Document apRG8XKwakOQy2JLEgqgdqZy

DownloadRandom document
.^' '-A^ R226-2353 Daikin America Decatur Plant Monitoring January 15, 2004 Daikin America Decatur Plant , - . . \oo A-e^s Monitoring Background Air modeling Surface water/sludge Groundwater/soil Next steps ;:-ll;:K'^ \\ - EXP000163 Daikin America Decatur Plan Background Daikin completed original construction o the facility in 1993 Fluoropolymer manufacturing operations started in early 1994 Telomer finishing facility constructed in 2000 and commercial production started 2001 Daikin America Decatur Plan Stack Monitoring /Air Dispersion Mode Dispersion modeled using the EPA approved industrial source complex short term 3 (ISCSTS model The 12-month period between October 5, 2002 e and October 4, 2003 was selected to assess ambient impacts resulting from actual emission of PFQA from Daikin5 s operations PFOA emissions during this period was 397 pounds Daikin America Decatur Plan Dispersion Modeling Results Daikin contribution only Fence line |Lig/m3 0.13 3M/Daik Property Bo j^g/m 0.02 Daikin and Dyneon Cumulative 0.13 0.02 Based on Daikin emission rate of 397 pounds in 1 year p Daikin America Decatur Plan Monitoring - Surface Water and Slud Two effluent points - Effluent to Tennessee river from Fluoropolyme process - Outfall to POTW from Telomer Finishing pro Wastewater treatment sludge to subpart D landfill s e Storm water runoff - 2 locations T3 0 0 0 a> -i "sy Daikin America Decatur Plant Monitoring - Groundwater/Soi Six points selected based on likely groundwater flow in subsurface above limestone bedrock Wells drilled and sampled in November 20 Only 2 of 6 wells produced water. During the drilling of the wells, soil sample were taken every 5 feet down to groundwa Split spoon sampler s 0 0 0 0) 10 bo<^ 'tcci/r^WQ /tprt^cAr 4w &lw- C^ &Ack flo^, Daikin America Decatur Plan Monitoring - Soils Preliminary Results (ppb) Depth (Feet) 0 MW-1 530 MW-2 1165 MW-3 NR MW-4 22.7 MW-5 48.9 MW-6 52.2 5 NR 3200 416 73.8 9.69 163 10 111 60.8 41.8 770 205 954 15 47.8 39.3 416 88.4 596 20 50.1 30.3 121 259 183 25 79.1 NR 138 86.4 30 76.4 49.0 35 25.1 MNPR> - MNo- !R-e>c.o.v-e.r-y. ' -- " Daikin America Decatur Plan Monitoring - Soils No clear pattern Potential sources of contamination ? - Land application of sludge - Deposition from air emissions Daikin America Decatur Plant Next Steps - Air releases Considering air deposition monitoring Substantial reduction in air emissions - Surface water Monitor storm water runoff - 2 locations Continue effluent monitoring - Soils/groundwater Better characterize hydrogeology Additional groundwater monitoring Additional soil monitoring