Document aJdKqzqwY2Raqd9GNJwXQkQeR

PURCHASE ORDER MMPfCATION FORM PA-POMP-1 (33221601 NEWP NEWS SHIPBUILDING AND DRY DOCK NEWPORT NEWS, VIRGINIA PANY 0BRP yB.n NO VENDOR ORDER NO. MODIFICATION N0.5 TO PURCHASE ORDER NUMBER 77240 ^^173-635^-22;....... IMPORTANT See Note Below____ _____________________________ The Terry Steam Turbine Company TO: The Hawklns-Hamilton Company, Inc . ,Rep|r. P.0. Box 7128 Richmond 21, Virginia mMs^^,PAi964 INSPECTION BY ' ABS and as noted herein INSPECTION AT Destination PLEASE MODIFY THIS PURCHASE ORDER AS SPECIFIED HEREIN. ALL TERMS AND CONDITIONS OF THE ORIGINAL PURCHASE ORDER AND APPENDICES ATTACHED THERETO REMAIN IN EFFECT UNLESS SPECIFICALLY ALTERED BY A MODIFICATION. ACKNOWLEDGE RECEIPT OF THIS MODIFICATION IMMEDIATELY, ADVISING ITS EFFECT ON PRICE AND DELIVERY. L. B. PETERSON, MANAGER OF PURCHASES (OR) W. K. WILLS, PURCHASING AGENT ITEM QUANTITY DESCRIPTION UNIT PRICE TOTAL TURBINES% STEAM, for Beepvell Main Cargo Oil Pumps - 2 Cancel ( Special Tools) On Sheet 2, change the fourth paragraph from the bottom to read: The guaranteed water rate at the above rating shall be 28A lbs./H.P.-Hr. when supplied with desuperheated steam at 280 psig and 498P. total temperature at the turbine Inlet flange and operating with a 10 pslg back pressure. Item 2 deleted per your letter of December 31,1963, Change In steam conditions Is per your letter of January 2, 1964. ARB 1/23 WJH-IIdm FBB* ----------------------'----------%----- SHEET NO. 1 OF SHEETS MODIFICATION This Number MUST Appear On All Correspondence, Invoices, Packages And Shipping Papers, MODIFICATION NO. " TO PURCHASE ORDER NUMBER H-573-635A-22 EXX-MOR-002461 PURCHASE ORDER M90KTCATION FORM PA-- POMP-1 (33221601 NEWPfiyt NEWS SHIPBUILDING AND DRY DOCK NEWPORT NEWS, VIRGINIA PANY O.B*R.P. vesO NO VENDOR ORDER NO. MODIFICATION NO. 4 TO PURCHASE ORDER NUMBER 77240 H-573-635A-22 The Terry Steam Turbine Company The Hawkins-Hamllton Co. Inc** Repr. TO: P.0. Box 7128 Richmond 21* Virginia IMPORTANT See Note Below DATE OF ISSUE (B^PA) January 28* 1964 INSPECTION BY ! ABS and as noted herein INSPECTION AT Destination PLEASE MODIFY THIS PURCHASE ORDER AS SPECIFIED HEREIN. ALL TERMS AND CONDITIONS OF THE ORIGINAL PURCHASE ORDER AND APPENDICES ATTACHED THERETO REMAIN IN EFFECT UNLESS SPECIFICALLY ALTERED BY A MODIFICATION. . ACKNOWLEDGE RECEIPT OF THIS MODIFICATION IMMEDIATELY, ADVISING ITS EFFECT ON PRICE AND DELIVERY. L. B. PETERSON, MANAGER OF PURCHASES (OR) W. K. WILLS, PURCHASING AGENT ITEM QUANTITY DESCRIPTION UNIT PRICE TOTAL TURBINES: STEAM* for Deepvell Main Cargo Oil Pumps - GROUP o35-3 - For Humble Oil and Refining Co. Tankers - Change the "Title" to read as shown above. On Sheet 1, at top of the Quantity Column, adds 2 Shins. Increase quantity from 4 to 8. Change Item 2 to read as follows: 22 \4- Outfits of special tools In accordance with Appendix:Bj Section V, one outfit per ship. Increase quantity from 6 to included includ ad Dlls modification exercises the option in the basic purchase order concerning purchase for a Becond vessel. Add shipment for second shlpset of material July 2, 1964. Increase total price by $18*940.00: ARB 1/21 WJH' dm FBB* i ---------- 1----------1----- -- SHEET NO. 1 OF ` SHEETS MODIFICATION _L___________ ;___________________________________ This Number MUST Appear On All Correspondence, Invoices, Packages And Shipping Papers, MODIFICATION NO. ER EXX-MOR-002462 PURCHASE ORDER MODIFICATION FORM PA-- POMP-- I (33221601 m fli NEWP NEWS SHIPBUILDING AND DRY DOCK PANY 1------I YESl----- 1 O.B.R.P. 1 NO VENDOR ORDER NO. NEWPORT NEWS, VIRGINIA 66 MODIFICATION NO. 3 TO PURCHASE ORDER NUMBER 77240 H-573-635A-22 The Terry Steam Turbine Company The HawkinB-Hamilton Co.,Inc., Repr. TO: P.0. Box 7128 Richmond 21, Virginia IMPORTANT - See Note Below'__________________ _________________ DATE OF ISSUE (BY PA) January 22, 1964 1 ^Taiufvas noted herein INSPECTION AT Destination 1 PLEASE MODIFY THIS PURCHASE ORDER AS SPECIFIED HEREIN. ALL TERMS AND CONDITIONS OF THE ORIGINAL PURCHASE ORDER AND APPENDICES ATTACHED THERETO REMAIN IN EFFECT UNLESS SPECIFICALLY ALTERED BY A MODIFICATION. . ACKNOWLEDGE RECEIPT OF THIS MODIFICATION IMMEDIATELY, ADVISING ITS EFFECT ON PRICE AND DELIVERY. L. B. PETERSON, MANAGER OF PURCHASES (OR) W. K. WILLS, PURCHASING AGENT ITEM QUANTITY DESCRIPTION UNIT PRICE TOTAL TURBINES: Steam for Deepwell Main Cargo Oil Pumps - Add the following: A connection shall be provided for determining steam chest pressure The connection is to be a 1/2" extra heavy I.P.S. carbon steel nipple 4" long with plain end. y^ ARB 1/8 WJH-br FBB* SHEET NO. I OF SHEETS MODIFICATION This Number MUST App&r On All Correspondence, Invoices, Packages And Shipping Papers, MODIFICATION NO. J EXX-MOR-002463 DISTRIBUTION COPY FORM PA-POD-2 (3322102) ITEM QUANTITY niwpoWnews shipbuilding and dry dock &1pany PURCHASE ORDE^NO. mJ DESCRIPTION 77240 H -5 7 3 ".p 3 S A r* 2 Records The Te rry Steam Turbine Company The Ha wkins-Hamilton Company, Inc.,Repr. P.0. Box 7128, Richmol(nd 21, Virginia Octoberl 15, 1963 ABS anti as noted herein Destination TURBINES: Steam for Deepwell Main Cargo Oil Pumps - Change inspection to read as shown above. !)n sheet 2, delete the following: Pixed Vibrating Reed Tachometer. (12th line) iigh pump discharge trip. (21st line) 3n sheet 3, in the sixth paragraph delete the Last sentence. Md the following: ' ; 'lOTE: Fixed mechanical tachometer (not vibrating reed type) will be provided by the shipyard. y y ARB 10/10 WJH-B FBB* SHEET NO. DISTRIBUTION COPY PURCHASE ORDe)i NO. II-573-63SA-22 EXX- M O R-002464 4 PURCHASE ORDER DISTRIBUTION COPY FORM PA-PQD-1 (3322100) T NEWS SHIPBUILDING AND DRY DOC9DMPANY LEAD YARD ORDER NO. Q.B.R3P0 CUyES^I) MO VENDOR ORDER NO. N.N. VENDOR NO. PURCHASE ORDER NUMBER VENDOR The Terry Steam Turbine Company The Hawkins-Hamilton Co.,Xnc.,Repr. P.0. Box 7128 Richmond 21, Virginia 7240 YD. REQN. NO. APPLICABLE APPENDIX H-573-635A-22 IMPORTANT- ' See Note Below DATE OF ISSUE (BY PAI _ September 25, 1963 INSPECTION BY Owners INSPECTION AT Destination ^ee "below ' : buyer PLACEMENT!I COMMI SETT 10 too" F.O.B. Hartford, Conn. TERMS Net 30 Days ITEM QUANTITY DESCRIPTION DATE SHIPMENT WANTED (March 2, 1964 CHARGE NO. 635 IDENT. NO. '19 ATE SHIPMENT PROMISED STOP NO. UNIT PRICE TOTAL PRICE See notes on last sheet. TURBINES: Steam for Deepwell Main Cargo Oil Pumps - Group 635-3 - For Humble Oil and Refining Co. Tanker One print of our Drawing No. 198350 Rev. 5 forms part of this purchase order. 1 Horizontal Marine Turbines, Terry Type GAT. 2 Outfit of special tools in accordance with Appen4ix B, Section V. Drawings. 3-a Drawings for preliminary and/or foundation infor- mation, in accordance with Appendix B, Section II^A. ' 3-b Drawings for approval, in accordance with Appendix B, Section IIIB. / ( PURCHASE ORDER NO. H-573-635A-22 SHEET 1 OF SHEETS This Number MUST Appear On All Correspondence, Invoices, Packages DISTRIBUTION COPY And Shipping Papers. EXX-MOR-002465 NEWPCWNEWS SHIPBUILDING AND DRY DOCK ANY TURBINES: Steam for Deepwell Main PURCHASE ORDER NO. DISTRIBUTION COPY FORM PA-POP-2 (3322102) Cargo Oil Pumps - H-5T3-635A-22 ITEM QUANTITY DESCRIPTION RECORDS 4. Instruction books in accordance with,Appendix B, included Section IV. ' The turbines are to be for non-condensing operation and are to drive self-priming deepwell pumps through L short extension shaft and right angle reduction jears. The extension shaft, turbine half flexible coupling, and foundation will be provided by the Shipyard. All equipment must be suitable for instill ation in an unheated enclosure on the weather deck of the vessel. 1 The turbines shall be equipped with the following: 7ixed Vibrating Reed Tachometer. 3ing oil lubrication system complete with auxiliary jear pump (to aid circulation at high RFM) and 3ight oil level indicator. Dverspeed trip (set at not over 115# rated speed). Constant speed governor (adjustable to 80# speed). Throttle valve. Steam strainer. ligh back pressure trip (get at 25 psig). ligh pump discharge trip (set at 150 psig). Sentinel valve on caBing. Emergency trip (suitable for operation by Shipyard Furnished pushbutton stations). Sach turbine is to be capable of delivering 900 '3.P. at not over 4110 R.P.M. Fhe guaranteed water rate at the above rating 3hall be 27.5 Ibs./lKP-Hr. when supplied with iesuperheated stafim at 300 psig and 500#F. total bemperature atythe turbine inlet flange and operabing with a 10 psig back pressure. The turbine shall normally operate , with steam at .. . ' 230 pulg 498F. and ^an^/a<^:urer the water rates at 75#, 50#, and 25# load. . The turbines must be of ample strength to withstand , 3team at 330 psig. SHEET NO. DISTRIBUTION COPY PURCHASE ORDER NO. -573-635A-22 >iflllNEWPORT EWS SHIPBUILDING AND DRY DOCK TURBINES: Steam for Deepwe11 Main DISTRIBUTION COPY Cargo Oil Pumps - FORM PA-POD-2 (3322102) ITEM QUANTITY DESCRIPTION ANY PURCHASE ORDER NO. y-573-635A-22 RECORDS The lubrication system Is to assure adequate lubrication at all speedB up to and including the overBpeed trip setting. The vendor is to advice the Shipyard immediately if water cooling is required. If cooling is required, the cooling medium provided will be salt water. Materials in contact with the cool ing medium must be suitable for use with salt water and designed to withstand a maximum pressure of 80 psig* The necessary boring information, etc. for the shaft couplings is to be forwarded to the Shipyard. as soon as available. Rotation is to be counterclockwise when viewing the turbine from shaft coupling end. Due to the self-priming feature of the deep well pumps (Bingham Pump Company) the turbines will be subjected to rapidly fluxuating load conditions and the constant speed governor system must be suitable to prevent undue acceleration or trip out of the turbine due to overspeed. All solenoids and switches are to be explosion proof. The solenoids must be suitable to be continuously energized during operation and arranged to trip the turbine when de-energized. The same solenoid employed for the high pump discharge trib is to be used with the remote emergency trip push}button stations. Electrical equipment Is to be suitable for 115 volt, 60 cycle alternating current. The turbines ph&ll be tested by the manufacturer for satisfactory operation, alignment/ etc. Further tests will be conducted at the Shipyard to insure satisfactory operation with the pumps and gears after Installation on board the ship. After completion of shop tests at Vendor's plant any packing liable to cause corrosion by remaining In place during shipping or storage of the equip ment is to be removed, stowed separately, and carefully marked so as to assist In Its reinstallation. Rods or shafts, in way of the packing, are to be properly protected from corrosion during shipment or storag of the equipment. SHEET NO. -- DISTRIBUTION COPY PURCHASE ORDER NO. IH-573-635A-22 EXX-MOR-002467 4k * . NEWPORTEWS SHIPBUILDING AND DRY DOCK TURBINES: Steam for Deepwell Main DISTRIBUTION COPY Cargo Oil Pumps - FORM PA-POD-2 (3322102) ITEM QUANTITY DESCRIPTION ANY PURCHASE ORDER NO. ft-573-635A-22 RECORDS lagging clips shall be welded or otherwise attached to each unit, in proper location, to permit attach ment of insulation. They are to be located close to bolted joints where fixed insulation will terminate. The Joint will be covered with portable pad. Connections are to be ASA Standard in accordance with the applicable pressure temperature rating. The raised faces of flanges over 150 pounds working pressure are to be machined in accordance with Drawing Number 198350 Bev. 5. Connections for Shipbuilders1 piping shall be suitable for withstanding loads imposed upon them due to normal expansion and contraction of tlje piping attached thereto in accordance with good Marine practice. All turbine lagging, structural base foundation and pressure and vacuum gauges not otherwise notec will be furnished by the Shipyard, but all attach ed gland sealing and lubrication piping is to be furnished with the turbineB. The equipment must meet all the applicable require ments of Appendix B-573. The material furnished for each item shall be substantially tagged or clearly marked for identi fication : with the item and purch Be order number thereof. For identification purposes during installation, the following electrical components are to have the following symbol numbers plainly marked thereon, or have a durable tag bearing these numbers Becurely attached thereto: Soln6id 5091 Pressure 5092 Switch Applicable Appendices A-573 B-573 Rev. A, dated June 26, 1963 SHEET NO. b!STR!BUT!0N COPY PURCHASE ORDER NO. H-573-635A-22 EXX-MOR-002468 ^. NEWPORTEWS SHIPBUILDING AND DRY DOCK TURBINES: Steam for Deepwell Main DISTRIBUTION COPY Cargo Oil Pumps - FORM PA-POD-2 (3322102) ITEM QUANTITY DESCRIPTION ANY PURCHASE ORDER NO. i-573-635A-22 RECORDS Vendor's plans were due in Newport News prior to the placement of this order. Your prompt forward ing of plans will he appreciated. Manufacturing Authorization: Release to manu facture is withheld pending approval of vendor's drawings. Any work done prior to approval of the drawings and authorization to proceed with work, except by specific written instructions from this Company, will be at the vendor's own risk. Release to manufacture will be given by a letter. Option: In the event the Owners, by February 15, 1964, contract with the Purchaser for the con struction of a tanker essentially duplicating that for which the equipment specified herein is to be used, the Vendor agrees to furnish to the Purchaser equipment duplicating that specified herein at a price of: In the event the Owners, within eighteen months, contract with the Purchaser for the construction of a third and/or fourth vessel of the same de sign, the Vendor agrees to furnish to the pur chaser a third and/or fourth set of equipment duplicating that specified herein at the price of the second shlpset of equipment escalated in accordance With The Bureau of Labor Statistics Index for Metal and Metal Products, but not1to exceed lOjG. Advise price to apply for the addition of Tachometer. . Total Price: ARB WJH-HMP-oc FEB* JTT SHG JLW HJC GWB TEL RLS 9/1* FOR NEWPORT NEWS INFORMATION ONLY: Schd. Reqd. Date 3-23-64 Wanted 3-23-64. 7' ' ' ' This order should have been placed by 7-1-63 in order to meet the "required In yard" date, when using average lead time. SHEET NO. DISTRIBUTION COPY PURCHASE ORDER NO. H-573-635A-22 'v