Document aJ8R0RmwYGKyprkdBbN9DeRKX
PLAINTIFF'S EXHIBIT
11 br/*
IP
Recommended Wfork Radices
farA/C Pipe
CTD010663
Contents
Introduction....................................................................
Asbestos and Health................................................................ 3
Summary of OSHA Asbestos Standard............................. 4
Products and Operations........................................................ 5
Recommended Work Practices Shipping, Receiving, Handling and Assembly................. 6 Cutting A/C Pipe
Carbide Blade Equipment.................................................... 7 Snap Cutting Equipment....................................................8 Machining A/C Pipe Field Lathe--Manual............................................................9 Field Lathe--Power............................................................ 10 Rasp--Manual...................................................................... 11 Cutting Holes in A/C Pipe Shell Cutters........................................................................ 12 Drill and Rasp.......... ........................................................ 13 Chisel and Rasp.................................................................. 14 Tapping A/C Pipe Non-Pressure ...................................................................... 15 Pressure .................................................................................16 Coupling Removal.................................................................. 17 Housekeeping and Waste Disposal................................... 18
Non-Recommended Work Practice Cutting
Abrasive Disc-Dry.............................................................. 19
2
Copyright 1977 by A/C Pipe Producers Association Printed in USA 877
1
CTD010664
Introduction
The Occupational Safety and Health Act in the United States and similar laws in Canada and other countries were enacted to ensure so far as possible, every worker a safe and healthy work place. This legislation is far-reaching. It cov ers millions of employees and nearly every employer, in cluding those involved in utility duct and pipeline construc tion.
In keeping with the spirit and intent of these laws, the asbestos-cement pipe industry is cooperating with labor by disseminating information regarding the potential hazards of exposure to airborne asbestos and the means of reducing such potential hazards through good work practices.
Good work practices is what this booklet is about. The recommendations that appear on the following pages are the result of field testing and were developed through study.* They are intended as general guides to achieve safe and clean job site conditions when working with asbestoscement (A/C) pipe products. Since field conditions will vary, adherence to these work practices will not necessarily guarantee compliance with national, state or local regula tions. Questions relating to compliance should be directed to appropriate regulatory agencies.
The A/C Pipe Producers Association believes this booklet will be helpful to engineers, superintendents, contractors, foremen and laying crews in understanding and explaining established procedures for the safe handling of A/C pipe products.
`See "Asbestos Exposures During the Cutting and Machining of AsbestosCement Pipe," report prepared by Equitable Environmental Health Inc., March, 1977 and "News from TAC," reporting on a survey by the Occupational Hygiene Unit of the North of England Industrial Health Service, TAC Construction Mate rials Ltd., February, 1977. 2
Asbestos and Health
As you are aware, airborne asbestos fiber has been iden tified as a possible health hazard. Very few things to which we are exposed are "zero risks." But like the automobile, electricity and x-rays, there are non-harmful ways to use potentially harmful things.
Generally, asbestos-cement (A/C) pipe products contain less than 20% asbestos. The asbestos fibers are not free, but encapsulated or "locked-in" the cement binder like rein forcing rods in concrete. The distinction between "free" and "bound" asbestos is extremely important. First of all, it determines the probability of fiber release, which in turn, directly relates to the probability of risk. More importantly, it explains clearly and simply why A/C pipe is a nonharmful use of asbestos.
Experience has shown that minimizing exposure to air borne asbestos dust is the only effective method of prevent ing asbestos-related diseases. Recommended work prac tices are the best assurance of providing exposure safe guards for yourself and your employees.
3
CTD010666
Summary of OSHA Asbestos Standard
The Occupational Safety and Health Act was signed into law on December 29, 1970, and became effective on April 28, 1971. On December 7, 1971, the Secretary of Labor issued a temporary standard for exposure to asbestos dust. As required by the Act, a permanent standard for asbestos exposure was promulgated six months later.
Under the current standard, it is the employer's respon sibility to assure that exposure of employees to airborne concentrations of asbestos fibers does not exceed the fol lowing "permissible exposure levels":
a. Eight hour time weighted average: Two fibers, longer than 5 micrometers, per cubic centimeter.
b. Ceiling concentrations: Ten fibers, longer than 5 mi crometers, per cubic centimeter.
In October, 1975, OSHA proposed a revision to the cur rent standard which would reduce the eight hour time weighted average exposure to 0.5 fibers per cubic centime ter of air and ceiling concentrations to 5.0 fibers per cubic centimeter. In their notice, OSHA stated that a separate "construction industry standard" would be issued to cover workers who handle asbestos-containing products. This work practice booklet will be revised as necessary to reflect any changes the construction industry standard may necessitate.
The work practices recommended in this booklet are based on data for "peak dust concentrations" representing short time periods ofmaximum exposure. Field cutting and machining opera tions involving AIC pipe are normally infrequent and of short duration. Using these recommended work practices, it is improba ble that field personnel would be exposed in a typical working day to levels exceeding the eight hour time weighted average.
i
4
CTD010667
Products and Operations
Types of A/C Pipe Products covered by these work practices include:
"Class" Pressure Pipe "Transmission" Pressure Pipe Pressure Sewer Pipe Gravity Sewer Pipe Building Sewer Pipe Storm Drain Pipe Perforated Underdrain Pipe Electrical Conduit Telephone Duct Air Duct Operations to which these work practices apply include: Shipping, Receiving and Handling Cutting Machining Hole Cutting Tapping Coupling Removal Housekeeping and Waste Disposal
5
CTD010668
Shipping, Receiving, Handling and Assembly*
A/C pipe is shipped clean from the factory and carefully loaded using methods acceptable to the carrier. Loading, unloading, stringing out and assembling A/C pipe are essentially dust-free operations. Even in enclosed spaces, airborne asbestos fiber levels from pipe handling operations are far below existing and proposed occupational standards.
All hand and mechanical unloading operations should be car ried out in accordance with the manufacturer's installation man uals. A/C Pipe Products: All Size Range: All
'Exposure data not currently available. Recommendation based on exposure data for operations believed to be comparable.
6
CTDO10669
Cutting Carbide Blade Equipment
Blade cutters consist of a frame adjustable to the circumference of the pipe and a number of outboard, self-tracking rollers that align one or more carbide-tipped cutting blades. Blade cutters are typically hand-operated. Due to the relatively low mechanical input and clean cutting action, significant amounts of airborne asbestos dust are not produced. A/C Pipe Products: All Size Range: 3" through 24"
7
CTD010670
Cutting Snap Cutting Equipment
Snap cutters or "squeeze and pop" equipment operates by means of cutting wheels mounted in a chain wrapped around the pipe barrel. Hydraulic pressure, applied by means of a remote electric or manually-operated pump, simultaneously squeezes the cut ting wheels into the pipe wall until the cut is made. A/C Pipe Products: All Size Range: Pressure Pipe--3" through 24"
Pressure, Gravity and Building Sewer; Storm Drain; Air, Electrical and Telephone Duct--3" through 36"
8
CTD01067A
Machining Field Lathe-Manual
Manual field lathes are designed to end-trim and re-machine rough pipe barrels to factory-machined end profiles. The lathe consists of an adjustable, self-aligning arbor inserted into the pipe bore (which acts as a mandrel upon which the turning handle operates), a screw-fed turning frame, carbide machining blades and manual (hand or ratchet) turning handles. A/C Pipe Products: All Size Range: All
CTD010672
Machining Field Lathe-Power
Power field lathes, like manual lathes, are designed to end trim and re-machine rough pipe barrels to factory-machined end pro files. The lathe consists of an adjustable, self-aligning arbor in serted into the pipe bore (which acts as a mandrel upon which the turning handle operates), a screw-fed turning frame, carbide machining blades and electric or pneumatic power drive. A/C Pipe Products: All Size Range: All
10
CTD010673
Machining Rasp-Manual*
Short lengths of A/C pipe (MEE's & MOA's) can be cut for pipe closures, repairs and to locate fittings exactly. Field cut ends may be rebeveled with a coarse wood rasp to form a taper approximat ing the same profile as the factory-beveled end. A/C Pipe Products: All Size Range: All
`Exposure data not currently available. Recommendation based on exposure data for operations believed to be comparable.
11
CTD010674
Hole Cutting Shell Cutters
For field connections into A/C pipe, clean, even entry cuts may be accomplished by means of shell cutting equipment. Shell cutters consist of a hole cutter housing mounted on the pipe, a carbide or diamond-tipped hole cutter and a manual ratchet, pneumatic, electric or gasoline drive to power the cutting head.
When cutting holes in A/C pipe products, all dust and cuttings should be removed from the pipe or duct interior after the cutting operation. Removal may be accomplished by flushing with wa ter, wet mopping or vacuuming prior to placing in service. DO NOT BLOW OUT WITH COMPRESSED AIR OR DRY SWEEP. A/C Pipe Products: Pressure, Gravity and Building Sewer;
Air Duct Size Range: All 12
CTD010675
Hole Cutting Drill and Rasp*
Field connections may be made with a heavy duty electric drill and rasp. Using a carbide-tipped drill, a series of closely-spaced holes are first drilled around the hole outline. The disc is knocked free with a hammer and the edges of the hole are dressed with a coarse wood rasp.
When cutting holes in A/C pipe products, all dust and cuttings should be removed from the pipe or duct interior after the cutting operation. Removal may be accomplished by flushing with wa ter, wet mopping or vacuuming prior to placing in service. DO NOT BLOW OUT WITH COMPRESSED AIR OR DRY SWEEP.
A/C Pipe Products: Pressure, Gravity and Building Sewer; Air Duct
Size Range: All
`Exposure data not currently available. Recommendation based on exposure data for operations believed to be comparable.
13
CTD010676
Hole Cutting Chisel and Rasp
f7--
/' \
// \
[> \
\ V\
\t VJL
;
Holes may be cut into A/C pipe with a hammer and chisel. The edge of a plumber's wood chisel is used to cut completely around the hole outline, about a V4" from the prescribed line. The opera tion is repeated and the cut deepened until through. The edges of the hole are then dressed with a coarse wood rasp.
When cutting holes in A/C pipe products, all dust and cuttings should be removed from the pipe or duct interior after the cutting operation. Removal may be accomplished by flushing with wa ter, wet mopping or vacuuming prior to placing in service. DO NOT BLOW OUT WITH COMPRESSED AIR OR DRY SWEEP. A/C Pipe Products: Pressure, Gravity and Building Sewer;
Air Duct Size Range: All
14
CTD010677
Tapping Non-Pressure
Non-pressure or "dry" tapping for service connections may be performed in or above the trench. The equipment is affixed to the pipe by means of a chain yoke. Separate drills and taps or a combination tool drills and taps the pipe wall. Corporation stops or other connections may then be affixed to the pipe.
To minimize (a) the fouling of valves, regulators, meters, etc. with chips and (b) unnecessary addition of asbestos to drinking water, all dust and cuttings should be removed from the pipe interior by flushing with water, wet mopping or vacuuming prior to placing in service. DO NOT BLOW OUT WITH COM PRESSED AIR OR DRY SWEEP. A/C Pipe Products: Pressure Pipe Size Range: All
* Exposure data not currently available. Recommendation based on exposure data for operations believed to be comparable.
15
CTD010678
Pressure
Pressure or. "wet" tapping for service connections is performed in the trench while the pipe is under pressure. The equipment (manual or power driven) is affixed to the pipe by means of a chain yoke. A combination boring and inserting bar drills and taps the pipe wall and inserts a corporation stop or pipe plug. The pressure chamber, which protects against water leakage, also catches the asbestos-cement chips, so this is essentially a dustfree operation.
To minimize (a) the fouling of valves, regulators, meters, etc. with chips and (b) unnecessary addition of asbestos to drinking water, provisions should be made for downstream flushing or use of tapping equipment with positive purge or "blow-off" features. A/C Pipe Products: Pressure Pipe Size Range: All
* Exposure data not currently available. Recommendation based on exposure data for operations believed to be comparable.
16
CTDO10679
Replacement of damaged pipe necessitates excavation, exposure and removal. Coupling removal may be accomplished by gradu ally splitting the coupling lengthwise, using a chisel andball-peen hammer. After the top of the coupling has been split, a crowbar or similar tool is used as a lever to split the bottom of the coupling. A/C Pipe Products: All pipe with A/C couplings Size Range: All
"Exposure data not currently available. Recommendation based on exposure data for operations believed to be comparable.
17
CTD010680
Housekeeping and Waste Disposal
Housekeeping is an important part of any safe construction operation. It is even more essential when airborne dust created by the lack of good housekeeping has the potential for harm to employees or others.
EQUIPMENT: All external surfaces of equipment should be maintained free of dust accumulations that might, if dispersed, create asbestos fiber concentrations above per missible exposure limits.
WASTE DISPOSAL: Asbestos-cement chips and cut tings from the field operations described in this booklet should be disposed of in a manner that will not contribute airborne asbestos dust to the atmosphere. Where cutting and machining operations are performed at the construc tion site, the chips should be placed in the trench and buried with the pipeline.
Where operations are performed at a central location such as a contractor's or distributor's yard on a more or less continuing basis, the chips and cuttings may be collected and mixed wet with cement and made into non-friable forms. These forms may be used in the trench as supports for cast iron fittings and valves, as appropriate.
Otherwise, chips and cuttings should be collected in sealed bags or closed containers impermeable to asbestos dust. Loose material should never be dry swept. When vacuum equipment is available, it should be used. Water or other dust suppressants should be applied in those circum stances where sweeping is unavoidable. DO NOT BLOW WASTE MATERIAL WITH COMPRESSED AIR.
No visible emissions to the atmosphere may result from the collection, processing, packaging, transporting or de position of any asbestos-containing material. Wastes should be disposed at a site operated in accordance with the requirements or applicable national, state or local laws.
18
CTD010681
Cutting Abrasive Disc-Dry
Power driven saws with abrasive discs (masonry blades) should not be used for dry cutting or beveling asbestos-cement pipe. Abrasive disc cutters produce concentrations of airborne asbestos dust which exceed OSHA permissible levels.* THIS WORK PRACTICE IS THEREFORE SPECIFICALLY NOT RECOM MENDED. A/C Pipe Products: All Size Range: All
'Data not currently available regarding effect of local exhaust ventilation/dust collection equipment or other engineering modifications on asbestos fiber con centrations.
19
CTD010682
A/C Pipe Producers Association
REGULAR MEMBERS Asbestos de Mexico, S.A. Tlalnepantla, Mexico Atlas Asbestos Company Montreal, Quebec, Canada Canadian Johns-Manville Co., Ltd. Mississauga, Ontario, Canada Cement Asbestos Products Company Birmingham, Alabama Certain-teed Corporation Valley Forge, Pennsylvania Johns-Manville Sales Corporation Denver, Colorado Mexalit del Norte, S.A. Mexico City, Mexico ASSOCIATE MEMBERS Amiantus Dienst Export Hamburg, Germany Asbestos Monterrey, S.A. Mexico City, Mexico Association de I'lndustrie I'Asbeste-Ciment Nyon, Switzerland Eternit, B.V. Amsterdam, Holland Everitube Neuilly-sur-Seine, France James Hardie & Company Pty., Ltd. Sydney, New South Wales, Australia Hellenit, S.A. Athens, Greece Hyderabad Asbestos Cement Products Ltd. Hyderabad, India Paraisten Kalkki Oy Pargas, Finland Sociedad Industrial Pizarreno, S.A. Santiago, Chile TAC Construction Materials, Ltd. Manchester, United Kingdom
20
CTDO10683
A/C Pipe ftoducersAssociation
1600 Wilson Boulevard, Suite 1308, Arlington, Virginia 22209
CTD010684