Document aJV4zkz0KVmXYmzDryoKY0zza
inter-office memo TENNECO CHEMICALS, INC.
To R. PavlIk
At Piscataway
From H. R. Horton
at Burlington
Subject Gel Evaluation - Modified DK Unit
date October 9, 1975
copy to W. C. Champion W. F. Gabel
Per our recent phone conversation, attached is the data from three separate gel evaluations on the modified DK unit at Matlack's Bayonne terminal.
Although the first run showed a possibility that the unit was contributing to the gels (generating fingernails, etc.), the next two evaluations seem to indicate that this unit does not increase the gel count in resin being transferred through it.
Samples were taken before and after the unit (from the car and the truck) at 10 minute intervals for one hour. Data for each car wifi be labeled as `.'Before" (from the car) and "After" (from the truck) along with the time into the run and the gel grade.
HRH/gs Attachments
"M. H. R. Horton
COLORITE 009860
DK EVALUATION tt\
6/IO/75
CAR flACFX q649S Compt. CA
TRUCK /A6878
T ime
10 minutes
II
20 minutes
II
30 minutes
II
40 minutes
H
50 minutes
II
60 minutes
II
Location
Before After
Before After
Before After
Before After
Before After
Before After
Gels'VfT
7 13
8
11
7
11
*7
11
7
11
8
9
COI<ORXTE 009861
DK EVALUATION #2 6/19/75 CAR flACFX 96^71 Compt. CB TRUCK IHl*99
T ime 10 minutes
tl
20 minutes
II ,
30 minutes
II
**0 minutes
II
50 minutes
II
60 minutes
II
Location
Before After
Before After
Before After
Before After
Before After
Before After
GelsVfT
5 12
10 9
11 6
: 16 5
13 8
8 6
COLORXTE 009862
PK EVALUATION #3 8/8/75 CAR //ACFX 96465 Compt. A TRUCK #8108
T ime 10 minutes
II
20 minutes
II
30 minutes <1
40 minutes
II
50 minutes
II
60 minutes
II
Location
Before After
Before After
Before After
Before After
Before After
Before After
Ge 1 sTffi
23 28
21 21
12 14
16 13
14 15
15 15
COLORITE 009863