Document aJ7D4Lab9ORBv1VX08r1B71n9

CHEVRON U.S.A. INC. ENGINEERING AND MAINTENANCE DEPARTMENT EL PASO, TEXAS CONTRACT NO. C-15-074-80, COHEE & ROLLINS, SPECIFICATION NO. EP-415-A November 1, 1980 (SHP) Page A1 of A5 INC SPECmCATION NO. EP-415-A CONTRACT MILLWRIGHT, MAINTENANCE AND CONSTRUCTION EL PASO REFINERY 1.0 SCOPE 1.1 This contract specification is for annual time and material based on millwright, maintenance^ and construction work at the El Paso Refinery, 6501 Trowbridge, El Pago, Texas. It includes the furnishing of all service labor, tools,"equipment, and material as required by CONTRACTOR, as requested by COMPANY!. The exact location and extent of each unit of work to be performed"by CONTRACTOR shall be as authorized and directed by COMPANY orrqan APW, "Authorization to Perforin Work", Form MFC--2649. ~ 1.2 The intent of this specification and contract is to establish standing contractural requirements and agreements between COMPANY and CONTRACTOR so that millwright, maintenance and construction work may be initiated and performed with mirmnum paperwork. As the need for millwright, maintenance and construction arises, each job will be initiated with a telephone call and the actual work will be performed with an APW when given to CONTRACTOR'S job supervisor upon entering the refinery. 1.3 This specification supplements the Contract Terms and Conditions (Form GO-279). In theravent any discrepancy is deemed to exist between this documentcand said Terms and Conditions, the provisions of" the latter shall decontrolling. 2.0 GENERAL 5= 2.1 CONTRACTOR shall abideTBy the rules and regulations as set forth in Refinery Instruction No. 140A, "General Instructions to Contractors Working Within the RefSery," which will be a part of the contract. Refinery Instruction Nor 1404 covers the generalities of the contract agreement and supplements the Contract Terms and Conditions (Form GO-279). '' " 2.2 One or more COMPANY representatives will be assigned to administer the details of the contract and to assign daily work priorities, for a given area within the-Saif inery. CHEV BB nioKnc CHEVRON U.S.A. INC. ENGINEERING AND MAINTENANCE DEPARTMENT EL PASO, TEXAS CONTRACT NO. C-15-074-80, COHEE & ROLLINS, SPECIFICATION NO. EP-415-A November 1, 1980 (SHP) Page A2 of a5 INC 2.3 Daily work priorities; manpower requirements, scheduling, and/or additional instruction to CONTRACTOR will be conducted orally between the COMPANY and CONTRACTOR representatives unless the situation, as determined by either or both partfBS, dictates the need for written authorization, as follows: ZZ 2.31 Any work d'e f irrHTIon, manpower requirement, schedule, or additional instruction tdTONTRACTOR that does not constitute a contract change, but requires ufjfitten authorization, will be transmitted on an "Autho rization to Perform Work," Form MFG-2649. An "APW" may be initiated and authorizedZby the COMPANY representative and the agreement may be commenced rfftnediate ly. Example: An "APW" would be required for the COMPANY tcc^uthorize an increase in the number of CONTRACTOR Technicians b<Z5g used. 2.32 Any work de f irtgion, manpower requirement, schedule, or additional instruction tefTlONTRACTOR that does constitute a contract change must be transnrtlted on a "Change", Form GO-283. The "Change" may be initiated by the COMPANY representative, but requires a signature ol. approve L atCJLhe appropriate level, ol authority before the agreetneni may be commenced. Example: A "Change" would bo required for the COMPANY tcFluthorize an increase in the labor rate of CONTRACTOR Technicians bcifig used. 3.0 PERFORMANCE OF WORK ZZ 3.1 CONTRACTOR is completely responsible for the quality control of all his work. Workmanship s.ha 11 be of the highest quality. COMPANY may spotcheck from time to time asSHet e rmin e d necessary by COMPANY. 4.0 WORKING HOURS Z 4.1 CONTRACTOR'S regulargovertime and/or premium working hours shall be as requested and authorized by COMPANY. 4.2 COMPANY'S regular wtreking hours are: No. 1 Shift - 12:00 'TL co 7:30 A.M. - 7 hours work - 30 minutes paid lunch pc riodZI No. 2 Shift and Regular Day - 7:30 A.M. to 4:Q0 P.M. - 8 hours work -30 minutejlEunpa id lunch period. No. 3 Shift - 4:00 PE3T. to 12:00 M - Ik. hours work - 30 minutues paid lunch period. CHEV BB 012506 CHEVRON U.S.A. INC, ENGINEERING AND MAINTENANCE DEPARTMENT EL PASO, TEXAS CONTRACT NO. C-15-074-80, COHEE & ROLLINS, SPECIFICATION NO. EP-415-A' November 1, 1980 (.SHP) Page A3 of a5 INC 4.3 All overtime and/or/premium work will be as specifically authorized by COMPANY and approved_on CONTRACTOR'S daily time record. 5.0 ITEMS TO BE FURNISHED BY CONTRACTOR 5.1 CONTRACTOR shall furu.ishall service labor, tools, equipment, material, and transportation,'t-ts outlined in CONTRACTOR'S Service Quotation and Material Price List,3Ior complete performance of the most routine units of work that CONTRACTOR has been authorized by COMPANY to perform as referred to in Sub-Settion 1.1. This includes, but is not limited to, Technician tools basic: to the Technician's craft. 6.0 ITEMS TO BE FURNISHED BY ^COMPANY 6.1 COMPANY will furni sh any and all tools, equipment, and material not incLuded in CONTRACTOR'S Service QuoLuliun and Material Price List unless COMPANY requests CONTRACTOR, in writing, to furnish otherwise. 6.2 COMPANY will turn isliTa 11 siiop drawings, diagrams, or blueprints of COMPANY equipment buJTig repaired as required by CONTRACTOR for complete performance of the w^jrk. 7.0 CONTRACT PRICE ~ 7.1 COMPANY will compensate CONTRACTOR (Plus all applicable taxes and finance charges) for labor, /grave 1 expense, tools, equipment, and material as outlined in CONTRACTOR'S Price Schedule (Exhibit A, Pages 1 & 2), attached hereto, which will be a part :of the contract agreement. 7.2 In the event of anyjjghcrcase or decrease In any labor rate or material rate prior to the terminnLion of this contract, CONTRACTOR shall notify COMPANY of the changes by submitting new rate proposals, in writing, for approval. Acceptance by COMPANY may be in whole or in part, and single labor rates qg.material rates, as well as the entire proposal, may be subject to negotiation and compromise prior to acceptance of a modification to conCEict by COMPANY. No change will be considered approved until a duLj4 authorized Contract Change Form (GO-283) is pro cessed. It is the COMPANY'S intent that all CONTRACTOR material rates and labor rates be Lqx the duration of the contract and not subject to negotiation unless t^erc are unusual circumstances. CHEV BB 012507 CHEVRON U.S.A. INC. ENGINEERING AND MAINTENANCE DEPARTMENT EL PASO, TEXAS CONTRACT NO. C-15-074-80, COHEE & ROLLINS, INC. SPECIFICATION NO. EP-415-A -- November 1,' 1980 (SHP) ' Page A4 of A5 8.0 ACCOUNTING OF CONTRACT 3STSTS 1* ----- 8.1 CONTRACTOR shall ktffip an accounting of all labor, equipment and material furnished by CONTHSUTOR and shall prepare and render by the end of each shift to COMPANY representative, a report using COMPANY'S Daily Time Record, Form CW-8LJL7 Daily time records not submitted for approval at the end of the shift on which the work was performed must be approved by the General Maintenance Supervisor. 8.2 CONTRACTOR shall retain one copy of each Daily Time Record and furnish COMPANY representative with the original after COMPANY'S and CONTRACTOR'S representatives ha\rr each signed the Daily Time Record acknowledging that it is correct! These Daily Time Records shall be used as a basis Lor computing the total contract. _pr ico. When submitting invoices for the work, CONTRACT shall furnish four copies of the invoice and attach one copy of each Daxly Time Record and one copy of the APW pertaining thereto. -= 8.3 invoicing InstructmJrs 8.31 CONTRACTOR sixiFTl, for COMPANY'S accounting purposes, furnish invoices in accordance with Paragraph 2.41 of the Contract Terms and Condi tonsAF^Form CO-279. ALl entries on the invoices must be supported by arDaily Time Record or Purchased Material List signed by a COMPANY representative. Lnvoices are to show a breakdown of each APW job E actual hours worked, materials, supplies and equip ment used, wiHI unit costs, and with the correct refinery charge, numbers.. Labor, equipment rental, material, and total invoices shall be as fallows: 8.31J Labor Invoices shall indicate APW number, date, refinery cha rgerfnurnbe r, labor classification, hours worked, rate per hoar, total charge for each Labor classification and total Labor charges. 8.312 EquipmOSB. rental invoices shall indicate APW number, date, refinefycharge number, equipment classification, hours used iOTiourly rate or length of time used if flat rate, rate pffiC_hour or flat rate, total charge for each equipment c lassif2ac ion and total equipment charges. When rental equiprruSS- is furnished for a flat rate, and the flat rate includcts equipment rental with operator, invoices will so state.. CHEV BB 012508 CHEVRON U.S.A. INC. ENGINEERING AND MAINTENANCE DEPARTMENT EL PASO, TEXAS CONTRACT NO. C-15-074-80, COHEE & ROLLINS, INC SPECIFICATION NO. Ep_415_A November 1, '1980 Page A5 of A5 (SHP) 8.313 MaterEE. invoices shall indicate APW number, date, refinery chargerpumber, name of supplier, supplier's invoice number, material classification, total charge for each material classEELcation, total handling fee if applicable, and total mn ter rrfl charge. 8.314 Total .jTnvoice, or recap, shall- indicate labor charges, equip ment rjmtal charges, material charges, and total labor, equipment rental, and material charge. 8.32 State sales tajc is paid on all materials when it. is initially purchased f rcinilwho lesa le or retail outlets. Quotes or bills ter. COMPANY shouUL ref 1ect the "ouL-of-pocket" sales tax costs to CONTRACTOR. Ho not apply sales tax a second time on materials for COMPANY use when submitting a quote or bill to COMPANY. 9.0 IN FORM AT IVES rr 9.1 The following Refinjnry Instruction and blank COMPANY forms are included with this specification for CONTRACTOR'S information: 9.11 Refinery Instruction No. 1108, "Use of Gas Mask' 9.12 AuthorizatioqTIo Perform Wo rk, Form MFC-2649. 9.13 Contract Chang, Form GO'-283 . 9.14 Daily Time ReSrd, Form >CW-811 CHEV BB 012509