Document aJrjxe2zEr55koxO8xVaa2Xbb
W. H. BEASLEY
VICE PRESIDENT - CONTROLLER CAPCO PIPE COMPANY,
to ^
Lxjl
,Q 7&~
sf; ^s/.-.-"'' dbi'-i-t' ifr-*'&**- /L
CAPCO JEN 0004833
AW
_ '/**/<?/
(yen
a Z&.
Zh, '&-*-?T~
<3^c ^ 'rxrZZZ^
Sj~~
. 7~i~L_ ^n
*-4-**<***Z`
atJ2-^- c^yi^fLZ'
-&*~jt-jCJicZ~
-<3^.
/t-K
---------'^lA> <^5
&cf-
? J PIGG *>7sroT "^ZZTM*tion,
'ghway Allj,n9'on.Va'A?S?:oSsO. Cr/,AT'0/V ?,(^^.'50
cAPco
JEN 04839
RESEARCH TRIANGLE INSTITUTE
post orrict box RESEARCH TRIANGLE
PARK.
NORTH
CAROLINA
operation* analysis division
November 10, 1980
1
Mr. John Copeland, Lead Engineer Emission Standards and Engineering Division U.S. Environmental Protection Agency (MD-13) Research Triangle Park, NC 27711
Dear Mr. Copeland:
Transmitted herewith are four (4) copies of the Phase I Work Plan for Review of Asbestos Standard, EPA Project No. 80/41, as required by Contract No. 68-02-3056, "New Source Performance Standards and National Emission Standards for Hazardous Air Pollutants."
If you have any questions concerning this Work Plan, please contact Michael N. Laney or me.
Sincerely yours.
DFTrda
&
cc: Mr. Thomas M. Bibb EPA Project Officer
. File: 440-1736-13i
Deane F. Tolman, Manager Applied Ecology Department Operations Analysis Division
{)(! 941-0 000
FROM
RALEIGH.
i
DURHAM
AND
CHAPEL
HILL
CAPCO JEN 0004-840
RTI PROJECT 44U-1736-13 EPA PROJECT 80/41
PHASE I REVIEW OF ASBESTOS STANDARD
Prepared for U.S. Environmental Protection Agency
Contract No. 68-02-3056 Mr. John Copeland Lead Engineer
November 10, 1980
Deane F. Tolman, Manager Applied Ecology Department Operations Analysis Division
i CAPCO JEN 0004841
REVIEW OF ASBESTOS STANDARD PHASE I WORK PLAN
I. INTRODUCTION
This document presents a Work Plan prepared by Research Triangle Institute (RTI) for Phase I, Review of Asbestos Standard* as required by the U.S. Environmental Protection Agency (EPA) Contract Number 68-02-3056, "New Source Performance Standards and National Emission Standards for Hazardous Air Pollutants."'*' The result of this review will be a recommendation to revise or not to revise the current standard. If the decision is made to revise the existing standard, a separate work plan will be developed. Thus, the work to be performed under this contract is as follows:
Phase I: Review of Asbestos Standard Phase II: Revision of the Asbestos Standard (contingent
upon Phase I results). In the event that a revision of.the current standard is found to be necessary, information collected in Phase I will provide much of the basis for Phase II. A Background Information Document (BID) will be prepared during Phase II and will provide background information to support the revision of the asbestos standard. Because there are no published procedures for the review (and revision) of existing National Emission Standards for Hazardous Air Pollutants (NESHAP), this Work Plan was developed based on discussions with the EPA Lead Engineer and adaptation of the procedures outlined in the Contractor Procedures Manual for Development of National Emission Standards.
*The current asbestos standard was promulgated in 40 CFR 61, Subpart 8. tAs a review of a National Emission Standard for Hazardous Air Pollutants, the
proposed work and schedule for Phase I of this study differs from that normally performed during the Phase I work for New Source Performance Standards.
1 i
CAPCO JEN 0004-84.2
II OBJECTIVES AND SCOPE OF WORK
The sources regulated by the current asbestos standard include asbestos
mills, roadways, manufacturing, demolition and renovation, spraying,
fabricating, insulating, and waste disposal. The purpose of Phase I is to
review the standard, regulating asbestos emissions from these sources,
determine its adequacy, and gather information that will assist in revising
the standard if a revision is recommended. A recommendation to revise or not
to revise the standard will be based upon the following:
Control Technology: Standards for air cleaning equipment and work . practices now specified will be reviewed. Information will be collected on improvements in control equipment and work practices that have occurred since promulgation of the current standard, as well as the feasibility of substitutes and control technologies under development. Data collected .on control technology during Phase I will serve as the basis for determining Best Available Control Technology (BACT) during the Phase II study if a revision of the standard is recommended.
Emission Sampling and Analysis:' Routine, standardized techniques for sampling and analyzing asbestos emissions were not available during promulgation of the current standard. Thus, numerical emission limitations are not included in the existing standard. Recent information on sampling and analysis will be collected and assessed for its applicability for monitoring asbestos emissions from sources identified in the existing standard. Advantages- and disadvantages of the various measurement methods will be discussed from the viewpoint of establishing numerical emission standards.
Health Risks: Recent data on health risks (including asbestosis, bronchogenic cancer, and mesothelioma) associated with exposure to airborne asbestos will be reviewed. Information relating asbestos-linked disease and asbestos concentrations commonly encountered in ambient air will be important in determining the need for numerical emission limits and the value at which limits should be set. EPA will supply RTI with any dose-response data or other quantitative data that may be required for the establishment of . numerical emission limits.
- Enforcement of the Standard: Enforcement experience with the existing asbestos standard will be evaluated in order to identify problem areas. Lack of compliance or inability to enforce certain provisions may result in a recommendation to revise the standard.
2 i.
CAPCO JEN 0004-843
Emission Sources: Emission sources regulated by the current standard will be reviewed, and an attempt will be made to determine if there are additional important sources of asbestos emissions that should be included in the standard.
III. PLAN FOR PERFORMANCE
The approach that RTI will take in the Phase I review of the existing asbestos standard is presented here. Nine tasks (shown in Figure 1) are envisioned as necessary for an adequate review of-the standard and are discussed below. Project participants and total hours of participation are shown in Figure 2, Project Organization Chart. Resumes of major project participants are in Appendix 1 of this work plan. The schedule and milestone are presented in Figure 1,,while Table I shows dollar and manhour expenditures for the Phase I study.
It is expected that Phase I, Review of Asbestos Standard, will require 10.5 months^to complete. The date of completion is set at August 28, 1981. A. Task 1: Review Background Information for Existing Standard
In evaluating the need to revise the existing standard, RTI will assemble and establish a docket of the background information that provided the basis for the standard. This information will be reviewed to aid RTI in evaluating events occurring since promulgation of the standard. Furthermore, such an exercise will.identify potential sources of information. Finally, a review, of
r
the background information wil.l identify any areas of inadequacies in the current standard which may or may not be amenable to revision.
RTI will review published EPA documents, including the following: * Background Information - Proposed National Emission Standards for
Hazardous Air Pollutants: Asbestos, Beryllium, Mercury (APTD-0753), ' December 1971.
3 i
CAPCO JEN 0004844
Background Information Development of National Emission Standards for Hazardous Atr Pollutants: Asbestos, Beryllium,, and Mercury
(APTD-1503), March 1973.
Background Information on National Emission Standards for Hazardous
Air Pollutants - Proposed Amendments to Standards for Asbestos and
Mercury (EPA-450/2-74-009a), October 1974.
*
Preambles to national emission-standards and amendments for asbestos.
Key EPA personnel that participated in the development of the current
standard will be identified and interviewed. RTI will ask to examine their
files on asbestos in order to assemble pertinent data.
During the examination of EPA's earlier background material, information
sources outside of EPA may be identified. These might include other
government agencies, industry associations and unions, individual companies
within the asbestos industry, and control equipment vendors. These sources
will be contacted as it is deemed necessary.
B. Task 2. On-site Investigations
In order-for RTI staff to evaluate processes, facilities, emission
problems, and control techniques involved in asbestos-related industries, RTI
plans to make several on-site investigations or plant trips. Information
gathered during site visits will also assist in determining which sites are
suitable for emission testing it if is determined later that emission testing
is required. Because of the variety of sources, RTI plans to limit to a
maximum of two, the number of visits made to each type of source. In the case
T
of the asbestos-'manufacturing industry, the diversity of processes requires
that at least twelve plant visits be made. The sites listed below, with
anticipated dates of visits, will be contacted to schedule visits following
4 i
CAPCO JEN 0004845
approval of this work plan.* If these visits cannot be scheduled, alternates
will be selected in consultation with the Lead Engineer.
Week of Visit Jan. 5, 1981
Site of Visit
Asbestos Fabricators, Inc., Charlotte, NC
Source Category Fabricating
Jan. 5, 1981 Jan. 5, 1981
Jan 12, 1981 Jan. 12, 1981 Jan. 19, 1981 Jan. 19, 1981 Jan 26, 198l" Feb. 2, 1981
Feb. 9. 1981 Feb. 9, 1981
Feb. 16, 1981
Raybestos-Manhattan, Marshville, NC
H.A. Haynie Co., Greenville, NC
Bendix, Cl eve!and,.TN
Sea Gulf Environmental Co., Louisville, KYt
f-fa* <^'e " Asarco, Inc., Ragland, AL
Jaquays Asbestos Corp., Globe, AZ
Washington Asphalt Co., Seattle, WA
(Left open for rescheduling of site visits as a result of cancellations)
Remington Arms Co., Bridgeport, CT
Raybestos-Manhattan,
Stratford, CT
1
Rogers Corp., Manchester, CT
Manufacturing - Textiles
Manufacturing - Fire proofing and insulating materials
Manufacturing - Fri ction materi als
Demolition and Renovation
Manufacturi ng - Asbestos/ Cement pipe
Milling
Manufacturing - Asphalt concrete
Manufacturing - Shotgun she! 1 s
Manufacturing - Friction materials, packing and gaskets
Manufacturing - PIastics
* The list of sites is subject to change based on the results of telephone contacts with these alfT other companies for information on products and pollution control methods. In addition, site visits will be coordinated with other research activities at EPA in order to avoid duplication of efforts and to avoid placing unreasonable demands on individual companies; this may necessitate modifying the list of proposed site visits,
t The location is that of the company office. Due to the temporary nature of the work, specific locations for site visits will be determined at a time closer to the dates given.
i-
5
CAPCO JEN 0004-84-6
Meek of Visit Feb. 16, 1981 Feb. 23, 1981 Feb. 23, 1981 March 2, 1981
March 2, 1981
March 9, 1981
Site of Visit Allied Chemical Corp.,
Solvay, NY H. B. Fuller Co.,
Phi ladel phi a^^PA* GAF, Whitehall, PA
Johns-Manville, Manville, NJ
Flintkote, Chicago Heights, IL
Vermont Asbestos Group, Lowell, VT
Source Category
Manufacturing - Chlorine
Spraying
Manufacturing - Paper, plastics
Manufacturing - Asbestos'/ Cement pipe, textiles, paper, coatings, packing and gaskets
Manufacturing - Vinyl/ Asbestos, floor tile, coatings
Mi 11 i ng
(To be visited during trips Waste Disposal to manufacturing facilities)
March 16, 1981 --
(Left open for rescheduling of site visits as a result of cancellations)
RTI also proposes that advantage be taken of site visits in order to
visit several of the EPA Regional Officers. Information on enforcement of the
current standard will be obtained during meetings with regional EPA
personnel.
C. Task 3. Data Collection
In Task"3, data collection and analysis will begin. Data will be
elicited from numerous areas. Initially, a literature search will be
performed through the library facilities of EPA in the Research Triangle Park,
North Carolina. Additionally, interviews and telephone contacts will be made
* The location is that of the company office. Due to the temporary nature of the work, specific locations for site visits will be determined at a time closer to the dates given.
6 i
CAPCO JEN 0004.847
with trade and worker associations, vendors of control equipment, companies within the asbestos industries, and government agencies.
The following is a list of sources of potentially useful information that RTI plans to investigate during this part*of the study. Additional sources will be added to the list as they are identified.
Literature Sources 1. Asbestos: A Bibliography. EPA-600/3-78-066 2. Asbestos: An Information Resource. (NIH) 78-1681 3. U.S. EPA, Electron Microscopy Measurement of Airborne Asbestos
Concentration: A Provisional Method Manual. EPA-600/2-77-178 4. U.S. EPA, Control Techniques for Asbestos Air Pollutants. AP-117 5. U.S. EPA, Chemical Market Input/Output Analysis of Selected
Chemical Substances to Assess Sources of Environmental Contamination Task III. Asbestos. EPA-560/6-78-005 6. U.S. EPA, Evaluation of a Commercial Vacuum System for the Removal of Asbestos, EPA-600/2-80-88 7. U.S. EPA, Sprayed Asbestos-Containing Materials in Buildings: A Guidance Document. EPA-450/2-78-014 8. U.S. EPA, Field Testing of Emission Controls for Asbestos Maufacturing Waste Piles, EPA-600/2-77-098 9. U.S. EPA, Hazardous Wastes: A Risk-Benefit Framework Applied to Cadmium and Asbestos. EPA-600/5-77-002 10. Asbestos magazine 11. Asbestos Information Association, News and Notes newsletter 12. EPA files Government Sources (other than EPA) 1. Pearl Harbor Naval Shipyard, U.S. Navy 2. U.S. Navy Environmental Health Center 3. OSHA
7 ^
CAPCO JEN 000484-8
4. NIOSH 5. Consumer Product Safety Commission (CPSC) 6. Bureau of Hines 7. Mine Safety and Health Administration (MSHA) 8. State and Regional Agencies of EPA 9. Bureau of Land Management 10. U.S. Geological Survey Trade and Worker Associations 1. Asbestos Information Association (AIA)2. Oil, Chemical and Atomic Workers (OCAW) 3. International Association of Heat and Frost Insulators and Asbestos
Workers 4. The International Brotherhood of Boilermakers Union Vendors of Control Equipment 1. Nilfisk of American, Inc. 2. Hoffman Air Systems, Division of Clarkson Industries, Inc. 3. American Cleaning Equipment Corporation 4. Diversified Vacuum Systems, Inc. 5. ` American Air Filter 6. Wheelabrator-Frye 7. MikroPul, Inc. 8. Western Precipitation, Division of Joy Major Mining and Manufacturing Companies in the Industry 1. Johns-Manville Canada Inc. 2. Asbestos Cojcp*, Ltd. 3. Johns-Manville
8 t-
CAPCO JEN 0004-849
4. Raybestos-Manhattan
5. GAF As information is received, its contents will be reviewed specifically for current information on new controT*technology, feasibility of sampling and
analysis, health risks, enforcement experience, and new emission sources. Relevant information will then be compiled and subject to analysis as
discussed in Task 4. D. Task 4. Data Analysis
Collected data will be analyzed by RTI in order to help assess the need to revise the current standard. The analysis will attempt to determine the
following: Control Technology Available technology Technology currently in use Effectiveness of existing controls Current asbestos emissions Availability and feasibility of alternate control, including technology transfer Feasibility of substitutes Emission sources not amenable to controls Control technology in the foreseeable future ( Costs associated with control technology
Sampling and Analysis Available methodology Advantages and disadvantages of various methods Avpilablity of routine, standardized method for compliance purposes Costs of sampling and analysis
Health Risks Human dose-response data (to be supplied by EPA)
Enforcement of the Standard Federal experience with enforcement Extent and approach of State enforcement
9 i-
CAPCO JEN 0004350
Emissions Sources Sources not covered by the existing standard Significance of emissions Use of controls Need for regulatory control
Industry Growth Historical growth pattern Expected growth pattern
E. Task 5. EPA Review
The results of the above analysis will be reviewed by EPA. RTI will meet with EPA to discuss its review and determine where there are additional data needs. The need to revise the standard will be discussed in light of the existing data.
If at this stage RTI and EPA agree that it is likely that a revision of the standard is necessary, RTI will initiate appropriate actions to revise the standard, including identification of emission sources, selection of sites to be visited, contact with selected companies, and preparation of Section 114 letters to be sent to selected companies. Initiation of these steps prior to completion of the Phase I review is important in view' of the time usually required to arrange plant visits and obtain information from companies. The appropriate EPA Regional enforcement offices will be informed of the tentative plans to visit plants in their Region. All of these actions will be
'4 - t coordinated closely with the Lead Engineer. F. Task 6. Final Data Analysis and Recommendation Regarding Standard
An attempt will be made to rectify any omissions of data identified during Task 5. A report will be prepared, which will include a discussion of the findings on control technology, sampling and analysis, health risks, enforcement experience, and emission sources. The report will include a
10
CAPCO JEN 0004851
recommendation to support or forgo revision of the current standard. If a revision is recommended, the parts of the standard requiring modification will be identified, and the extent of the required revision will be determined. G. Task 7. Incorporate EPA Comments
The Phase I report will be submitted to EPA for review and comments. RTI will incorporate these comments into the report. H. Task 8. WorK Plan for Phase II. Revision of theAsbestosStandard
If a revision of the standard isreconmended, a work planfor Phase II will be developed. The Phase II Work Plan will detail the approach that RTI will take in revising the standard, including the level of effort required in developing a BID in support of the revision. I. Task 9. Project Documentation
Throughout the review of the standard, RTI will maintain a project Docket. During development of the existing asbestos standard, a formal docket was not maintained due to the absence of regulations requiring a docket. Therefore, RTI will incorporate all of the available information that was collected during the development of the existing standard, in addition to more recent information, into the Docket for review of the standard. Information collected by RTI and data submitted by EPA will be included in the Docket in accordance with guidelines from the EPA Lead Engineer. Items to be entered into the Docket will be labeled, filed, and indexed identifying items included in the Docket. The index (to be current to within about 3 weeks) will be submitted monthly to the Lead Engineer. A copy will also be sent to Midwest Resarch Institute (MRI), Raleigh, North Carolina, which is currently performing an analysis for EPA on asbestos emissions from the surfacing of roadways. Similarly, MRI will provide RTI with a copy of its asbestos Docket index.
11
CAPCO JEN 0004852
CAPCO JEN 0004.853
Figure 1. .Project Task Plan and Milestones fo r Phase I
4-3 03 U 4-> 03 3 JO 4-3 X-
03 -M SC CO c I-- DC 03 03 *-- cn o> xco 03 03 Ur- CO
4-> jc e O 03 u *a *0 *-- 03 tO CO 03 03 Xa: a.
-
o. 3 o SCD _i
to 03 o IS 0--3 o
-C 1--*J CD U 4J O c 03 E c co o L* t- *"o > c* UJ
T3 C *3 CD C
03 cn^X_J c to ts-- 0u3 03 Q. 03 1 C 03 F- (J C7)^_ WC >w
'
k O>>) s_ 03 c LlJ
to x3 o JZ CNt r*
to
*> r--
f--
O 3T=~
to
f--
to ^ >>
rs US
<c *
L.
CO o
C 4-3
ou
-4fXar-i>-}-
0X3wo
CL
o
--* * t,
to x3 O JS
04 in . --
c
a c
E CD
4-> E
CUCOLrO*---
oa>
>1o3>)
LL.
o
roo--' t.*
UJ 03
>
*U to
a> c
r-- CO
ra- w2u
*CCl
co X-
o JZ
CO to -C--O
1 1 1 1 t 1
tO- JC
to o
a>ur>- -*caO0>
3 U
lO *0r-)
1
4u0->)
OC
Or>CO
x-
a. o
to u 3 o JC o co H 1 1 1 1 t 1 1 1 t 1
u s? 0o3 CcD C0O3 -J 4O- f--
QJ 03
cd
Ou JuC
a.
tto-
to o sCO =3
o J *H '--'tO
CO 4W-> hw- ^ T- to 4-3 X- XCOS 03 O O FT- C JC u *to coco
C CM *-- UJ F-H CD w 4-> r-- ca L 03 U O E-- 4-> c E *O QJD L JC 111 r-- O >* c UJ X
X co * CD r-- o CO CO CD L E SC CO
Uo 4J (O
10 03 X-
nx- cc joq _1J0 M0) O03
M 03 to CD C a. u o V4-3 x. CD J= O c o 4-3 CD N C CD cn u o +-> O 03 *r~3 O X. o.
013J.
cn
1 i
13
CAPCO JEN 0004-854.
QJ
c to
CoO>
u
qj
JEO
>> JO
qj
>
auo; o
uo
tO
CQJL
4a->5
c
L.
a.
ord
o
o QJ
C
CtOO
JXaZ3>
V IS)
oo
to
4o-5
4c3->j
tQoJ
XJ
<CO 4(-/>) <to
CoO
O<-
UJ
'QcUifOo.J "O
oQrJ
c ro
uo
o
u ruo
o oo
Cl
Total Budget/
Hours $7.9 240
$23.5
712
$13.7
416 $13.5
408 $145.7
4.416
089
- KZZ$
wv>CMO-.
O CO
in C4M0
cCcoOm
Htwoo 4CtOf
s
cCWMnO ccoo 4Otn0 iCn-hM
CHO co
9CWM>O* CCOO
4cC>Mn0 cCoO
4CC-OO5
44in3^" ct*oHo
CcoM ctOn ciw-Hoo- 403"
Ocn CNcmM
00
oo
CO
to
ttoo
0
0CM
4rcH0of-t tino 4Om^- trHo
4OO*0 NCCMM
uro o
to
J3o= C-Oc
EC
rrCL--oO.
CO CO
*o rCHO oc CM
4O0 CM
to CO Hwo-
r4rHo0- 4O0* *H-*--oh*< tCrOoO
4tC*oM0- OCO V
*
*Tm*soi
OCO
cm
ro
4O^
WtrooO
cOf--mv
C44M>* CCOMO WoHO co 4Cr4oM** tcOn
<4iz*n*f>t* tHo mO40* trHo f-wtOrs>- troH OxwO>- rtHo
tino Ct?hoO
00
4C^c4HMn* CcoOm> 44nrH3*-0- CCinOM firtnH3" ^*0M2"" 4*0
o cQ QJ 4fu>-a*
O
CL CL
CJ
rX3O--J*'
c
XJ
cro
4-> oo -CO
<
QoCL3oQOJ-J
o . ^CM
4rmM*0 oCCOM CWOO orH WH30O tino
4itnn^ *ct-oo
twHoo- *rC5HOJ-
>> -4CC->
coo
wCOVJ fto-i
CO CM
O CO 4*0
*VWHDO *rC3HO"
CoO oH
co in CO H
CO o 4*0
wtinno ctrHoo
COO Cn
--* CM tO
4Ct*oO0 rCoHM>
ro o43WO
IOWcOO- ^C3M* 4r"H0H- CCOM
CO tino 4*0-
m4W3O"- tcrHoo
ro O H4*0
OCirnHOO *t43o3*-
4rCrH*M-0 4CC3OO*
CM
0
tC*oHO
OO
rH Cn rinH 4j-
4rf^HHH** tCCOOO
QGJJ
QJ
>
O
X CJ
to
i. #o
o
xj
o
too
c ro
C3oO
-hcC(XUOoM
QtrodJ
JC CL
--arco. oL.
**t4r$fcooo-Oo>-
J*aCrhQCoOJ.J4<CtOCQ-DoO>OJ KXQ>Q*JJ
f>oT^rSC30Icu(>QU*o9-frJo lfIiO--CrELU0oCff--jo--*4-*Lt4(M0UfcccK*roJiO>7~Jo--
o4pCQc-I-OJ CM
CeoO f44CCrQ>c---oO>>J*
c
0
4UC->J
0 LJ
to 4-> to a
co
tA t>n> <rco O4rrooJ
-c-
Q3J: > QQCJ <aUcJ.
in
-cr(n-A-*OrC--J S*Xr0fJ-l --4O<-(tfcrE1OooJ-DXXcOCQrtCEEcOooJJrJJl.4^*OtCttC$caQo3JooSr7J-r>
<GLlc-I
4Q-5J
--Otu0iOOco-*.
4ccJn qEEj O0
QtrnoJ JaZ_ s40-- rCrc--ol.
3UO:
4-
0
C t0*n> o3r *W--h4
TX4tsrrcn-Ooo35. tn 40c-n> Xqc3nj <
c
4C3*-->J>
44rCC0EH--o55J
3
OC.
Cu
OOO
O CO cn
0H
c
a
QJ
O
CL QJ
QJ U
ro co
4t-o5 uO
<
Emission te s ts costs are not Included; see Appendix 2.
CAPCO JEN 0004-855
APPENDIX 1 Resumes
i-
CAPCO JEN 0004856
KENNETH H. BABB
Education
B.S., Chemical Engineering, North Carolina State University, Raleigh, North Carolina, 1979.
Experience
.
1979 to date. Research Triangle Institute, Research Triangle Park, North Carolina. Chemical Engineer in the Applied Ecology Department. Member of project team developing National Emission Standards for Hazardous Air : Pollutants (NESHAPS) for benzene emissions from maleic anhydride plants. 'Provides engineering analysis and evaluation of_data relating to cost and design. Developing emissions, energy, and cost data for New Source Performance Standards (NSPS) for coating of beverage cans and large .apliances. Also worked with team conducting survey on status of continuous emission monitoring and monitors for Environmental Protection Agency, Division of Stationary Source Enforcement.
Summer 1978. National Institute of Environmental Health Sciences, Research Triangle Park, -N;C. Laboratory Technician. Maintained crab population for experiments, performed various chemical analyses, evaluated data gathered from analyses, and evaluated and altered experimental procedures.
Professional Memberships
American Institute of Chemical Engineers Tau Beta Pi
June 1980
1-1 CAPCO JEN 0004857
LAURA A. CONRAD
Education
B.A., Chemistry, State University College of New York, Buffalo, New York, 1973
M.S., Chemistry, State University of New York, Binghamton, New York, 1977
Experience
1980 to date. Research Triangle Institute, Research Triangle Park, North Carolina. Environmental Scientist in the Applied Ecology Department. One current project includes reviewing EPA's National Emission Standards for . Hazardous Air Pollutants for Asbestos and determining whether there exists a need to revise the emission limitations of the existing standard. A second project includes the task of preparing'*an industry profile regarding occupational exposures to waste anesthetic gases and vapors for the Occupational Safety and Health Administration (OSHA).
1978 to 1980. Occupational Safety and Health Administration (OSHA), Washington, D.C. Industrial Hygienist. Managed a high-priority standard development project on grain handling facilities. Concentrated on the health effects associated with exposures to grain dust, pesticides, and toxic contaminants, such as aflatoxin. Prepared and published two Federal Register notices regarding rulemaking proceedings and v/rote the initial . draft proposal on Occupational Exposures to Hazardous Substances Found in Grain Handling Facilities. Participated both in public hearings presided by an administrative law judge and in 'informal public meetings presided by an OSHA panel. Conducted field trips to several U.S. grain elevators and mills and represented OSHA at several interregulatory agency and interest
group meetings. Also, was a recipient of a cash award for work excellence for the Agency.
1977 to 1978.' OSHA, Buffalo, New York. Industrial Hygienist.' Enforced the Occupational Safety and Health Act. Conducted over 70 health inspections in various industrial establishments. Sampled for such substances as wood dust, grain dust, mercury, silica, lead, and several ; different solvents. Attended four formal industrial hygiene and safety courses at the OSHA Institute in Chicago. Attended a Los Alamos/NIOSH Respirator training course.
1975 to 1977. State University of New York, Binghamton. Teaching Assistant. Taught the freshman chemistry laboratory course in addition to chemistry problem-solving classes while attending graduate school.
1973 to 1974. Bishop Timon High School, Buffalo, New'York. Chemistry Teacher. Taught general chemistry and music, and performed other assigned supervisory duties.
September 1980
lr2
CAPCO JEN 0004858
APPENDIX 2 Asbestos Emissions Measurement Program
i
CAPCO JEN 0004859
Appendix 2 Asbestos Emission Measurement Program
To he! p determi ne the protecti on afforded by the current requi rement for
*. . . no visible emission. .
information is needed on asbestos emissions
from the various sources. Data collected in Task 4. Data Collection will be
examined for information on asbestos emissions, including atmospheric levels
of asbestos. If data on asbestos emissions are considered to be inadequate,
RTI proposes two alternatives for obtaining emission data.
Alternative one consists of utilizing ongoing or proposed EPA research,
which includes asbestos sampling in the scope of research work. Specifically, .
RTI may be able to utilize.data that are generated as part of a proposed
multiagency (e.g., NIOSH, EPA) - asbestos industry research project, "The
Environmental Research Program Plan for Asbestos." The Industrial
Environmental Research Laboratory - Cincinnati (IERL-Ci) is responsible for
organizing the asbestos research program which will encompass three areas of
study, including an industrial survey, fugitive emissions, and use and
disposal of conmercial projects. The details of the program are being .
prepared in a proposal by III Research Institute. RTI will review the
proposal and will determine, in consultation with the Lead Engineer, the
feasibility Of'utilizing the proposed research to obtain the necessary data on
f
asbestos emissions. This will be determined at the earliest feasible time.
If emissions data are not available through the asbestos research program
described above, RTI will, as the second alternative, examine the feasibility
of developing its own emission measurement program using the procedure given
in EPA's Contractor Procedures Manual for Development of National Emission
Standards, 3.2.6, Emission Measurement Program. Briefly, this entails the
CAPCO JEN 0004-860
preparation of a Source Test Plan by RTI to be reviewed by the Emission Measurement Branch (EMB) for technical feasiblity, time needed for method devlopment, resources, and other relevant items. EMB then submits its comments on the adequacy of the Source Test Plan to the Lead Engineer.
Presently there are no EPA reference methods for either emission sampling or atmospheric sampling of asbestos (a method for the sampling and measurement of airborne asbestos has been proposed*). Therefore, any asbestos sampling must be preceded by the development of test methods. This will require the efforts of and cooperation between EMB and the Office of Research and Development.
A limited number of emission tests will be performed in Phase I, the purpose being support for the feasibility assessment of emission testing as well as the establishment of a numerical emission limitation. RTI, in consultation with the Lead Engineer, will select three or four sites for testing.
Because emission testing by RTI is one alternative for obtaining emission data and may not be required, the additional costs of emission testing are estimated here and are not included in the costs in Table I. The costs shown here represent the cost of developing a Source Test Plan, the cost' of arranging for the source tests, the cost of pretest survey trips, and the cost of trips to test sites for observation of emission sampling. Furthermore, the inclusion of emission testing in Phase I will likely require an extension of the Phase I schedule due to the time necessary to prepare a Source Test Plan, arrange and make pretest site surveys, sample (estimated at one week minimum
* Electron Microscope Measurement of Airborne Asbestos Concentrations: A Provisional Methodology Manual, EPA-600-2-77-178, Revised June 1978.
i
2-2
CAPCO JEN 0004861
per site), and analyze emissions. It is probable that emission testing would
not begin until after completion of the initial on-site investigations, which
are tentatively scheduled to end in Marcli.
It is estimated that for emission testing at four sites, a minimum of 8
man-weeks will be required to prepare a Source Test Plan, arrange for and
participate in each pretest survey, and 'arrange for and observe the actual
sampling. Thus, the estimated hours and minimum dost for emission testing are
as follows: Man-Weeks 8
Man-Hour's 320
Estimated Cost $10,560
2-3 CAPCO JEN 0004.862
Copies To
W. R. Bond H. C. Davis L. C. McNeill L. J. LeBlanc C. W. Adair J. V/. Hager G. Lewis
J. B. Casey V. P. Dean D. H. Clay A. Jacobs Horace Beasley A1 Schmidt Korm Chamberlain James Jones Sara Forsgard L. L. Sample Ewald Schmidt Bill Reed Pete Wright A. A. Hollingsworth James Conaway Gerald Abbott H. G. "oore, Jr. Gurdon Buck T. 3. Stafford T. G. Gffterdinger G. T. Worthy Charles Cobb Charles V'. Tinton Len Schmidt Bill Rich
S. J. Tucker Bill Stoddard S. D. 'Weaver Sam Preston Bill Abercrombie
John Benton George Ho]istein
1 CAPCO JEN 0004-863
d>'-? r- *7/ i
WOODWARD COMPANY A Division of The Mead Corporation
'Woodward, Alabama
From: Stanley H. Mooney To: All Divisions
?
Subject: OCCUPATIONAL H3AI.TH Af'P SAFETY ACT.
May 20, 1971
Beginning July 1, 1971, the 'attached material must be complied with. Look it over carefully to be sure all records and reports are made and kept up-to-date as required.
SHM:cd
Director of Safetv
1. CAPCO JEN 0004-864-
Copies To:
W. R. Bond II. C. Davis L. C. McNeill L. J. Le Blanc C. W. Adair J. W. Hager G. Lewis J. B. Casey
V. P. Dean D. H. Clay A. Jacobs Horace Beasley A1 Schmidt Kora Chamberlain James Jones Sam Forsgard L. L. Sample Bwald Schmidt Bill Reed Pete V*right k. A. Hollingsworth James Conaway Gerald Abbott H. G. Moore, Jr.
Gurclon Buck T. 2. Stafford T. G. G'Tterdinger G. T. Worthy Charles Cobb Charles V'. Tinton
Len Schmidt Bill Rich
3. J. Tucker Bill Stoddard
S. D. V/eaver Sam Preston Bill Abercrombie John Benton George Hollstein
1 CAPCO JEN 0004865