Document aq69M5pnwKOb7KwZKgyB3XxY

EPA REGION 10 Enforcement and Compliance Assurance Division INSPECTION REPORT Inspection Entry Date/Time Inspection Exit Date/Time Weather Media Statute(s)/Program(s) Type of Inspection 04/06/2023 10:45 AM (PT) Announced: No 04/06/2023 03:20 PM (PT) Access: Granted 50F, Overcast and Drizzly Water Clean Water Act, NPDES, Stormwater - Construction Compliance Evaluation Inspection Permittee Name Facility or Site Name Facility/Site Physical Address City, State, Zip Code County Facility GPS Coordinates Mailing Address City, State, Zip Code Lennar Northwest, LLC. Olympic Ridge No Defined Address Belfair, WA 98528 Mason 47.455405, -122.818175 33455 6th Avenue S, Suite 1-B Federal Way, Washington 98003-6074 FRS ID Permit Number SIC WAT6367826686 WAR309505 1522 (Multifamily housing construction (pt)) Lead Inspector: RAYMOND ANDREWS Date: 2023.06.14 13:44:20 -07'00' Digitally signed by RAYMOND ANDREWS Raymond Andrews EPA Region 10 andrews.raymond@epa.gov (206) 553-4252 Supervisor Review: PETER CONTRERAS Date: 2023.06.14 13:52:08 -07'00' Digitally signed by PETER CONTRERAS Peter Contreras EPA Region 10 contreras.peter@epa.gov (206) 553-6708 SECTION I - Opening Conference I arrived at the Olympic Ridge construction site (the "Site" or "Facility"), located in Belfair, WA 98528, at 10:45 AM (PT) on 04/06/2023 for an unannounced inspection. I presented my credentials to Maggie Sturm, Division Environmental Manager, and informed her I was there to conduct an inspection to determine compliance with the Clean Water Act (CWA) and the Washington Department of Ecology (WDOE) Construction Stormwater General Permit (CGP). This report is based on information supplied by Olympic Ridge representatives, direct observations made by me, and records and reports maintained by the permittee. In addition, information gathered prior to, or after, the inspection from a review of EPA, State, and/or public records may be included in this report. Note: The on-site Representatives said the site had not been previously inspected by EPA or WDOE. Attendees Organization EPA Region 10 Lennar Northwest, LLC. Attendee Name Raymond Andrews Maggie Sturm Olympic Ridge Permit # WAR309505 Title Lead Inspector Division Environmental Manager Present in Opening Conf. Yes Yes Present in Closing Conf. Yes Yes Facility/Site Information Operator Name Lennar Northwest, LLC Disturbed Area The total area of the project is approximately 35.53 acres. Site Receiving Water Irene Creek Number and location The site has a single outfall that drains all stormwater into a stormwater retention pond. of outfalls Once the stormwater in the retention pond reaches a certain level, it flows to Irene Creek. Construction start and Phase 1 of the project started on October 26, 2022. The projected end date of the project is projected end dates February 12, 2025. Current Phase of Construction At the time of inspection, the site was in the vertical construction phase of the project. Signed SWPPP on-site There was a Stormwater Pollution Plan (SWPPP), dated August 5, 2022, available on-site. Inspection Frequency Weekly routine inspections are conducted on-site, as well as inspections within 24-hours of a rain event of 0.5 inches or greater. Date of most recent self-inspection At the time of the inspection, the most recent routine site inspection had been conducted the week of April 6, 2023. Required Sampling The site is required to conduct turbidity and pH sampling. Chad Welch, Construction Manager, conducts sampling using pH test strips and a Lamotte 2020t Tubidimeter to test for turbidity. SECTION II - Observations At the time of inspection, I observed a small pile of dirt and two small piles of gravel that were not covered. Since the site was actively using the material, I did not consider it an area of concern. SECTION III - Records Review Records may not be in sequential order. Record: Other - Site Discharge Sampling Log Ref #: RA1-RR-006 Reviewed By: Raymond Andrews AOC: No Reviewed Date: 04/06/2023 At the time of the inspection, I reviewed the site's discharge sampling log covering the period from November 10, 2022, until March 30, 2023. Record: Other - Site Routine Best Management Practices (BMP) Report AOC: No Ref #: RA1-RR-005 Reviewed By: Raymond Andrews Reviewed Date: 04/06/2023 At the time of the inspection, I reviewed a Lennar site routine BMP inspection report, dated November 10, 2022. Record: Other - SWPPP Map Ref #: RA1-RR-004 Reviewed By: Raymond Andrews AOC: No Reviewed Date: 04/06/2023 At the time of the inspection, I reviewed the SWPPP Map. Record: Other - Stormwater Pollution Prevention Plan (SWPPP) Ref #: RA1-RR-003 Reviewed By: Raymond Andrews AOC: No Reviewed Date: 04/06/2023 At the time of inspection, I reviewed the site's SWPPP, dated August 5, 2022. Page 2 of 4 Olympic Ridge Permit # WAR309505 Record: Other - Notice of Permit Coverage Transfer Ref #: RA1-RR-002 Reviewed By: Raymond Andrews AOC: No Reviewed Date: 06/06/2023 At the time of the inspection, I reviewed a Notice of Permit Coverage Transfer, dated October 31, 2021. The notice transferred coverage from Harbor Custom Development, Inc. to Lennar Northwest, LLC. Record: Other - EPA's Integrated Compliance Information System (ICIS) Database AOC: Yes Ref #: RA1-RR-001 Reviewed By: Raymond Andrews Reviewed Date: 06/12/2023 After the inspection, I reviewed information in EPA's ICIS database from June 1, 2018, through May 31, 2023. I found the site was late in submitting Discharge Monitoring Reports (DMRs) for turbidity and pH monitoring data for the monitoring periods ending January 31, 2021, and February 28, 2021. The data was due to WDOE by February 15th and March 15th, respectively. The data for both months was reported on May 11, 2021. SECTION IV - Sampling Activities No sampling was conducted. SECTION V - Area of Concern The presentation of an Area of Concern does not constitute a formal compliance determination or violation. AOC Reference #: RA1-RR-001 Records Review: Other - EPA's ICIS Database Permit Requirement Permit Part S5.B, "Permittees must submit DMR forms to be received by Ecology within 15 days following the end of each month." AOC: The site was late in submitting Discharge Monitoring Reports (DMRs) for the monitoring periods ending January 31, 2021, and February 28, 2021. The data was due to WDOE by February 15th and March 15th, respectively. The data for both months was reported on May 11, 2021. SECTION VI - Closing Conference I held a closing conference with Ms. Sturm at 03:20 PM (PT) on 04/06/2023 for the inspection. During the closing conference, I discussed the observations and the Area of Concern identified during the inspection. Observations and Areas of Concern have not yet been evaluated for a formal compliance determination. SECTION VII - List of Appendices 1. Photo Log Page 3 of 4 Olympic Ridge Permit # WAR309505 APPENDIX 1: Photo Log All photos were taken by Lead EPA Inspector, Ray Andrews, during the inspection. Photos were not manipulated beyond minor cropping for sizing and labels or callouts to draw attention to the subject of the photo. All photos taken during the inspection are included in the Photo Log; however, only photos that support an Area of Concern are included in the inspection report. P1010711 - Transfer of Permit Coverage, page 1 P1010712 - Transfer of Permit Coverage, page 2 P1010713 - Transfer of Permit Coverage, page 3 P1010714 - Transfer of Permit Coverage, page 4 P1010715 - SWPPP Cover Page P1010716 - SWPPP Signature Page P1010717 - SWPPP Site Map P1010718 - Lennar BMP Inspection Report, page 1 P1010719 - Lennar BMP Inspection Report, page 2 P1010720 - Lennar BMP Inspection Report, page 3 P1010721 - Lennar BMP Inspection Report, page 4 P1010722 - Lennar Discharge Sampling Log P1010723 - Silt Fencing, photo 1 P1010724 - Silt Fencing, photo 2 P1010725 - Retention Pond, photo 1 P1010726 - Retention Pond, photo 2 P1010727 - Uncovered Dirt & Gravel Piles, in current use Page 4 of 4