Document aJmdgbxM0g1Qed9E5gOGmN6OB

SALES TRIP TO THE U. S. A. May 23, 1974 C, H. SC^C wsi with W. H. SMITH CERTAIN-TEED PRODUCTS CORP. (A/C pipe Pipe and Plastics Croup. manufacturer) Valley Forge, Pa. 19482 Mr. W, E. Gatewood, President Mr. John P. McGlnley, Director of Manufacturing A/C Mr. R. S, Hartman Mr. C. H. Striegel, General Purchasing Agent Mr. A. Lcff The main purpose of the trip was to introduce Walter Smith and to advise them that he would be calling on them regarding both Bell and C Cassiar fibres on a regular basis. If, However, there were any large quality problems with Cassiar fibre, Walter Smith might have to ask Cassiar to become involved directly. There were some particular Cassiar problems discussed which were brought up by Cassiar shortfall in production and by the White Pass Yukon Railway strike. Mr. Gatewood was particiiarly concerned with the cutbacks and having to change their mixes on such a regular basis to ~ accommodate Cassiar*s supply situation in the various gjanca oraersd. Even though they are, of course, very grateful to^-^7 Bell and T. A. F. (Havelock) for all the extra fibre they are offering to cover the Cassiar shortfall, it is a very expensive pastime to change their mixes to try and use this extra fibre economically. Mr. Gatewood was of the opinion that Cassiar should first fill James Hardie, TAC and Certain-teed requirements before filling any other customer's requirements. His reasoning is that J-M is offering guaranteed tonnages and does not understand (or wan: to understand) why Cassiar cannot do the same. He also brought up the matter t of their contract with T. A. F. , but I advised that unfortunately I was unable to be of any assistance in this matter and that he should discuss it with T, A, F. We fortunately parted on a good note. Mr. A. Leff requested Walter Smith to be of assistance to them in their laboratory and Walter Smith is planning to visit them at the earliest possible moment. Mr. C. H. Striegel asked us to send him some large maps of Canada indicating where Cassiar, Clinton and Bell Mines are located. (Last called on January 13-14, 1974) Tonnage shipped in 1973: 450 4T 3, 640CP 7, 643 AK 12, 525 CT 4, 399 AX 2. 992CY 7 AY 2CZ 2 AZ <'!Ss 50USC2 Cassiar CP / 1 Cassiar AK* Cassiar AX* Cassiar CT Cassiar CY T&N BT/AD (Blue) Special ML6 (Blue) Government (Blue) *-.ms-Kaville AT John*-K*nvill* 5& Bell - 4 HVL ASBESTOS FIBER . Contracted 1974 3,500 8,000 ' 6,120 12,840 . 5,000 2,495 1,764 1,800 3,000 600 0 0 Actual (Anticipated) 1974 4,860 6,675 4,920 11,168 7,320 ' .. ^ 2,495 1,760 1,800 3,000 600 ' 650 600^ Required . 1974T 3,000 8,000 8,000 12,000 8,000 3,200* Hawn a *ri# 4 + rSa 1,800 N/A 2,500 (1,500) 500 (1,500) 1,000 0 45,119 45,04a 43,000 * Since Increased to 1,650 ton*