Document aVk129DJ3a99eaZLNDqE8QmN
Monsanto
CALL REPORT -- OftGANfC DfVBl
DICTATE IN SEQUENCE:
1. HEADING INFORMATION 2. NAMES OF ADDRESSEES 3. NAMES OF CARBONEES
4. IMMEDIATE ACTION NEEDED
*>. REPORT ON CALL
CUSTOMER NAME
ELECTRONIC COMPONENTS
CITY AND SUIE
Bridgeport, Conn.
NAME AND TITLE
REPORT CAPTIONS:
1. OBJECTIVE 2. PERSONS CONTACTED 3. RESULTS 4. ACTION REQUIRED
REGION
SERVICE CENTER
New York ..S1jt
gran
msTn.
CATCOONV COOKS cr
"!r&. Bryant
TO p. o. Penlgnua N. T. Johnson
CC p. it. Munch
CONTACTED: Pay Clark, President; Olerm Fayno, Chief Eng.; Mike Glanottl, Tech.
PURPOSE:
Discuss conversion to MCS 1016 and review problems In
"cleaning up" formerly waste Aroclor.
RESULTS: No problems anticipated with Aroclor 1016.
Fay Clark seeks notification on the first shipment. Clark had
visitors from Whirlpool which did not leave him optimistic
on motor run type capacitors. Whirlpool presently is pro
ducing 2400 Air Conditioning units vs. their peak load of
3500 units par day. Ray says they project a steady pattern
with a growth of 5-100 but do not foresea any boom in sales.
Clark feels this swans they have worked orf the large stock of
capacitors in inventory and they are not about to restock heavily under present conditions.
Toured the facilities and the plant la extbemely clean, free of
of Aroclor spillage etc. Fayno felt that under best conditions
Aroclor only had about 5 more years. Reviewed Porocel column
adsorption and cleaning of Aroclor. They have built a 5 feet
column about six inches in diameter for recycling Aroclor.
S . 331 |Rl V,
3 - SERVICE CENTER COPY
NCNS 072419
Monsanto
CALL REPORT - ORGANIC OfVBI
DICTATE IN SEQUENCE:
1. HEADING INFORMATION 2. NAMES OF ADDRESSEES 3. NAMES OF CARBONEES 4. IMMEDIATE ACTION NEEDED
5. REPORT ON CALL
CUSTOMER NAME
_____ FTJTCTKPMTr; ROMPOMFHTS_____________________
ClIY AND STATE
OAIC RECEIVED
Date or cau oatc rrtco
CUSTOMER MAILING LIST CHANGES - SERVICE CENTER USE ONLY
NAME AND TITLE
CAItGOHV COM*
REPORT CAPTIONS;
1. OBJECTIVE 2. PERSONS CONTACTED 3. RESULTS 4. ACTION REQUIRED
SEAVICt CENK*
TO CC Two There Is no question about which scavenger they uae. I saw the 55 gallon drum with an>f EFL 4206 label with the container etc. for addition to the Arcelor. A mgjor problem EC has on PCE control la the Aroelor 1254 used In their vacuum diffusion pumps becomes diluted with Aroelor 1254 which necessitates refilling the system. The operating conditions are 350F-400F at a vacuum of 500-1000 microns. The Model pump Is 900-150-8-dtokes. Recommended the operating temperature be dropped to 3?5F and Aroelor 1242 tried In the system. This keeps the vapor pressure about the same. A complete copy of the.Tecumseh Specifications are attached. This primarily for Dr. Munch but it doea spell out the various systems employed^ meet the Tecumseh Standards.
FOLLOW UPl. 1. Follow up temperature drop on the diffusion pump and change out to Aroelor 1242. 2. Follow up visit with Frank DIJacomo at Totowa.
Attachment
i - 331 |AV. 12/61)
3 - SERVICE CENTER COPY
HOMS 072420