Document aBdngkJ61kNRZ676p4yYry349

PLAINTIFF'S EXHIBIT DEC-1-2000 09:23A FROM: nvironmental Reconditioning E8630 Boeing Ste 12 El Paso, Texas 79925 (915)778-3813 Fax:(9.15)778-3827 www.SoutliwestaLatement.com Texas # 80-0080 TO:5411866 P:l'2 Proposal andAcceptance Date of Proposal: November 29,2000 Proposal Submitted to: Peggy Munseii PhonpNo.: 521-3640 Organization Name: ASARCO FaVNo.: 541-1866 Address: P.O. Box 1111 Job Name Copper Converter Boil^ : City, State, Zip: El Paso, Texas 79999 Consultant: Sun City ERJ Estimate No.: OONO-4^6^1867.01 Job Location: ASARCO We hereby submit specifications anil'proposal for: Labor and materials for the removal of the asbesto^ontaining insulatiorf as identified. All work will be completed with strict regard to all Federal, Slate, and Local regulations. Closure documents will be submitted upon completion ofdisposal. ERI to load waste into disposal container next to containmeh ACM debris will be transported to an PA approved landfill (jyASA'RCO. ASARCO to provide manlift for scafold erection and tcar-down. 80' lift is required for one month to erect containment. ERI can i : lift for ( $6,800.00) '->*> i Area #1 South section------- ($ 38,642.00) Area #2 West section---------( $ 42,620.00) Area3J2astsectioi^ pSJ t t.J 0 We propose, to furnish material and labor in accordance witty the above specifications, foNjie sum of: One Hundred Twenty Thousand Four Hundred Six/y Two Dollars and OO/tXK,------( $ 120,462.00) Payment to be made as follows: Due in fall upon completion. Tax is not Included. XT Bond is not included; however, it can be provided for a sum of 2ji% of the total contract amount. A one mmiqn dollar liability insurance is in Extra coverage and higher limits can be provided for additional cpsls. \ All materials are guaranteed as specified here within. Work to<tbc performed in a workman like manner in accordant with up to date standarc Alterations or deviation of the specifications in this proposal nuy involve extra cost and shall be executed only upon written approval, and shal an extra charge to this proposal. This agreement is contingent upon strikes, accidents, or delays beyond our control. Owner, shall cany fire, ton other necessary insurance. Our workers are covered by Workman's Compensation Insurance. ded. acticcs. e deemed lo, and ERI Authorized Signature:. Note: This proposal may be withdrawn by ERI If not accepted within 30 days. ")J~ ' TTvwi in West Project Manager/ Estimator Acceptance of Proposal: The above prices, specifications and conditions are satisfactory and are hereby accepted. SAI is au start and perform the work as specified in this proposal. Payment shall be made as ootlined above. irized to Date of Acceptance:. ____ Signature:. Printed Name: C'\MyFi!cf\.,ob*'i SQQ\! 86?'!S67.0!.uj>d Page 1 of2 ASARCO ELP 0014059 DEC-1-2000 09:24A FROM: *: i 'Date ofProposal: November 29,2000 PROJECT NAME: Hoppers to the East of the Copper Converter Building Project Estimate Number: OONO-4566-1867.01 Job Number: 10:5411866 WORK SCOPE: INSTALL A CRITICAL BARRIER FULL CONTAINMENT. HEPA VENTILATE THE WORK AREA. COLLECT OSHA AIR SAMPLES. REMOVE INSULATION FROM THE HOPPERS UTILIZING WATER AND HAND TOOLS. CLEANUP RESIDUAL DEBRIS AND CONDUCT VISUAL INSPECTION TO VERIFY REMOVAL IS COMPLETE. REMOVE CONTAINMENT, EQUIPMENT. UPON MEETING FINAL AIR CLEARANCE. P:2'2 INCLUSIONS/EXCLUSIONS INSURANCE $ 1,000,000.00 CONTAINMENT SUPPLIES BOND N/A CONTAINMENT EQUIPMENT EPA NESHAP NOTICE YES* ABATEMENT SUPPLIES DISPOSAL MANIFEST YES ABATEMENT EQUIPMENT CERTIFIED WORKERS YES DEBRIS TRANSPORTATION WORKERS PROTECTIVE EQ YES DEBRIS DISPOSAL OSHA MONITORING OSHA MONITORING - THIRD PARTY FINAL CLEARANCE REPLACE REMOVED ITEMS NO FINAL CLEARANCE - THIRD PARTY Exclusions, that must be provided by others unless otherwise noted. ACCESS TO THE WORK YES WATER PROJECT TIME SCHEDULE ELECTRICAL POWER TDH NOTIFICATION FEES YES ASBESTOS DISPOSAL I MONTH LIFT ACCESS TO THE WORK AREA TEN WORKING DAYS NESHAP NOTICE MAY BE REQUIRED AND SHOULD BE CONSIDERED WHEN SCHEDULING. I.___________________________ understand the above and direct ERI to proceed with the work. YES YES YES YES YES ^ YES,,q YES NO NO NO YES YES YES^Jo YES P- Signed Dated C.\MyFik5\Jobi\! 800\l ?67U S67 01 Page 2 of2 ASARCO ELP 0014058