PLIBRICO ENGINEERING
JCMi INSTALLATION DATA
Issued by Plibrieo Jointless Firebrick
Uarch 21, 1946
BULLETIN NO. 107
HOT CORE WALLS A hot core wall tends to dry out a Plibrieo wall too rapidly. This should be the last wall installed and baking out should follow immediately. Other wise, due to drying out, an increased shrinkage occurs which will crack the wall but not cause spalling except in very extreme cases. There is no sat isfactory remedy for this situation but to bake out as fast as possible after the core wall i3 installed. The best procedure is never to install Plibrieo against a hot wall until you are sure a baking fire can be started immediately the wall is finished.