U. S. Environmental Protection Agency Region 4 Air Enforcement Branch 61 Forsyth Street, SW Atlanta, Georgia 30303
INSPECTION REPORT
Facility Inspected 4404 Acworth Industrial Drive Northwest Acworth, Georgia 30101
Inspection Date: June 27, 2023
Facility Programmatic ID 3601538816 LAT: 34.0604 LON: -84.6604
Inspection Type
Clean Air Act (CAA) National Emission Standards for Hazardous Air Pollutants (NESHAP) - Asbestos
Inspector
Tony Spann
Introduction
An inspection pursuant to Section 114 of the CAA was conducted on June 27, 2023, at 4404 Acworth Industrial Drive Northwest in Acworth, Georgia 30101 (the facility). The purpose of this inspection was to determine compliance with the CAA NESHAP Asbestos Standard and the regulations promulgated at 40 CFR Part 61, Subpart M, for the demolition activity conducted at the facility. The unannounced inspection was conducted by Tony Spann and Pamela Storm who possess EPA inspector credentials to conduct CAA NESHAP asbestos inspections.
The inspectors obtained information prior to the inspection regarding demolition permit # P2300419 which was issued on February 16, 2023, by the City of Acworth for the demolition activity conducted at the facility. According to the demolition permit, the job description was listed as an interior demolition of the facility. The owner of the facility listed on the demolition permit was the City of Acworth. The contractor listed on the demolition permit was Macallan Construction, LLC.
The EPA Region 4 CAA NESHAP asbestos program targets facilities for inspection located in the State of Georgia based on tips/complaints; permits issued on a local level; and demolition and/or renovation/abatement notices sent to the State. This inspection was conducted based on the previously mentioned permit.
Facility Information
The facility is the Acworth Power and Public Works building.
Inspection
Upon arrival at the facility, the EPA inspectors presented inspector credentials to Bevan Cobbs, Superintendent of Macallan Construction, LLC. The inspectors observed ongoing construction activities at the time of inspection. The interior demolition activities had been completed prior to the inspection. Bevan Cobbs explained all relevant information to the inspectors pertaining to the interior demolition activities conducted at the facility. Bevan
CAA Asbestos Inspection Report: 4404 Acworth Industrial Drive NW Acworth, GA 30101
Inspection Date:
06/27/2023
Page 1 of 2
Cobbs informed the inspectors that an asbestos survey was conducted prior to the initiation of interior demolition activities at the facility. According to Bevan Cobbs, the asbestos survey concluded that regulated quantities of asbestos were not detected at the facility in which the interior demolition was to be conducted. Bevan Cobbs also said that copies of the asbestos survey and other required documentation related to the interior demolition could be provided upon request.
Conclusion
The inspectors will follow up with the contractor(s) and/or owner(s)/operator(s) listed on the demolition permit as deemed appropriate, to obtain information and necessary paperwork related to this demolition activity. This information will include, but not necessarily be limited to, copies of asbestos inspection reports and demolition notifications submitted to the Georgia Environmental Protection Division prior to the demolition activity conducted at the facility.
Report Approval
This inspection report was written by:
Digitally signed by Spann,
Spann, Tony Date: 2023.08.14 Tony
13:22:26 -04'00'
Tony Spann, Inspector
August 14, 2023 Date
This inspection report was approved by:
JASON
Digitally signed by JASON DRESSLER
DRESSLER 10:47:02 -04'00' Date: 2023.08.14
Jason Dressler, Chief
North Air Enforcement Section
August 14, 2023 Date
CAA Asbestos Inspection Report: 4404 Acworth Industrial Drive NW Acworth, GA 30101
Inspection Date:
06/27/2023
Page 2 of 2