Document aBKLJQDevbp1Egy9n36EX43Ya

Water supply and wastewater disposal for a steel mill Basic oxygen furnace process has varied water requirements and waste treatment needs Although the subject of this paper is water and waste treatment for a Basic Oxygen Furnace, comments on air pollution abatement are in order. To prevent air pollution, water is needed to clean the gases evolved in the operation of a Basic Oxygen Fur nace during steelmaking. In steelmaking, the operation of a Basic Oxygen Furnace (BOF) in volves several steps. The furnace is charged with molten iron, scrap steel, and fluxing materials. High purity, high pressure oxygen is then intro duced through a water-cooled lance to remove carbon, silicon, manganese, and phosphorus. The oxidation of these elements provides the heat necessary for the process. During the oxygen-blowing period, iron oxide is formed and is carried out of the fur nace along with flue gas and other . dust. The facilities for collecting and recovering this dust require more than 90 percent of the water used by the plant. Inland Steel Co.'s BOF shop has two furnaces which have a nominal capacity of 230 tons; the average heat size, however, is 254 tons. Only one furnace is operated at a time, and the average tap-to-tap time is 37 min, which results in an average production rate of 412 tons per hr. The total water use is approximately 70 mgd, of which 50 percent is in recirculated water and 50 percent is water with drawn from Lake Michigan. There are five major water systems in the plant: hood cooling, oxygen BY JOHN R. BROUGH AND THOMAS F. V0GES Mr. Brough is director of air and water control and Mr. Voges is assistant super intendent, power steam and combustion dept., both of the Inland Steel Company. This article is based on a paper presented at the 24th Annual Purdue Industrial Waste Conference. FROM HOOD.'- \---------- Fig. 1. Hood cooling system Fig. 2. Oxygen lance cooling system JANUARY 1970 A-25 STLCOPCB4090702 DSW 552285 lance cooling, spark box spray cool ing, gas scrubbing, and gas after cooling. Hood cooling The purpose of the hood is to con tain the gases which are discharged from the BOF vessel. The gases can then be conveyed into the gas-cleaning system for removal of the iron oxide and other dust. The temperature of the gases leaving the vessel is about 2800F. Their major component is carbon monoxide, which is converted to carbon dioxide by combustion with air drawn into the hood from the at mosphere in the shop. The hood is constructed of steel plates with a space for cooling water between the inner and outer plates. Fig. 3. Spark box spray cooling system _) Fig. 4. Gas scrubbing system Cooling not only keeps the plates from burning up but also cools the gases be fore they can be cleaned. After the cooling process, which requires 16,000 gpm of water, the water is returned to the cooling tower. The tower is an induced-draft, single-flow-type with four cells. Each cell is rated at 5600 gpm with a 10 approach to the at mospheric dew point. From the cool ing tower basin, the water is repumped to the hood cooling system. There are four 5620-gpm pumps, of which three are normally operated. The treatment for the hood cooling water recirculation system (Fig. 1) consists of adding a biocide for slime and algae control, sulfuric acid for pH control, and a zinc-organic compound for prevention of scale and corrosion. To prevent excessive build-up of dis solved solids due to evaporation in the cooling tower, blowdown is provided. The dissolved solids are limited to about 800 mg per L, which is four to five times that of the raw water. Typical of the daily analyses made on the system is the following: Item pH 7.5 Alkalinity (CaC03) Hardness (CaC03) Sulfates (S04) Dissolved solids Suspended solids mg/L 90 400 300 800 40 The anti-foulant corrosion inhibitor is maintained at 50 to 80 mg per L, and the biocide is slug-fed once a week at a dosage of 35 mg per L. To eliminate problems of water pollution, the corrosion inhibitor contains no phosphates or chromates and the bio cide contains no phenol or heavy metals. It was recognized that, with the high temperature of the BOF opera tion, the risk of hood failure was sub stantial if scaling occurred on the water side. For this reason, the cooling water is treated to prevent scaling. By using recirculation rather than a oncethrough system, the treatment costs less and is more easily controlled. Oxygen lance cooling The oxygen lance (Fig. 2), which is used to blow oxygen in order to convert molten metal into steel, is subjected to very high temperatures and must be water cooled. The lance is 76 ft, 8 in. long and consists of concentric 12-, 10-, and 8-in. pipes. Oxygen flows through the 8-in. pipe, and cooling water enters through the 10-in. pipe and discharges out of the 12-in. pipe. The water enters the lance through a manifold by means of a 6-in. flexible hose. From there, the water passes through two heat ex changers in parallel, loses about 15 in temperature, and then is returned to the two 1800-gpm pumps. The water used to cool the lance cooling water in the heat exchanger is from the hood cooling system. Between the lance and the heat exchangers is a 1000-gal surge tank. Make-up is added to the surge tank to replace water lost during lance changes or leaks in the system. Be cause of the severe process tempera ture conditions, high quality water is required to prevent lance failure due to scale deposits or sedimentation in the cooling passages. This require ment is met by using boiler feed water treated with the hot lime zeolite pro cess. There have been no lance failures because of water-side eondi- A-26 I WATER AND WASTES ENGINEERING/INDUSTRIAL DSW 552286 STLCOPCB4090703 tions. A typical analysis of this water is: pH, 10; alkalinity, 20 mg per L; hardness, 0; and dissolved solids, 70 mg per L. Spark box sprays To cool the hood gases before they enter the gas-cleaning system and to remove large particles of material which are blown out of the vessel, the gases pass through a refractory-lined chamber called the spark box. There the gases are cooled from 2800 to 800F by four banks of water sprays. Three banks have ten nozzles each and the fourth, 20 nozzles. One bank of sprays comes on as the oxygen lance is lowered into the vessel; the other banks automatically come on in order to maintain the 800F gas exit temperature. The maximum flow of water (Fig. 3) to the spark box is 1550 gpm. Part of this water is evaporated, the rest falling into the spark box along with the solid material washed from the gas stream. The water and grit are discharged to one of two dewatering bins. These bins are small clarifiers with the water entering at the top center and flowing down under a baffle and then across a weir at the top circumference of the tank. When one bin is filled with solids, the water is diverted to the other bin. Upon re moval from service, the bin is drained, and .the solids are dumped into a slag pot for disposal. Water from the bins was at first re pumped to the sprays. This practice was, however, impractical. Lime dust, carried out of the vessel with the gases, caused severe scaling in pumps, pip ing, and spray nozzles. A typical analysis of the recirculated water that caused operating difficulties included: pH, 12.5; alkalinity, 1680 mg per L; hardness, 1700 mg per L; dissolved solids, 1950 mg per L; and suspended solids, 600 mg per L. Efforts to solve these problems by chemical treatment and mechanical changes were not successful. There fore, fresh water was provided to the spray system and the used water was piped to the clarifiers for the scrubber water system. As a result, reasonable continuity in the operation of the spark box spray water and grit han dling system has been achieved. For any new BOF shop, however, an en tirely different approach is recom mended. Gas scrubbing system Waste gases from the steelmaking process are drawn through the gas cleaning plant in the following se quence: Gases are collected in the water-cooled hood and pass through the spark box, up a stack, and into a downcomer, which directs them from the BOF building into the gas-cleaning building. A quench tower serves the dual purpose of coding the gas enter ing from the downcomer and of al lowing large particles of solid matter to drop out before the gas passes to the scrubbers. A notched weir is provided around the circumference of the tower near the top over which water flows. This water, which is from the gas scrubber system (Fig. 4), cools the sides of the tower and prevents a build-up of solids. The remainder of the water is used in sprays to cool the gas before it leaves the tower by means of ducts con nected to four scrubbers. Each scrubber has a scrubbing sec tion, a moisture-separator section, and 119 small venturi nozzles. Each nozzle has a scrubbing and a flushing spray, each spray operating at different times. When either spray is actuated, approxi mately 10 percent of the total water flows through the other spray in order to prevent clogging or freezing. Upon leaving the scrubbers, the gases pass through deflector vanes and moisture-separator elements and the water is collected in two surge tanks. A portion of this water is screened and recycled to the quench tower, and the balance is pumped to the clarifiers. Two clarifiers, 60 ft in diam by 27.5 ft deep, have a detention time of 3.6 hr. The design criteria called for an effluent quality of less than 200 mg per L suspended solids for re circulation back to the scrubber sprays. This quality could not be achieved by gravity settling alone so a system for adding a polyelectrolyte (0.25 to 0.5 mg per L) was installed. The clarifier effluent quality is gen erally less than 50 mg per L of sus pended solids. Without coagulation treatment the recirculated water would contain as much as 10,000 mg per L of suspended solids. Magnetic floc culation is also being evaluated on one of the clarifiers. The original clarifiers were of double tray design, but an unusual accumulation of sludge on the upper tray caused the collapse of one clari fier. It was rebuilt without its upper tray, and the upper tray was removed also from the other clarifier. There after, operation was simpler, and the effluent quality was not adversely affected. The clarifier effluent flows to a clean water tank from where it is pumped to the scrubbers. In the clean water tank, make-up water is received and blowdown is adjusted to maintain the dissolved solids content of the recircu lated water below 800 mg per L. Shortly after the BOF began oper ating, heavy scale deposits appeared in the venturi scrubbers. This condi tion was due to lime dust from the lime-handling system, because the sys tem's collectors discharged into the furnace gas-cleaning system. The ad dition of sulfuric acid and a dispersing agent to the scrubber water was not successful. The problem was finally solved by an independent dust collec tor using bag filters. The settled sludge from the clari fiers, which has a solids content of 35 to 40 percent, is pumped to two vacuum filters which produce a filter cake containing 30 to 33 percent mois ture. Each filter has an effective area of 170 sq ft and produces about 2 tons per hr of filter cake (dry basis). (At times this is not adequate, and unfiltered sludge must be hauled by tank truck to a disposal site and al lowed to air dry.) The filter cake is fed into a rotary dryer which further reduces the moisture content to about 10 percent for use as raw material in the sintering plant. Gas cooling Gases leaving the scrubber and moisture separators are passed through aftercoolers (one for each scrubber). Their purpose is to cool the gas, there by reducing its volume and fan ca pacity requirements. The aftercooler is a large cylindrical vessel with a 6 in. layer of marbles supported on a screen halfway up the tower. The cleaned gases flow upward through the aftercooler while service water is sprayed downward over the marbles. The bed of marbles serves to increase the surface area and promote more efficient cooling. Water used in the aftercoolers is discharged without treatment, as it has come into contact only with cleaned gas. Cleaned gases, containing less than 0.05 grains per cu ft of particu lates and having been cooled to 160F, are drawn into the induced draft fans and forced out the stack. Of the five water systems for BOF, four are recirculating or reuse sys tems. Recirculation was used in the hood cooling and the oxygen lance cooling systems primarily because of process water quality requirements. The use of recirculation or reuse in the spark box spray cooling and scrubber water systems was based on the need for water pollution control. Ninety percent of the 70 mgd of water required by the company's BOF shop is needed to prevent air pollution by 125 tons of dust a day which is gen erated in the process. KEY WORDS Industrial Water Supply; Industrial Wastes. JANUARY 1970 | A-27 DSW 552287 STLCOPCB4090704 new products Aeration process A new oxygen aeration process has been developed by Union Carbide's Linde Division, which was recently awarded a 19-month contract by FWPCA to demon strate the process in a full-scale treat ment plant. A feature of the process is a method of contacting oxygen with wastewater and microorganisms. Results to date have shown that the process pro duces higher dissolved oxygen levels and lower oxygen transfer costs than with air aeration. Also, biological phosphate and nitrate removal appear to be im proved. Circle No. 1 on Reader Service Card Particle measurement Millipore Corp. has developed a device, consisting of a microscope, television camera, screen, and computer, for pre cision particle measurement and analysis and quality control. The ^MC particle measurement computer can provide in minutes data that previously required hours to obtain, says the manufacturer. An unskilled operator can instantly make detailed measurements on individual particles or entire fields by pressing a switch. Results are displayed on the tele vision screen and can be classified, sorted, and stored or fed to a printer. Circle No. 2 on Reader Service Card Remote meter reader Engineered Controls, Inc. is offering the Kent remote readout system con sisting of a magnetic-pulsed, continuous register meter head, an outside wall re ceptacle, and either of two types of port able totalizers. The meter head can be installed on any popular make water meter. The outside wall receptable is con nected to the meter head by a double wire cable. By plugging into the wall re ceptacle, one type of totalizer visually show's the gallonage used since the pre vious reading. Another type totalizer, which computes and prints out the entire water bill, including gallonage and price, is also available. Circle No. 3 on Reader Service Card Chlorination system Wallace & Tieman Division, Pennwalt Corp., has announced a new housed chlo rination system. It is a complete system in a weatherproof, fiberglass house. With internal piping and wiring completed at the factory, the system is shipped as a self-contained unit. Installation requires placing the house on location and con necting to electric power, water supply, and the point of chlorine application. The house contains a V-notch chlorinator with capacity to 400 lb per day against 100 psi, or higher with an optional boost er pump. Operation can be manual or au tomatic flow proportional. A two-cylin der scale is included in the system. Circle No. 4 on Reader Service Card Metering pump Gorman-Rupp Industries Division has developed an all polypropylene bellows type metering pump. By configuration, the bellows behaves as a positive dis placement pump in the low pressure range. Because the bellows generates no friction, it can run dry and handle many abrasive liquids and slurries. The pump is self-priming except at very low pump- ing rates. Incorporated in the pump are hypalon poppet valves, making hypalon and polypropylene the only materials being exposed to the liquid being pumped. Circle No. 5 on Reader Service Card Main connection A U-branch connection that allows two water meters to be connected to a single water service line has been de veloped by A. Y. McDonald Mfg. Co. With the new No. 3795 connection, a single tap in the main can accommodate two adjacent services, reducing the cost of both labor and material. Either flat head or lock wing style meter stops can be attached to the outlet sides of the con nection. The connection has a 1-in. cop per inlet, 3A-in. male iron pipe outlets, and 7Vi-in. centers on the outlets. Circle No. 6 on Reader Service Card Improved boring tool A new helically grooved nose section for the PneumaGopher is reported by Schramm, Inc. to markedly improve the tool's performance in driving horizontal or inclined boreholes through wet and slippery subsoils, including clays. The spiral grooving gives the air-actuated, impact-boring tool a firmer frictional bite. The new nose section is compatible with units already in service. A simplified valve assembly, which substitutes two simple rubber bushings for seven separate mechanical compo nents formerly required! and the substitu tion of wire-braided leader hose for the air line formerly supplied are two more improvements noted. Circle No. 7 on Reader Service Card A-28 I WATER AND WASTES ENGINEERING/ INDUSTRIAL DSW 552288 STLCOPCB4090705