Document aDvvmbQ8mR790jLK25jLjqkkX
rK
S0M3
DOW CHEMICAL U.S.A.
TEXAS OPERATIONS FREEPORT. TEXAS 77S41
CONFIDENTIAL
FOR THE USE OF DOW EMPLOYEES ONLY
INDUSTRIAL HYGIENE REPORT
1986 ASBESTOS ICNITQRING DURING REMOVAL AT POLYETHYLENE II, B-2500 MAJOR UNIT DEMOLITION, APB
FILE NO. #R35-3024 date MARCH 1.9 f 1987 AUTHOR T- F. HJTJARD
CHECKED cA/rrtfftAjofo.
datef//g//Py----------------
Summary
Asbestos monitoring was done during stripping of asbestos from lines located inside a cement-walled, roofless structure at Polyethylene II, B-2500, prior to demolition. The monitoring was done to assure that the use of approved job procedures would result in acceptable airborne concentrations of asbestos.
Monitoring results were within acceptable limits. The highest 8-hcur TWA potential exposure was 0.23 fibers/cc.
All personnel within the restricted area wore the required protective equipment during asbestos removal.
The results of this survey should be furnished to A-Z Masonry, the contractor for this job. A Contractor Appendix is attached for distribution to the contractor.
co --i O -- cr.
^
Distribution
H. G. Ahlich, B-1053 *J. T. Barton, APB C. K. Browdy, B-101 D. E. Cragar, B-101 G. G. Hinojosa, B-108 A. G. Molina, B-5400 V. G. Perry, Jr., B-101 Asbestos File
L. W. Ranpy, 1803, Midland A. W. Schaffer, 2030, Midland M. G. swartk, 1803, Midland *F. D. Axe, Pittsburg *J. E. LeBeau, 1803, Midland *M. E. Neville, Plaquemine *G. L. Meier, Strongsville *s. M. Gorgacz, 474, Midland
Cover sheet only
AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY
ST0459444
DOW CHEMICAL U.S.A. 50063____________ _______
TEXAS OPERATIONS FREEPORT. TEXAS 77S*1
CONFIDENTIAL----------- FOR THE USE OF DOW EMPLOYEES ONLY
INDUSTRIAL HYGIENE REPORT
1986 ASBESTOS MONITORING DURING EEMDUTICN OF A-703 BUILDING, MAJOR UNIT CEMOUTICN, APB
rle no. A7-3048 DATE March 25. 1987 author L.F. Rlllard__________
CHECKED. o&&TMbcu pate -H'/QsJS'I
Summary
Asbestos monitoring was done during the removal of transits shingles from building A-703. A front-end loader was used to remove the shingles from the sides of the building prior to demolition. The monitoring was done to assure that the use of an approved job procedure would result in acceptable airborne concentrations of asbestos.
Monitoring results were within acceptable limits. The worker operating the front-end loader had a potential 8-hour time-weighted average exposure of 0.015 fibers/cc. The worker picking up rubble had a potential 8-hour TWA exposure of 0.06 fibers/oc. Area samples taken at the denpster box where the transite material was deposited resulted in asbestos ocncentraticns of 0.002 fibers/oc and 0.02 fibers/cc.
All personnel within the restricted area wore the required protective equipment during asbestos removal.
The results of the survey should be furnished to Rod & Sons, the contractor for this job. A Contractor Appendix is attached for distribution to the contractor.
lr 4/9/87
Distribution
H. G. Ahlich, B-1053 *J. T. Barton, APB C. K. Brcfcdy, B-101 D. E. Cragar, B-101 G. G. Hinojosa, B-108 A. G. Molina, B-5400 V. G. Perry, Jr., B-101 Asbestos File
L. W. Raspy, 1803 Midland A. W. Schaffer, 2030 Midland M. G. Swank, 1803 Midland * F. D. Axe, Pittsburg * J. E. LaBeau, 1803 Midland * M. E. Nevill, Plaquesiine * G. L. Meier, Strongsville * S. M. Gorgacz, 474 Midland
_
* cover Sheet Only
AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY
S*ifl6 9 !i0iS
ST0459445
50963
DOW CHEMICAL U.S.A.
______________
TEXAS OPERATIONS FREEPORT. TEXAS 77S41
CONFIDENTIAL----------- FOR THE USE OF DOW EMPLOYEES ONLY
INDUSTRIAL HYGIENE REPORT
1986 ASBESTOS M3NTTGRING DURING REMOVAL AT EHHUNE OXIDE PLANT, B-5400 MAJOR UNIT EEMOLECTON, APB
FILE no. #B54-3Q14 DATE . MARCH 18, 1987 AUTHOR Zu F. BULLARD
CHECKED D*TE
()&, tiJ-
Summary
Asbestos monitoring was done during stripping of asbestos from lines and vessels on the south side of the Ethylene oxide Plant, B-5400 Block prior to demolition. The monitoring was done to assure that the use of approved job procedures would result in acceptable airborne concentrations of asbestos.
Monitoring results were within acceptable limits. The highest 8-hcur TWA potential exposure was 0.07 fibers/cc.
All personnel within the restricted area wore the required protective equipment during asbestos removal.
The results of this survey should be furnished to Win Way, Inc., the contractor for this job. A Contractor Appendix is attached for distribution to the contractor.
S V 'lD ^iO lS
Distribution
H. G. Ahlich, B-1053 *J. T. Barton, APB C. K. Browdy, B-101 D. E. Cragar, B-101 G. G. Hinojosa, B-108 A. G. Molina, B-5400 V. G. Perry, Jr., B-101 Asbestos File
L. W. Ranpy, 1803, Midland A. W. Schaffer, 2030, Midland M. G. Swank, 1803, Midland *F. D. Axe, Pittsburg *J. E. LeBeau, 1803, Midland *M. E. Neville, Plaquemine *G. L. Meier, Strongsville *S. M. Gorgacz, 474, Midland
Cover sheet only
AN OPERATING UNIT OP THE DOW CHEMIQAL COMPANY
ST0459446