Document ae6Eq75KJ28RGKr6RveZOY0a
Region 6 Enforcement and Compliance Assurance Division
INSPECTION REPORT
Inspection Date(s): Media: Regulatory Program(s)
10/08/2019 Water Brine - CWA
Company Name: Facility Name: Facility Physical Location:
(city, state, zip code) Mailing address:
(city, state, zip code) County/Parish: Facility Contact:
Eskridge Production Company Casino Lease 36.206905, -96.000395 Sperry, Oklahoma 412 S. Allegheny Ave. Tulsa, Oklahoma 74112 Tulsa County Chris Pellers 918-836-3058; 918-698-2337
FRS Number: Identification/Permit Number: Media Number: NAICS: SIC:
N/A N/A N/A 21111 1311
Personnel participating in inspection:
Kent W. Sanborn
6ECDWE
Environmental Engineer
(918) 557 - 1615
EPA Lead Inspector Signature/Date
Supervisor Signature/Date
Kent W. Sanborn
Kent W. Sanborn
Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2019.11.18 14:13:06 -06'00'
GUY
TIDMORE
Digitally signed by GUY TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2019.11.19 14:33:52 -06'00'
Guy Tidmore
Date 19 NOV 2019 Date
6ENFORM-019-R7 (2/15/2017)
1
Section I - INTRODUCTION
Eskridge Production Company / Casino Lease Inspection Date: 10/08/2019
PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the Eskridge Production Company oil and gas facility located at latitude 36.206905 and longitude -96.000395 near Sperry, Oklahoma on 10/08/2019 for an unannounced inspection. There were no representatives of Eskridge Production Company present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations.
FACILITY DESCRIPTION The facility is known as the Casino lease and is located next to the Osage Casino north of Tulsa, Oklahoma.
Section II - OBSERVATIONS The secondary containment area at the tank battery was recently full, and I observed oil and produced water that flowed to a nearby ditch. The fluids in the pit had been lowered, and oil and produced water remained in the flow path. The ditch was connected to a storm drain and produced water likely entered the storm sewer from the facility. I observed surface damage outside the secondary containment area and along the flow path from the oil and produced water released from the facility. The secondary containment was not adequate and had seepage from the berm walls. Additionally, the facility did not have an identification sign.
Section III - AREAS OF CONCERN There was surface damage outside the tank battery secondary containment area. The secondary containment berms were inadequate and seeped. The produced water and oil were released from the facility and flowed to a nearby storm drain.
Section IV - FOLLOW UP EPA water enforcement will refer this facility to the EPA SPCC program.
Section V - LIST OF APPENDICES N/A
2