year Pydrauls. Aroclor Blend Sales Forecast, M Lbs. ' (H. J. Day, 9/26/67) . TABLE III Pyranols: Expanded Capacity 't, 1968 1269 1970 1971 1972 Inerteen PPO (1260) Inerteen 54201 KA Pyranol A13B3B 7200 2000 1736 7500 1800 1800 8000 8700 9200 I960 2100 2100 _2200 _2200 . TOTAL PYRANOLS 24000 10936 11100 11850 13000 13500 Pydrauls: b-> rc0oo0aos Pydraul A-200 Pydraul 280 2340 1700 24o 1100 320 1100 350 TOTAL PYDRAULS TOTAL BLENDS 6900 30900 2537 13475 1940 1304o 1880 13750 1420 14420 1450 14950 C. Drumming 1. Current Capacity . Drumming is done on two shifts, one standard operator per shift, 5 days per week. The standard operator also helps load trailers and tank cars (25^ of time). . During the 12 month period, June '1, i960 - May 31, 1967, the following drums and cans were filled: (see Appendix A for detailed drumming report.) _ Size ; TABLE IV 55 Gal. 30 Gal. 0190727 5 Gal . Total Aroclors Blends 7221 8249 0 2*0 569 2148 7790 1023J TdWOLDM6N0045331 91370:21)6(1) Page 7 2/21/68 IV. Capacity (Continued) C. Drumming (Cont'd) 1'. Current Capacity (dont'd) Grand Total: 18,727 drums and cans Average Output: 36 drums and cans/man/shlft 2 Future Drumming Needs ' TABLE V Total Production, M Lbs 1972 (Sales Forecast) 5 Year $ Increase Aroclor Blends 29.8 11.9 45.3 14.9 52/ 2 5$ On the assumption that drumming requirements Increase proportionally in 1972 with total production, 26,600 drums and cans will be needed. By adding tone man on third shift drumming, these needs can be met with an average output of 3? drums and cans/man/shift. After 1972, a seven-day operation may be needed. If drumming requirements Increase sharply, a more auto mated drumming facility might be considered. (A rough estimate of such an installation Including building is $200-300 M) Another source of justification for an automated system is the possible need of a drum flushing Bystem for improved "as packaged" quality. Anniston ,TSD has the assignment of determining total company needs for maintaining Aroclor quality while packaged. Results of their studies will dictate drumming needs for future quality requirements. D. Tank Car and Trailer Loading The following table shows the number of tank cars and trailers loaded during June 1, 1966 - May 31, 1967, and the projected loadings for 1972: TABLE VI Number of Trailers or Carsi 0190728 Tank Cars: Aroclors Pyranols Total Trailers: 95$ Aroclors 5$ Pydrauls 6/66-5/67 72 197 1212 111 236 300 TOWOLDMONOQ45332 91370:246(1). Page 8 2/21/68 1 IV. Capacity (Continued) '' D. Tank Car and Trailer Loading (Cont'd) The existing loading facilities plus the two unloading . docks included in the proposed plant expansion (CKA 1800) will be adequate through 1972. E. Haw Materials The following raw materials 'will be needed based on sales forecast. TABLE VIX ' (M lbs) 1968 197? Biphenyl Chlorine TCB TTCB 18.0 M lbs 34.1 5-5 0.9 25.2 46.6 4.3 1.2 F. Expansion - Continuous Chlorination__(CEA - l800) 1. Scope , a) Five new 22.000 gallon aluminum storage tanks (EDC 7-1-68). b) Railroad spur and two unloading docks c) One 100,000 gallon biphenyl storage tank d) Three existing 15,000 gallon underground tanks will be dismantled . e) Separate transfer lines for each product from day tanks to tank farm, and from tank farm to loading or drumming areas. f) Chain of four chlorinators with external cooling and continuous feed tank (EDC 12-1-68) g) Continuous blow tank and intermediate storage tank hj Two semi-continuous distillation systems . I) Four continuous porocel column treatment systems J) A complete therminol heating system k) Additions to the existing control room including instrumentation l) Electrical substation changes to supply power m) Motor control center ' n) Foreman's office 0190779 TOWOLDMONOQ45333 t}1370:246(1) Page 9 2/21/68 IV. Capacity (Continued) ' F. Expansion - Continuous Chlorination (Cont'd) 2 'Justification for Expansion . a) Provide a total WGK Aroclor capacity of 65-0 M lbs/year which will be sufficient to meet sales needs through 1972 with a 40$ excess at WGK. b) ' Protect market by achieving corporate quality goals as follows: 1242 1294 Resistivity, x 10^ ohm-cm 10,000 13,000 Power Factor, % 0.6% 0.3$ Thermal Chemical Chlorides, <0.1 <0.1 ppm c) Ability to supply all customers with Aroclor1 . from either Anniston or WGK. d) Lower maintenance costs. e) Increased profits will begin In 1970 with payout occurring during 1974. At maximum capacity in the new plant, profits (R.T.) will be.approximately $2.0 M/year over profits at maximum capacity in the old plant. If the Aroclor sales growth pattern continues, and with only a small increase in Anniston Aroclor capacity, maximum WGK capacity of 70 M lbs/year will be needed by 1976-77- If ' a 25$ surge capacity is required, further expansion . should be anticipated in 1972-75* 3. Capacity After the continuous chlorination plant is on stream, all biphenyl will be chlorinated to the 1142 level in the new plant. It will then be chlorinated to the 1148, 1154, and 1160 levels in the batch plant. In 1972, based on H. J. Day's forecast of 9/7/67, the capacities and requirements of each plant will be: a) Chlorlnator Capacity, M lbs/year TABLE VIII Maximum Capacity 1972 Sales Based on 1972 Forecast Product Split For Internal Use: Continuous System (1142) For Sales: ; Continuous System (1142) 15-9 25*6 0190730 TOWOLDMONOQ45334 91370:246(1) Page 10 2/21/68 IV. Capacity (Continued) 3 . Capacity (Cont'd) Maximum Capacity 1972 Sales Based on 1972 Forecast Product Split For Sales (Cont'd) Batch System using lll)2 as feed for l-l1*8, 1154, and 1160 19.8 9. Batch System using Biphenyl as feed for 1148, 1154, 1160 0 24.5 Total Aroclors For Sales 45.4 70.0 b) Still Capacity, M lbs/year Still No. Product TABLE IX 1972 Sales Forecast Maximupi Capacity Based on 1972 Product _Sp li t__ 2 3 1(new) 4 new) 1260-62 Boil-down 1242 1242 1248 1254 only. . 8.6 all aroclors 25.0 0.6 4.9 6.3 Boi 1 - downs 20.0 25.0 10.0 6.5 8.5 Total Aroclors . 45.4 70.0 A. Goals The following Aroclor quality goals were set at the corporate Aroclor meeting held on May 9-10, 1967: 121)2 Resistivity x 109 ohm-cm Power Factor, % TCC, ppm 10,000 0.6 <0.1 1251) Resistivity x 109 ohm-cm Power Factor, % TCC, ppm 15,000 0.3 <0.1 ' TOWOLDMONOQ45335 91370:246(1) Page 11 2/21/68 V. Quality (Continued) B. 1967 Aroclor Quality In December 1966 the removal of the catalyst baskets from the chlorinators was completed at W.G.K. No other normal operating conditions have been changed. During 1967 the only quality shift has been an improvement in the electrical properties of both 1242 and 1254 during the third quarter. This is unexplained. Normal quality ranges have been as follows: TABLE X 1242: 1254: W.G. K. - 1967 - In Plant Analysis 1967 8/07-11/67 Normal Range Average Spec. Resistivity x ioy ohm-cm Power Factor, * TCC, ppm 1,000-10,000 0.5-3.0 0.45-0.6 6,000 0.7 0.49 500 5-0 0.65 Resistivity x 109 ohm-cm Power Factor, % TCC, ppm 5,000-40,000 0.2-1.0 0.6-1.0 40,000 0.2 0.8 ' None None None For a complete storage tank analysis record of Aroclor 1242 and 1254, see Appendix B. C. Batch Quality Studies and Recommendations Since early in 1967 there has been a concerted effort to improve Aroclor stability and electrical properties. This is a corporate effort headed by D. C. Armstrong of W. G. K., PR & D. It was initiated by the realization that Monsanto's Aroclor was surpassed in quality by foreign competitor's products. The following quality factors have been considered and/ or investigated: (For a complete report of PR & D batch work, see J. A. Gloeckner's progress report 91370:3794(1).) 1. Chlorination *. a) Higher temperature chlorination will improve Aroclor quality. Four storage tanks of 1242 have been made at 195C with'an average 0.30 ppm TCC. The normal material' made Just prior to the tests averaged 0.45 ppm TCC. Optimum temperature has not been determined. , 0190732 TOWOLDMONOQ45336 91570:246(1) Page 12 2/21/68 ) V. Quality (Continued) C. Batch Quality Studies and Recommendations (Cont'd) 1. Chlorination (Cont'd) . b) Higher ferric chloride concentrations (0.2/) are" beneficial at 150"C. At 26UDC, the benefit Is doubtful. . c) Catalyst particle size was checked and found to vary considerably! 7[See Appendix C).Pennsalt Is the only supplier of anhydrous ferric chloride and they do not attempt to control particle size. d) Biphenyl quality Is an Important variable under normal conditions. At higher temperature or catalyst level the effect of biphenyl quality is greatly reduced. ' ' e) Initial reaction temperature does not affect quality as long as'it is at least 120C. f) Bromine was added to the chlorine to a 700-800 ppm level and used to make a storage tank of ' 1242. At reaction conditions of 195C and 8 lbs. FeCls/batch, a TCC of .047 was obtained. This material was life-tested by Electric Utilities and approved. g) Sparger design has been changed to give better chlorine distribution and to prevent catalyst . settling. Resulting quality data has not been . obtained. h) Off-gas condensate is not suitable as a raw material for electrical grade Aroclor, but could be used for non-electrical grade. Off-gas losses increase ,, by five times when increasing the reaction < temperature from 150C to 195C. Cost of yield loss will increase by $50,000 for production of 50 M lbs. Conclusion: Only one change can be recommended to improve Aroclor quality in the chlorination step. A temperature of 195C should be used. 2. Filtration of Crude Aroclor If catalyst concentrations higher than 0.05/ arc used, the undissolved ferric chloride should be removed before distillation. A centrifuge installation would cost $25-40,000. ' 0190711 TOWOLDMONOQ45337 91370:246(1) Page 13 2/21/68 V. Quality (Continued) C. Batch Quality Studies and Recommendations (Cont*1d) 3 Distillation . a) A lime charge equivalent to 0.8$ o.f the chlorination mass should be used (present practice). b) Bor good process control, a level recorder is recommended for No. 2 Still. Especially during 'boil-downs, guess work risks line pluggage and considerable downtime. ' 11 Earth Treatment vs Porocel In the present plant, 20 lbs. of attapulgus earth is mixed into a blend tank of distilled Aroclor for 30 minutes and then filtered to a finished product . ' tank. Varying amounts of earth and porocel were tried, but no significant quality difference was noted. Power factor was measured on a temporary in line instrument. 3. Storage and Transfers , ' a) All Aroclor storage tanks should be 21-23,000 gallon aluminum tanks with a nitrogen blanket. The existing nitrogen system does not work and is being checked for modifications. It will be ' operable by 4/1/68. b) Separate aluminum transfer lines should be available for each aroclor product. D. Continuous Chlorination Recommendations WOK PR & D recommends the following process conditions be used in the continuous chlorination Aroclor plant expansion: - 1. Chlorination a) Biphenyl Biphenyl will be monitored for water content. If high levels (80 ppm and above) are encountered . frequently, the biphenyl should be dried with a molecular sieve prior to chlorination. o' TOWOLDMONOQ45338 91270:2*16(1) Page 1*4 2/21/C V. Quality (Continued) . D. Continuous Chlorination Recommendations (Cont'd) TABLE XI . Temperature Min. Temp. Max. Temp Biphenyl Feed Tank Chlorinator 1 .. 2 3 4 100C 140 150 170 190 120C 160 170 190 210 c) Catalyst ' Use 0.1/ FeCl3 having a mesh size specification . of 50/ less than 15 microns and 100/ less than 50 microns. Direct addition of the catalyst to the chlorinators is being explored. No baskets are to be used. d) Yield Losses - Based on laboratory continuous chlorinatlons, vapor losses are expected to be 2-5 ' times that experienced at the Anniston Plant. This material should be used for non-electrical grade Aroclor production. e) Circulation rate should be as high as possible compatible with good maintenance (narrows isomer distribution). 2. Crude Aroclor (11*12) Storage a) Temperature should be as high as possible, 150-190UC minimum. b) Residence times should be as long as possible with a 12 hour minimum. The new intermediate storage tanks are sized for a 48 hour residence time. c) The catalyst present improves stability. d) Agitation is recommended for optimum contact of catalyst and 1142. It will also minimize catalyst build-up in the tank. e) HC1 removal will be accomplished by maintaining a mild vacuum (650 mm absolute) on the 1142 storage tank. Further work will determine if this is necessary. Air blowlhg is not recommended. OH1** TOWOLDMONOQ45339 91370:246(1) Page 15 2/21/68 V. Quality (Continued) D. Continuous Chlorination Recommendations (Coat'd) 5. Distillation .. a) Lime charge of 0.8% adequately handles up to 0.2% catalyst concentration. b) Pressure Is not very critical, but the lower the better. Starting with the same crude and distilling to the same yield, pressure and TCC are related as follows: TABLE XII Pressure Temperature TCC 5 mm 40 60 190C 240 280 0.22 ppm 0.27 0.J2 e) A forecut of 1% will result in an improvement of 0.01-0.03 ppm TCC, independent of earth treatment method, chlorination conditions, or ageing. The forecut could be added to the condensate from the chlorinators and used for non-electrical Aroclors. Present plant expansion does not . anticipate making this forecut. Further PK & 1) . Investigation is scheduled. 4. Earth Treatment Use porocel columns as demonstrated at Anniston. 5. Future Work ' _ EIM1 a) Assist in plant demonstration at Anniston using 5/1/ chlorination conditions of 190-195C in the third chlorlnator and FeCl3 added to each mix tank. Evaluate results. (Test scheduled for 3/11/68). b) Define where FeCl3 should be added (pending 4/1/ Anniston demonstration). c) Determine necessity arid means of HC1 removal 3/1/ from crude. ' d) Investigate effect of water and trace Impurities 9/1/ in! biphenyl on Aroclor stability. Monitor IIE0 level in department biphenyl 'Storage. e) Monitor bromine content of department chlorine. 3/1/ f) Evaluate additional routes for improving 9/1/ ' Aroclor stability. . . 0190736 TOWOLDMONOQ45340 91}70:246(1) Page 16 2/21/68 V. Quality (Continued) . . E. Aroclor Blends - Specifications are normally met on all Aroclor blends, but sometimes with great difficulty. The following conditions hinder the production of high quality blends: 1. General a) . b) . . c) . d) e) The blend tanks are inadequate in size and TTCB storage non-existent. Project 288h will provide a third blend tank (20,000 gallons). It is recommended that one of the underground storage tanks (15,000 gallons) be retained for TTCB storage. There is only one supplier (Hooker) of TCB and TTCB. These raw materials have poor electrical qualities and are difficult to clean up. To aid in the mixing process, the blends are blown with plant air. This is not a good practice and an alternate method should be used. Earth treatment of the blends does little good, sometimes degrading the electrical properties. During 1967 earth treatment of 1260 PP0 and 1254 PP0 has been stopped. Less difficulty in meeting specifications has resulted. The chloride scavenger harms electrical properties. 2. Specifications a) Pydrauls - No problems b) 1254 PPO - No problems c) 1260 PPO - Two causes make the specific gravity and refractive index specification difficult to meet: (1) The specifications for the blend are narrower than for the components. (2) The specific gravity and refractive index specifications do not correlate well with each other. The per batch average is three blend adjustments and eight control sample analyses. This means increased lab costs, but more importantly, delay in shipments, below minimum .drummed Inventory, and poor TCB and TTCB yields.. -I A program to correct this problem was set up in 1966 by Don Harris and Bill Caraway, but was dropped after preliminary work because'the dollar . value was low ($10-12M/year). Completion of . this w6rk is still needed as the time factor becomes more important and blend sales Increase. 0190717 TOWOLDMONOQ45341 91370:246(1) Page 17 2/21/68 V. Quality (Continued) E. Aroclor Blends (Cont'd) ' d) A 13 B 3 B - Tills blend suffers from the same specific gravity and refractive index problems as does 1260 PPO. In addition, blends must be adjusted with 1260 since there Is no TTCB storage. Finally, because of the poor quality TTCB, the electrical property specifications are difficult, and occasionally Impossible to meet. Five electrical property checks and seven specific gravity and index analyses arc made on an average batch. VI. Yields A. Biphenyl TABLE XIII Year Actual Yield Standard 1964 1963 1966 1967 96.37^ 98.39 98.66 98.30 97.0/ The yield loss is in the off-gas condensate and is worth $7,000 in 1968 when chlorinating at 150C and $37,000 when chlorinating at 195C. In the continuous chlor ination plant this material will be used in the feed stream when producing non-electrical grade Aroclor. B. Chlorine Chlorine usages are calculated by the chlorine department and therefore are not a meaningful gauge to the Aroclor Department operations. 1 TTCB TABLE XIV Actual Yield 1967 Standard TCB TTCB 98.23 94.11 98.0# 98.0 The yield losses are worth $10-12 M in 1968 and are due to lack of TTCB storage and mix tank capacity. 0190738 TOWOLDMONOQ45342 91370:246(1) 18 '/21/68 VII. Manufacturing Costs (Year 1967) Total cost variance on the Aroclor production and blending operation was (-) $9,298 for 1967* The following items represent the larger cost variances: A. Compressed Air Act $12,132 Sch $6,007 Var (-) $6,123 Compressed air is pro-rated to the using departments. E. Supplies Act $17,381 Sch $22,5^3 Var $3,16? Supply costs appear normal and are itemized in Appendix D. C. Packing Containers Act $120,886 '. Sch $113,293 Var (-) . $7,393 A larger than expected percentage of Aroclor and Ardor blends are being sold in drums. D. Laboratory Act $35,993 Sch $31,772 Var (-) $4,223 As noted previously, many control samples are analyzed in achieving blend specifications. * E. TSD, Experimental, and PH & D Act $107,635 Sch $30,794 Var (-) $76,841 Since early in 1967, an intensive program has been planned and pursured in an effort to improve Aroclor quality. F. Mechanical Expense Act $129,008 Sch $192,778 Var $63,770 A plant expansion expected in 1967 which did not materialize causes the large positive variance. Mechanical expenses and downtime during 1967 were above 1966, but in line with 1964-65- Other downtime results primarily from low chlorine pressure. This should be corrected with the completion of projects 3824 and 4864. For a summary of 1964-1967 mechanical expense and downtime, see Appendix E. Appendix F itemizes the mechanical expenses for 1966 1967. Pumps continue to be a source of high maintenance costs. It is recommended that all new pumps installed be equipped with mechanical seals. Replacement or modification ol1 existing pumps to pumps with mechanical seals will be evaluated. 0190739 TOWOLDMONOQ45343 91570:246(1) Page 19 2/21/68 VII. Manufacturing Costs (Continued) F. Mechanical Expense (Cont|d) ' ' Appendix G lists all projects currently pending, or . completed during 1967. VIII. Stream and Air Pollution The principal stream pollutants from I)cpt. 2*16 are biphenyl and chlorinated biphenyl. These are sewered at a rate of 700-800 Ibs/day and are not considered a pollution problem. The sewering of this material will be eliminated with the Aroclor plant expansion by.January, 1969- The principal air pollutant is HC1 gas. This is minimized by drowning the blQW tank vapors. 01907*0 TOWOLDMONOQ45344 APPENDIX "A" ' DRUMMING OP AROCLOR & BLENDS, 6/56 - 3/67 Prod. Type Container, Gallons 55 50 June 1966 55 30 July 1232 1242 " 1248 ! 1254 1260 i ! 1262 i A 13 B 3 B 1 1254 ppo ; 1620 PPO i '\ PYD A-200 1 PYD A-280 1254 + 10% XYL i : I ! j THERM 1 I THERM 2 * THERM 3 88 985 138 249 196 64 *- 40 39 302 158 36 510 66 251 7 95 22 16 91 203 > , 42 IqIi 55 5 Aug. 55 30 Sent. j 22 ! 40 ! 192 i 402 1 i 19 > 352 ! 96 : 433 ` 76 :1 ; 195 20 30 ; 183 132 : 297 -`*148 : i53 377 60 ' 190 . 61 - 255 4 TOTALS 1696 64 91 ' 1656 29 66 1641 162 1^75 ii- 32c IV /.06T0 TOWOLDMONOQ45345 APPENDIX "A" fCCNTINYED? DRUMMING OF AHOCLOP. & BLENDS. 6/66 - 5/6? Prod. Type Container, Gallons 55 30 Oct. 1966 5 - 55 30 Nov. 12J2 - 1242 1248 1254 1260 1262 A 13 B 3 B 1254 PPO 1260 PPO 150 345 2? 216 PYD A-200 I 366 PYD A-2 80 1254 + 10& XYL THERM 1 THERM 2 therm 3 i . J1 ! . ! 59 70 231 12 142 178 1 1 91 ! i 1 j 231 ; ! 39 : 52 5 ' 55 5 55 30 Dec . 138 Q4 35 354 1034 ^ 170 64 . 161 200 52 - 120 221 24 58 70 134 Jan. . " IOC 50 174 - 174 116 152 1 39 28 ( 75 - TOTALS ; 1229 142 9311 1069 1319 252 , 1037 150 l 5 10 61 32 103 0190742 TOWOLDMONOQ45346 APPENDIX "A"' ^09r'T,"r\T"ED' DRUMMING OP AROCLOR & SPENDS, 6/66 - 5/67 Prod. . Type Container Gallons 55 5 ! 55 30 5 55 30 5 ! 55 30. 5 4 55 30 5 '1232 ' ' 1242 - 1248 1254 1260 1262 A 15 B J B 1254 PPO 1260 PPO . FES. 41 176 108 154 53 ! 37 2 143 74 ; ' MAR. 92 72 250 30 14 255 15 APRIL MAY TOTAL 18 104 U!i8 52 1 141 s 36 98 201 456 35 53 ^ 130 151 63 1560 1039 71 4456 24 416 79 99 175 1571 Ti53 1649 244 37 10 1790 50 203 PYD A-200 PYD A-2 80 225 -' I 60 224 158 9 2766 212 1254 + 10^ XYL rrnjERM 1 74ERiy! 2 THERX 3 39 16 ' 110 38. 52 112 90 1 15 16 *4 I'd 231 Id yQ 36 1 7,ii 16 TOTALS 1029 127 969 15 16 128 7 35 123 12::; 99 2-5 55 0 7l. 15 - 7 C G19 0 7 43 , ' J.) Gal. 5h~' d, cn ^ p7 TOWOLDMONOQ45347 APi'E;;dk Jj AA1jSIS_Eli'.CTRIC AL CK/O)8 1 S'! 2 Spec. u. 63 max. G^G min. 5.0 max. Mo.,__19>V Lo'L Ko. TC C Resistivity x 10--' r F. Co.,,; 0 ..to January Kobruarv Karc.'i Apr] 1 May June Ju] y Auj.US t September October1 November December January 1968 February K3 - '101 0.2 1330 4 02 0.29 3930 4 03 0.30 20Gu J{ 09 ' 0.37 ' 6co `106 0. i) 1 oGG ^ 0Y 0.49 600 4 08 0.51 . 1030 4n 0.43 3200 412 G.G^ 2040 bvj ii -J) -|, 0.39. . O . "t .y ' 1600 960 421 0.28 700 4?2 0.34 680 423 0.43 900 427 0.47 1600 426 0.52 431 0.48 880 730 436 0.32 2130 437 0.36 i) 4 0 0.62 1300 4240 444 0.61 2300 447 0.53 3230 nil C 0.28 2880 433 0.39 433 0.33 436 0.49 437 0.47 459 0.35 462 0.63 2620 20 4 0 74 69 5000 2560 2610 463 0.46 469 0.47 10400 6900 471 0.38 1172 0.30 22400 13600 473 0.44 476 0.41 13690 7330 '177 0.26 4 80 0.30 13750 4000 - 1)82 0.37 8000 485 '488 489 492 49? 494 KK- 4 02 403 406 408 0.53 0.64 0.35 1.81 0.40 0.35; 0.34 0.37 0.35 0.50 2000 1300 1450 1545 2500 2880 1320 10600 1880 1900 0. C G G. ? 1.63 2.?0 ] .1 c 2.64 4.44 G . VG 0.7 6 I.60 >. - 5. GG 2.37 t J : ; , 6:;;: .! 1, ' u : J : o: (jn.. 'g, g ... ]-'eC J 3 ) A'] 1 ot:u r 1 0 Ci 'j a 'J i. 0 1 c; . no . ' 1 .02 3.06 1.66. 0.2o 3.24 0.(6 0.64 0.83 0.8] - (-11 '01 G ) o 0.63 i1':' C ' 3 ) 1 -39 0.3`J 1.36 -- (1>'PC, 6 ilo 0.99 O.o4 FeC'la 76-' 60(1 pi>:.. ii}-s 0.62 0.7 8 0.4o 0.36 - (3 93 "0, 2 ] b; 0.23 0.40 0.24 - F0CJ3) (] 2 1 ] : 1.26 bcOJ.s, 0.19 - (19'V'C, 2 IU I2O3) 1.74 2.64 2.96 -- (l95c, 2 lbs 4,4l . FcC]3) 2.46 --. (I93c, 2 lbs 1.23 Fe C 3 3 ) 2.49 0.66 1.33 2.27 o'"1" TOWOLDMONOQ45348 ArPE.DIX (Continued ) SyvC. -- .. ' pvcU.t SOS C Si,. 'Jc.'C^C US . *Ot rio. ICC Resistivity ; a VO o% ~i i o Jc nu&'-"'J ocbruary Marcn Aprs 1 Kay . June Julv August September oc tober November December January 1968 February KI6 01 6^4 601,' 606 607 Cop 613 6io 616 619 62 1 623 625 26 63I 632 633 634 636 637 KK602 605 0. cO 0.65 o.b 0.63 1 .Cv1 1.07 1.00 0.33 1.13 0.36 ^. !>0 0.79 1.06 1.05 G.>0 0.67 0.85 1.34 1.24 0.82 0.85 0.57 ca 0 310 4060 22.'...', 1 1200 10400 22400 663O 5rC6 O Jf V, ^ 36020 24015 4323,. 0\^u4 Dv 4160 13500 6950 8805 2650 16000 P.F. .r 4.12 1 (>f. 0.50 0.24 2.33 0.4 p 0.29 0.31 a. C'') u.70 0.14 0.15 0.27 0.11 0.20 0.31 0.43 O.76 0.70 1.44 0.31 0190745 TOWOLDMONOQ45349 AP?K3>IX C Particle size was determined by St. Louis Testing Laboratories, Inc.. Plant Date Sample Tested _ V. G;\ 5/6 -'6?' Anniston 5/25/'6T Per Cent less than pee Cent less than 1 micron s micron per Cent less than 10 micron Per Cent less than 20 micron Pe r Cent less than. .. ..iCS'On Per Cent less. uh&n ib,, micron ' ----. ----- 17.4 40.6 . 65.5 95.1 6.6 24.5 42.0 9.3.4 -- -- 1 G.i 7/6/6? An;b ^ 0 (, v cY 5^ C'-- ,c-` yi.'k -- -- -- -- 5. b' 21.fc .( 0190746 TOWOLDMONOQ45350 APPENDIX D 8 J..- PEj.E^ Items over bought from the storeroom during 9 months of 1567: Kilter paper, Spar-tier Glass bottles, 9 pt. Oakite cleaner . Seals (labels) Filter cartridges Soaps and detergents ' 16 oz. bottles and caps Kerosene . Filter cartridges,-Also? Pressure gauges Rags . Steam hose 9-2' flanged tees, 4 gate valves S062,g j 6-97.52 502.26 475-00 462.00 551.66 355.93 277.2m 272.-'. u 24g.`;o 244.66 221.61 24 0.00 The above items account for about 50$ of the total supply, cost. T.10 balance is made- up of non-repeating items bought through the storeroom, and through purchase orders. TOWOLDMONOQ45351 APPENDIX E SUMMARY OF TRUE- REPAIR, MECHANICAL ' EXPENSE, AND DONETIKE FOR 1964 - 1967 CateRory True Repair Mechanical Expense Repair D. T. ' Process D. T. Total D.T. 1264 1965' 1966 1967 $80,404 $82,302 $70,450 $ 116,834 100,379 88,592 . 129,008 1.92# 2.93^ 056 3.13# 3.29 2.00 0.46 4.48 9.03 9-20 2.76 10.50 0 TOWOLDMONOQ45352 co'oJ -t-v- vjJ c no c.o Category Pump furnace Dept, rcpa 1 men Instru: eno Ejector Plautexriant l;'^.rot e.jcoio Work to Assist Tank, Closed Pi pin ^ Electrical I'ij. see llano ous All Others Total ;:.E. liLChALi.CAL LXPLLoLA, 1966-1767 YTD (JULY) 1967 Thru July % oT Total j-i.L . $10,971 1,384 4,799 3,533 2,030 13.333 6, 0 CA 5,702 575 2,544 636 1,320 4,236 ` 17.05 2.2 7.7 5.7 3.3 24 ;y 14.0 9.2 0.Q .6 1.1 2.5 6.6 1966 $10;O66 1,844 P r r ' 7,34o 2,5p4 13', 2 _: 3 ? Yd 9,124 2 ; 647 6,722 4,331 3,435 7,623 $62,200 $68,552 I 01907A9 TOWOLDMONOQ45353 APPENDIX G PROJECTS CURRENTLY PENDING OR COMPLETED DURING 1967 Engr. Auth. No.- S-842 S-892 S-893 S-670 S-650 S-647 S-7060 M-6049 M-5034 Est. No. 5331* 2844 5639 1138 4263 4467 4448 4871 5018 5411 3446 3528 2698 R3771 3491 Minor Date h2&L. 8/67 4/66 10/67 12/66 1/67 3/67 4/67 4/67 5/67 8/67 7/66 7/66 12/65 8/66 8/66 Description Cost Status Install heat exchanger Blending & Loading Facilities Relocate TCB Dock Install alarms on chlor. Dism. gravity instrument Replace steel & handrails Replace vacuum jet Install Exp. Filter P.M. painting steel P.M. insulation repairs Install safety showers Alter shower tracing Alter three loading docks Dismantle & replace lean-to Upgrade control room Upgrade office Upgrade lighting Relocate 6" fire protection line Roof over loading dock Install mech. remote Ram valve Install spare #2 still pump $ 8,000 . 60,000 2,100 3,^50 500 18,810 4,620 2,600 23,380 5,375 2,700 1,000 5,700 30,500 4,000 6,000 8,000 EDC 2/1/68 Given to CED for construction; mat'l being ordered. EDC 7/1/68 Comp. 8/67 Complete Complete Complete Complete 6/67 Complete Complete Comp. 5/67 Comp. 5/67 Complete Held up pending study of drumming required. Held up pending department expansion by CED. Est. sub. 8/67 Complete 5/67 Complete 2/67 Scheduled for December 1967 T/A Estimate submitted 01907^ TOWOLDMONOQ45354 APPENDIX H Using the cost standard prepared by .H. F. Ray for the expanded Aroclor plant operating at a maximum capacity of 70 M lbs/year, the following manufacturing costs and net profits/year were calculated: Sales Forecast, M lbs. Unit Mfg. Cost Net Profit (B.T.) M $ Increased Profit Compared to .1968, M $ 1968 1262 1970 1971 . 1972 1976-77 32.75 35.76 39-01 42.47 45.54 70.00 $6.84 $7.66 $7.47 $7.29 $7.16 $6.48 1.59 1.45 I.65 1.87 2.06 3-65 . -- _ -0.14 0.06 0.28 0.47 2.06 Payout should occur during 1974. Assumptions: " 1. Average sales price of 15-OfS/lb. 2, SARE of 22^. 5. Salary and wage increase of 4^ annually over 1968. 4. 1967 prices on biphenyl and ferric chloride, 1968 prices on other raw materials. 5. Depreciation based on addition of 1.5 M $ capital with 12 year life. 6. Addition of four operators, one packer, and one foreman. 7. Biphenyl yield of 97%} chlorine - 93%. 01907^ TOWOLDMONOQ45355