Document aJYLKYbJpX0Gp8g11End5aD3M

PLAINTIFF'S EXHIBIT ASARCO El Paso Plant SUPPLEMENTAL ENVIRONMENTAL PROJECTS MONTHLY DEMOLITION UPDATE March 1998 1. Invoice #98-122 for $4350.00 to Sun City Analytical Inc. for Air Monitoring at the Zinc Hoppers during (asbestos contained) insulation removal. 2. Invoice #10266 for $2,915.62 to LYNCO Electric Co. Inc. for rerouting electrical lines around Zinc Plant demolition area. 3. Invoice #6751 for $527.31 to James & Luther for removing and blinding 6" air line which went along Zinc flue to Cadmium plant. Zinc flue was removed as pan of demolition project. 4. ASARCO Voucher #020413 for $740.64 for Electrical line removal and rerouting at Zinc plant area. 5. Invoice #6730 for $21,840 to Southwest Abatement, Inc. for removal of asbestos impregnated insulation from Zinc Plant Baghouse Hoppers. ASARCO ELP 0011402 Detet 3/20/199$ OLJt Entry by Originator (RQ-ENTRY) Peget Itqoititicmi 269594 Project / Description Origin*tort Work Contort co90 1X10 hunsell piggy a INDUSTRIAL RELATIONS Enteredi Required byt 1/12/1999 3/23/1999 ASBESTOS ABATEMENT COT/PH ASBESTOS ABATEMENT COT/PH 31,200.00 Roqn In Seg Typo 2C 3C 4C I ton No POT POT POT Mb Description / Convents RETURNING OXJt POR ADD'D DOLLARS SHOULD BE $31,200.00 ELIZABETH Unit Cost Uoi Quantity Ext Coot Tex 249594 1 0 01 1C 2c 3c 4c 5c Cc 7c 9c 9c 10 c 11 c 12 c 13 c 14 c IS c 1C c nc it c 19 c 20 c 21 c 22 c 23 c 24 c Direct 02 ASBESTOS ABATEMENT Charge: EPN 5131 00004C 100.0% PAN CONVERTER COTTRELL 1C7? SQ PEST $9444.00 PAH POWERHOUSE BOILER/PIPE 215 SQ FEET 7490.00 PAM POWERHOUSE PLOT 179 SQ PT 7490.00 PAM TOTAL $17,377.00 PAM PAM COTTRELL(REMOVE MASTIC AND FIBERGLASS INSULATION) PAM PAM POSSIBLE ANOTHER 714 SQ TEST TO BE REMOVED $4.48 PER SQ. rOOT. PAM PAM POWERHOUSE ABATEMENT INCLUDES REMOVAL OP FRIABLE PAM ASBESTOS INSULATING MUD. PAM PAM ASARCO TO TARE CARE OP ASBESTOS DISPOSAL POR PAM CONVERTER COTTRELL PAM ERX PAM 9430 BOEING STE. 12 PAM EL FASO TX 7992S PAM PAM TYSAN WEST CONTACT PERSON 915 778-3813 PAM PAM SUPPLIER TO PERFORM PHASE 1 $ 17,444.00 PAM PHASE 2 13,756.00 PAM PAM $31200.00 31,200.000 EA 1.00 31,200.00 57 S-JCoUl 2 <b ? a.<? / AocO f- Po ^@ %J(0/ 31/ Pg, /n(/c?/ c ; f\ uoi<&& t/c /<?ooy///. >7,317 Asfrno o>e>{& & S/J l fc % ASARCO ELP 0011403