Document aBQQgwy6Gy0Le57jd4zwojOx9
Monsanto
art 1UIACCT
TO
A. Plerle - Sc. Louis. G4WT - 4-8882
. February 26, 1987 ; AHNISTON
.R. G, Potter
C4KH
ce.H. J. Corbett
R. L. Fields T. L. Goasage
T. H. Lafferra V. T. Matteuccl D. Mlckslson D. 3. Rsdingcon F. B. Reining M. W. Wlnkel
DID C2NJ
C4HH G4WJ G5NR C2NA C2SB
G4N0 G5NG
You requested that v* estimate ths potential sice environmental costs at
the Anniston plant. KAC has provided current estimates of these costs and
we have.reviewed them.
-
Various restructuring, ROSA closure and ERA? reserves for che Anniston
sice were established at J5.3H exclusive of PN? and polyphenyls ($LM). Anticipated expenditures against these reserves will result in a $1.9M balance. This includes reasonable estimates for closure of various RCRA facilities and equipment, decontamination of psrathlon and P.S. departmants, clean up of the ditch to Snov Creek, and additional llte
Investigations.
.'
Ongoing monitoring and remedial actions assoclatad with tha old parathlon plant and the landfill are estimated at $300-400k per year. KAC has
budgeted funds for 1987 to cover these costs, and is committed to cover che same coats-in future years.
It should be msds clear, however. Chat no monlee have been reserved for a
major site cleanup program. The basic assumption, based on present knowledge of the site end regulations, is that any current contamination can beat be contained In place, A requirement for removal and disposal of contaminated soil or to deal with significant.changes in currant regula tions on Idle sites, would require major, undefined expenditures. Should such a major need develop, the corporation would need to address proper allocation of costs.
In summary, planned environmental improvements can be accommodated within
the current reserve with an expected balance of $1.9M environmental and
SI.OH PH? and polyphsnyls. The ongoing coses associated with planned
closure ($300-400/yr.) will be borne by MAC. The expanded sics study will
be started in 1987 with results expected in about 12 months. While che
S1.9H would cover reasonable further cleanup efforts, any significant
issues would have to be dealt with based upon the facts at that time. As
we have indicated before, discontinued MCC operations were a significant
part of the Anniston history.
-
We are ready to discuss the details at your convenience.
IN-1 1^0
344.122/PAH.1
M. A. Plsrle
DSw UQ0Z7
WATER PCB-SD0000067189