Project 1430 - flroclor Expansion - Anniston and W. G. Krumrorich CEP Appropriation Request Data Transmittal
September 28, 1967
PREMISES
Forecasted requirements of liquid Aroclors together with the need for 30% excess capacity over average demand necessitates addi tional manufacturing facilities. Also, in order to service our customer accounts promptly, adequate storage capacity is needed for the primary Aroclors and the numerous blends sold. And finally, the quality of our products as they reach the customer needs to be improved to meet existing overseas and potential domestic demands.
Based on these premises an expansion plan has been developed which includes a major increase in production capacity and added storage facilities at the WGK plant, and major new storage capacity together with badly needed drumming, flawing and pack aging facilities at Anniston.
TECHNOLOGY
.
Existing technology will continue to be utilized but will be supplemented by quality upgrading of the finished products for electrical use. A continuous adsorption system which signifi cantly improves quality has been demonstrated at Anniston in plant scale equipment; experimental work is continuing. In addition, improved materials of construction in storage and shipping containers is expected to reduce product deterioration.
CAPITAL
.
For accounting purposes it is necessary to separate the work
into two projects - CEA 1430 for Anniston and CEA 1800 for
Krummrich.
.
a. Scope of Project
'
CEA 1430 - At Anniston
12 storage tanks with accessory piping, pumps and filters will be installed for raw materials and finished goods. All Aroclor storage and piping will be aluminum and will be provided to eliminate cross contamination.
A new spur track with facilities for loading (and un loading) tank cars and tank trucks will be provided. This spur will also service the warehouse proposed in project 1452.
0015770
TOWOLDMONOQ43954
-2 -
New flakers (2) and packaging equipment for solid Aroclors and for flaked biphenyl will be installed in a 60' X 120' building which is planned to be one end of a warehouse to be proposed on project 1452. A new high speed drumming station for liquid Aroclors and HB-40 will be installed in the same building.
No finished goods adsorption equipment is included at Anniston. Part of the needed facilities are in existence (demonstration unit); this will be expanded later as needed.
Minor utility extensions for steam, water and electricity are provided as well as a sewer revision to eliminate use of . the area involved for septic tank disposal fields.
CEA 1800 - At Krummrich
A new 40 M lb./year Aroclor 1242 plant will be built adja cent to the present Aroclor department. Continuous chlorin ation as operated at Anniston for several years will be used and finished goods adsorptive upgrading included. In addi tion, 5 new storage tanks for finished goods and biphenyl, tank car and tank truck loading and unloading, and an exten sion of an existing spur.track will be installed.
b. Estimate
'
.
The estimate of cost has been prepared by CED from a de tailed scope of work and preliminary layouts. In the ex pense estimate for Anniston, allowance has been provided for relocating a portion of the existing acid sewer _if on fur ther study this is found necessary.
The cost of the 60' X 120' manufacturing building at Anniston has been estimated assuming the warehouse is not constructed at the same time. On this basis the cost is $18.50/ft . If the two buildings are constructed at the same time, we esti mate that,costs can be reduced by $40,000 and the unit cost to $13/ft .
Capital M&E Buildings Railroads
Anniston CEA 1430
$1,212,000 133,000 55,000
WGK CEA 1800
$1,479,000 15,000 6,000
Total
$2,691,000 148,000 61,000
Total
Division Expense Dismantling Repairs Relocations and Modifications
CED Expense Start-up
Total
$1,400,000
$1,500,000 $2,900,000
41,300 8,900
99,800 $150,000
$5,000
.
28,500
--
31,500 $60,000
$10,000
69,800 8,900
131,300 $210,000
$15,000
Retirements:
A list of planned retirements is attached (Authority for Retirement, Form A823).
0015771
TOWOLDMONOQ43955
3
XII.
c. Project Status
.
One flaker is on order and 15 aluminum storage tanks will be ordered shortly; detailed design on both projects is under way on General Manager's approval.
Project completion is estimated to require 15 months.
RISK EVALUATION
.
'
No new hazards are introduced by this expansion. At Krummrich, the most likely source of loss exposure is the therminol furnace where loss of a tube might result in a business interruption loss of $20,000 and a repair cost of $3000. At Anniston, damage to the solid Aroclor flaker drum requiring resurfacing may en tail one month and $4000 to repair with a business interruption loss of perhaps $100,000.
(If this statement of risk is changed by the Division, S&PP con
currence must first be obtained as required by Controller's
Bulletin 12-02.)
XIII. POLLUTION AND TOXICITY PROBLEMS
,.
.-
There are no significant waste streams Aroclor plants. Gaseous chlorine is a chloride a by-product; these materials without contributing to air pollution.
entering sewers from the raw material and hydrogen are handled routinely
R. P. Stevens vo