Document aJa5EmvG8pk7yRbxBLQ3VXYJy

UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY * *REGION 1 ENVIRONMENTAL AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12 100 PROTECTION Date:Dated as shown on electronic signature(s) Subj:Inspection Report Clean Water Act - National Pollutant Discharge EliminationSystem (" NPDES ") Cranberry Road Gas line From:Andrew Spejewski, Inspector Digitally signed by ANDREW ANDREW SPEJEWSKI SPEJEWSKI Date: 2023.03.15 16:32:12 -04'00 ' Thru:Stephanie Tougas To:File I. Facility Information A. Facility Name:Cranberry Road Gas line installation B. Facility Location: 2259 Cranberry Highway Wareham, MA 02576 C. Facility Contacts: Bobby Bonollo NEUCO, Inc. 617-293-0585, bbonollo@neuco-inc.com D. NPDES ID No (s).: N / A II. Background Information A. Date(s) of inspection: March 7, 2023 B. Weather Conditions: Clear, dry C. US EPA Representative(s): Andrew Spejewski D. State / Local Representative(s): none E. Federally Enforceable Requirements Covered During the Inspection: EPA Construction General Permit ED_019088A_00019901-00001 F. Previous Enforcement Actions: none III. Type and Purpose of Inspection Evaluation of Construction General Permit Compliance IV. Facility Description The site is a project to install gas line along a length of Cranberry Highway. The installation involves cutting a trench in the existing pavement, installing pipe, and backfilling and repaving. V. Inspection Mr. Spejewski arrived at approximately 11:00. A. Opening Conference Mr. Spejewski asked for a supervisor and was directed to Gualberto Madieros. Mr. Madieros said he worked for New England Utility Construction (NEUC) and described the project. Mr. Madieros provided a NUEC contact for further information about permitting; Bobby Bonollo 617-293-0585. B. Facility Tour A gas line along a section of roadway sloping down to a bridge over a stream was being installed. Two catchbasins were in the roadway downhill of the active trench, with a gravel stockpile between the active trench and the catchbasins. Mr. Madieros said the catchbasin covers were bolted down, so he could not install sediment bags. Mr. Madieros said they had haybales ordered to put around the bridge. Mr. Spejewski noted that haybales would also effectively protect the catchbasins from sediment. Mr. Madieros said that the site was cleaned and swept each day, and pointed out on site the sweeper attachment for a bobcat vehicle. D. Closing Conference Mr. Spejewski told Mr. Madieros that he would discuss permit issues with Mr. Bonollo. On March 8, 2023, Mr. Spejewski called Mr. Bonollo. Mr. Bonollo said the project was only installing gas line along one stretch of highway. He did not know off - hand the total area of disturbance but estimated 10,000 linear feet of two - foot wide trench, resulting in about a half - acre total. Pictures: IMG_2905.JPG Close - up, catchbasin 2 ED_019088A_00019901-00002 IMG 2906.JPG Catchbasin and bridge IMG 2905 Active trench * END * Unless otherwise noted, this report describes conditions at the facility / property as observed by EPA inspector(s), and / or through records provided to and / or information reported to EPA inspector(s) by facility representatives and as understood by the inspector(s). This report may not capture all operations or activities ongoing at the time of the inspection. This report does not make final determinations on potential areas of concern. Nothing in this report affects EPA's authorities under federal statutes and regulations to pursue further investigation or action. 3 ED_019088A_00019901-00003